Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
725 Granville St, Vancouver
An address in Downtown, Vancouver, zoned CD-1 (455) (Comprehensive Development). 101 building permits are on file, most recently “Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 fo…” (issued 5 November 2026). The City's 2026 assessed value is $715,240,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154143, 844 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · $22,984,000
Etro Construction Limited Issued -
2026-09-24
#500 Interior alterations to combine three Office (Group D) suites on the 5th floor into single unit and provide tenant improvements for this new full-floor tenant, Lululemon Athletica, of this existing commercial building on this site. Notes: - AL-2026-00066 (Accepted) for proposed locked door between elevator lobby and reception area and exit stair on this crossover floor. Mitigating features includes: 1. Floor-locked elevator 2. Electric mortise door 3. Manual release button at lobby side 4. Smoke detectors on both sides of doors 5. Intercom system at lobbies 6. Doors from exit stairs into Level 5 will remain unlocked. \t *** Reviewed under the VBBL 2025 *** · $10,400,000
Matra Construction Inc Issued -
2026-09-15
15th Floor - 700 W GEORGIA ST Interior alterations to provide improvements to this existing common elevator lobby space on the 15th Floor in this existing commercial building on this site. · $170,000
no contractor listed Issued -
2026-07-24
#200-700 W Georgia Street Interior alterations to provide tenant improvements to this existing Office (Group D) for the existing full floor tenant at #200 - 700 W Georgia Street, on the 2nd floor in this existing commercial building on this site. Okay for FR as per City staff · $3,794,865
no contractor listed Issued -
2026-07-14
Interior tenant improvement for the fit-out of a three-storey, interconnected retail store (La Maison Simons) for this CP TI of the existing building. Scope of work includes display windows at the Granville Street entrance. VBBL 2025 - NFPA 13 Stage 1 - CP TI - for full construction issued on July 14, 2026. · $20,000,000
Canadian Turner Construction Company Ltd Issued -
2026-06-22
Interior alterations to provide tenant improvement for a two-storey Retail store (Group E) at 735 Granville in this existing commercial building on this site. · $3,000,000
3469051 Canada Inc Issued -
2026-05-13
#500, #550, #575 - 5th floor Interior alterations to demolish all interior non load bearing partition walls in all three units on the 5th floor (unit#500, #550, #575) in this existing commercial building. Scope of work: Remove all interior partitions, ceiling. millwork, and finishes. Restore the area to base building- warm shell space. Demising walls between units and common corridors to remain as is. Electrical, Plumbing, Sprinklers to suit. *Separate permit(s) required for future tenant improvement to these spaces. · $280,000
no contractor listed Issued -
2026-05-07
Interior alterations to combine suite #2970 and #2975 AND to provide tenant improvement to this existing office tenant on the 27, 28, 29th floors of this existing commercial building on this site. Scope of work: Demo/construct partition walls, ceiling, finishes, millwork, electrical, plumbing, mechanical, sprinkler work to suit. Stairs between levels 27 & 28 interconnected per City staffr R. Rattray · $8,285,868
Omicron Construction Ltd Issued -
2026-04-17
700 W Georgia Interior alterations for voluntary fire alarm upgrade to this existing commercial building on this site. · $675,000
no contractor listed Issued -
2026-02-12
Exterior alterations to add a equipment cabinet on existing mount on the roof top of this existing commercial building on this site. · $50,000
no contractor listed Issued -
2026-02-06
#900 - 9th Floor Interior alterations by the landlord to provide improvements to this existing general office on the 9th floor (#900) of this existing commercial building on site. Scope of work: Demo existing office interior and reconfigure current space to suit new office layout, electrical, plumbing and sprinkler work to suit. REVISION #1: Change in applicant and change in contractor from Central West to Gibraltar Holdings. Changing the original project cost from $250,000 to $340,000. - April 10/26 - LLL Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $340,000
Gibraltar Holdings Ltd Issued -
2026-01-06
#2301 - 23rd Floor Interior alterations to provide tenant improvements to this existing general office on the 23rd floor (#2301) in this existing commercial building on site. Scope of work: Demo 2 private offices and their existing flooring. Construct new partition walls, sliding door for 1 private office, new closets, new vinyl flooring, paint, electrical and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $40,000
no contractor listed Issued -
2025-11-24
7th Level - 700 W Georgia Interior alterations to provide improvements to this existing common elevator lobby space on the 7th Floor in this existing commercial building on this site. Scope of work: Limited to the update of the 7th level lobby finishes, electrical and mechanical work to suit · $170,000
no contractor listed Issued -
2025-09-29
Base building reconfiguration of existing 3-storey retail store to accommodate four new commercial retail units. Work includes new internal divisions and demising walls to create the CRU shell spaces, and a new entry vestibule addition from the Granville Street Plaza. All tenant work will be completed under separate building permit submissions. · $39,000,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2025-09-23
