890 W Pender St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 20 building permits are on file, most recently “#800 – 8th Floor Interior alterations to provide tenant improvements and a change of use …” (issued 19 May 2026). The City's 2026 assessed value is $21,809,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
20
Assessed value (2026)
$21,809,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 890 W Pender St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154146, 1,156 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,156
Households
490
Median age
37.6
Median household income (2020)
$74,000
Own their home
32%
Vancouver: 45%
Average household size
1.6
Under 15
3%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-05-19 #800 – 8th Floor Interior alterations to provide tenant improvements and a change of use from Office to Beauty Salon in this existing office space on the 8th floor (#800) of this existing commercial building on this site. Scope of work: Demising and construction of partition walls, new doors, flooring, finishes, millwork, electrical and plumbing work to suit · $80,000
    no contractor listed
    Issued
  2. 2026-05-12 #720 - 7th Floor - Interior alterations to demise the existing two-storey suite #720 (Group D - Office) into two suites adding suite #800 in this high-rise commercial building. Notes: \t\t\t 1. Reviewed per the 2025 VBBL · $400,000
    M Moser Associates Inc
    Issued
  3. 2026-02-04 #750 - 7th floor Interior alterations to provide improvements for this existing office tenant on the 7th floor (#750) of this existing commercial building on this site. Scope of work: New demountable partition and door in the reception area with card readers and electric strike. * In accordance with VBBL 2025 * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $22,000
    M Moser Associates Inc
    Issued
  4. 2024-10-22 #720 and #750 - 7th Floor Interior alterations on the 7th floor to re-demise the existing office #720 and #750 in this existing commercial building on this site. Scope of work: Demolish and re-adjust the demising wall between 2 suites, demolish all office partitions, doors for new layout in suite #750, electrical, plumbing and sprinkler work. · $1,000,000
    no contractor listed
    Issued
  5. 2024-01-08 #220 - 890 W Pender Interior alterations for first TI in newly demised office unit. Scope of work to include removing interior partitions to create open-concept office space, addition of electrical and plumbing fixtures for kitchenette, replacing entry door to suite. REVISION#1: Revised plans to remove proposed kitchenette from scope of work. (EV) June 12, 2024 Ok for DTI per City staff · $30,000
    Allspaces Design & Management Ltd
    Issued
  6. 2023-08-31 #210 - 2nd floor Interior alterations to demise full floor office tenant #210 into two units to be #210 and #220 and to provide tenant improvements for the existing office tenant in #210 in this existing commercial building on this site. Scope of work: remove partition walls, doors, construct new demising wall, partition walls, doors, finishes, adjust HVAC, electrical, mechanical, plumbing and sprinkler work. TENANT: Dye & Durham Corporation · $110,000
    Allspaces Design & Management Ltd
    Issued
  7. 2023-06-26 #310 - 3rd floor Interior alterations to the existing office unit on the 3rd floor (#310) in this existing commercial building on this site. Scope of work: remove select partition walls and portion of wall to suit new entry door. Sprinkler work. OK for Office TI Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $25,000
    Reotech Construction Ltd
    Issued
  8. 2022-06-20 #440 - 4th floor Interior alterations in this existing office unit on the 4th floor (#440) in this existing commercial building on this site. Scope of work: creating a server room by adding 2 walls, door and frame. TENANT: Social Research and Demonstration Corporation E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades REq'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $15,000
    Reotech Construction Ltd
    Issued
  9. 2022-05-05 #750 - 7th Floor Interior alterations to provide tenant improvement for a new office tenant on the 7th floor (#750) in this existing commercial building on the site. Scope of work: Demolish/construct new partition walls to create office rooms, new doors, new millwork, electrical, plumbing and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK For Field Review per City staff: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $90,000
    no contractor listed
    Issued
