Permit GopherAlberta and B.C. property, permit and zoning records

700 W Pender St, Vancouver

An address in Downtown, Vancouver, zoned CD-1 (455) (Comprehensive Development). 83 building permits are on file, most recently “#400 - 4th floor - consolidate #401, #405, #410 into one unit. Interior alterations to th…” (issued 24 September 2026). The City's 2026 assessed value is $119,177,000.

Zoning
CD-1 (455) · Comprehensive Development
Neighbourhood
Downtown
Permits on file
83
Assessed value (2026)
$119,177,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 700 W Pender St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154146, 1,156 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,156
Households
490
Median age
37.6
Median household income (2020)
$74,000
Own their home
32%
Vancouver: 45%
Average household size
1.6
Under 15
3%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-09-24 #400 - 4th floor - consolidate #401, #405, #410 into one unit. Interior alterations to the 4th floor to consolidate #401, #405, #410 into a full floor office space (to be #400) in this existing commercial building on this site. Scope of work: demo entire floor to shell, construct new partitions, doors/frames, millwork, finishes for new layout. Electrical, mechanical/plumbing, and sprinklers to suit. · $800,000
    no contractor listed
    Issued
  2. 2026-06-30 Level 1 - Main Lobby Interior alterations by the landlord to provide cosmetic upgrade and some electrical work to the existing ground/main floor elevator lobby of this existing commercial building on this site. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $425,000
    Gibraltar Holdings Ltd
    Issued
  3. 2026-06-30 Level 1 - Main Lobby Interior alterations by the landlord to provide cosmetic upgrade and some electrical work to the existing ground/main floor elevator lobby of this existing commercial building on this site. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $425,000
    Gibraltar Holdings Ltd
    Issued
  4. 2026-06-18 #301 - 3rd Floor Interior alterations on the 3rd floor to demise the existing office suite #301 into 2 units to be #301 and #306 and to provide tenant improvements in this existing mixed use commercial building. Scope of work: Construct a demising wall to create 2 separate suites, selective demo of existing partitions, new interior walls and doors to alter layout. · $40,000
    no contractor listed
    Issued
  5. 2026-06-01 #201 - demising into 4 units (to be #210, #220, #260, #270) Interior alterations to provide landlord improvements to this vacant office spaces on the 2nd floor to demise unit #201 into 4 units (to be #210, #220, #260, #270) of this existing commercial building. Scope of work: demo all partition walls to shell and construct new demising walls to demise into 4 units, new partitions in units #260 and #270 only, door/frames, millwork, finishes. Electrical, mechanical/plumbing, sprinklers to suit. * All work to be in accordance with VBBL 2025 · $950,000
    no contractor listed
    Issued
  6. 2026-06-01 #700 & #705 - 7th floor Interior alterations to provide landlord improvements to these vacant office spaces on the 7th floor (unit#700 & #705 only) of this existing commercial building. Scope of work: remove and replace demising wall in same location, demo all parititon walls to shell and construct all new partitions, door/frames, millwork, finishes. Electrical, mechanical/plumbing, sprinklers to suit. * All work to be in accordance with VBBL 2025 · $750,000
    no contractor listed
    Issued
  7. 2026-06-01 16th floor - #1602 and #1604 Interior alterations to provide landlord improvements for the existing vacant office spaces on the 16th floor (units #1602 & #1604) to prepare for leasing, in this existing commercial building on this site. Scope work: demo to shell including demising and corridor wall and construct new demising, partitions, door/frames, millwork, finishes. Electrical, Plumbing & Sprinklers to suit. * All work in accordance with VBBL 2025. · $750,000
    no contractor listed
    Issued
  8. 2026-06-01 14th floor (#1400, #1406 & #1408 re-demising into 3 new units and changing to #1410, #1420, 1430) Interior alterations to provide improvements to this existing vacant office space on the entire 14th floor (#1400, #1406, #1408) of this existing commercial building on this site. Scope of work: demo to shell and re-demise into 3 new units (to be #1410, #1420, & #1430) * In accordance with VBBL 2025 · $800,000
    no contractor listed
    Issued
  9. 2026-02-09 #1205 - 12th floor Interior alterations to provide improvements to this existing office space on the 12th floor (#1205) of this existing commercial building. Scope of work: demo to shell, new partition walls, doors/frames, millwork finishes. Electrical, plumbing, sprinklers to suit. In accordance with VBBL 2025 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and · $128,000
    no contractor listed
    Issued
  10. 2026-02-06 #804 - 8th floor Interior alterations to provide improvements to this existing office space on the 8th floor (#804) of this existing commercial building. Scope of work: demo to shell, new partition walls, doors/frames, millwork finishes. Electrical, plumbing, sprinklers to suit. In accordance with VBBL 2025 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and · $134,000
    no contractor listed
    Issued
  11. 2026-02-06 #1105 - 11th floor Interior alterations to provide improvements to this existing office space on the 11th floor (#1105) of this existing commercial building Scope of work: demo to shell, new partition walls, doors/frames, millwork finishes. Electrical, plumbing, sprinklers to suit. In accordance with VBBL 2025 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $125,000
