Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
999 Canada Place, Vancouver
An address in Downtown, Vancouver, zoned CWD (Comprehensive Development). 16 building permits are on file, most recently “#660 - 6th Floor Interior alterations to provide tenant improvements for this existing of…” (issued 7 January 2026). The City's 2026 assessed value for the 7 accounts at this address is $530,876,846.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153466, 693 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-01-07
#660 - 6th Floor Interior alterations to provide tenant improvements for this existing office tenant on the 6th Floor (#660) of this existing commercial building on site. Scope of work: Remove a portion of an interior walls, doors. Construct new exit door, new accordion partition, new washroom, electrical, plumbing and sprinkler work to suit. TENANT: The Philippine Consulate General Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $195,000
Epic Spaces Inc Issued -
2025-06-17
Interior alterations to provide elevator modernization and related fire alarm work to meet the requirements of CSA B44-16 to elevators 3, 4, 5 and 8 of this existing hotel commercial building on this site. Notes: 1. Main Recall Level: Level 16K Convention Hall Level (Ground) 2. Alternate Recall Level: Level 8 3. Permit reviewed and approved to VBBL #12511 (2019) Revision #1 (pending approval ...) Revise drawings to indicate floors not shown on previously approved drawings. · $147,100
Sasco Contractors Ltd Issued -
2025-02-07
#598 - 5th floor Interior alterations to provide improvement to this existing office space on the 5th floor (#598 ) of this existing commercial building on this site. Scope of work; remove 3 interior office to create open floor plan. Electrical to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $69,000
Epic Spaces Inc Issued -
2024-03-11
#532 - 5th floor Interior alterations to provide improvements for a new office tenant on the 5th floor (#532) of this existing commercial building. Scope of work; remove and construct partition walls, doors/frames , millwork, finishes, flooring for new layout. Electrical, Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $45,000
Epic Spaces Inc Issued -
2023-05-16
Unit #519 Related to DP-2023-00145 Interior alterations to provide improvements for a new General Office in conjunction with similar to Beauty and Wellness Centre tenant in unit #519 in this existing commercial building. OK for field review as per City staff: - This building is sprinklered. DBI to determine if a sprinkler permit is required. No SP req’d per City staff · $40,000
no contractor listed Issued -
2023-01-04
#670 - 6th floor (#600 and #670 combining) Interior alterations to the 6th floor to combine #600 & #670 (retaining #670) and provide improvements for a new office tenant in this existing commercial building on this site. Scope of work: remove demising wall/partition walls, doors, and construct new partition walls, doors, finishes, millwork, ceiling, electrical, plumbing and sprinkler work. REVISION #1 - Change applicant from Ryan Saunders to [name withheld] (Axiom Builders) - remove mechanical work from scope; Removed reception/servery, lavatory and in suite washroom - Minor revisions to partition locations to allow for coordinate glass/office fronts OK for Field Review by J. Zhang September 27, 2022. · $1,500,000
Axiom Builders Inc Issued -
2021-11-09
#610 - 6th floor Interior alterations to office unit #610 on the 6th floor of this commercial building on this site. Tenant improvements for new floor, removal of walls and addition of new partition walls and finishes for new tenant. REVISION #1 - Eliminate the server room and phone booth, add larger secondary meeting room, and add 2 private office #6 & 7. increase project value from $75,000 to $80,000. DBI to determine if Sprinkler Permit is required/SP required per City staff: E2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. OK for Field Review per City staff · $80,000
Elevation Ventures Inc Issued -
2021-11-09
#606 Interior alterations to combine unit #606 and #605 into one unit and expand to unit #654 on the 6th floor of this existing commercial building on this site. · $5,400
no contractor listed Issued -
2021-09-01
#654 - 6th floor Interior alterations to provide tenant improvements to unit 654 on the 6th floor of this existing commercial building on this site. Scope of work: - demo existing doors including frame & hardware, partitions, and lightings - install partitions, full height glazing, doors, lighting, OK for field review per City staffgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $280,000
VPAC Construction Group Ltd Issued -
2021-09-01
