Permit GopherAlberta and B.C. property, permit and zoning records

95 Nelson St, Vancouver

An address in Downtown, Vancouver, zoned CD-1 (324) (Comprehensive Development). 1 building permit is on file, most recently “To construct a mixed-use building consisting of: 3-storey firehall: 1st storey - fire tru…” (issued 8 May 2026). The City's 2026 assessed value is $7,367,000.

Zoning
CD-1 (324) · Comprehensive Development
Neighbourhood
Downtown
Permits on file
1
Assessed value (2026)
$7,367,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 95 Nelson St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154000, 3,103 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
3,103
Households
1,815
Median age
34
Median household income (2020)
$83,000
Own their home
39%
Vancouver: 45%
Average household size
1.7
Under 15
8%
65 and over
6%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-05-08 To construct a mixed-use building consisting of: 3-storey firehall: 1st storey - fire truck bays; office: community space 2nd storey - gym; mechanical room 3rd storey - dormitories; kitchen; outdoor amenity 28-storey tower: 1st storey - residential amenity room 2nd to 4th storeys - dwelling units 5th storey - child care facility (44 children) 6th to 27th storeys - dwelling units; indoor & outdoor amenities on L12 28th storey - indoor & outdoor amenities all over 2 levels of underground parking accessed from Expo Blvd. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. 3. The 3-storey fire hall portion has greater floor-to-floor heights, equivalent to 4 storeys of the residential tower. 4. The firehall portion and the entire underground structure have been designed using the Importance Factor applicable to post-disaster buildings. STAGED CONSTRUCTION STAGE I: Excavation & Shoring (S.Yoo) ISSUED: Oct. 31, 2025 REVISION I: Change of Owner (S.Yoo) ISSUED: Feb. 24, 2026 STAGE II: Foundation up to Grade (S.Yoo) ISSUED: May 8, 2026 REVISION II: Revisions to Structural Drawings - Foundation to Grade (S.Yoo) ISSUED: Oct. 2, 2026 STAGE III: Full Construction - In review · $167,907,400
    Ventana Construction Corporation
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

347 W Pender St
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc
2026-10-30
180 Keefer St
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd
2026-10-30
885 W Georgia St
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.