    no contractor listed
    Issued
  12. 2026-02-06 #820 - 8th floor Interior alterations to provide improvements to this existing office space on the 8th floor (#820) of this existing commercial building Scope of work: demo to shell, new partition walls, doors/frames, millwork finishes. Electrical, plumbing, sprinklers to suit. In accordance with VBBL 2025 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $216,000
    no contractor listed
    Issued
  13. 2026-02-06 #302 - 3rd floor Interior alterations to provide improvements to this existing office space on the 3rd floor (#302) of this existing commercial building Scope of work: demo to shell, new partition walls, doors/frames, millwork finishes. Electrical, plumbing, sprinklers to suit. In accordance with VBBL 2025 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $148,000
    no contractor listed
    Issued
  14. 2026-02-06 #509 - 5th floor Interior alterations to provide improvements to this existing office space on the 5th floor (#509) of this existing commercial building on this site. Scope of work: demo to shell, new partition walls, doors, frames, millwork, finishes & new entrance door.. Electrical, plumbing, & Sprinklers to suit. In accordance with VBBL 2025. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $198,000
    no contractor listed
    Issued
  15. 2026-02-06 #203 - 2nd floor Interior alterations to provide improvements to an existing office space on the 2nd floor (#203 ) of this existing commercial building on this site. Scope of work: demo to shell, new partition walls, doors/frames, millwork, sink. Electrical, plumbing, sprinklers to suit. In accordance with VBBL 2025 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $223,000
    no contractor listed
    Issued
  16. 2025-12-12 #1501 - 15th floor (combine #1501 & #1505) Interior alterations to the 15th floor for this existing office tenant in #1501 to expand into #1505 (retain #1501) to become a full floor tenant in this existing commercial building on this site. Scope of work: opening made in two demising walls. * VBBL 2025 *District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $30,000
    Syncor Solutions Limited
    Issued
  17. 2025-11-06 #1700 (#1700 and #1760 combining) Interior alterations to this existing office space to remove a demising wall between #1700 & #1760 (retain #1700) in this existing commercial building Scope of work: remove demising wall and patch and repair as needed. Millwork for new kitchenette in lunch room with sink, dishwasher and fridge. * VBBL 2025 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing · $25,000
    Central West Project Management Inc.
    Issued
  18. 2025-09-22 #507 - 5th Floor (demise into 2) Interior alterations on the 5th floor to demise the existing office into two units to be #507 and #509 in this existing commercial building on site. Scope of work: Construct a demising wall to create 2 suites. TENANT: Blue Start Gold Corp Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $10,000
    Central West Project Management Inc.
    Issued
  19. 2025-05-15 #1103 - 11th floor (combining #1102 & #1103) Interior alterations to existing office space on the 11th floor to combine units #1102 & #1103 ( to retain #1103) in this existing commercial building. Scope of work; to remove a portion of demising wall between #1102 & #1103. * District Building Inspector to determine if a Special Sprinkler Permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $7,000
    Central West Project Management Inc.
    Issued
  20. 2025-04-10 #301 - 3rd Floor Interior alterations to provide improvement to this existing office on the 3rd floor (#301) in this existing commercial building on site. Scope of work: Select demo and construction of partition walls and doors. New finishes, flooring, new sink, electrical and plumbing work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $75,000
    Central West Project Management Inc.
    Issued
  21. 2025-01-10 #800 - 8th floor Interior alterations to provide improvements for an existing office tenant space on the 8th floor (#800) of this existing commercial building. Scope of work: demo to select areas and construction new of partition walls, glazing, doors to alter layout. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $75,000
    no contractor listed
    Issued
  22. 2024-12-11 #1000 - 10th floor Interior alterations to provide improvements to this existing full floor office space on the 10th floor (#1000) of this existing commercial building on this site. Scope of work; demo to select areas. remove of washroom/shower room and partition walls to 4 room to create open area. Patch and repair to match existing. Electrical, plumbing, Sprinkler to suit. Revision #1 - Additional floor plans added for upper floors to show location of floor penetrations for mechanical/fire lines. Feb 5/26 mk · $50,000
    no contractor listed
    Issued
  23. 2024-11-20 #209 Interior alterations to provide improvements to this Office unit #209 on the 2nd floor of this commercial building on this site. Scope of work: Demo of existing wall base, sink and millwork, installation of new rubber base and carpet tile, millwork, dishwasher, sink and faucet, GFCI receptacles, glazing films and interior rolling blinds. Notes: - This building is sprinklered. no sp req'd per City staffth your Building Permit application. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). It is the applicant's responsibility to identify and note all required upgrades on their BP drawings at BP stage. OK for Field Review per City staff · $92,334
    Central West Project Management Inc.
