Permit GopherAlberta and B.C. property, permit and zoning records

815 W Hastings St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 34 building permits are on file, most recently “#810 - 8th floor Interior alterations to provide improvevments for this existing office t…” (issued 8 June 2026). The City's 2026 assessed value is $42,798,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
34
Assessed value (2026)
$42,798,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 815 W Hastings St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153466, 693 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
693
Households
375
Median age
32.8
Median household income (2020)
$74,000
Own their home
39%
Vancouver: 45%
Average household size
1.7
Under 15
4%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-06-08 #810 - 8th floor Interior alterations to provide improvevments for this existing office tenant on the 8th floor (unit #810) of this existing commercial building on this site. Scope of work: interior demolition to alter layout including, new interior partitions walls, relocation of exisitng door/frames, glazing, finishes. Electrical, Mechanical, Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $79,327
    Reotech Construction Ltd
    Issued
  2. 2026-06-01 Interior alterations to provide tenant improvements to this existing retail space for a new Retail Limited Food tenant on the ground floor of this existing commercial building on this site. Ok for field review as per City staff(s) will be required for any future tenant improvements to either suite. · $19,500
    no contractor listed
    Issued
  3. 2026-04-30 #510 - 5th floor (demise into #510 & #540) Interior alterations on the 5th floor to demise the existing office #510 into two units to be #510 and #540 and to provide tenant improvements only to suite #510 in this existing commercial building on this site. Scope of work: Construct a demising wall to create 2 suites, new partitions for new offices, new suite entry doors, flooring, millwork. Electrical, mechanical/plumbing and sprinkler work to suit. TENANT: HHBG Law Corp · $500,000
    Allspaces Design & Management Ltd
    Issued
  4. 2025-09-18 #401 & #425 - 4th Floor (T.I to #401) Interior alterations on the 4th floor to demise the existing office space #425 into two units to be #401 and #425 and to provide tenant improvements for suite #401 only, in this existing commercial building on this site. Scope of work: Construct demising wall to create 2 suites, new partition for a new office layout, electrical, mechanical/plumbing and sprinkler work to suit. · $500,000
    no contractor listed
    Issued
  5. 2025-07-11 #310 - 3rd floor Interior alterations to provide improvements for a new tenant to this existing office space on the 3rd floor (#310) of this existing commercial building on this site. Scope of work: Demo/construct walls and doors, new interior finishes, millwork, electrical and sprinkler work to suit TENANT: BC Treaty Commission · $400,000
    no contractor listed
    Issued
  6. 2025-06-16 #730 - 7th Floor Interior alterations to provide tenant improvement to this existing general office for a new tenant on the 7th floor (#730) in this existing commercial building on site. Scope of work: Complete demolition of existing layout and construct to create private offices, pantry, reception, millwork, electrical, plumbing and sprinkler work to suit. TENANT: Vohora LLP · $400,000
    no contractor listed
    Issued
  7. 2025-03-10 #725 - 7th floor - expanding into a portion of #730 Interior alterations to provide improvements for this existing office tenant space on the the 7th floor, unit #725 to expand into a portion of #730 in this existing commercial building on this site. Scope of work: demo demising wall, and partitions in the expanded area. construct new demising wall and new partitions for 5 offices, new egress door, RCP, millwork, finishes. Electrical and sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $100,000
    Reotech Construction Ltd
    Issued
  8. 2025-01-31 #905 - 9th Floor Interior alterations to provide improvement to this existing general office on the 9th floor (#905) of this existing commercial building on site. Scope of work: Construct new interior partitions for new offices, new millwork, new kitchen, electrical, plumbing and sprinkler work to suit. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $270,000
    Syncor Solutions Limited
    Issued
  9. 2024-07-26 #801 - 8th floor Interior alterations to provide improvements to an existing office space on the 8th floor (#801) of this existing commercial building on this site. Scope of work: remove and construct new partition walls, doors/frames, millwork, finishes for new layout. Electrical, Plumbing, Sprinklers to suit. · $800,000
    no contractor listed
    Issued
