Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
885 W Georgia St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 80 building permits are on file, most recently “#1150 - 11th floor Interior alterations to provide improvements to this existing general …” (issued 30 October 2026). The City's 2026 assessed value is $226,812,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154146, 1,156 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-10-30
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $42,000
Central West Project Management Inc. Issued -
2026-10-07
#1100 demising into two units , to be #1100 and #1120 Interior alterations to the 11th floor to demise this existing office space into two units (to be #1100 & #1120) in this existing commercial building. Scope of work: construct a demising wall only. Electrical, mechanical, & sprinklers to suit. Separate Permit(s) will be required if there are further Tenant Improvements to these units. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $107,700
FINELINE COMMERCIAL INTERIORS INC. Issued -
2026-10-01
#1350 - 13th floor - expanding into a portion of #1380. Interior alterations to the 13th floor for unit #1350 to expand into a portion of #1380 and to provide improvements to this existing office space in this existing commercial building. Scope; demo and construction of a demising wall, partition walls, doors/frames, millwork, finishes for new layout. Electrical Plumbing, and sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $190,000
Central West Project Management Inc. Issued -
2026-09-25
#2000 - 20th floor Interior alterations to provide improvements for this existing full floor office tenant space on the 20th floor (#2000) of this existing commercial buiding on this site Scope of work: demo and construction of partition walls to primarily the Southeast portion of this floor.. Electrical to suit. District Building Inspector to determine if a Special Sprinkler Inspection is required. · $100,000
TCC Projects Inc Issued -
2026-08-18
Interior alterations to remove and replace the fuel tank on the P4 level of this existing commercial building on this site. Ok for field review per City staff · $255,000
MCR Mechanical Ltd Issued -
2026-07-22
#1019 - 10th floor Interior alterations to remove non load bearing partition walls to this existing vacant office space on the 10th floor (#1019) of this existing commercial building on this site. Scope of work: remove partition walls to select areas, doors, millwork, and floor finishes to create an open floor plan. * District Building Inspector to determine if a Special Sprinkler Inspection is required. See BP-2026-00064 for new demising wall. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $20,000
Central West Project Management Inc. Issued -
2026-04-15
#2200 - 22nd floor - common washrooms. Interior alterations to provide improvements to the 22nd floor common washrooms in this existing commercial building. Scope of work: Demo existing washroom partitions, ceiling, millwork, plumbing fixtures and lighting. Install new partition, ceiling, millwork, plumbing fixtures and lighting. · $200,000
no contractor listed Issued -
2026-04-15
Level 21 - (full floor tenant) - Lobby and Washroom Upgrade Interior demolition of non load-bearing partition walls on the 21st floor (#2105) to create a "shell" office space in this existing commercial building on site. Scope of work: Demo existing layout to shell, lobby and washroom upgrade, electrical, mechanical, plumbing and sprinkler work to suit. · $480,000
no contractor listed Issued -
2026-03-04
#1110 - 11th floor Interior alterations to provide improvements to this existing vacant tenant space on the 11th floor (#1110) of this existing commercial building on this site. Scope of work: demo to shell, new partitions, doors/frames, ceiling, millwork, finishes for new layout. Electrical, Plumbing, Sprinklers to suit. REVISION #1 - Change Applicant/Contractor from Central West Project Management Inc. TO; Gibraltar Holdings Ltd. April 10/26 mk Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
Gibraltar Holdings Ltd Issued -
2026-01-14
#1020 - 10th floor (demising into #1020 & #1019) Interior alterations on the 10th floor to construct a demising wall in #1020 to divide into two units (to be #1020 & #1019) in this existing commercial building on this site. Scope of work; select demo to partition walls, GWB ceiling, remove entry door. construct demising wall, and two new entry doors, ceiling tiles, lighting and a partition wall, & sliding glass door for new boardroom in #1020. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $60,000
Central West Project Management Inc. Issued -
2026-01-14