#2910 & #2950 - 29th Floor (combining suites) Interior alterations to combine suite #2910 and #2950 (to become #2975) AND to provide tenant improvements for a new office tenant in this existing commercial building on this site. Scope of work: Remove the demising wall to combine the 2 units, complete tenant build-out including T-bar ceiling, light fixtures, electrical, mechanical and sprinkler work to suit. · $485,960
Omicron Construction Ltd Issued -
2025-07-04
#900 - 9th Floor Interior alterations by the landlord to provide improvements to this existing general office on the 9th floor (#900) of this existing commercial building on site. Scope of work: Selective demo of partition walls, glazing, doors, flooring, millwork and electrical work to suit. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
Central West Project Management Inc. Issued -
2025-05-22
20th floor Interior alterations to provide improvements to this existing full floor office space on the 20th floor of this existing commercial building on this site. Scope of work: demo and construction of partition walls, & doors/frames for new layout, millwork, finishes. Electrical, plumbing/mechanical and sprinklers to suit. · $1,800,000
no contractor listed Issued -
2025-05-21
26th floor Interior alterations to provide improvements to this existing office space on the entire 26th floor of this existing commercial building on this site. Scope of work; to demolish and replace T-bar grid and ceiling tile, lights (to base building standard fixtures), EM and fire alarm upgrades. Add two new VAV boxes to improve thermal comfort in two rooms. Minor sprinkler work - adjust heads to suit new T-bar grid, special sprinkler permit less than 20 heads. * Existing interconnecting stairs · $300,000
no contractor listed Issued -
2025-05-21
25th floor Interior alterations to provide improvements to this office space on the entire 25th floor of this existing commercial building on this site. Scope of work: to demolish and replace T-bar grid and ceiling tile, lights (to base building standard fixtures), EM and fire alarm upgrades. Minor sprinkler work - adjust less than 20 heads. *Also to the east side - demolish walls, door, and plumbing fixture to staff lounge, add new partitions, new millwork, appliances, and plumbing fixtures, with minor drainage relocation and slab coring. * Existing interconnecting stairs · $347,500
no contractor listed Issued -
2025-05-21
24th floor Interior alterations to provide improvements to this existing office space on the entire 24th floor of this existing commercial building on this site. Scope of work: demolish and replace T-bar grid and ceiling tile, lights (to base building standard fixtures), EM and fire alarm upgrades. Add two new VAV boxes to improve thermal comfort in two rooms. Minor sprinkler work - adjust heads to suit new T-bar grid, special sprinkler permit less than 20 heads. · $302,500
no contractor listed Issued -
2025-05-21
19th floor Interior alterations to provide improvements to this existing office space on the entire 19th floor of this existing commercial building on this site. Scope of work; demolish and replace T-bar grid and ceiling tile, lights (to base building standard fixtures), EM and fire alarm upgrades. Add two new VAV boxes to improve thermal comfort in two rooms. Minor sprinkler work - adjust heads to suit new T-bar grid, special sprinkler permit less than 20 heads. REVISION #1 - additional work areas added to scope. March 26/26 mk · $342,500
no contractor listed Issued -
2025-05-02
#700 - 7th Floor Interior alterations to this existing office space to remove all non loadbearing partitions, ceiling and finishes to return to base building on the 7th floor (#700) in this existing commercial building. Scope of work: Interior demo only of all tenant build out to return to shell condition. Electrical, plumbing and sprinkler work to suit. Separate permit is required for future tenant improvement or to change the use. · $450,000
no contractor listed Issued -
2025-03-06
#1140 - 11th floor Interior alterations to provide improvement to this existing general office on the 11th floor (#1140) in this existing commercial building on site. Scope of work: Demolish one partition wall and a door. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $15,000
Central West Project Management Inc. Issued -
2025-01-29
Level 1, 2 & 3 Interior alterations to demo floors 1, 2 & 3 of this Retail tenant at this commercial building on this site. Remove the existing tile and wood flooring inside the CRU space, as well as remove all non structural drywall and wood ceilings and internal non structural drywall partition demising walls. Also remove existing kitchen and restaurant furnishings, booths, bar counter, cold room etc. · $2,100,000
no contractor listed Issued -
2024-12-04
#2910 - 29th floor Interior alterations to remove all non load bearing partition walls and return to shell space in this existing office space on the 29th floor (#2910) of this existing commercial building on this site. Scope of work: Remove all partitions, doors/frames, millwork, finishes, ceiling, electrical, and upturn sprinklers REVISION #1 - change applicant from Central West Projects to Gibraltar holdings ltd. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $80,000
no contractor listed Issued -
2024-12-04