#654 & #650 - 6th floor Interior alterations to demise office unit #654 into office units #654 and #650 on the 6th floor of this commercial building on this site. OK for Field Review per City staffI. Energy Upgrade: E4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1.1 of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $70,000
VPAC Construction Group Ltd Issued -
2021-03-01
Interior alterations to provide modernization of existing four elevators to allow for elevator recall in this existing commercial building on this site for CSA-B44 upgrade. Scope of work: - Reprogram existing addressable two-stage fire alarm system and modify existing fire alarm annunciator to show additional automatic emergency elevator recall zones. - Install new relays and reprogram existing addressable FAS initiation devices to allow for activation of the automatic emergency elevator recall sequence. - Programming of Elevator Recall and FEO functions. Rev. #1 - C. Fong - May 18, 2021 - reviewed during COVID-19. - Add new feeder and transformer to supply elevator #4. - project value increase by $15,486.0. ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND REVIEWED DURING THE 2020 COVID-19 PANDEMIC CRISIS. ******** Building Review Branch Notes: · $78,673
no contractor listed Issued -
2020-07-31
Suite #536 - 5th floor Interior tenant improvements for new Office tenant in Suite #536 on the 5th floor in this existing commercial building. Scope of work includes validate previously relocated demising wall between suites #536 and #550. REVISION #1: to add two (2) new interior partition walls in the corridor space to provide smoke separation and two (2) new doors (D26 and D27). Also increase in project value from $1,170,000 to $1,190,000. Oct. 19, 2020 mlh OK for Field Review per City staff · $1,190,000
no contractor listed Issued -
2020-02-12
#400 - 4th Floor Per the 2019 VBBL to provide interior alterations for this existing office tenant on the 4th floor (#400) in this existing commercial building. Scope of work: remove/construct interior partition walls, glazing, doors, millwork, flooring, finishes, ceiling work, lighting, electrical, plumbing and sprinkler work. TENANT: The Vancouver Board of Trade/Greater Vancouver Board of Trade Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work · $460,000
Aura Office Environments Inc Issued -
2019-10-08
#615 & #620 - 6th floor #t.i. work to #615 only Interior alterations only to provide a new demising partition and to provide tenant improvements for a new General Office tenant at unit #615 and also to create a new General Office 'shell' tenant space and for the expansion of unit #615 into unit #611 (retaining #615) in this existing Pan Pacific Hotel/Office Portion commercial building. Scope of work includes demolition of partition walls, doors, glazing, millwork, etc., new demising walls and partition walls, doors, millwork, glazing, lighting, power/data, finishes, ceiling work, electrical, plumbing and sprinkler work. Separate permit(s) and ASHRAE checklist will be required for tenant improvements to newly demised #620. TENANT: #615-Infobip Communications Inc. #620-vacant Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for field review as per City staff. L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $140,000
Syncor Solutions Limited Issued -
2017-04-21
#555 - 5th floor Interior alterations to provide tenant improvements for an existing office tenant in unit #555 on the 5th floor of this existing commercial building. Note: Portion of Demising wall between #555 & #568 will be removed under this application and not under previous BP-2016-04291. Unit #555 and #568 combining (retaining #555). Address Note: #568 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #555 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. Scope of work to also include new staff kitchen, partition walls, doors, glazing, ceiling, electrical, plumbing, & sprinkler work. OK for field review as per City staff · $425,630
Priority Projects Limited Issued -
2017-01-27
#555 and 568-5th floor Interior alterations only to expand #555 into #568 (retaining #555) and remove non-loadbearing walls at #568 for the existing general office tenant at #555 on the 5th floor of this existing commercial building on this site. Scope of work: #568-remove all partition walls, doors, glazing, millwork, etc. to bring to "shell" space; #555-remove some partition walls, glazing, door, millwork and electrical, plumbing and sprinkler work. TENANT: Augusta Group OK for field review per City staff: Interior Demo; Separate permits or revisions (including updated Energy checklist and reflected ceiling plans) will be required for further tenant improvements. · $15,000
Priority Projects Limited Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc2026-10-30
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd2026-10-30
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.2026-10-30