Level 13 - (#1301, 1320, 1380 AND 1350) Interior alterations in this existing office space on the 13th floor to combine suite #1301 and #1320 (retaining #1320) AND combining suite #1380 and #1350 (retaining #1380) in this existing commercial building on site. Scope of work: Demolish existing demising walls, interior partition walls/doors, kitchen. Combine suite #1320 and #1301 and return to shell. Install new t-bar ceiling, flooring, fixtures, electrical, plumbing and sprinkler work to suit. electrical, plumbing and sprinkler work to suit. REVISION #1: To remove suite #1350 and suite #1380 in the scope of work. - July 9/26 - LLL OK to process under one permit per City staffprovement or to change the use for suite #1320. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $150,000
no contractor listed Issued -
2025-12-09
#1200 - 12th Floor Interior alterations to provide improvements to this existing general office on the 12th floor (#1200) in this existing commercial building on site. Scope of work: Demo existing space back to shell condition, all interior walls, finishes. New t-bar ceiling, electrical, mechanical/plumbing and sprinkler work to suit. REVISION #1: To retain (9) existing office; demolish existing board room wall to install new tempered glass partition and relocate existing door. - Mar 26/26 - LLL Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $175,000
Central West Project Management Inc. Issued -
2025-11-25
885 W Georgia 17th Floor Interior alterations to provide tenant improvements to these existing common bathrooms on the 17th floor of this existing commercial building on this site. Scope of work is limited to the bathrooms only. This includes partitions, ceiling, millwork, plumbing fixtures and lighting. · $320,000
no contractor listed Issued -
2025-07-25
17th floor Interior alteration to return this existing office (full 17th floor) to shell condition in this existing commercial building. Scope of work including • Removal existing interconnecting stairs between the 17th and 18th floor • Infill the concrete floor where the stair will be demolished • Removal of interior partition walls ceiling, electrical, plumbing, mechanical and ducts • Re-finish elevator lobby. Building Review Branch Notes: - Reviewed under VBBL 2019 · $175,000
Matra Construction Inc Issued -
2025-07-25
18th floor Interior alteration to return this existing office (full 18th floor) to shell condition in this existing commercial building. Scope of work including • Removal existing interconnecting stairs between the 17th and 18th floor • Infill the concrete floor where the stair will be demolished • Removal of interior partition walls ceiling, electrical, plumbing, mechanical and ducts • Re-finish elevator lobby. Building Review Branch Notes: - Reviewed under VBBL 2019 · $200,000
Matra Construction Inc Issued -
2024-02-26
#500 - 5th floor Interior alterations to provide improvements for this existing office tenant on the 5th floor (#500) of this existing commercial building on this site. Scope of work: remove 2 non structural walls to create two larger meeting room from 4 meeting rooms. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $7,600
Aura Office Environments Inc Issued -
2024-02-01
#1800 - 18th Floor (common washroom) Interior alterations to provide upgrades to the existing common washroom on the 18th floor (#1800) of this existing commercial building. Scope of work includes: New accessible washroom, electrical, plumbing and sprinkler work. · $150,000
no contractor listed Issued -
2023-11-28
Exterior alterations to repair skylights on the 3rd floor roof at this existing commercial building on this site. OK for DB per City staff · $384,000
no contractor listed Issued -
2023-10-30
#200 - lower level Interior alterations to provide improvement for this existing multi-level financial institution (HSBC) tenant on the lower level of this existing commercial building on site. Scope of work: Modify one partition wall, and upgrade emergency backup electrical system. TENANT: HSBC · $275,000
Gibraltar Holdings Ltd Issued -
2023-05-30
#2000 & #2040 - 20th Floor Interior alterations for an existing office tenant on the 20th floor to expand unit #2000 to #2040 (retaining #2000) in this existing commercial building on this site. Scope of work: Remove the 2 demising walls to become a full floor tenant TENANT: Namdo Management Services Ltd · $3,500
BLT Limited Partnership Issued -
2022-12-13
Interior alterations to add strobes for additional visual notification to the concourse, ground and 3rd storeys of this existing bank in this existing mixed-use commercial high-rise building. · $65,000
no contractor listed Issued -
2022-10-28
#1500 – 15th and 16th (Full Floor) - interconnecting stairs Interior alterations to provide first tenant improvements to this office shell space (Group D) on the entire 15th and 16th Floor of this existing commercial building on this site. Scope of work includes new interconnected stairs between the 15th and 16th storey. This project is considered a major renovation and upgrade mechanism triggers F2, S2, N3, A3 and E4 apply to this project. OK, for BP only, as per City staff. · $4,000,000