    Issued
  24. 2024-08-01 #610 - 6th Floor (combining to #615) Interior alterations on the 6th floor for a new office tenant to expand unit to #615 (retaining #610) and provide tenant improvements in this existing commercial Building. Scope of work: Remove a portion of the demising wall to create an opening between #610 & #615. REVISION #1: Retain suite #615 instead of #610 AND no changes to the plans. Aug 20/24 - LLL TENANT: EBC Iincorporated Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $2,500
    TotalPlan Inc
    Issued
  25. 2024-07-25 #1101 and #1107 - 11th Floor (demised from #1101) Interior alterations to provide improvements to this existing general office on the 11th floor (#1101) in this existing commercial building on site. Scope of work: Construct a demising wall to create suite #1101 and #1107. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $20,000
    Central West Project Management Inc.
    Issued
  26. 2024-06-05 Interior alterations to replace the existing parkade vestibules doors with glazing units on P1, P3 & P4 level of this existing commercial building on this site. OK to process as DTI as per City staff · $25,000
    Central West Project Management Inc.
    Issued
  27. 2024-04-10 Minor Renovation of #104 - 750 W Pender St Interior and exterior alteration of the existing Restaurant-Class 1 (Tim Horton's) on the first floor of this existing commercial high-rise building. Scope of work includes expansion of the kitchen area and reduction in inside seating area, relocation of existing and installation of new commercial kitchen exhaust hoods and to authorize the outdoor patio seating. Note: 1- The outdoor seating is approved under DE406051. Related BP was not obtained, thus the patio is now validated under this DB 2- Class-2 Cooking operation 3- Reviewed for compliance with VBBL 2019 4- Max Occupant Load (inside seat + outside patio seats + staff) is 50 Persons. · $300,000
    no contractor listed
    Issued
  28. 2024-04-08 #209 - 2nd floor Interior alterations to provide improvements for this existing office tenant on the 2nd floor (#209) of this existing commercial building on this site. Scope of work; new partitions, door/frame to an existing room. new millwork, & flooring. New recessed lights, switches and finishes. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $47,210
    Central West Project Management Inc.
    Issued
  29. 2024-03-27 Voluntary Fire Alarm Upgrade option 1 Scope of Work: - fire alarm renovation to interconnect the fire alarm system in 701 West Georgia building and 700 and 750 Pender building: - Provide fibre optic cable 12 string from 700 and 750 Pender to new DGP located in 701 W. Georgia Mezz. Level communication room. - Provide new remote annunciator panel in security office located in 701 W. Georgia mezz. Level security office. · $40,000
    no contractor listed
    Issued
  30. 2023-06-29 #915 - 9th floor Interior alterations to provide tenant improvements for a new office tenant on the 9th floor (#915) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, millwork, finishes, electrical and sprinkler work. TENANT: Canadian Bar Association of BC OK for Field Review per City staffequired for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $170,000
    Epic Spaces Inc
    Issued
  31. 2022-10-04 #507 - 5th floor Interior alterations to the existing office space on the 5th floor (#507) to provide an accessible washroom in this existing commercial building on this site. · $50,000
    no contractor listed
    Issued
  32. 2022-06-07 #301 - 3rd floor Interior alterations to the existing vacant office space on the 3rd floor (#301) to provide an accessible washroom in this existing commercial building on this site. · $40,000
    no contractor listed
    Issued
  33. 2022-03-21 #1700 -17th Floor (full floor tenant) Interior alterations to provide tenant improvements to an existing office tenant on the 17th floor (#1700) in this existing commercial use building on site. Scope of work: construct new partition walls, new doors, millwork, new shower facility, electrical, plumbing and sprinkler work. REVISION #1: interior layout changes. - No increase in Project Value per applicant. Aug 9, 2022 mlh TENANT: Copper Mountain Mining Corporation · $1,250,000
    Matra Construction Inc
    Issued
  34. 2022-03-01 #510 - 5th floor Interior alterations to provide tenant improvements for a new office tenant on the 5th floor (#510) in this existing commercial building on this site. Scope of work: remove partition walls to create open office area. Repair walls, flooring, ceiling as required. DBI to determine if Sprinkler Permit required. Ok for Field Review per City staff: Western Pacific Enterprises E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1 (a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $6,500
    Central West Project Management Inc.