#2970 - 29th floor Interior alterations to remove all non load bearing partition walls and return to shell space in this existing office space on the 29th floor (#2970) of this existing commercial building on this site. Scope of work: Remove all partitions, doors/frames, millwork, finishes, ceiling, electrical, and upturn sprinklers Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $145,000
Gibraltar Holdings Ltd Issued -
2024-11-20
2nd floor Corridor - 700 W Georgia Interior alterations to provide improvements to the Riser room on the 2nd floor corridor of this existing commercial building on this site. Scope of work: demolish fire hose cabinet (FHC) and wall and decommission fire hose connection. Patch and repair remaining wall. Build new fire rated door and frame for new access to the riser room · $3,500
no contractor listed Issued -
2024-11-18
#630 - 6th Floor Interior alterations to provide tenant improvements to a new office tenant on the 6th floor (#630) in this existing commercial building on the site. Scope of work: Construct new interior glass partitions, new glass doors/frames and electrical work. TENANT: Chateau Granville Inc Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $30,000
Central West Project Management Inc. Issued -
2024-07-10
#2200 - (interconnected with #2300) Interior alterations to provide tenant improvements to a new tenant on the 22nd Floor (#2200 and #2300) in this existing commercial building on site. Scope of work: Construct new partitions to create new offices, demountable glazings, new floor, relocate and re-used furniture, electrical and sprinkler work to suit. TENANT: Answith Leasing Corporation NOTE: Existing interconnecting stair shown for reference only to show existing condition. · $500,000
Canadian Turner Construction Company Ltd Issued -
2024-06-21
7th Floor - common washroom Interior alterations to provide improvements to the common washrooms on the 7th floor in this existing commercial building on this site. Scope of work: Aesthetic upgrade includes ceiling, floor and wall finishes replacement. Some electrical and sprinkler work, HVAC to suit. · $200,000
no contractor listed Issued -
2024-06-21
14th Floor - (corridor & elevator lobby) Interior alterations only to provide improvements to the common corridor and elevator lobby on the 14th floor in this existing commercial building on site. Scope of work: Aesthetic upgrade includes ceiling, floor, fixtures, wall finishes replacement, HVAC, electrical, and sprinkler work to suit. · $200,000
no contractor listed Issued -
2024-06-03
#1600 - 16th Floor Interior alterations to provide tenant improvements to this new office tenant in this shell space on the 16th Floor (#1600) in this existing commercial building. Scope of work: Complete tenant build out, new wall/partition layout, lighting, floor, wall finish, electrical, plumbing and sprinkler work to suit. See BP-2022-01007 for demo. REVISION #1: Change layout due to unforeseen site conditions which includes egress updates, new type of partition, door schedule, millwork. See Revision Application form for detailed scope. - July 30/24 - LLL TENANT: TD Bank Group · $2,200,000
no contractor listed Issued -
2024-05-13
Interior alterations to add a diesel storage tank to fuel the generator in the basement mechanical room of this commercial building on this site. 2019 VBBL Revision 1 - The new proposed piping will be routed through a rated enclosure within the existing stairwell. The work will be confined to specific areas within the stairs to ensure no existing clearances are affected. Replacement of the existing door between the mechanical room and the electrical room. · $450,000
no contractor listed Issued -
2024-03-21
#2301 - 23rd Floor Interior alterations to provide tenant improvements to this existing general office on the 23rd floor (#2301) of this existing commercial building on site. Scope of work: Construct new partitions to build private offices, new kitchenette and interior finish upgrades. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $300,000
Central West Project Management Inc. Issued -
2024-02-01
#510 - 5th floor Interior alterations to provide tenant improvements to this existing general office on the 5th floor (#510) of this existing commercial building on site. Scope of work: Demolish the full floor back to shell condition. Construct new public corridor around base building with upgrade and lobby finishes. Electrical, plumbing and sprinkler work to suit. Separate permit is required for future tenant improvement or to change the use. · $500,000
no contractor listed Issued -
2023-10-24
#1200 - 12th floor Interior alterations to provide improvements for a new full floor office tenant on the 12th floor (#1200) of this existing commercial building. Scope of work: minor demo of doors and walls around entrances to shell office space. Install new partitions walls , doors, millwork, finishes, lighting for complete tenant fit out. Electrical, plumbing, sprinklers, HVAC to suit. · $2,000,000
Govan Brown Ltd Issued -
2023-07-19
#2800 - 28th floor (full floor tenant) Interior alterations to the existing full floor office tenant on the 28th floor (#2800) in this existing commercial building on this site. Scope of work: remove glass panels, doors, millwork, construct new partition walls to create smaller offices, electrical and sprinkler work. TENANT: Alexander Holburn OK for Office TI per City staffrequired for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $100,000
Harrier Construction & Project Management Ltd Issued -