applicant withheld (individual) Issued -
2022-07-13
#1600 – 16th Floor (Full Floor) #1500 – 15th Floor (Full Floor) Scope of work is for SHELL only. Interior alterations to demolish all non-load bearing partition walls on the entire 15th floor and return to base building for future tenancy. Revising the public corridor / cross over floor on the 16th floor and cutting a hole in the slab to create an opening for the future interconnection of the floors. Existing FRR to be maintained. OK, for BP only, as per City staff. · $50,000
no contractor listed Issued -
2022-06-16
#1100 and #1110 - 11th floor Interior alterations to demise the existing office on the 11th floor (#1100) into two units to be #1100 and #1110 in this existing commercial building on this site. Scope of work: demise by infilling a doorway and upgrade existing partition wall. Electrical to suit. OK for Field Review for Office TI; May 31, 2022 E4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1.1 of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $6,500
Central West Project Management Inc. Issued -
2022-04-25
#1100 - 11th floor Interior alterations to expand #1100 into #1110 (retaining #1100) and to provide improvements for the existing office tenant on the 11th floor in this existing commercial building on this site. Scope of work: remove a portion of the demising wall to expand #1100 into #1110, remove/construct partition walls, doors, glazing, finishes, ceiling work, lighting, electrical, plumbing and sprinkler work. · $200,000
Priority Projects Limited Issued -
2022-01-19
#2150 - 21st floor (full floor tenant) Interior alterations to provide tenant improvements to east side of the 21st floor (#2150) for this existing office tenant in this existing commercial use building. Scope of work: remove/construct partition walls, millwork, finishes, ceiling work, HVAC, lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: Scougall Management (1987) Limited · $400,000
Omicron Construction Ltd Issued -
2021-12-02
#2000 - 20th floor Interior alterations for a new office tenant on the 20th floor (#2000) for layout changes in this existing commercial building on this site. Scope of work: remove/construct select partition walls, doors, finishes, millwork, lighting, electrical and sprinkler work. TENANT: Namdo Management Services Ltd. REVISION #1: Interior lay-out changes by adding a partition wall to create two (2) separate rooms, new lighting and millwork. Increase project value by $5,000 (from $200,000 to $205,000). Nov 1/22 - LLL · $205,000
no contractor listed Issued -
2021-11-09
3rd Floor (HSBC) Interior alterations for this existing full floor tenant to provide improvements and layout changes in this existing commercial building on this site Scope of work: Remove and construct partition walls, doors and lighting, new staff lunch room, finishes, millwork, electrical, plumbing, mechanical and sprinkler work. OK for field review as per City staff: HSBC Bank Canada Energy Upgrade: L2 - Lighting - Upgrade to Incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of Ashrae 90.1-2016 Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $825,000
Gibraltar Holdings Ltd Issued -
2021-11-04
16th floor elevator lobby, corridors & washrooms. Interior alterations to provide improvements to the 16th floor common elevator lobby, corridors & washrooms in this existing commercial building. Scope of work: new finishes for elevator lobby, & corridors. Refresh/reconfigure existing washrooms for gender neutral washrooms. The remainder of the 16th floor remains as shell space. * Boma Best Building. No energy upgrade required. * Separate permit(s) required for future improvements to the tenant spaces. OK for Field Review per City staff · $300,000
no contractor listed Issued -
2021-11-03
#200 Interior alterations to provide improvements to this existing office unit #200 on the second floor of this commercial building on this site. Scope of work includes reconfiguring the internal partition walls and a new condensing unit in the parkade level. OK for Field Review per City staff: - This building is sprinklered. A separate permit is required for this work. - Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) · $885,000
Gibraltar Holdings Ltd Issued -
2021-10-19
#600 - 6th full Floor Interior alterations to provide improvements for this existing full floor office tenant on the 6th floor (#600) of this existing commercial building on this site. Scope of work: demo/construct new partition walls, doors, millwork, finishes for new layout. Electrical, plumbing, sprinklers to suit. ok for filed review as per City staff Revision #1 - Interior walls and doors revised and mechanical and electrical items are added/revised due to site conditions. Above changes in revision 1 will not affect energy calculation - no new energy checklist required. Value of revision work: $100,000 Project value: $900,000 ($800,000 + $100,000; Previous value + revision) · $900,000