    Issued
  35. 2021-12-22 #1700 - 17th Floor Interior alterations to provide improvements for a new office tenant on the 17th floor (#1700) of this existing commercial building on this site. Scope of work: remove/construct select partition walls for larger staff kitchen and smaller IT room, millwork, finishes, electrical and sprinkler work. TENANT: Cloud MD Software & Services Inc OK For Field Review per City staffler permit required for proposed sprinkler work. Note: Energy trigger not required BOMA BEST building. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $40,000
    Mainland Office Environments Ltd
    Issued
  36. 2021-10-22 #800 - 8th floor (full floor tenant) Interior alterations to provide tenant improvements for a new full floor office tenant on the 8th floor (#800) in this commercial building on this site. Scope of work: remove/construct partition walls/doors to reconfigure layout including new library, staff kitchen, workstations electrical, plumbing and sprinkler work. REVISION #1: to add washrooms to scope of work. Changes to mechanical and electrical plans and increase project value from $600,000.00 to $640,000.00 Feb 22, 2022 mlh TENANT: GHL Consultants · $640,000
    Fusion Project Management Ltd
    Issued
  37. 2021-08-10 #1101 - 11th floor Interior alterations to provide tenant improvements for this existing general office tenant on the 11th floor (#1101) of this existing commercial use building. Scope of work; Add 1 glass door & sidelight to add privacy to southern portion of office. TENANT: GeoScience BC Society OK For Field Review per City staff: Energy trigger not required BOMA BEST building. Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage · $5,765
    TotalPlan Inc
    Issued
  38. 2021-08-05 #405 - Interior alterations to provide tenant improvements for a new office tenant, (#405) on the 4th floor of this existing 16 storey commercial building. Scope of work includes: alterations to remove existing entrance doors and partition; install a new entrance door from elevator lobby and new glazing partition. Tenant: David Aplin & Associates Inc. OK for Field Review as per City staff. Notes: ~ Energy Upgrade: N/A (BOMA BEST) ~ Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. · $12,000
    Aura Office Environments Inc
    Issued
  39. 2021-07-23 #900/#1003 - 9th and 10th (Full floor tenants) Interior alterations to provide partial tenant improvements for this existing office tenant on the 9th and 10th floors (#900 & #1003) of this existing commercial building on this site. Scope of work: demo and construction of partition walls to select areas of the 9th and 10th floors. Any required new finishing to be consistent with existing. TENANT: Real Estate Council of British Columbia · $250,000
    no contractor listed
    Issued
  40. 2021-07-12 #500 & #600 - 5th and 6th (full floor tenants) Interior alterations to construct new tenant improvements to the office shell spaces on the 5th and 6th floors (#500 & #600) in this existing commercial building on this site. Scope of work: Construct tenant spaces on 5th and 6th floors; interior walls, doors, ceilings, millwork, finishes, lighting, electrical, mechanical, plumbing and sprinkler work. * See BP-2021-01234 for interior demo. TENANT: Real Estate Council of British Columbia Note: Energy trigger not required BOMA BEST building. Note: Energy trigger not required BOMA BEST building. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $1,250,000
    no contractor listed
    Issued
  41. 2021-06-04 18th floor - Mechanical Room Interior alterations to provide a voluntary upgrade to add sprinkler fire protection 18th floor Mechanical room in this existing building on this site. NOTE: no other work, no modification to walls, floors, ceilings. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. OK for Field Review per City staff · $23,000
    Central West Project Management Inc.
    Issued
  42. 2021-06-04 Penthouse level mechanical rooms Interior alterations to provide voluntary sprinkler fire protection to the Penthouse level - mechanical rooms in this existing commercial building. OK for Field Review per City staff · $21,000
    Central West Project Management Inc.
