Permit GopherAlberta and B.C. property, permit and zoning records

858 Beatty St, Vancouver

An address in Downtown, Vancouver, zoned CD-1 (324) (Comprehensive Development). 22 building permits are on file, most recently “95 Smithe St Interior alterations to change the use from Retail to Barber Shop or Beauty …” (issued 24 June 2026). The City's 2026 assessed value is $148,961,000.

Zoning
CD-1 (324) · Comprehensive Development
Neighbourhood
Downtown
Permits on file
22
Assessed value (2026)
$148,961,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 858 Beatty St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154000, 3,103 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
3,103
Households
1,815
Median age
34
Median household income (2020)
$83,000
Own their home
39%
Vancouver: 45%
Average household size
1.7
Under 15
8%
65 and over
6%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-06-24 95 Smithe St Interior alterations to change the use from Retail to Barber Shop or Beauty Salon on the ground level of this existing commercial building on this site. Scope of work includes new partition walls, plumbing fixtures and electrical. · $63,000
    no contractor listed
    Issued
  2. 2025-11-24 Interior demolition to this existing Retail Space on the P1 level of this existing commercial building on this site. OK to process as DTI as per City staff · $42,000
    AD Projects Inc
    Issued
  3. 2023-07-26 #501 - 5th floor (#501 & #550 combining) Interior alterations to the 5th floor to combine #501 & #550 (retaining #501) and provide improvements for a new full floor office tenant in this existing commercial building. Scope of work: remove portion of retaining wall, remove/construct partition walls, doors, millwork, finishes, lighting, HVAC, electrical, mechanical, plumbing and mechanical work. TENANT: Visier · $2,800,000
    PB Management Group Inc
    Issued
  4. 2022-06-02 Building Permit for DP-2021-00565 Bldg 1 - 893 & 889 Expo Blvd Existing veterinary clinic(893 Expo blvd) expansion to adjacent space (889 Expo blvd).Interior alterations to remove the interior partition wall between 893 & 889 Expo Blvd, thereby changing the use of 889 Expo Blvd from fitness centre to animal clinic, creating one large space for the existing animal clinic (Yaletown Pet Hospital) at 893 Expo Blvd, and to add approximately 474.00 sf of mezzanine floor area, in this existing commercial building on this site. Scope of work includes new HVAC distribution, new electrical distribution, and new sprinkler system to existing and new space. Note: Application is processed under VBBL 2019. · $600,000
    no contractor listed
    Issued
  5. 2021-08-10 #210 - 2nd Floor Interior alterations to provide tenant improvements for a new office tenant on the 2nd floor (#210) in this existing commercial building. Work to include new walls, glazing partitions, doors, millwork and ceiling. TENANT: Sotheby's International Reality Canada E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) DBI to confirm if Sprinkler Permit is required Okay for field review per City staff · $180,580
    Counterpoint Interiors Inc
    Issued
  6. 2020-08-27 Exterior alterations only to provide for the removal and replacement of six (6) antennas, and three (3) future antenna installations at the rooftop of this existing commercial building for Freedom Mobile. Exterior alterations for the removal and replacement of antennas and future antenna installations accepted by Hamid Shayan, August 11, 2020. OK for SIPS processing as per City staff. · $150,000
    Highlight Pacific Construction ltd
    Issued
  7. 2020-02-13 893 Expo Blvd Interior alterations to provide improvements in the exam room in this existing animal clinic. Scope of work: remove interior walls, create one new exam room #4 Ok for Field Review as per City staff · $15,000
    Everlast Construction Inc
    Issued
  8. 2019-08-21 #220 - 2nd floor Interior alterations only to provide improvements for a new General Office tenant on the 2nd floor (#220) at this existing commercial building. Scope of work: remove/construct partition walls, glazing, doors, for 2 phone booth rooms, 1 meeting room, collaboration room and storage room, relocate lighting, ceiling work, finishes, new power/data, electrical, mechanical and sprinkler work. TENANT: Visier Solutions Inc. · $200,000
    Fusion Project Management Ltd
    Issued
  9. 2019-08-12 #501 - 5th Floor Interior alterations to provide tenant improvements for this existing office tenant on the 5th floor (#501) in this existing mixed use building. Scope of work: remove/construct several partition walls, doors, ceiling work, new lighting, card reader, electrical and mechanical work TENANT: West Fraser Timber Co. Ltd · $130,000
    no contractor listed
    Issued
  10. 2019-07-02 RETRACTABLE CANOPY Exterior alterations only to this existing restaurant building to provide a retractable canopy with aluminum structure. OK for DB as per City staff. Tenant: Boston Pizza Rev #1 - accepted Dec.2/19 - To remove exit signage from convenience gate on the exterior patio. · $150,000
    no contractor listed
    Issued