2023-07-07
#880 - 6th floor Interior alterations to provide tenant improvements to the existing office tenant on the 8th floor (#880) in this existing commercial building on this site. Scope of work: remove two partition walls, construct three new partition walls with doors and finishes. TENANT: Intergulf Development Group OK for Office TI Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $15,000
no contractor listed Issued -
2023-03-07
11th floor - Elevator Lobby/ Common Corridor Interior alterations to provide improvements to the Elevator lobby and common corridor on the 11th floor of this existing commercial building. Scope of work: replacement of walls, ceiling, flooring, finishes, ceiling mounted fixtures and controls. · $170,000
no contractor listed Issued -
2023-02-08
#1150 - 11th floor Interior alterations to provide tenant improvements to this existing office space on the 11th floor (#1150) in this existing commercial building on the site. Scope of work: remove select partition walls, doors, millwork, flooring, electrical and plumbing work. OK for Office TI Building Sprinklered - Building Inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $15,000
Central West Project Management Inc. Issued -
2022-10-20
Main Floor (west corner, next to Robson/Howe St entrance) Interior alterations to provide tenant improvements for a new retail tenant (Celine) on the ground floor in this retail store (Nordstrom) in this existing commercial building on this site. Scope of work: remove flooring, ceiling, millwork, add new millwork, ceilings, finishes, lighting, power and data, electrical, mechanical and sprinkler work. TENANT: Celine Canada · $175,500
no contractor listed Issued -
2022-09-02
#950 - 9th Floor Interior alterations to provide tenant improvement for an existing office tenant on the 9th floor (#950) on this existing commercial building on this site. Scope of Work: Demolish existing partition walls, doors and frames and millwork. Construct interior walls to create offices and 1 big meeting room, new floor finish. Electrical, sprinkler and plumbing work to suit. TENANT: Mackenzie Investment · $325,000
Govan Brown Ltd Issued -
2022-08-23
#630 - 6th Floor Interior alterations to provide tenant improvements to an existing office tenant on the 6th floor (#630) in this existing commercial building on the site. Scope of work: remove closet and add new full height 12mm glass wall with a new 3' x 8' glass door. * District Building Inspector to determine the following: · $15,000
Gibraltar Holdings Ltd Issued -
2022-08-23
Interior alterations to provide improvements for a new Retail (Limited Food Service) on the ground floor at the Northeast corner of Retail Store (Nordstrom) on the site. New Tenant: Milk Bar OK for Field Review per City staff: - This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. - Energy Upgrade: 1. E2 - SWH - Upgrade SWH system Temperature Maintenance Controls (per City staff.4.4.2 of ASHRAE 90.1-2016). 2. E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016). · $245,000
no contractor listed Issued -
2022-07-13
Unit 400 - 4TH FLOOR\t Interior alterations to provide tenant improvements to this unit #400 on the 4th floor of this existing commercial building. E2-HVAC 3.) Clean and Balance All Air Systems. · $3,500,000
Matra Construction Inc Issued -
2022-05-19
#1200 - 12th floor Interior alterations to the 12th floor (#1200) to remove all non load bearing partition walls to return to shell space of this existing commercial building on this site. Scope: Complete demolition of existing interior partitions, millwork and finishes, removal of tenant signage, elevator lobby alterations to include new lobby wall panels, new millwork, electrical, plumbing and sprinkler work to suit. · $400,000
no contractor listed Issued -
2022-04-11
#1600 - 16th floor (full floor) Interior alterations to demolish non load-bearing partition walls on the 16th floor (#1600) to create a shell office space in this existing commercial building. Scope or work: remove all partition walls, doors, drop ceiling, millwork, finishes, electrical, mechanical, plumbing and sprinkler work. Separate permit(s) will be required for any tenant improvements to this space. · $180,000
no contractor listed Issued -
2022-03-08
#2300 & #2301- 23rd floor (demised from #2300) Interior alterations to remove non load bearing partition walls and to demise full floor office tenant on the 23rd floor (#2300) into two units to be #2300 and #2301. Work to include tenant improvements to #2300 ONLY for the existing office tenant, building a common corridor and refinishing common lobby. Unit #2301 to remain as shell. Unit #2300 - existing tenant occupying 22nd and portion of 23rd floor. * Separate permit(s) required for any future tenant improvements to unit #2301. NOTE: related to AL-2021-00201 for interconnecting stair between 22nd and 23rd floors. · $4,500,000
Canadian Turner Construction Company Ltd Issued -
2022-01-24
#2200 - 22nd Floor (full floor tenant) Interior alterations to provide tenant improvements for a new full floor office tenant on the 22nd floor (#2200) in this existing commercial building on this site. Scope of work: construct new partition walls, doors, new universal washroom, kitchenette, millwork, finishes, ceiling work, HVAC, lighting, card reader, electrical, plumbing, mechanical and sprinkler work. REVISION #1 - May 18/22 - revisions to Level 22 - to interconnected stair design, door swing from Elevator lobby, reflected ceiling & finishing plans for stair design, toilet location, add maglocks. (see BP-2021-06696 for L23) - increase project value from $1,500,000.00 to $1,550,000.00. *************************************************** Related to BP-2021-04770 for interior demolition · $1,550,000