  10. 2024-04-23 #900 - 9th floor (demising into #900 and #905) Interior alterations to demise the 9th floor into two units to be #900 and #905 and provide tenant improvements to unit #900 only for a new office tenant in this existing commercial building on this site. Scope of work: demise walls, and minor demo to mostly shell space in #900 only to include new partition walls, doors/frames, millwork, finishes. Electrical, mechanical/plumbing, sprinklers to suit. · $850,000
    no contractor listed
    Issued
  11. 2023-05-18 #600 & #650 - 6th Floor (T.I to #600) Interior alterations on the 6th floor to demise the existing office (vacant) space #600 into two units to be #600 and #650 and to provide tenant improvements for a new tenant to suite #600 only, in this existing commercial building on this site. Scope of work: Construct demising wall to create 2 suites, new partition walls to build meeting rooms, storage, glazing, new door, millwork, electrical, plumbing and sprinkler work to suit. REVISION #1: Minor layout changes includes demo of floor finish and existing ceiling at entry, revised library millwork and lighting layout, remove copy/print door, sink location revised/deleted, wall addition to south of meeting room 607. See detailed list on the Revision form. - Sept 29/23 - LLL TENANT: M Moser Associates Inc · $490,000
    no contractor listed
    Issued
  12. 2023-04-27 #701 - 7th floor (demised from #700 & change #700 to #730) Interior alterations to the 7th floor to demise the existing office space in #700 into two units (to be #730 & #701) and to provide improvements to #701 only in this existing commercial building. Scope of work: new demising wall, and improvements to #701 only. Remove existing door, frame, hardware, & auto door opener. Replace door hardware to match existing. Remove and replace carpet and vinyl flooring throughout. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $65,000
    Reotech Construction Ltd
    Issued
  13. 2022-12-15 #725-7th floor Interior alterations to provide tenant improvements to a portion of of this existing office tenant space on the 7th floor (#725) of this existing commercial building. Scope of work: Install interior walls & doors, plumbing fixtures, sprinkler, and electrical work. OK for field review as per City staff. Energy upgrade exempt: BOMA best Building · $90,000
    Reotech Construction Ltd
    Issued
  14. 2022-11-25 Interior alterations to provide tenant improvements to this existing retail space for a new retail tenant on the ground floor of this existing commercial building. Scope of wall: Removal of an interior wall and door, dropped ceiling bulkhead, sink faucet and all related plumbing fixtures w cap to finish · $8,000
    Reotech Construction Ltd
    Issued
  15. 2022-02-22 #725 - 7th Floor Interior alterations to remove all interior partition walls from this existing office space on the 7th floor (#725) to create a one shell space for future tenant in this existing commercial building. Scope of work per VBBL 2019: remove all partition walls, doors, ceiling work, glazing, millwork, electrical, plumbing and sprinkler work. Separate permit is required for any future tenant improvement or to change the use. OK for Field Review per City staffY UPGRADES ARE REQUIRED Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $55,000
    Reotech Construction Ltd
    Issued
  16. 2021-12-20 #600 - 6th Floor (#600 & #630 combined) Interior alterations to combine #600 and #630 (retaining #600) and the demolition of non load-bearing partition walls on the 6th floor (#600) to create a "shell" office space. Scope of work: remove demising wall and all interior partition walls and doors. Energy upgrade exempt: Interior demolition. Separate permit(s) will be required for any tenant improvements to this space. OK for Field Review per City staff; Nov 10, 2021 · $175,000
    Reotech Construction Ltd
    Issued
  17. 2021-12-15 #305 - 3rd floor Interior alterations to the 3rd floor to combine office units #301 and #305 (retaining #305) and return to base building in this existing commercial building. Scope of work: remove demising walls and select interior partition walls and finishes, electrical, plumbing and sprinkler work. Separate permits required for tenant improvements to this space. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for Field Review per City staff(Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $95,000
    Reotech Construction Ltd
    Issued
  18. 2021-06-17 Ground Floor - 817 W Hastings Interior alterations to provide improvement to a new tenant and change of use of 2319 sq. ft. of office space to a health care office on the Ground Floor of this existing commercial building. · $190,000
    no contractor listed
    Issued
