Permit GopherAlberta and B.C. property, permit and zoning records

910 Mainland St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 10 building permits are on file, most recently “#106 910 Mainland St Interior alterations to separate An office unit addressed as unit #1…” (issued 13 February 2026). The City's 2026 assessed value is $137,587,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
10
Assessed value (2026)
$137,587,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 910 Mainland St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153843, 2,188 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
2,188
Households
1,385
Median age
34
Median household income (2020)
$87,000
Own their home
35%
Vancouver: 45%
Average household size
1.6
Under 15
5%
65 and over
7%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-02-13 #106 910 Mainland St Interior alterations to separate An office unit addressed as unit #106 from the existing office space for a new office tenant on the ground floor of this existing commercial building on this site. · $15,000
    no contractor listed
    Issued
  2. 2025-09-18 1st Floor Interior alterations to provide improvements for this new office tenant on the 1st floor of this existing commercial building. Scope of work: To add an interior wall in the office space to create a new room. TENANT: SAP Canada Inc OK for TIPS per City staffctor to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $24,209
    Matra Construction Inc
    Issued
  3. 2025-03-13 Interior alterations to provide improvements to the telecommunications room on the ground floor of this commercial building on this site. OK for Field Review per City staff · $10,000
    no contractor listed
    Issued
  4. 2025-02-21 3rd floor (atriums) Interior alterations to provide improvements to this existing office space on this full floor office space on the 3rd floor of this existing commercial building on this site. Scope of work: enclose two atriums · $15,000
    no contractor listed
    Issued
  5. 2025-01-16 2nd floor Interior alterations to provide improvements for this existing office tenant on the 2nd floor of this existing commercial building. Scope of work , removal of the interconnecting stairs to the 3rd floor. (opening will remain). Demo and construction of partition walls to alter layout. · $1,000,000
    no contractor listed
    Issued
  6. 2022-03-28 Exterior and interior alterations to provide improvements for this existing office tenant at this existing commercial building on this site. Exterior work to add a heat pump on the roof. OK for DB per City staffnuary 24, 2022 · $69,000
    Sage Commercial Inc
    Issued
  7. 2020-12-14 1st and 3rd floors - Common Washrooms Interior alterations to the common washrooms on the 1st and 3rd floors of this existing commercial building. Scope of work: remove asbestos, remove and replace plumbing supply lines, upgrade plumbing fixtures, new lighting, new drywall, finishes, electrical and plumbing work. OK for Field Review per City staffuired. · $100,000
    Sage Commercial Inc
    Issued
  8. 2019-05-10 To upgrade the water service to connect to the water entry station and re-pipe water entry station in this existing commercial building. OK for SIPs as per City staff · $200,000
    no contractor listed
    Issued
  9. 2017-08-10 Interior renovations including a new space plan for the 1st storey and a new interconnection between the 1st and 2nd storeys resulting in 3 levels of interconnected floor space. Change of major occupancy for the portion of the 1st floor level to be occupied by SAP Canada Inc from Group A, Division 2 (previously a language school) to Group D (proposed offices). · $6,500,000
    no contractor listed
    Issued
  10. 2017-03-06 910 Mainland - 1st floor Interior alterations to demolish non load bearing partition wall for this school tenant on the 1st floor (910 Mainland) portion of this existing commercial building. Scope of work: demolish the interior assembly including partitions, finishes, lighting fixtures, and to install some upright sprinkler heads. *SEPARATE PERMIT(S) REQUIRED FOR FUTURE ALTERATIONS TO THIS SPACE. OK for SIPS processing as per City staff. · $150,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

347 W Pender St
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc
2026-10-30
180 Keefer St
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd
2026-10-30
885 W Georgia St
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.