    Issued
  43. 2021-05-07 #500 & #600 - 5th and 6th Full Floors Interior alterations to remove non loadbearing partitions only in this existing General Office space to create open shell space on the 5th and 6th floors (#500 & #600) of this existing commercial building on this site. Scope of work: remove interior partition walls to create open space, electrical and plumbing work. Energy upgrade exempt: Interior demolition NOTE: See related Building Permit BP-2021-01331 for tenant improvements · $100,000
    no contractor listed
    Issued
  44. 2021-01-11 #1501 - 15th floor - 700 W Pender St Interior alterations to provide tenant improvements and expand unit 1501 into unit 1515 to an existing General Office tenant on the 15th floor (#1501) of this existing commercial building on this site. Scope of work: remove partition walls , new partition walls, demolish existing doors, frames, millwork and electrical work. #1515 has been cancelled and is to be removed TENANT: Equinox OK for field review as per City staff: E2 - Lighting - Upgrade to Bilevel Lighting Control (per City staff.4.1.1.(d) of ASHRAE 90.1-2016) NOTE: Building Sprinklered – separate sprinkler permit NOT required. · $40,000
    no contractor listed
    Issued
  45. 2020-11-20 #700 - 7th Floor Interior alterations to the 7th floor to demise the unit #700 into 2 office units (to be #700 and #709) in this existing commercial building on this site. Scope of work includes : Construct new demising wall to create 2 suites and sprinkler work. REVISION #1: Interior layout changes and increase in project value from $18,000 to $30,000. April 12, 2021 mlh TENANT: Gracorp Addressing Note: #709 has been assigned to the newly created space and #700 retained for the remainder space. #700 & #709 are to be posted as shown on the approved plans & clearly visible from the suite entry prior to final inspection. OK for field review as per City staff: BOMA Best This permit was reviewed under the 2019 VBBL during the Covid 19 pandemic. NOTE: Building sprinklered – Sprinkler Permit is required. · $30,000
    no contractor listed
    Issued
  46. 2020-07-10 #700 Interior alterations to demise the existing office unit #700 into two units (#700 & #705) on the 7th floor of this existing commercial building on this site. OK for field review per City staff · $8,500
    Central West Project Management Inc.
    Issued
  47. 2020-06-02 #900 - 9th floor Interior alterations to provide tenant improvements for an existing full floor General Office tenant on the 9th floor (#900) of this existing commercial building. Scope of work: demo two small areas of this floor to convert one existing office into a new accessible washroom and convert an existing copy/production room into a private office. * to also valid minor WWOP ok for Field Review per City staff · $40,000
    BOSTON CONSTRUCTION CORP
    Issued
  48. 2020-05-07 #302 and #303 - 3rd floor Interior alterations to validate work without permit to demise #302 into two offices spaces to be #302 and #303 and to provide tenant improvements to #302 in this existing commercial building. Scope of work: Per the 2019 VBBL to validate demising wall, remove/construct interior partition walls, doors, glazing, finishes, lighting and electrical work. TI work in #302 TENANT: Central West Project Management Inc. Building Sprinklered – Building inspector determined on site a separate sprinkler permit is required OK for Field Review per City staff · $20,000
    Central West Project Management Inc.
    Issued
  49. 2020-04-24 #1003 - 10th floor (full floor tenant) Interior alterations only to provide improvements to this existing General Office tenant in unit #1003, which also includes the expansion into unit #1004 (retaining #1003) in this existing commercial building. Scope of work: per the 2019 VBBL to remove demising wall, interior partition walls and doors and construct new partition walls, doors, millwork, finishes, lighting, power and date, electrical and sprinkler work. TENANT: Real Estate Council of BC. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for field review as per City staff. · $175,000
    BOSTON CONSTRUCTION CORP
    Issued
  50. 2020-03-26 #700 - 7th floor Interior alterations to provide improvements to this existing office tenant space on the 7th floor (#700) of this existing commercial building. Scope of work: to demolish partition walls to existing lunch room and server room to reconfigure to add a new phone room. Tenant: Knightsbridge. District Building Inspector determined a sprinkler permit is required to relocate an existing sprinkler head by the new phone room as per City staff. Selected Energy Upgrade: E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) OK for Field Review per City staff · $60,000
    Syncor Solutions Limited
    Issued
  51. 2020-02-26 Unit #103 Interior alterations to install a new kiosk at unit #103 - 750 W Pender St in the mall of this existing commercial building. OK for field review as per City staff · $6,000
    0373498 BC Ltd
    Issued
  52. 2020-02-25 9th Floor - common lobby/corridor Interior alterations to provide improvements to the common lobby/corridor area on the 9th floor of this existing commercial use building. Scope of work: per the 2019 VBBL to remove and replace all existing finishes (wall, floor and ceiling finishes), millwork, lighting, electrical, plumbing and sprinkler work. Selected Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) OK for Field Review Dec 19, 2019 Processed THRU Fit · $94,200
    Central West Project Management Inc.