Gibraltar Holdings Ltd Issued -
2021-08-23
Concourse Level Interior alterations to create two ATM labs in this existing financial institution (HSBC) on the ground floor of this commercial building on this site. Scope of work: Construct interior wall. Electrical and Sprinkler to suit. E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) · $20,000
no contractor listed Issued -
2021-02-08
14th floor - elevator lobby/ common corridor Interior alterations provide improvements to the elevator lobby and common corridor on the 14th floor of this existing commercial building on this site. Scope of work: remove finishings and replace with new, electrical and sprinkler alterations. Sprinkler Permit required Energy Upgrade Exemption: N/A (BOMA BESt (Path 1)) OK for Field Review as per City staff: Any units numbers showing on submitted plans are not verified. · $150,000
no contractor listed Issued -
2021-01-18
10th floor - elevator lobby/ common corridor Interior alterations provide improvements to the elevator lobby and common corridor on the 10th floor of this existing commercial building on this site. Scope of work: remove finishings and replace with new, electrical and sprinkler alterations. OK for Field Review as per City staff: N/A (BOMA BESt (Path 1)) · $150,000
no contractor listed Issued -
2021-01-13
11th floor - common mens and womens washrooms interior alterations to renovate the existing common mens and womens washroom on the 11th floor of this existing commercial building on the site. scope of work: remove/construct new toilet partition walls, lighting, fixtures, finishes, electrical and plumbing work. · $170,000
no contractor listed Issued -
2020-11-05
8th Floor Interior alterations to provide tenant improvements for this full floor office tenant on the 8th floor (#800) of this existing commercial building. Scope of work: Cut down a section of partition to 60” AFF. Remove interior partition wall, clerestory glazing, remove electrical and data outlets, finishes, paint, new lights, electrical outlets. Energy Upgrade exempted: N/A (BOMA BESt (Path 1)) Note: 7th to 9th floors are interconnected. · $35,000
Priority Projects Limited Issued -
2020-08-11
Lower Ground Level Including Operational Letter from K. Gordon of The Cadillac Fairview Corporation Limited, date-stamped "Received" on November 27, 2019 for interior alterations only to existing to provide improvements in the existing fitness centre (gym for tenants) and amenity space on the lower ground level at this existing commercial building on site. Scope of work includes removal of existing storage/crating and preparation area and existing sauna, expansion of the exercise area, alterations to the existing women's and men's washroom layout, and installation of universal washroom/shower room. OK for BP only as per City staff. Occupant Load = Max 42 persons · $700,000
Matra Construction Inc Issued -
2020-03-31
#1600 - 16th Floor (full floor) Interior alterations to demolish all non-load bearing partition walls to the vacant office spaces on the entire 16th floor (units #1600 & #1650) and return to base building for future tenancy. Scope of work: per the 2019 VBBL to remove all partition walls, doors, ceiling, electrical, mechanical, & plumbing fixtures and return to base building only. · $500,000
no contractor listed Issued -
2020-03-18
#1040 - 10th Floor Interior alterations to provide tenant improvements on the 10th floor (#1040) in this existing commercial building on this site. Scope of work: per the 2019 VBBL to remove/construct partition walls, glazing, doors for new offices, ceiling work, lighting, finishes, data, electrical and sprinkler work. TENANT: Clark Wilson LLP · $50,000
Priority Projects Limited Issued -
2020-02-07
#300-3rd floor and corridor (full floor) Interior alterations for an existing tenant on the 3rd floor (#300) in this existing commercial building. Scope of work per VBBL 2019: construct new public corridor and related improvements in tenant suite; update finishes and partition alterations to staff room, ceiling, electrical and sprinkler work. Scope of work: TENANT: HSBC Bank of Canada · $40,000
Gibraltar Holdings Ltd Issued -
2020-01-20
#500 - 5th Floor (full floor tenant) Interior alterations to provide tenant improvements for a new full floor office tenant on the 5th floor (#500) of this existing mixed use building. Scope of work: remove/construct partition walls, doors for meeting rooms, new staff kitchen, millwork, finishes, lighting, ceiling work, electrical, plumbing and sprinkler work. TENANT: Charest Reporting Services · $625,000
Aura Office Environments Inc Issued -
2020-01-20