Canadian Turner Construction Company Ltd Issued -
2021-12-17
#900 and #980 - 9th floor (**T.I work to #980) Interior alterations to demise #980 into two units to be #900 and #980 and to provide improvements for the existing tenant in #980 in this existing commercial building on this site. Scope of work: construct new demising wall, partition walls, glazing partitions, doors, finishes, millwork, HVAC, lighting, electrical, mechanical and sprinkler work. TENANT: Conifex Timber Inc. · $98,600
Concrete Cashmere Ltd Issued -
2021-10-21
22nd & 23rd floor - Common Washrooms Interior alterations to provide improvements to the washrooms on the 22nd & 23rd floors in this existing commercial building on this site. work to include: providing two accessible stalls on the 23rd floor, and replacement of all fixtures, stalls, finishes, lighting, sprinkler heads, electrical outlets, fire alarm speakers & doors on both floors. OK for field review per City staff: Energy trigger not required: BOMA BEST Building. DBI To determine onsite if Sprinkler Permit Required. · $200,000
no contractor listed Issued -
2021-10-14
#2200 - 22nd floor Interior alterations to demolish non load-bearing partition walls on the 22nd floor (#2200) to create a shell office space in this existing commercial building. Separate permit(s) will be required for any tenant improvements to this space. NOTE: Existing interconnecting stair shown for reference only to show existing condition. · $150,000
Canadian Turner Construction Company Ltd Issued -
2021-09-08
#410 & #420 - 4th Floor Interior alterations to provide tenant improvements to an existing office tenant to expand into an adjacent unit on the 4th floor, combining #410 & #420 (retaining #420), in this existing commercial building. TENANT: Microsoft Vancouver E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) · $4,000,000
Canadian Turner Construction Company Ltd Issued -
2021-08-03
#600 & #700 - Floor 6 & 7 Interior alterations to the 6th and 7th floors to convert existing Women's washrooms to Gender Neutral washrooms in this existing commercial building on this site. Scope of work: Replace existing partitions with full height partitions. Electrical and HVAC to suit. DBI to determine if a Special Sprinkler Permit is required. DBI determined on site sprinkler permit is required Jul 30, 2021. OK for field review as per City staff: Energy trigger not required BOMA BEST building. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $275,000
no contractor listed Issued -
2021-07-20
#420 - 4th floor Interior demolition of select non load-bearing partition walls on the 4th floor (#420) to create a "shell" office space. Energy upgrade exempt: Interior demolition Separate permit(s) will be required for any tenant improvements to this space. · $90,000
Canadian Turner Construction Company Ltd Issued -
2021-06-08
Mechanical Room - 30th floor Interior alterations to the mechanical room on the 30th floor of this existing commercial building on this site. Scope of work: voluntary upgrade to provide sprinkler fire protection. OK for Field Review per City staff required for proposed sprinkler work. · $25,000
Central West Project Management Inc. Issued -
2020-12-07
Exterior alterations to remove existing decorative canopy, reclad the exterior columns, alter main entry doors and re & re lobby exterior soffit and lighting fixture at the lobby at 700 W Georgia St for this existing commercial building. OK for field review as per City staff · $50,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2020-11-05
700 W Georgia - Ground Floor Interior alterations to provide tenant improvements to this existing financial institution tenant in this mixed-use building on the site. Scope of work: interior partition reconfigurations, new electrical, plumbing, mechanical and sprinkler work and to remove existing window films on the ground floor. TENANT: TD Dominion Bank · $800,000
no contractor listed Issued -
2020-11-02
Main floor entrance and elevator lobby Interior alterations to provide improvements to the existing ground floor elevator lobby and side interior entrances in this existing commercial building. Scope to Include: Updates to the existing flooring, lighting, mechanical and HVAC. Building a new Storage space and front counter for the concierge staff Use. Square off existing void spaces. * Sprinkler Permit is required. · $3,000,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2020-06-05
#2905 - 29th Floor Interior demolition of non load-bearing partition walls on the 29th floor (#2905) to create a shell office space in this existing commercial building. Scope of work per City staff: remove partition walls, doors, millwork, finishes, electrical & sprinkler work. REVISION #1:To add glass doors and partitions, relocate two lighting fixtures, realign ceiling grid, new flooring and change of use from office shell to office. Increase project value from $10,000 to $36,750.00. July 27, 2020 mlh District Building Inspector determined Sprinkler Permit is required. · $36,750
Central West Project Management Inc. Issued -
2020-05-15