    Issued
  53. 2019-11-15 Exterior alterations to add 15 exterior patio seats to this existing Restaurant- Class 1 (Group A2) at Unit 102B on the ground level of this existing mixed-use commercial building. Refer to DB-2018-06054 for tenant improvement. Maximum seats = 84 (69 interior + 15 exterior) A permanent sign indicating the maximum occupant load shall be posted in a conspicuous location. Refer to washroom commitment letter. Permit Amendment #1- 2020-06-29- S.Le Railing style changed from glazing to horizontal cabling. · $22,000
    no contractor listed
    Issued
  54. 2019-11-12 #301 - 3rd Floor Interior alterations to provide tenant improvements for a new office tenant on the 3rd floor (#301) in this existing mixed use commercial building. Scope of work: remove/construct partition walls, doors, glass, millwork, new main glass entry door with sidelite, electrical and plumbing work. TENANT: Cementation Canada (Merit Consultants) OK for Field Review - Oct 7, 2019 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Processed Thru FIT L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $50,000
    Central West Project Management Inc.
    Issued
  55. 2019-08-08 #301 & #303-3rd floor Interior alterations to demise one office suite into 2 new office Suites (#301 and #303) on the 3rd floor of this existing commercial building on this site. Scope of work: construct one small (4'9") demising wall to separate suite #301 into 2 smaller suites, the dividing partition walls to be upgraded to provide smoke separation above the suspended ceiling, electrical and sprinkler work. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to these suites. Okay for field review as per City staffan and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) · $5,000
    Central West Project Management Inc.
    Issued
  56. 2019-08-01 #900-9th floor (full floor tenant) Interior alterations only to provide three (3) new private offices at this existing General Office tenant at unit #900 at this existing Pender Place 2 commercial building. Scope of work: construct new partition walls, glazing, doors, electrical and sprinkler work. TENANT: Real Estate Council of BC OK for field review as per City staff. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $45,000
    Central West Project Management Inc.
    Issued
  57. 2019-04-30 #304 - 3rd floor Interior alterations only to provide improvements for a new General Office tenant at unit #304 at this existing commercial building. Scope of work: remove interior partition walls/doors and glazing, construct new partition walls, doors, millwork, new sink, finishes, electrical and plumbing work. TENANT: Adecco Employment Services Limited OK for field review as per City staff. No energy upgrade required. BOMA BESt building Note: DBI to determine if a sprinkler permit and occupancy permit are required. · $116,240
    TotalPlan Inc
    Issued
  58. 2019-04-18 #1501 - 15th floor Interior alterations to provide tenant improvements for this existing General Office tenant on the 15th floor (#1501) of this existing commercial building on this site. Scope of work: remove partition walls and doors, new partition walls and doors, new glazing, data, millwork and electrical work. Work includes validating some previous work without permit partition walls. TENANT: Equinox Gold-Pamela Kinsman OK for field review as per City staff: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) NOTE: Building Sprinklered – Building inspector to determine on site is a separate sprinkler permit is required. · $120,000
    Syncor Solutions Limited
    Issued
  59. 2019-03-20 #801-8th floor Interior alterations to provide improvements for new office tenant on the 8th floor (unit #801) of this existing commercial building on site. Scope of work: remove partition walls and doors, and new partition wall for new phone room and closet. OK for field review as per City staffing. · $160,000
    Aura Office Environments Inc
    Issued
  60. 2019-02-28 Unit 102B Interior and exterior alterations to provide tenant improvements for new tenant (Tractor Foods) in this existing Restaurant Class-1 (A2) on the ground floor of this existing commercial building. Notes: 1. Outdoor patio seating requires a separate permit. 2. Shared public washrooms with Tim Horton's on the ground floor. 3. Exterior alteration limited to 1 exhaust venting out to lane. 4. Class 1 cooking proposed. 5. Permit related to BP-2018-06142. 6. Maximum allowable occupant load: 100 7. Any increase in seating/occupant load and/or changes to Tractor restaurant and/or to the 3rd floor require further review of the VBBL and may require changes to washroom requirements. Revision #1: Relocating the ecologizer by 2 ft to the north within kitchen, alter reflected ceiling plan, and add extra seating to the interior. P Volpi, Aug. 6, 2019. · $275,000
    no contractor listed
    Issued
  61. 2018-12-07 #102-1st floor Interior alterations to alter layout and create a shell space in the existing Restaurant Class 1 on the ground floor level in the existing highrise commercial building on this site. Scope of work includes removing partition walls, millwork, dropped ceiling features, finishes, perimeter storefront and exterior, plumbing and electrical, sprinkler work. REVISION #1-Keep two partition walls from demolition scope. No change to value or ASHRAE. January 7, 2019 jm Addressing ok per City staff. Energy upgrade exempt: Interior demolition only. OK for Field Review per City staff · $65,000
    Central West Project Management Inc.