#450 - 4th Floor (full floor tenant) Interior alterations to provide tenant improvements for a new full floor office tenant on the 4th floor (#450) of this existing mixed use building. Scope of work: remove/construct partition walls, doors for meeting rooms, new staff kitchen, millwork, finishes, lighting, ceiling work, electrical, plumbing and sprinkler work. TENANT: Charest Reporting Services · $625,000
Aura Office Environments Inc Issued -
2019-12-09
#1200 - 12th floor Per City staffts #1200 and #1260 (retaining #1200) on the 12th floor in this commercial building on this site. Scope of work: remove demising wall, electrical work. TENANT: Fresh Tracks OK for field review per City staff: 1. Building inspector to determine on site if a separate sprinkler permit is required. 2. No Energy trigger required; BOMA BESt building · $6,000
1100287 BC Ltd Issued -
2019-07-17
#150 - Ground Floor (Amenity Meeting Room) Including the Letter of Operation dated May 10, 2019 from Jesse Gregson, The Cadillac Fairview Corporation Ltd. interior alterations to provide amenity meeting space in unit #150 in this existing commercial building. REVISION #1: replace lost applicant's set of drawings and revise ceiling and associated lighting in meeting room #101 and storage room #102 including changes to ASHRAE. Dec 12, 2019 mlh OK for field review as per City staff · $300,000
no contractor listed Issued -
2019-07-11
#1150-11th floor Interior alterations to provide improvements for this existing office tenant at office unit #1150 on the 11th floor of this commercial building on this site. Scope of work: demolish partition wall, remove door, millwork, feature drop ceiling, finishes, construct new partition walls, glazing, millwork, finishes, lighting, electrical, plumbing and sprinkler work to reconfigure to enlarge one office and divide a meeting room to create two smaller offices. REVISION #1-Interior layout changes (partition walls/glazing). No change in value. ASHRAE unaffected./Sept.24/19 jm REVISION #2: to reduce scope of work: printer closet outside of Office 3 removed, sink in kitchenette removed, dropped ceiling in Office 6 retained, update location of recessed lighting on RCP, update drawing for new sprinkler installations, change wall assemblies for Offices 3 and 4 and to change the "Applicant" from Tony Kollmuss from Central West Project Management to [name withheld] and the "Contractor" from Central West Project Management to FairTradeWorks. May 10, 2021 mlh TENANT: Westmark Tax Group Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for field review per City staff. Note: No energy trigger required; BOMA BESt building · $45,000
Fair Trade Work Ltd Issued -
2019-06-18
#1500 - 15th floor (full floor tenant) Interior alterations to provide tenant improvements to this existing office space on the 15th floor (#1500) in this existing commercial building Scope of work: remove some existing partition walls throughout office, remove and relocate the kitchenette, construct new partition walls to create new offices and meeting rooms, new lighting, finishes, electrical, mechanical, plumbing and sprinkler work. REVISION #1-To relocate the access doors to the suite on the south side of the floor, open up the locker room and keep a portion of wall formerly to be demolished. No change in value. ASHRAE reviewed. July 19, 2019 jm · $1,450,000
no contractor listed Issued -
2019-05-22
9th floor-Common washrooms Interior alterations only to provide improvements to the 9th floor common washrooms at this existing Hong Kong and Shanghai Bank commercial building. Scope of work includes toilet partitions, millwork, fixtures, toilet accessories and ceiling to be removed and replaced, new lighting, finishes, electrical, plumbing and sprinkler work. OK for field review as per City staff. No energy upgrade required. BOMA BESt building. · $100,000
Matra Construction Inc Issued -
2019-05-22
8th floor-Common washrooms Interior alterations only to provide improvements to the 8th floor common washrooms at this existing Hong Kong and Shanghai Bank commercial building. Scope of work includes toilet partitions, millwork, fixtures, toilet accessories and ceiling to be removed and replaced, new lighting, finishes, electrical, plumbing and sprinkler work. OK for field review as per City staff. No energy upgrade required. BOMA BESt building. · $100,000
Matra Construction Inc Issued -
2019-05-22
7th floor-Common washrooms Interior alterations only to provide improvements to the 7th floor common washrooms at this existing Hong Kong and Shanghai Bank commercial building. Scope of work includes toilet partitions, millwork, fixtures, toilet accessories and ceiling to be removed and replaced, new lighting, finishes, electrical, plumbing and sprinkler work. OK for field review as per City staff. No energy upgrade required. BOMA BESt building. · $100,000
Matra Construction Inc Issued -
2019-05-07