#2000 - 20th Floor (full floor tenant) Interior alterations to provide tenant improvements for a new office tenant on the 20th floor (#2000) in this existing mixed use commercial building. Scope of work includes new interior partition walls, new accessible washroom, updates to lighting, plumbing, HVAC and sprinklers TENANT: TD Bank Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work · $4,000,000
no contractor listed Issued -
2020-04-14
Exterior alteration to validate the fuel tank, cooling system, electrical generator, and steel platform of the existing office building on this site. · $360,985
no contractor listed Issued -
2020-03-06
24th, 25th, 26th floor washrooms and lobby Interior alterations to the 24th, 25th, 26th floors to provide improvements to the existing washrooms and lobbies for the existing office tenant (same tenant on all 3 floors). · $500,000
Fusion Project Management Ltd Issued -
2020-02-25
29th floor - common lobby/corridor Interior alterations to provide tenant improvements to the common lobby/corridor area on the 29th floor in this existing commercial building. Scope of work: per the 2019 VBBL to remove and replace all existing finishes (wall, floor and ceiling finishes), millwork, lighting, electrical, plumbing and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work OK for Field Review Dec 19, 2019 Processed THRU Fit · $175,000
Central West Project Management Inc. Issued -
2020-02-20
Interior alteration for tenant improvement on the 2nd and 3rd level of this existing retail store on this site. · $250,000
EllisDon Corporation Issued -
2020-01-20
Interior alterations to upgrade the perimeter heating system on the 2nd-15th Floors of the existing highrise commercial building on this site. Scope of work includes new heating water supply & return piping, and new mechanical equipment (heat exchanger, expansion tank, reheat coils, and vertical intake line). OK for Field Review per City staff. · $1,440,000
no contractor listed Issued -
2020-01-17
#1140 - Interior alterations to provide tenant improvements for this existing Office Tenant in unit #1140 in this existing building. Scope of work to include: Demo some interior existing walls. Add a new interior wall with door, build new offices, and add a kitchenette. OK For Field Review per: A.Campbell - Nov.29.2019 This permit was Reviewed and Issued under the 2019 VBBL Energy Upgrade: L2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) · $70,000
Matra Construction Inc Issued -
2019-11-13
#601 - Interior alterations to suite #601 on the 6th floor of this existing General Office space of this existing commercial building on site. Scope of work includes: interior layout changes to new boardroom, new enclosed break room, new diffusers, relocated lighting. · $25,000
New Image Projects Inc. Issued -
2019-10-25
#2800-28th floor (full floor) Interior alterations for this existing full floor tenant on the 28th floor in this existing commercial building. Scope of work includes some demolition work, renovate portions of floor to create new offices (new partition walls, glazing, doors, finishes, millwork), mechanical, electrical and sprinkler work. TENANT: Alexander Holburn (Reception on 27th floor-#2700) · $150,000
Harrier Construction & Project Management Ltd Issued -
2019-10-25
#2700-27th floor (full floor) Interior alterations for existing full floor tenant on the 27th floor in this existing commercial building. Scope of work includes some demolition work, renovate portions of floor to create new offices (new partition walls, glazing, doors, finishes, millwork), mechanical, electrical and sprinkler work. TENANT: Alexander Holburn (Reception on 27th floor-#2700) · $150,000
Harrier Construction & Project Management Ltd Issued -
2019-10-16
17th Floor Interior alterations to provide improvements only to the building men's washroom on the 17th floor of this existing mixed use building. Scope of work includes the removal and replacement of plumbing fixtures, finishes, materials at the existing men's washroom. OK for Field Review - Sept 20/19 Processed Thru FIT Note: 1. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. 2. Energy Upgrade Exempted: Voluntary Upgrade (N/A) · $50,000
North Stream Contracting Ltd Issued -
2019-10-15
#500-5th floor Interior alterations for for existing office tenant in Suite #500 on the 5th floor to convert existing offices into a projection room for employee use in this existing commercial building. REVISION #1 - Sept. 18/20 mk Reduced scope of work: - no new work, no stepped seating, & no new door D2 in Room N-5119 OK for field review per City staff: · $250,000
Fusion Project Management Ltd Issued -
2019-09-24
#R103 - Lower Mall Level Interior demolition of non load-bearing partition walls on the lower mall level (#R103) to create a shell retail space in this existing building. Scope of work: remove partition walls, doors, ceiling, millwork, finishes electrical and sprinkler work. Energy upgrade exempt: Interior demolition. Separate permit(s) and ASHRAE checklist will be required for future tenant improvements to this space. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for Field Review Sept 9, 2019 Processed Thru FIT. · $55,000
no contractor listed Issued -
2019-08-16
#2000 - 20th Floor (full floor) Interior demolition of non load-bearing partition walls on the 20th floor (#2000) to create a "shell" office space Scope of work: remove all interior partition walls, doors, finishes, electrical and sprinkler work. Energy upgrade exempt: Interior demolition Separate permit(s) and ASHRAE checklist will be required for any tenant improvements to this space OK for Field Review Aug 8, 2019 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Processed Thru FIT · $80,000
