Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
865 Hornby St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 15 building permits are on file, most recently “3rd Floor Interior alterations to construct two new temporary walls to divide the existin…” (issued 7 November 2025). The City's 2026 assessed value is $61,902,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154143, 844 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-11-07
3rd Floor Interior alterations to construct two new temporary walls to divide the existing third floor for temporary offices and file storage room, and to create two new offices on the third floor for this existing third floor tenant of this existing commercial building on this site. Separate building application is required to relocate the temporary walls. Revision#1: To reduce the number of new enclosed offices from two to one. December 11, 2025 (EV) Revision#2: Increase in number of new enclosed offices from 1 to 3. Increase in project cost to $58,000 (from $50,000). January 23, 2026 (EV) Okay for DTI per City staff. · $58,000
Matra Construction Inc Issued -
2022-09-21
#203 - 2nd Floor Interior alterations to provide tenant improvement to a new office tenant on the 2nd floor (#203) in this existing commercial building on site. Scope of work: remove/construct partition walls, ceilings, fixtures, millwork, finishes, HVAC, lighting, electrical, mechanical, plumbing and sprinkler work. TENANT: Natural Resource Ministries (CBRE) · $1,400,000
no contractor listed Issued -
2022-05-25
#202 The interior alterations to install a new partition with double doors in this existing Fitness Centre use at unit #202. · $20,000
no contractor listed Issued -
2022-03-28
13th floor (full floor tenant) *South Tower* Interior alterations to provide improvements to an existing office tenant on the 13th floor in this existing mixed-use building on this site. Scope of work: Remove partition walls & bifold doors of existing data closet and construct new data room, electrical and sprinkler work. TENANT: Ministry of Attorney General - Legal Services Branch OK for Field Review per City staffnkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1 (a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $20,000
no contractor listed Issued -
2021-10-21
#1000-10th Floor Interior alterations to provide tenant improvements for this existing office tenant on the 10th Floor of this existing mixed use building. Scope of work: demo partition walls to change layout for larger admin area and to create 5 new offices. Electrical and sprinklers to suit. Ok for Field Review per City staffno longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $60,000
no contractor listed Issued -
2019-09-24
Interior alterations to repair the concrete in the underground parkade P1 to P4 level in this existing mixed-use building on this site. Scope of work includes to remove the WWOP bike storage on P1 level. REVISION #1: to change the scope of work to validate WWOP bike storage. This includes a chainlink fence and bike storage lockup within the chainlink fence area. August 31, 2020 mlh · $380,000
no contractor listed Issued -
2019-03-20
13th floor (full floor tenant) *South Tower* Interior alterations to provide partition walls and doors to this existing office space on the 13th floor of this existing mixed-use building on this site. Scope of work: construct partition walls and in-fill a wall to create a new office space, new door and glazing, electrical, mechanical and sprinkler work. TENANT: WS1-Michael Pol NOTE: There may be discrepancy between B461567 and B452480 as their existing floor plan does not match B461567(2014) and matches closer to B452480(2011). To validate all new partition walls and doors, and removal without permit. · $7,000
no contractor listed Issued -
2019-03-20
6th floor (full floor tenant) *South Tower* Interior alterations to provide partition walls and doors to this existing office space on the 6th floor of this existing mixed-use building on this site. Scope of work: construct two partition walls to create two office rooms and a photocopy/media room, new doors and glazing, lighting, electrical, mechanical and sprinkler work. TENANT: WSI-Michael Pol NOTE: To validate all new partition walls and doors, and removal without permit. Last permit on file : BU112588 · $20,000
no contractor listed Issued -
2018-09-17
3rd floor, 10th floor and Roof level To replace the post-tension strand on levels (3rd floor, 10th floor & roof) OK for field review per City staff: · $130,000
no contractor listed Issued -
2018-05-11
#1100 - Interior alterations to a portion of the 11th floor for this existing entire 11th floor office tenant to provide tenant improvements. Refer to BP-2018-01511 for fees Ok for Field Review as per City staff
no contractor listed Issued -
2018-05-11
#1000 - Interior alterations to a portion of the 10th floor for this existing entire 10th floor office tenant to provide tenant improvements. Refer to BP-2018-01511 for fees Ok for Field Review as per City staff
no contractor listed Issued -
2018-05-11
#500 - Interior alterations to a portion of the 5th floor for this existing entire 4th floor office tenant to provide tenant improvements. Refer to BP-2018-01511 for fees Ok for Field Review as per City staff
no contractor listed Issued -
2018-05-11
#400 - Interior alterations to a portion of the 4th floor for this existing entire 4th floor office tenant to provide tenant improvements. Ok for Field Review as per City staff · $20,000
no contractor listed Issued -
2017-07-19
Interior alterations to provide elevator upgrades to four (4) elevators in this existing 13-storey office building on this site for CSA-B44-07 upgrade. Scope of Work: - Installation of automatic emergency elevator recall - Replacement of elevator motors - Replacement of elevator controls - Replacement of elevator car interiors Building Review Branch Notes: 1. Related Electrical Permit EP-2017-05393. 2. Fire Safety Plan and or Operations Manual to be updated to show alterations. Plans to be submitted to Fire Prevention office for approval. Evacuation plans for occupants to be updated. Revision#1 - Revise Work Description to have correct building height - Aug. 15, 2017, J. Chen Revision#2 - Reduce scope of work to include only three passenger elevators - Sep 1, 2017, J. Chen Revision#3 - Expand scope of work to include parking elevator - Dec 12, 2017, J. Chen · $1,000,000
Sasco Contractors Ltd Issued -
2017-01-11
(5th & 6th Floor) Interior alterations for structural repairs (replacement of post-tensioning strands within the concrete slabs) on the 5th and 6th floors (general office) of this existing mixed-use commercial building. OK for field review as per City staff(OK for multiple permits open for the floors also), November 23, 2016. Note: · $150,000
Vector Construction Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05