#1700-17th floor (full floor tenant) Interior alterations only to provide improvements to this existing General Office tenant at unit #1700 at this existing Hong Kong and Shanghai Bank commercial building. Scope of work: remove two walls and floor finishes and add one new wall to create a new boardroom and one shared work area, new and relocated glazing, new finishes, ceiling work, one relocated and one new door, electrical work. REVISION #1: To revise the renovation scope by installing a 6'-0" wide opening with two (2) pocket doors between the two (2) existing office rooms, with the boardroom scope to remain the same. Apr 30, 2019 mlh TENANT: BMO Capital Markets Real Estate Inc. (Bank of Montreal) Building Sprinklered – Building inspector to determine on site is a separate sprinkler permit is required. OK for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) · $21,000
applicant withheld (individual) Issued -
2019-05-06
#1440-14th floor Interior alterations to provide improvements to this existing office space for new financial institution office tenant in this existing commercial building. Scope of work: minor demolition, new partition walls and door to create a new server room, sink and dishwasher, new glass entry door, card reader/electric strike, power/data, furniture systems, millwork, lighting, finishes, electrical and plumbing work. TENANT: Bank of Montreal Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK for field review per City staffbuilding · $100,000
Novacom Building Partners Ltd. Issued -
2019-05-06
#1480 - 14th floor Interior alterations to provide tenant improvements to this existing office space on the 14th floor (#1480) in this existing commercial building on this site. Scope of work: remove some existing partition walls throughout office, remove and relocate kitchenette, build new partition walls to create new offices and meeting rooms, finishes, lighting, electrical, mechanical, plumbing and sprinkler work · $865,000
no contractor listed Issued -
2019-02-22
Interior alterations to this existing Retail Store to provide improvements for the new tenant (Cycle City). Scope of work includes: removal of t-bar ceiling, non-loadbearing partition walls, and internal ramp; installation of new stairs between the split slabs, new bicycle racks, new millwork. · $70,000
Pacific Solutions Contracting Ltd Issued -
2019-02-08
Exterior alterations to replace skylights on the 4th and 22nd floor roof of this commercial building on this site. OK for DB per City staff. OK for Field Review per City staff. · $4,535,379
Chandos Construction Issued -
2018-12-19
#300 - 3rd floor (full floor tenant) Interior alterations only to provide improvements to the existing video conference room and small meeting room for this existing General Office tenant on the 3rd floor (#300) at this existing commercial building. Scope of work: demolish interior partition wall/door in video conference room, construct new sliding glass door, new finishes, power and communications and electrical work. TENANT: HSBC Bank of Canada · $20,000
Gibraltar Holdings Ltd Issued -
2018-09-13
Roof Top To replace two cooling towers on the existing rooftop well. OK for field review as per City staff: · $780,000
no contractor listed Issued -
2018-08-30
#1040 - 10th floor Interior alterations to provide improvements to combine two units #1040 and #1060 (retaining #1040) on the 10th floor of this existing commercial building on this site. Scope of work: demolish demising wall and demolish and construct partition walls, doors, finishes, millwork, lighting, ceiling work, electrical, plumbing, mechanical and sprinkler work. TENANT: Clark Wilson LLP · $320,000
Priority Projects Limited Issued -
2018-08-22
#1150 Interior alterations to provide improvements for a new office tenant at this existing office unit #1150 on the 11th floor of this commercial building on this site. Scope of Work: - demolish existing and install new interior partition walls to suit new office layout - relocate existing lighting and install new lighting to suit new layout - install new finishes, millwork, electrical and mechanical work OK for field review per City staff. Note: No energy trigger required; BOMA BESt building · $100,000
no contractor listed Issued -
2018-06-29
Unit 1328 - 13th floor Interior alterations to provide improvements for new general office tenant in this existing commercial building with work to include demo/construct partition walls to reconfigure layout, including staff lunch room area. OK for field review per City stafft building. · $70,000
Reotech Construction Ltd Issued -
2018-04-04
unit 2101 - Interior alterations to this office space to provide tenant improvements for an existing office tenant. Scope of work includes demolition and replace of existing partitions, finishes, millwork, and lighting. Mechanical, plumbing & electrical work to suite new layout. Okay for field review as per City staff: Energy trigger not required BOMA BEST building.\t · $694,000