Matra Construction Inc Issued -
2019-07-24
#1750 - 17th floor Interior alterations to the 17th floor to expand suite #1750 into #1730 (retain #1750) for a new office tenant in this existing commercial building. Scope of work: to remove a demising wall and demolish/construct partition walls/doors in the expansion area to reconfigure layout for offices/meeting room, workstations, lighting, power/data, electrical and sprinkler work. TENANT: Collette Parsons Harris Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. · $250,000
Fusion Project Management Ltd Issued -
2019-05-24
#818 - To permit interior alterations and provide tenant improvements to this existing office space in this existing commercial building. Scope of work to include: Satisfy the removal of some old interior partition walls (done by previous owner). Demo the existing main entrance to office and build a new entrance with double doors and sidelights. New partition walls throughout to create offices, boardrooms, storage area for computer servers, meeting rooms and staff lunchroom. Update lighting, flooring and paint. OK For Field Review as per City staff.2019 Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate automatic lighting shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016) · $186,000
Aura Office Environments Inc Issued -
2019-04-02
#700-7th floor (full floor) Interior alterations to to #700 on the 7th floor to provide tenant improvements to this existing full floor tenant at this existing building on this site. Scope of work: demolish/construct partition walls, glazing, doors and millwork, new power/data, finishes, electrical, plumbing and sprinkler work. TENANT: Cushman & Wakefield ULC · $200,000
no contractor listed Issued -
2019-02-28
Installation of 22 Electric Vehicle Chargers in existing parkade to facilitate new conduit and sprinkler work. **NO NEW BUILDING WORK IS PROPOSED.** BRB Note: · $987,500
no contractor listed Issued -
2019-02-11
#410 - 4th floor Interior alterations to provide tenant improvements for a new office tenant on the 4th floor (#410) in this existing commercial building on this site. Energy upgrade selected: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) Scope of work: construct new interior partition walls, doors, millwork, glazing, finishes, ceiling work, HVAC, electrical, mechanical, plumbing and sprinkler work. TENANT: Microsoft · $700,000
Matra Construction Inc Issued -
2019-01-30
30th floor - Interior alterations to the generator room on the 30th floor of this existing commercial building on this site. Scope of work: coring holes for the sprinkler pipes completed under related sprinkler permit. Okay for Field Review per City staff: Energy trigger not required BOMA BEST building · $7,000
no contractor listed Issued -
2019-01-28
4th floor (#400) Interior alteration to provide improvements for this existing full floor office tenant on the 4th floor (#400) of this existing commercial building. Scope of work; demo partition wall/doors/ceiling to a select area to create new file room and meeting room. Also, to add a new unisex accessible washroom to this tenant space. Tenant: TD Bank · $140,000
New Image Projects Inc. Issued -
2018-11-06
#980 - 9th floor Interior alterations only to provide improvements for this existing General Office tenant on the 9th floor (#980) at this existing commercial building. Scope of work: construct 2 partition walls for suite entry and office, relocate glass door, card reader, rcp and electrical work. TENANT: Conifex Fibre OK for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) Related to Special Sprinkler Permit No. IA-2018-01460 · $56,500
no contractor listed Issued -
2018-11-05
29th floor - common washrooms Interior alterations to provide improvements to the common washrooms on the 29th floor in this existing commercial building on this site. Scope of work includes repair/replace plumbing fixtures, lighting, finishes and materials, electrical, plumbing, mechanical and sprinkler work. · $99,750
Central West Project Management Inc. Issued -
2018-11-05
16th floor - common washrooms Interior alterations to provide improvements to the common washrooms on 16th floor in this existing commercial building on this site. Scope of work: replace all finishes, new fixtures, replace plumbing fixtures, mirrors, countertops and toilet partitions, lighting, electrical, plumbing and sprinkler work. OK for field review as per City staff · $85,350
Central West Project Management Inc. Issued -
2018-11-05
12th floor - common washrooms Interior alterations to provide improvements to the common washrooms on the 12th floor in this existing commercial building on this site. Scope of work: replace all finishes, new fixtures, replace plumbing fixtures, mirrors, countertops and toilet partitions, lighting, electrical, plumbing and sprinkler work. OK for field review as per City staff · $85,350
Central West Project Management Inc. Issued -
2018-07-24
#3020 - Interior alterations in this existing office tenant space to provide tenant improvement for a new office tenant. OK for field review as per City staffed: BOMA BESt (Path1) · $75,000
Syncor Solutions Limited Issued -
2018-06-01
LOBBY- #RM-15 & #RM-18 Interior alterations to add two new kiosks (#RM-15 & #RM-18) in the lobby area at the street level in this existing commercial building on this site. Scope of work includes electrical. · $150,000