  11. 2018-12-13 Exterior renovation to validate the WWOP exterior patio seating to this existing Class-1 restaurant. Notes: 1. Permit related to BP-2018-01482. 2. Proposed occupant load (interior and exterior): 277 3. Any increase in occupant load/seating to the interior or exterior seating requires further review of the VBBL and may require additional washrooms.
    no contractor listed
    Issued
  12. 2018-12-05 #200-2nd floor Interior alteration to provide improvements to suite #200 on the 2nd floor for an existing tenant in this existing commercial building on this site. Scope of work: demolish partition walls, remove millwork, door, cap sink, construct new partition walls, glazing, doors, electrical, mechanical, plumbing and sprinkler work to add more offices/workstations, remove storage room and relocate coffee area. TENANT: McElhanney · $28,000
    no contractor listed
    Issued
  13. 2018-08-03 Interior alteration to alter floor layout, including existing kitchen and bar, in this existing one storey and mezzanine restaurant building for a new tenant. Note: 1- Class -1 Cooking operation 2- Occupant load including outside seating and staff is 277- person. Revision-1, October 16, 2018 Modification to floor layout and the cooking equipment. · $900,000
    no contractor listed
    Issued
  14. 2018-03-09 To erect and install 1 - 10' x 50' and 1 - 8' x 30' tents for the VIP patio for the Rugby 7's event for a limited period of time expiring March 12, 2018. · $1,070
    no contractor listed
    Issued
  15. 2017-09-07 #550 - 5th floor Interior alterations to provide improvements for a new tenant at this existing general office on the fifth floor (#550) of this existing commercial building on this site. Scope of work: new partition walls, glazing, doors, millwork, reflective ceiling, card reader with electric strike, finishes, electrical, plumbing and sprinkler to suit new layout. TENANT: Visier Solutions Inc. (Main reception-#400) OK for field review per City staff. · $270,000
    Fusion Project Management Ltd
    Issued
  16. 2017-09-07 #400 - 4th floor (full floor) Interior alterations to provide improvements for a new general office tenant on the entire fourth floor (#400) of this existing commercial building on this site. Scope of work: new partition walls, glazing, doors, millwork, reflective ceiling, card reader with electric strike, finishes, electrical, plumbing and sprinkler to suit new layout. TENANT: Visier Solutions Inc. (Main reception-#400) OK for field review per City staff. · $480,000
    Fusion Project Management Ltd
    Issued
  17. 2017-07-14 Interior alterations for the interconnected stairs only between the 2nd and 3rd storey. Note: 1. Proposed stairs are for convenience only and not to be used as a means of egress. 2. Related Alternative Solution: AL-2017-00113 · $150,000
    no contractor listed
    Issued
  18. 2017-07-12 #400 and #550 - 4th and 5th floors Interior alterations to provide for demolition only of interior partitions walls for this existing General Office tenant on the entire 4th floor (#400) and part of the 5th floor (#550) this existing commercial building. Separate permit required for future tenant improvements. OK for SIPS processing as per City staff. · $26,000
    Fusion Project Management Ltd
    Issued
  19. 2017-06-20 850 Beatty Street - ground floor Interior alterations to provide tenant improvements for a new office tenant at 850 Beatty Street on the ground floor of this existing commercial building on this site. Scope of work: demo and construct partition walls, electrical, sprinklers, reflective ceiling , and finishes for new layout. OK for field review per City staff. Energy trigger chosen; L2 - LIghting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $150,000
    no contractor listed
    Issued
  20. 2017-05-09 (#200-3rd floor) Interior alterations to provide improvements for a new office tenant at #200 on the third floor (Main reception at #200-2nd floor) of this existing commercial building on this site. Full floor renovation. OK for field review per City staff. Related to BP-2017-01241 alterations to 2nd floor Related to BP-2017-01605 interconnecting stair Schedules submitted: · $1,800,000
    no contractor listed
    Issued
  21. 2017-05-09 (#200-2nd floor) Interior alterations for a new office tenant and to combine units #260, #270 and #290 creating #200 (to be interconnected with office space on 3rd floor) on the second floor of this existing commercial building on this site. OK for field review per City staff. Related to BP-2017-01243 alterations to 3rd floor Related to BP-2017-01605 interconnecting stair Schedules submitted: · $150,000
    no contractor listed
    Issued
  22. 2017-02-27 2nd floor common washroom Interior alterations only to add one additional shower stall in the common men's washroom on the second floor of this existing commercial building on this site. · $130,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

347 W Pender St
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc
2026-10-30
180 Keefer St
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd
2026-10-30
885 W Georgia St
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.