  10. 2022-02-15 #410 - 4th floor Interior alterations to provide improvements to this existing vacant office space on the 4th floor (#410) for a new office tenant in this existing commercial building on this site. Scope of work: select removal and construction of partition walls, finishes to reconfigure layout, electrical and plumbing work. OK for Field Review per City staffpector to determine on site if a separate sprinkler permit is required. E2 Upgrade HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $35,000
    Reotech Construction Ltd
    Issued
  11. 2019-10-08 #600 - 6th floor (full floor tenant) Interior alterations to this existing full floor office tenant on the 6th floor (#600) of this commercial building. Scope of work: remove partition walls, glazing, door, construct new millwork, light fixtures, power and data and electrical work. TENANT: Shelley Morris Business Services Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Processed Thru FIT L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $60,000
    Syncor Solutions Limited
    Issued
  12. 2019-04-12 (#210) Interior alterations to provide tenant improvements for this existing office space #210 on the second floor in a existing commercial building. Scope of work to include: Construct 2 new security doors within unit. · $5,000
    Allspaces Design & Management Ltd
    Issued
  13. 2019-01-15 #701 Interior alterations to remove interior partitions and prepare the existing office space unit# 701 on the 7th floor for future office tenant. BOMA BESt building · $120,000
    Reotech Construction Ltd
    Issued
  14. 2018-11-08 #330 - 3rd floor Interior alterations to provide improvement for a new General Office tenant in unit #330 on the third floor of this existing commercial building. Scope of work includes validating interior partition walls and plumbing work done without permit. OK for field review as per City staff Inspection No. IA-2018-01337 Energy Upgrade Exempted: BOMA BESt Building · $20,000
    no contractor listed
    Issued
  15. 2018-09-12 #720-7th and 8th floors (existing interconnection) Interior alteration to provide tenant improvements in suite #720 on both the 7th and 8th floors of this existing commercial building on this site. Scope of work: 7th floor-demolish partition walls, remove doors, new partition walls and glazing, doors, millwork, finishes, lighting, electrical, plumbing and sprinkler work; 8th floor-demolish partition walls, remove/relocate doors, adjust existing washrooms, new partition walls, doors, millwork, finishes, lighting, electrical, plumbing and sprinkler work. TENANT: New Hippo Health · $105,000
    The Dom Group Innovative Products and Services Ltd
    Issued
  16. 2017-09-26 Interior alterations to provide elevator upgrades to two (2) elevators in this existing 8-storey office building for CSA-B44-07 upgrade. Scope of work: - Installation of automatic emergency elevator recall in accordance with Bulletin 2008-002-BU/EL. - Installation of a new feeder and grounding for the elevator power system - Installation of new smoke detectors in the elevator lobbies Building Review Branch Notes: 1. Related Electrical Permit EP-2017-07073. 2. Fire Safety Plan and or Operations Manual to be updated to show alterations. Plans to be submitted to Fire Prevention office for approval. Evacuation plans for occupants to be updated. · $360,000
    Mott Electric General Partnership
    Issued
  17. 2017-07-13 #320 - 3rd floor Interior alteration to provide tenant improvements by adding glazing partition and wall partition to this existing office in unit #320 on the 3rd floor of this existing commercial building on this site. Okay for field review as per City staff: Exempt - Boma Best · $30,000
    PROVETTO SOLUTIONS INC
    Issued
  18. 2017-05-25 Lobby-main floor Interior alterations to provide improvements to the entry lobby on the main floor of this existing commercial building. Scope of work: Demolition/construction of wall panels, interior flooring, t-bar ceiling, finishes, electrical and sprinkler work. OK for field review per City staff: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) · $25,000
    All Spaces Project Management Ltd
    Issued
  19. 2017-02-09 (#210) Interior alterations for new office tenant in unit #210 (2nd floor) of this existing commercial building. OK for field review as per City staff: Related to BP-2017-00076 to combine units #210 and #220; retaining #210. Selected energy checklist:L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) · $80,000
    All Spaces Project Management Ltd
    Issued
  20. 2017-01-31 #210 Interior alterations only to remove non-loadbearing walls and to combine #210 and #220 to become #210 for a new general office shell space on the second floor of this existing commercial building on this site. Scope includes interior demolition, new finishes, mechanical relocation and upgrading of lighting. OK for field review per City staff: Voluntary upgrade · $81,000
    Reotech Construction Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05