no contractor listed Issued -
2018-05-30
#2100 - 21ST floor Interior alterations to provide improvements for this existing radio communications tenant at unit #2100 on the 21st floor of this commercial building on this site. Work to include removing the two interconnecting stairs to unit #2000 and filling in the floor, demo and install new partitions to portions of the 21st floor to alter layout. OK for field review per City staff · $150,000
no contractor listed Issued -
2018-05-30
#2000 - 20th floor Interior alterations to provide improvements for this existing radio communications tenant on the 20th floor (#2000) of this commercial building on this site. Work to include removing the two interconnecting stairs to unit #2100 and filling in the floor. OK for field review per City staff · $100,000
no contractor listed Issued -
2018-04-10
#601 - 6th floor Interior alteration to demolish non load bearing partition walls only in this existing office space on the 6th floor (unit #601) in this existing commercial building on this site. OK for field review as per City stafft building · $28,000
Reotech Construction Ltd Issued -
2018-02-16
Unit #950 Interior alterations to provide improvements for a new office tenant at this existing office unit #950 on the 9th floor of this existing commercial building on this site. OK for field review per City staff. · $300,000
Vestacon Limited Issued -
2018-01-15
3rd floor - washrooms Interior alterations to provide improvements to all existing washrooms on the 3rd floor in this existing commercial building. · $150,000
no contractor listed Issued -
2017-08-18
#1488 Interior alterations to provide improvements this existing office space for a new office tenant unit#1488 on the 14th floor of this existing commercial building on this site. OK for field review per City staff · $350,000
CDC Construction Ltd Issued -
2017-07-14
#400 - 4th floor (full floor) Interior alterations to provide improvements for this existing general office tenant on the entire 4th floor (#400) of this existing commercial building. Scope of work: demolish/construct partition wall to reduce the size of the staff kitchen and to install six additional work stations, new millwork, finishes, plumbing, electrical, lighting, power/data, sprinkler and HVAC work. · $160,000
CDC Construction Ltd Issued -
2017-06-23
Unit #630 - 6th floor Interior alterations to provide tenant improvements for a new General Office tenant on the 6th floor (unit #630) of this existing commercial building. Scope of work: demo and construct partition walls, doors, glazing, millwork, finishes, ceiling, electrical and sprinkler alterations. * Addressing note: Unit #603 changed to #630. OK for field review as per City staff. Energy upgrade exempt: BOMA best Building · $32,000
Aura Office Environments Inc Issued -
2017-06-21
#510-5th floor (full floor tenant) Interior alterations to combine office units #510 and #520 into unit #510 on the 5th floor of this existing commercial building on this site. Scope of work: demolish demising wall and some partition walls, remove some glazing, doors, new millwork, partition walls, doors, glazing, power/data, lighting, electrical and sprinkler work. Address Note: #520 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #510 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. OK for field review per City staff. Note: No energy trigger required BOMA BESt building · $650,000
Fusion Project Management Ltd Issued -
2017-05-02
(#2300) Interior alteration to provide improvements for this existing General Office tenant in unit #2300 on the 23rd floor of this existing commercial building. Scope of work: demo and construction of partition walls, finishes, lighting, HVAC, & sprinklers for new Telepresence Room. OK for field review as per City staff · $80,000
no contractor listed Issued -
2017-04-27
To install three card access doors to provide secure area within space of the Microsoft tenant on the 7th floor of this existing general office building. · $30,000
no contractor listed Issued -
2017-01-19
#1800 - 18th floor Interior alterations to remove non-loadbearing walls, reconfigure interior layout and to provide an electrical fireplace in the reception area for the existing tenant in this existing general office at unit #1800 on the 18th floor of this existing commercial building on this site. · $910,000
no contractor listed Issued -
2017-01-12
Interior alterations to provide improvements to this existing retail store at 799 Robson St on the ground floor of this existing commercial building on this site. Work to add two interior Chanel and Kiehl display booths. OK for field review per City staff. · $25,000
no contractor listed Issued -
2017-01-12
Interior alterations to provide improvements to this existing retail store at 799 Robson St on the ground floor of this existing commercial building on this site. Work to add two interior Yves St.Laurent and Armani display booths. OK for field review per City staff. · $25,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
#320 - 3th floor Interior alterations to provide improvements to create a show suite in this existing office space on the 3rd floor (#320) of this existing commercial building on this site. Scope of work: demo and construction of parititon walls for new layout, millwork, lighting, & finishes.. Electrical, plumbing/mechanical, & sprinklers to suit. · no contractor listed2026-11-05
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05