  19. 2021-03-10 Ground floor Interior alterations to this existing office on the ground floor level to provide tenant improvements for an open concept office space in this existing commercial building on this site. Scope of work includes: to remove interior partition walls, doors, flooring, sprinkler head relocation, millwork, electrical Separate permit required for any future tenant improvement Related Permits: SP-2021-00312 & EP-2021-00873 · $45,000
    Reotech Construction Ltd
    Issued
  20. 2019-12-17 #425-4th floor (full floor) Interior alterations only and to provide for the expansion of the existing General Office use at unit #425 into the existing General Office tenant space at unit #401, and retaining unit #425 at this existing commercial building. Validation of removal of demising walls (previous work without permit) to become a full floor tenant space. Scope of work per VBBL 2019: remove wall, carpet and floor finishes, replace furniture, new finishes, electrical work. TENANT: Vancouver City Savings Credit Union. OK to accept the removal of the two (2) demising partitions as a retroactive scope of work as per City staff. This is now a full floor tenant space. OK for field review and district building inspector to determine if a sprinkler permit would be required as per City staff. Energy Upgrade Selected: L2 - Lighting - Upgrade to Restricted to Manual ON (per City staff.4.1.1.(b) of ASHRAE 90.1-2016). · $10,000
    Eyford Construction Ltd
    Issued
  21. 2019-07-11 #205-2nd floor Interior alterations to provide tenant improvements for a new General Office use at unit #205 at this existing commercial building. Scope of work: remove and alter a portion of corridor wall and door to modify entrance, add kitchen and add new partitions to alter layout. TENANT: Arris Design Ltd. OK for field review as per City staff. Energy upgrade exemption: BOMA BESt · $40,000
    Reotech Construction Ltd
    Issued
  22. 2019-06-25 LOBBY ON GROUND FLOOR W/ UNIT ADDRESS CHANGES Exterior and interior alterations to relocate the lobby entry doors to the front near building facade to expand the lobby area. Scope of work includes a new hose bib at the front. OK for DB as per City staff. OK without new vestibules as per City staff. · $85,000
    Allspaces Design & Management Ltd
    Issued
  23. 2019-05-27 #900-9th floor (full floor tenant) Interior alterations to provide improvements to this office unit #900 (full floor tenant) on the 9th floor in this existing commercial building on this site. Scope of work: demolish partition walls, remove doors, construct new partition walls, doors, millwork, finishes, card reader, power/communication, replace lighting, mechanical, electrical, plumbing and sprinkler work to accommodate a new lounge and a few rooms and replacing furniture. TENANT: Vancouver City Savings Credit Union (Vancity) · $200,000
    Eyford Construction Ltd
    Issued
  24. 2019-05-27 #510-5th floor (full floor tenant) Interior alterations to provide improvements to this office unit #510 (full floor tenant) on the 5th floor in this existing commercial building on this site. Scope of work: demolish partition walls, remove doors, construct new partition walls, doors, millwork, finishes, card reader, power/communication, mechanical, electrical, plumbing and sprinkler work to accommodate more open office workstations and new furniture layout. TENANT: Vancouver City Savings Credit Union (Vancity) · $200,000
    Eyford Construction Ltd
    Issued
  25. 2019-05-14 #300 - 3rd floor Interior alterations to provide tenant improvements for a new office tenant on the 3rd floor (#300) of this commercial building on this site. Scope of work: remove/construct partition walls, doors, glazing, new staff kitchen, millwork, finishes, ceiling work, power & data, electrical, plumbing and sprinkler work. TENANT: Rio Tinto Exploration Canada Inc. OK for field review per City staff: 1. Related to BP-2019-01660 for demising to create this unit 2. No energy trigger required; BOMA BESt building Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work · $175,000
    Reotech Construction Ltd
    Issued
  26. 2019-05-14 #300 & 310-3rd floor *tenant improvement work to #310 only Interior alterations to divide this existing office unit #300 into two units (to be #300 & #310) and provide improvements to newly demised #310 on the 3rd floor in this existing commercial building on this site. Scope of work: remove a suite entry door and sidelite and replace with demising wall, remove another suite entry door, construct demising wall, new partition walls, doors, glazing, millwork, finishes, ceiling work, power/data, card reader/electric strike, electrical, plumbing and sprinkler work. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to these suites. TENANT: InMed Pharmaceuticals Inc. · $300,000
    Reotech Construction Ltd
    Issued