Omicron Construction Ltd Issued -
2018-04-04
#500-5th floor (full floor) Interior alterations to provide tenant improvements for this full floor office suite on the 5th floor of this existing commercial building. Scope of work: demolish partition walls, doors, remove flooring, workstations, construct new partition walls, new doors and glazing, card reader, finishes, lighting, electrical and sprinkler work. , TENANT: CA Technologies See related BP-2018-00159 for work on the 4th floor. · $50,000
no contractor listed Issued -
2018-04-04
#450-4th floor (full floor) Interior alterations to provide tenant improvements for this full floor office suite on the 4th floor of this existing commercial building. Scope of work: demolish demising walls to combine #401 and #450 (retain #450), demolish partition walls, doors, millwork, remove flooring, workstations, construct new partition walls, doors and glazing, millwork, card reader, finishes, lighting, electrical and sprinkler work. Address Note: #401 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #450 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: CA Technologies See related BP-2018-00183 for work on the 5th floor. · $50,000
no contractor listed Issued -
2018-03-22
#1900 - 19th floor Interior alterations to provide tenant improvements to the north half of the 19th floor (#1900) for this existing full floor General Office tenant in this existing commercial building. Scope of work: demo and construct partition walls, doors, millwork, reflective ceiling, electrical, sprinkler, finishes throughout. REVISION #1 - Revise layout, change office fronts, from 1901-1911 & 1929 from drywall to glazing. New set of plans submitted; renumbered 1A to 16A. One additional paged numbered 12.1. Scope reduced by $5,000 (negative amount-fee not adjusted). Sept. 12/18 mk/jm OK for Field Review per City staff · $500,000
Fusion Project Management Ltd Issued -
2018-03-08
Main floor - Elevator lobby Interior alterations provide improvements to the elevator lobby on the main floor of this existing commercial building on this site. Scope of work: remove finishings and replace with new, electrical and sprinkler alterations. · $200,000
no contractor listed Issued -
2018-01-19
13th floor Common Lobby & 14th floor Washrooms Interior alterations to renovate the common lobbies on the 10th and 13th floors and renovate the common washrooms on the 14th floor of this existing commercial building on this site. REVSION #1 - REMOVE 10TH FLOOR FROM SCOPE OF WORK. Alterations to the 13th floor Lobby and 14th floor washroom only. ASHRAE reviewed. mk/jm Sept.6/18 OK for field review per City staff · $450,000
no contractor listed Issued -
2017-09-27
#2300 - 23rd floor Interior alterations to provide improvement for this existing general office tenant on the 23rd floor (unit #2300) of this existing commercial building. Scope of work; alter partitions to allow for additional work stations, minor electrical, HVAC, glazing and finishes to match existing. Revision #1 - layout changes. June 7/18 mk Tenant: Bank of Montreal OK for field review as per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $180,000
Novacom Construction Ltd Issued -
2017-09-27
#1800 - 18th floor Interior alterations to provide improvements to this existing general office tenant on the 18th floor (unit #1800) of this existing commercial building. Scope of work: Remove one interior wall to change two offices into a lounge space. Minor electrical/HVAC changes and glazing panels. Tenant: Bank of Montreal OK for field review as per City staff. Related to Special Inspection No. IA-2017-01033. Energy Upgrade Exempt: BOMA BESt Building. · $150,000
Novacom Construction Ltd Issued -
2017-09-06
#1040-10th floor Interior alterations for existing office tenant on the 10th floor to combine units 1030 and 1040 into one unit (retain #1040) in this existing commercial building with work to include reconfiguring the partition walls and removal of one lunchroom facility. Scope of work: remove demising wall, demolish/construct partition walls, remove/replace doors, new glazing, relocate lighting, new finishes, mechanical, electrical and data, sprinkler work. Address Note: #1030 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #1040 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. · $115,000
Priority Projects Limited Issued -
2017-07-31
#1328 Interior alteration to consolidate unit #1326 and #1328 into one unit #1328 on the 13th floor of this existing commercial building on this site. Scope of work includes removal of interior partition walls. Okay for field review as per City staff: #1326 & #1328 combining and retaining #1328. #1326 will be cancelled upon permit issuance. #1328 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. Note to DBI: SP or IA Req'd Energy Upgrade: Exempt - Boma Best · $8,000
Central West Project Management Inc. Issued -
2017-07-13
