Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
94 W King Edward Av, Vancouver
An address in Riley Park, Vancouver, zoned RM-8A (Residential). 20 building permits are on file, most recently “Building 6 - To construct a three storey building containing 3 dwelling units. Building P…” (issued 4 December 2020). The City's 2026 assessed value for the 52 accounts at this address is $72,949,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150689, 450 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2020-12-04
Building 6 - To construct a three storey building containing 3 dwelling units. Building Permit for BP-2019-04497 To construct 51 town homes over 1 underground level of parking with vehicular access from the lane. VBBL2014. Revision 1 - (May 13, 2022) changing from 4 to 3 units, revise description and addressing update.
no contractor listed Issued -
2020-12-04
Building 5 - To construct a three storey building containing 10 dwelling units. Building Permit for BP-2019-04497 To construct 51 town homes over 1 underground level of parking with vehicular access from the lane. VBBL2014. Revision 1 - (May 13, 2022) - revise description and addressing update.
no contractor listed Issued -
2020-12-04
Building 4 - To construct a three storey building containing 11 dwelling units. Building Permit for BP-2019-04497 To construct 51 town homes over 1 underground level of parking with vehicular access from the lane. VBBL2014. Revision 1 - (May 13, 2022) - revise description and addressing update.
no contractor listed Issued -
2020-12-04
Building 3 - To construct a three storey building containing 6 dwelling units. Building Permit for BP-2019-04497 To construct 51 town homes over 1 underground level of parking with vehicular access from the lane. VBBL2014. Revision 1 - (May 13, 2022) - revise description and addressing update.
no contractor listed Issued -
2020-12-04
Building 2 - To construct a three storey building containing 11 dwelling units. Building Permit for BP-2019-04497 To construct 51 town homes over 1 underground level of parking with vehicular access from the lane. VBBL2014. Revision 1 - (May 13, 2022) changing from 14 to 11 units, revise description and addressing update.
no contractor listed Issued -
2020-12-04
Building 1 - To construct a three storey building containing 10 dwelling units. Building Permit for BP-2019-04497 To construct 51 town homes over 1 underground level of parking with vehicular access from the lane. VBBL2014. Revision 1 - (May 13, 2022) - revise description and addressing update.
no contractor listed Issued -
2020-08-10
To demolish by deconstruction this existing one-family dwelling (1943) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $15,000
Fairway Recycle Group Inc Issued -
2020-08-07
To demolish by deconstruction this existing one-family dwelling (1941) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $15,000
Fairway Recycle Group Inc Issued -
2020-08-07
To demolish by deconstruction this existing one-family dwelling (1948) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $15,000
Fairway Recycle Group Inc Issued -
2020-07-24
To demolish by deconstruction this existing one-family dwelling (1941) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $15,000
Fairway Recycle Group Inc Issued -
2020-07-24
To demolish this existing one-family dwelling (2011) to grade on this site. OK for SIPs without plans per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $15,000
Fairway Recycle Group Inc Issued -
2020-07-24
To demolish by deconstruction this existing one-family dwelling (1941) to grade on this site. OK for SIPs without plans per City staff: 1. Green demolition Conditions apply. 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed] 2. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $15,000
Fairway Recycle Group Inc Issued -
2020-07-20
To construct 6 new, two to three storey, residential buildings consisting a total of 51 town homes over 1 underground level of parking with vehicular access from the lane. The project will be sprinklered and equipped with a monitored fire alarm system. VBBL2014. Building 1 - 10 units is under BP-2020-02208. Building 2 - 11 units is under BP-2020-02209. Building 3 - 6 units is under BP-2020-02210. Building 4 - 11 units is under BP-2020-02211. Building 5 - 10 units is under BP-2020-02212. Building 6 - 3 units is under BP-2020-02213. STAGE 1 - Excavation and Shoring only issued on July 20, 2020. STAGE 2 - Foundation to Grade issued on Sept. 1, 2020. STAGE 3 - Full Construction issued on Dec. 4th, 2020. Revision 1 (May 13, 2022)- Changing number of units from 55 to 51 units regards to Building 2 (14 dwelling units to 11 dwelling units) and Building 6 (4 dwelling units to 3 dwellings). · $14,000,000
OrrMoniz Projects Corp Issued -
2020-07-06
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Steve Sokalski, Xcel Safety Systems Ltd; [contact removed]
Fairway Recycle Group Inc Issued -
2020-07-06
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Steve Sokalski, Xcel Safety Systems Ltd; [contact removed]
Fairway Recycle Group Inc Issued -
2020-07-06
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Steve Sokalski, Xcel Safety Systems Ltd; [contact removed]
Fairway Recycle Group Inc Issued -
2020-07-06
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Steve Sokalski, Xcel Safety Systems Ltd; [contact removed]
Fairway Recycle Group Inc Issued -
2020-07-06
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Steve Sokalski, Xcel Safety Systems Ltd; [contact removed]
Fairway Recycle Group Inc Issued -
2020-07-06
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling. A separate building permit is required to demolish or deconstruct the building. OK for SIPs without plans per City staff: Steve Sokalski, Xcel Safety Systems Ltd; [contact removed]
Fairway Recycle Group Inc Issued -
2018-12-06
Interior alterations only to remove the unapproved secondary suites in the basement and on upper floors and to reinstate the interconnection between the main and basement floors of this existing One-Family Dwelling building. OK for field review as per City staff. Re-checked OK for Field Review as per City staff.2018 Note: · $3,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Riley Park
5628 CAMBIE ST. Interior alterations to provide improvement to this existing Office (D) at 5628 Cambie St. on the first floor of this existing mixed-use building on the site. Okay for DTI per City staff · no contractor listed2026-11-05
#12 - 10 W 17TH AV - Building 3 Interior alterations to provide improvements to this TH #12 - 10 of this existing multiple dwelling building on this site Project scope: relocation of kitchen from level 3 to level 1, bedroom and bathroom reno Okay for DTI as per City staff · AMC Project Management Ltd2026-11-04
Interior alterations to renovate one of the dwelling units of this existing duplex. OK to process as DTI as per City staff · Diseno Development Corporation2026-11-03