  27. 2019-04-18 #801-8th floor Interior alterations only to provide improvements for a new General Office tenant at unit #801 including the expansion into a portion of #810 in this existing commercial building. Scope of work: demolish demising walls (including unapproved demising wall creating #805), partition walls, remove doors, t-bar ceiling and lighting, change door swing, change entry to glass double doors, remove millwork, infill wall (remove entry door to unapproved #805), construct new demising wall (expanding into a portion of #810), new partition walls, doors, glazing, millwork, electrical, plumbing and sprinkler work. REVISION #1-Replace lost drawings (p.6 and p.7), interior layout changes (p.3, 5, 6 and 7). ASHRAE reviewed. No change in value. This revision also includes BP-2019-01067 as both units are affected. June 20, 2019 jm TENANT: Login Radius Inc. · $50,000
    applicant withheld (individual)
    Issued
  28. 2019-04-18 #810-8th floor Interior alterations only to provide improvements for a new General Office tenant at unit #810 (reducing in size) at this existing commercial building. Scope of work: demolish partition walls, remove t-bar ceiling and lighting, remove millwork, doors, construct new partition walls, doors, glazing, millwork, electrical, plumbing and sprinkler work. See REVISION #1 dated June 20, 2019 under related BP-2019-01068. jm TENANT: Login Radius Inc. · $25,000
    applicant withheld (individual)
    Issued
  29. 2019-02-04 #305 - 3rd floor To provide interior non load-bearing demolition to existing office space to consolidate unit #305 & (#320) into a single office space on the 3rd floor on the 3rd floor of this existing commercial building. Scope of work includes : demolish/construct new partition walls and doors (validate), finishes, relocate lighting and diffusers, relocate sink, electrical, plumbing, mechanical and sprinkler updates. REVISION #1: Reduce scope of work to demolish one wall and a couple of furniture walls only. · $200,000
    Eyford Construction Ltd
    Issued
  30. 2018-12-18 2nd and 8th floors - Common corridors and washrooms Interior alterations to provide improvements for the common washrooms and corridors on the 8th floor of this existing commercial building on this site. *see REVISION #1 below now including the 2nd floor REVISION #1-Scope of work increased and plans submitted to provide new ceiling and lighting on the 2nd floor (OK per City staff). Increase in value of $15,000 and ASHRAE reviewed. Feb.25/19 jm OK for field review per City staff. Note: No energy trigger required; BOMA BESt building · $140,000
    Reotech Construction Ltd
    Issued
  31. 2018-09-27 #205-2nd floor Interior alterations to demolish all non load bearing partition walls to create shell space for future tenant on the 2nd floor (#205) of this existing commercial building on this site. Scope of work; demolish/remove partitions, counter, double sink, millwork, finishes, electrical. (note; this unit was a staff lunch room for unit #250) Separate permit(s) and ASHRAE checklist required for future tenant improvements. Interior demolition only: ASHRAE not required. OK for SIPS processing as per City staff. · $8,000
    Reotech Construction Ltd
    Issued
  32. 2018-09-04 #700 Interior renovation for this existing office tenant in suite #700 in this existing commercial building on this site. Okay for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $275,000
    Eyford Construction Ltd
    Issued
  33. 2017-11-24 #300 & Common Washrooms/Corridors -3rd floor Interior alterations to this vacant office space on the 3rd floor (#300) in this existing commercial building on this site. Work to include widening the corridor and renovating common washrooms. Scope of work includes demolition of partition walls and glazing, removal of doors, flooring, millwork, sinks and faucets, electrical, plumbing and sprinkler work. New partition walls, glazing, millwork, finishes, lighting, relocate suite entry doors. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to #300. Okay for field review as per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $90,000
    Reotech Construction Ltd
    Issued
  34. 2017-10-26 Including the Operational Letter dated September 27, 2017, submitted by Jed Grieve, CEO Cook Culture, to provide exterior and interior alterations for existing retail tenant, "Cook Culture", scope of work to include an ancillary Retail-Ltd Service Food (smoothie bar), ancillary School Self-Improvement (cooking classes) in the new demonstration kitchen and the installation of a commercial ventilation system. Class-1 Cooking operation. Note: Smoothie bar shall have maximum of 16 seats at any time and demonstration kitchen shall have maximum of 25 people(including staff and trainees). Exterior alterations & ancillary School SI cleared for DB per City staff · $350,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.