    Issued
  62. 2018-11-23 (#100 - Ground Floor) Exterior alterations to provide outdoor patio seating for the Restaurant Class 1 tenant (Starbucks) at this existing commercial building. Building Review Branch Notes: 1. Maximum occupant load is 150 = (92 interior seats + 48 exterior seats + 10 staff) 2. Proposed patio is at grade. · $20,000
    no contractor listed
    Issued
  63. 2018-11-21 #1700 - 17th floor Interior alterations to provide improvements for an existing office tenant on the 17th floor (#1700) of this existing commercial building on this site. Scope of work: new partition walls,doors, HVAC , electrical and sprinkler work for two new offices. Okay for Field Review per City staff · $12,500
    Central West Project Management Inc.
    Issued
  64. 2018-08-30 #1406 Interior alteration to remove 1 non-loadbearing partition wall in this existing office suite #1406 on the 14th floor in this existing commercial building on this site. Okay for field review as per City staff · $4,000
    Central West Project Management Inc.
    Issued
  65. 2018-08-15 #720 Interior alterations only to provide improvements to this existing General Office tenant at unit #720 at this existing Pender Place 1 commercial building. Scope of Work: - Add 2 interior walls and doors to partition office area OK for field review as per City staff. Related to Special Sprinkler IA-2018-01126. Energy Upgrade Exempted: BOMA BESt Building · $12,000
    Central West Project Management Inc.
    Issued
  66. 2018-08-02 Unit #0100 Interior alteration and a change of major occupancy from retail store to restaurant class 1 for Starbucks at this existing commercial building. *No Grease-Laden Cooking Vapour is permitted. See K3. Note: Existing storefront glazing to remain clear and unobstructed, no films are permitted. *S3/N3 Letters accepted. The maximum occupant load is 150 including patio seatings. · $1,049,674
    no contractor listed
    Issued
  67. 2018-06-26 #410 - 4th Floor Interior alterations to provide tenant improvements for this new office tenant in this existing office space #410 on the 4th floor of this existing mixed use building on this site. OK for Field Review per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $25,000
    Allspaces Design & Management Ltd
    Issued
  68. 2018-05-03 #100 - 700 W Pender Street. To alter the exterior and interior of this ground floor suite (#100) to remove non-load bearing partition walls and all floor finishes and ceilings to bring back to shell in this existing retail unit on the ground floor of this mixed-use building on this site. Scope includes new exterior openings for exhaust louvres. Scope of work will result to a Retail Shell. Separate Permits and ASHRAE will be required. Okay for Field Review per City staff · $38,300
    Central West Project Management Inc.
    Issued
  69. 2018-03-16 #1003 - 10th floor Interior alterations to provide tenant improvements for this existing General Office tenant and to combine units #1003, #1005, #1008 and #1010 (retain #1003) in this existing commercial building. Scope of work: demolish partition walls/doors, construct new partition walls, doors, millwork, finishes, ceiling work, electrical, plumbing and sprinkler work. TENANT: Real Estate Council of British Columbia · $330,000
    Aura Office Environments Inc
    Issued
  70. 2018-03-16 #900-9th floor (full floor) Interior alterations to provide tenant improvements for this existing full floor General Office tenant on the 9th floor (#900) of this existing commercial building. Scope of work: demolish partition walls/doors/finishes and construct new partition walls, millwork, finishes, ceiling work, electrical, plumbing and sprinkler work. TENANT: Real Estate Council of British Columbia · $330,000
    Aura Office Environments Inc
    Issued
  71. 2018-01-19 Level 14 & 16 - common washrooms Interior alterations to renovate the common washrooms on the 14th and 16th floor of this existing commercial building on this site. OK for field review per City staff · $200,000
    no contractor listed
    Issued
  72. 2018-01-19 3rd floor Lobby and corridors Interior alterations to renovate the common lobby and corridors on the 3rd floor of this existing commercial building on this site. OK for field review per City staff · $150,000
    no contractor listed
    Issued
  73. 2017-12-20 #1250 - 12th floor Interior alterations only to provide tenant improvements for a new General Office tenant on the 12th floor (#1250) in this existing commercial building. Scope of work: demolish and construct new partition walls for new offices and staff kitchen, doors, millwork, new sink, ceiling work, mechanical, electrical, plumbing and sprinkler work. TENANT: Clark Builders · $200,000
    Canadian Turner Construction Company Ltd
    Issued
  74. 2017-12-05 #1250 & 1270 - 12th floor Interior alterations to demise existing unit #1250 into 2 units to be addressed #1250 and #1270 on the 12th floor in this existing commercial building. Scope of work: demolish partition walls and doors, construct demising wall and new door to #1270, electrical and sprinkler work. Address Note: Suite numbers (#1250 & #1270) to be posted by suite entry prior to final building inspection. #1205 is cancelled and is to be removed from the building/suite entry. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to these units. Okay for field review per City staff · $15,000
    Central West Project Management Inc.
