Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
788 Beatty St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 12 building permits are on file, most recently “#307 - 3rd floor (#307 & #311 combined) Interior alterations to provide improvements to t…” (issued 12 January 2026). The City's 2026 assessed value is $15,449,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154000, 3,103 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-01-12
#307 - 3rd floor (#307 & #311 combined) Interior alterations to provide improvements to this existing office space on the 3rd floor (#307) of this existing commercial building on this site Scope of work: validate work done by others to consolidate #307 and #311 into one unit (#307) and demo and construction of partition walls to alter layout. * per VBBL 2025 * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $20,000
no contractor listed Issued -
2024-02-16
no exterior/interior alterations proposed to increase the occupancy of this existing school to maximum two hundred and ten (210) students and twenty (20) staff. O.K. for Field Review by Shawn Dyste Related to DP-2023-00608 · $1,000
no contractor listed Issued -
2023-01-06
Exterior alterations to repair the facade for safety at this existing commercial building on this site. · $86,000
no contractor listed Issued -
2022-06-15
Interior alterations and to change the use of approximately 9,585.00 sq. ft. from School – Arts or Self-Improvement to School – Elementary/Secondary in this existing mixed-use building on this site. Tenant: The Westside School · $1,800
no contractor listed Issued -
2022-04-04
#404 - 4th floor Interior alterations to this existing office tenant on the 4th floor (#404) in this existing commercial building on this site. Scope of work: remove/construct partition walls, glazing, doors, T-bar ceiling, new staff kitchen, millwork, lighting, finishes, electrical, plumbing and sprinkler work. E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) Ok for Field Review per City staffth your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $300,000
Concrete Cashmere Ltd Issued -
2021-10-01
#304 - 3rd floor Interior alterations to provide tenant improvements for a new office tenant on the 3rd floor (#304) in this existing commercial building on this site. Scope of work: remove all walls, doors, lighting, HVAC vent & diffuser, finishes, millwork for new open floor plan. Construct partition walls/doors for one meeting room, two telephone rooms, kitchenette, electrical, plumbing and sprinkler work. Ok for Field Review per City staff · $150,000
no contractor listed Issued -
2021-09-29
#200 & #201 - 2nd floor Interior alterations to provide improvements for a new office tenant on the 2nd floor (#200 and #201) in this existing commercial building on this site. Scope of work: demo/construct new partition walls, doors, t-bar ceiling, HVAC, & lighting. TENANT: Vancouver Whitecaps FC LP · $100,000
Concrete Cashmere Ltd Issued -
2021-08-17
Interior alterations and a change of occupancy from production studio (F2) to fitness centre (A2) in this existing 4 storey mixed use building. the scope of work would be classified as a change of major occupancy to a small suite/small suite renovation with applicable upgrades of F1, S1, N1, A1, E2. to be reviewed under the 2019 VBBL. · $40,000
no contractor listed Issued -
2019-06-10
#302 - 3rd floor Interior alterations only to provide improvements for a new General Office tenant at unit #302 at this existing commercial building. Scope of work: remove partition walls/doors, flooring & baseboards, ceiling fixures, T-Bar ceiling, millwork and plumbing fixtures, construct new partition walls/doors for 2 meetings rooms, staff rooms and 2 phone booth rooms, electrical, mechanical, plumbing and sprinkler work. TENANT: Compass Resource Management Ltd. · $73,000
no contractor listed Issued -
2019-06-10
#200 - 2nd floor Interior alterations only to provide improvements for a new General Office tenant on the 2nd floor (#200) at this existing commercial building. Scope of work: remove/construct flooring & baseboards, bulkhead, ceiling fixtures, lighting, T-Bar ceiling, finishes, appliances, electrical, plumbing, mechanical and sprinkler work. REVISION #1: Remove sprinklers from mechanical drawings. Oct. 9, 2019 mlh · $222,000
no contractor listed Issued -
2019-04-04
#308-3rd floor Interior alterations to provide improvements for this existing office tenant at office unit #308 on the 3rd floor of this commercial building on this site. Scope of work: demolish/construct partition walls, new glazed door, electrical work. TENANT: Stage 3 System OK for field review per City staff: 1. Building inspector to determine on site is a separate sprinkler permit is required. 2. Energy trigger chosen; L2 - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $17,500
Fair Trade Work Ltd Issued -
2018-12-14
Interior alteration for an elevator upgrade to meet the CSA-B44 standards to this existing 4-storey commercial building. · $200,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc2026-10-30
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd2026-10-30
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.2026-10-30