Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
7 W Hastings St, Vancouver
An address in Downtown, Vancouver, zoned HA-2 (Historical Area). 3 building permits are on file, most recently “Interior alteration to provide tenant improvements to this existing Retail Store (art gal…” (issued 24 October 2024). The City's 2026 assessed value is $1,668,202.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153582, 1,396 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2024-10-24
Interior alteration to provide tenant improvements to this existing Retail Store (art gallery) at 9 W. Hastings Street at this Designated Vancouver Heritage Register 'B' Beacon Hotel Building. Scope of work: - Removal of existing millwork, cabinets, non structural partitions, doors, plumbing fixtures, lighting - Install new interior partition & door, millwork, finishes, lighting & plumbing fixtures, new air conditioning unit Ok for field review as per City staff · $450,000
Curve Construction Inc Issued -
2023-09-20
Exterior alterations to install cooling system in this existing Municipally Designated 'M' Vancouver Heritage Register 'B' Single Room Occupancy (SRO) building (Beacon Hotel) on this site. DTI per City staff · $310,000
no contractor listed Issued -
2017-10-11
Interior alterations only to provide improvements to this existing Retail Store use (art gallery) at 9 W. Hastings Street at this existing SRA Bylaw Designated Vancouver Heritage Register 'B' Beacon Hotel Building. OK for field review as per City staff. Related to IA-2017-01163. Separate Permits will be required for a new signage. Energy upgrade: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems · $28,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05