    Issued
  75. 2017-09-18 (#801-8th floor) Interior alterations to provide improvements for new office tenant in unit #801 in this existing commercial building. OK for field review as per City staff: BOMA best Building · $20,000
    Genuine Quality Construction & Design Ltd
    Issued
  76. 2017-09-14 #1120 - 11th floor (full floor tenant) Interior alterations to combine units #1120 and #1150 into one unit (retain #1120) to become a full floor tenant space and provide tenant improvements for new office tenant on 11th floor of this existing commercial building. REVISION #1- changes to layout as follows.. - Keeping portion of demising wall between #1120 and #1150 - demo partition walls between two office to create one larger office. - demo partition to add a pocket door to boardroom. - fill in end of corridor with glass partition wall to close off conference room. - change estimate from $60,000 to $63,000. New pages numbered A2, A3, A4. March 8/18 mk Address Note: #1150 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #1120 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. · $63,000
    VPAC Construction Group Ltd
    Issued
  77. 2017-07-28 (#1604-16th floor) Interior alterations only to removel non-loadbearing walls and to provide improvements to the reception area and storage room for this existing tenant at this general office of this existing commercial building on this site. Scope of work includes new lighting. Ok for field review per City staff: All new and existing lighting changed to LED lighting; L3 (lighting) - Meet the interior lighting power allowance by the Building Area Method, of the suite (per City staff.5 of ASHRAE 90.1 - 2010) · $77,000
    Aura Office Environments Inc
    Issued
  78. 2017-06-28 #700-7th floor Interior alterations to the 7th floor to combine units #700 and #709, retaining unit #700, and to relocate interior non-loadbearing walls in this General Office unit. Scope of work: demolish demising wall and partition walls, new partition walls, glazing and doors to create larger boardroom and additional offices, open work areas, new finishes, electrical and sprinkler work. Address Note: #709 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #700 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. Energy upgrade exempt: BOMA best building · $160,000
    TotalPlan Inc
    Issued
  79. 2017-06-22 #507-5th floor To expand #507 into #509 (retain #507) and provide interior alterations for the existing office tenant in this existing commercial building. Scope of work: demolish/construct partition walls including a portion of the demising wall between #507 and #509, relocate/new doors, electrical and sprinkler work. Address Note: #509 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #507 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. Energy upgrade exempt: BOMA best Building · $120,000
    Central West Project Management Inc.
    Issued
  80. 2017-06-12 #720-7th floor Interior alterations to remove an interior partition wall for this office space in this existing office building on this site. Scope of work: demolish one partition wall and demolish a desk, electrical work. TENANT: Immigrant Employment Council of BC See related Special Sprinkler Inspection Permit No. IA-2017-00625. Energy Upgrade: Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $15,000
    Gibraltar Holdings Ltd
    Issued
  81. 2017-02-22 #1201 Interior alterations to provide improvements for an existing office space in unit #1201 on the 12th floor of this existing commercial building. Notes: - OK for field review per City staff · $40,000
    H J M Renovation & Construction Ltd
    Issued
  82. 2017-01-16 #203 and #205-2nd Floor Interior alterations to provide tenant improvements for an existing office tenant on the 2nd floor (#205) of this existing commercial building. Scope of work: demise #205 into two units (#203 and #205); existing tenant will be moving into newly created smaller space (#205). Address Note: Suite numbers to be posted by suite entry prior to final building inspection. TENANT: #203-vacant #205-Micon International Limited Separate permit(s) and ASHRAE checklist will be required for any tenant improvements to these spaces. See related Special Inspection Permit No. IA-2016-00577. Energy Upgrade Exempt: BOMA BESt Building · $5,000
    no contractor listed
    Issued
  83. 2017-01-03 (#520) Interior alterations to provide tenant improvements for a new General Office tenant on the 5th floor of this existing commercial building. Scope of work includes construct two new partition walls/doors, relocate glass panel, new lighting, electrical, sprinkler work. See related BP-2016-03562 (#520 expanding into a portion of #507). Energy Upgrade: Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $30,000
    Optimum Solution Design Build Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.