#1110 - 10th floor Interior alterations to provide improvements for this existing office tenant on the 10th floor (unit #1110) of this existing commercial building on this site. Scope of work: demolish and construct parition walls to reconfigure layout for offices and kitchen relocation. Plumbing, Electrical and sprinkler work. * see Building Permit No. BP-2017-01931 for demising wall OK for field review per City staff. Note: No energy trigger required BOMA BESt building. · $100,000
Syncor Solutions Limited Issued -
2017-06-13
#700 Interior alterations to provide tenant improvements for (#700) - 7th floor existing office tenant in this existing commercial building on this site. Interconnecting stairs are to remain - no alterations proposed. · $160,000
Priority Projects Limited Issued -
2017-06-08
Roof Exterior alteration only to remove and replace the existing skylight glazing, including the removal and replacing of the existing roof assembly as indicated on the submitted drawings at this existing commercial building. · $950,000
no contractor listed Issued -
2017-05-23
#1250-12th floor Interior alterations to provide tenant improvements on the 12th floor for the expansion of the General Office use at #1250 into the existing General Office tenant space at #1228 and into a portion of the common corridor, and thereby retaining #1250 at this existing commercial building. Scope of work: demolish/construct partition walls, doors, glazing, millwork, new lighting, finishes, electrical and data, plumbing and sprinkler work. Addressing Note: #1228 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #1250 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: Capital West Partners OK for field review as per City staff. Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $300,000
Fusion Project Management Ltd Issued -
2017-05-23
630 Hornby St-1st floor Interior alterations only and a change of use from Restaurant-Class 1 (shell) to provide tenant improvements for a new Health Care Office use at 630 Hornby Street at this existing commercial building. Scope of work: new partition walls, new glass replacement door and sidelite, new accessible washrooms, ceiling, lighting, finishes, millwork, electrical, plumbing, mechanical and sprinkler work for new tenant layout. TENANT: 4538901 Canada Inc. dba Lasik MD · $425,000
no contractor listed Issued -
2017-05-10
#1110 and #1150-11th floor Interior alterations to demise #1110 into two units (vacant office spaces) (#1110 and #1150) on the 11th floor of this existing commercial building. Scope of work: demolish partition walls, construct new demising wall to create #1150 and new corridor and door, electrical and sprinkler work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permits and ASHRAE checklist will be required for future tenant improvements in both units. OK for field review as per City staff: BOMA BESt Building. · $25,000
no contractor listed Issued -
2017-05-03
#1250 and #1260-12th floor Interior alterations on the 12th floor to provide a new demising partition to facilitate the expansion of #1260 into a portion of #1250 in these existing General Office spaces in this existing commercial building. Scope of work: demolish/construct partition wall, electrical and sprinkler work. Separate permit(s) and ASHRAE checklist will be required for any tenant improvements to these spaces. OK for field review processing with the TIPS department as per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $18,000
no contractor listed Issued -
2017-04-12
11th floor lobby Interior alterations to the lobby of 11th floor of this existing commercial office building on this site. Scope of work includes replacing T-Bar ceiling tiles, add new lights, replace drywall on floor and ceiling. Okay for field review as per City staffidor to be constructed as a smoke separation under it can be demonstrated that a smoke separation is not required. P. Weber · $150,000
no contractor listed Issued -
2017-03-10
12th floor lobby/corridor Interior alterations only to provide improvements to the lobby and common corridor of the 12th floor of this existing commercial building on this site. Scope of work: Upgrade finishes, lighting, HVAC, sprinkler work to elevator lobby and corridor area. · $150,000
no contractor listed Issued -
2017-03-06
Interior alterations to remove a freight elevator/dumbwaiter from existing vacant restaurant space. Okay for field review per City staff. · $80,000
no contractor listed Issued -
2017-01-18
Main & Lower Main-common washrooms Interior alterations to provide improvements to common washrooms only on main and lower main floors of this existing commercial building. Scope of work: remove/replace existing washroom fixtures, fittings and finishes, electrical, mechanical, plumbing and sprinkler work. OK for field review as per City staff · $150,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05