Permit GopherAlberta and B.C. property, permit and zoning records

666 Burrard St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 93 building permits are on file, most recently “Exterior alterations for roof membrane and insulation upgrade to this existing commercial…” (issued 26 October 2026). The City's 2026 assessed value is $352,165,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
93
Assessed value (2026)
$352,165,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 666 Burrard St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154146, 1,156 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,156
Households
490
Median age
37.6
Median household income (2020)
$74,000
Own their home
32%
Vancouver: 45%
Average household size
1.6
Under 15
3%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-10-26 Exterior alterations for roof membrane and insulation upgrade to this existing commercial building on this site. Okay for Field Review by Jamie Z., July, 27, 2026 · $750,000
    no contractor listed
    Issued
  2. 2026-10-05 #400 - 4th floor - Elevator lobby and corridors Interior alterations to provide improvements to the elevator lobby and corridors on the 4th floor (#400) of this exisiting commercial building. Scope of work; select demolition and construction of walls for new ring corridor and four new entrance doors. * District Building Inspector to determine if a Special Sprinkler Inspection is required. * Separate permit(s) will be required for any further work beyond the scope work of this permit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $305,000
    no contractor listed
    Issued
  3. 2026-09-24 #720 - 7th Floor Interior demolition of all non load-bearing partition walls on the 7th floor (#720) to create an "empty/shell" office space in this existing commercial building on site. Scope of work: Demolish interior walls, finishes, doors, millwork, electrical and plumbing work to suit. Separate Building Permit (BP) and Occupancy Permit (OC) is required for future tenant improvement or to change the use. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $72,250
    no contractor listed
    Issued
  4. 2026-09-21 #770 expanding into #710 / retaining #770 Interior alterations to the 7th floor to expand the existing office tenant in #770 into #710 (retaining #770) and provide improvement in this existing commercial building on this site. Scope of work; demo demising wall, partition walls and construct new partition walls to alter layout. Electrical and Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $850,000
    no contractor listed
    Issued
  5. 2026-05-29 16th Floor (#1700) to be demised into two units (#1650 & #1700) Interior alterations to demise this existing full floor office space on the 16th floor (#1700) into two units (#1650 & #1700) and to provide tenant improvements to the newly created unit #1650 in this existing commercial building on site. NOTE: Suite #1700 (on the 16th floor) is interconnected to the 17th floor (where reception is) through an existing interconnecting stairs. TENANT: Versamet Royalties · $490,000
    Mansouri Enterprises Inc
    Issued
  6. 2026-02-25 B2 – 666 Burrard St Interior alterations to provide an ancillary exercise room amenity space (low occupant load - D) on level B1 in this existing commercial building on this site. Scope of work: Construction of partition walls and door. Ok for Field Review as per City staff · $14,500
    Central West Project Management Inc.
    Issued
  7. 2025-11-26 Interior alterations to install a new emergency floor drain in the communications room on floors 2 through 34, and provide a new sanitary riser connected to the existing on-site sanitary drain in this existing commercial building on this site. OK for DTI as per City staffL 2025 · $230,000
    no contractor listed
    Issued
  8. 2025-10-21 8th and 9th Floor Interior alterations to provide tenant improvement to this existing office on the 8th and 9th floor of this existing commercial building on site. Scope of work: Selective demo, lounge update, electrical, mechanical/plumbing and sprinkler work to suit. This permit was reviewed under VBBL 2019. · $300,000
    no contractor listed
    Issued
  9. 2025-10-20 #1260 - 12th floor Interior alterations to provide improvements for a new office tenant on the 12th floor (#1260) of this existing commercial building on this site. Scope of work: minor demolition and reconfiguring 6 private offices, addition of 1 meeting room, 1 closet and 1 staff coffee area. Electrical, Plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $250,000
    no contractor listed
    Issued
  10. 2025-10-10 Interior alteration to provide improvements to the existing ground floor lobby in this existing commercial building on site. Scope of work: New interior finishes, lighting, millwork, mechanical/ electrical modifications and localized interior structural work; Alteration to the interconnected stairs between ground floor and P1 2019 VBBL Revision 1 (IN PROCESS): Related to DPMA DP-2025-00976. - Added mezzanine (118 SF) and level 2 landing area (127 SF) and curved stairs connecting them from ground floor and added new vestibules (175 SF) on both entrances at Hornby St and Burrard St. Total floor area added by 420 SF. - Expanded public lobby facing Hornby St in to the adjacent existing CRU and removed doors into Burrard Plaza. - New double-glazed facades at the Burrard Street and Hornby Street entrances and improved building envelops. Building Review Branch Notes: - Separate permit is required for tenant improvement on Level 2. · $10,200,000
    no contractor listed
    Issued
  11. 2025-10-02 #2900, #3000 and #3100 (29th, 30th and 31st floor) Interior alterations to provide improvement to this new multi-floor office tenant on the 29th, 30th and 31st floor (#2900, #3000, #3100) of this existing commercial building on this site. Scope of work: Complete tenant build-out including new partitions, millwork, finishes, lighting, mechanical, electrical and sprinkler work to suit. Revision #1: Per City staff suite #2901. See Documents tab - Nov 13/25 - LLL TENANT: Cassels Brock & Blackwell LLP · $10,000,000
    Canadian Turner Construction Company Ltd
    Issued
  12. 2025-08-27 Interior and exterior alterations and an addition of 439.34 m2 / 4729.02 sq. ft. to this existing mixed-use building, and to change the use from Financial Institution to Restaurant Class 1 (SHELL) in Unit #101 with an interconnected floor. Upgrade Trigger: F2, S3, N3, A3 - N3 upgrade commitment, see letter. VBBL 2019 - NFPA 13 Related AL: AL-2025-00037, AL-2025-00038, AL-2025-00094, AL-2025-00095. A separate building permit is required for future tenant improvements. A patio permit is required for the future tenant improvements. · $15,000,000
    Axiom Builders Inc
    Issued
  13. 2025-08-07 #3220 - 32nd Floor Interior alterations to provide improvement to this existing office for a new tenant on the 32nd floor (#3220) of this existing commercial building on site. Scope of work: Demolish all existing partitions, offices, doors, millwork for a new office layout, electrical, plumbing/mechanical and sprinkler work to suit. TENANT: The Futura Corporation · $200,000
    Reotech Construction Ltd
    Issued
  14. 2025-07-08 #2100 - 21st floor Interior alterations to provide improvement for this this existing full floor office tenant on the 21st floor of this existing commercial building on this site. Scope of work: select demo to north west side of floor and corridor. New millwork, sink, finishes. Electrical, RCP, mechanical, sprinklers to suit. · $380,000
    no contractor listed
    Issued
  15. 2025-06-24 #2020 - 20th Floor Interior alterations to provide tenant improvements to an existing general office for a new tenant on the 20th floor (#2020) in this existing commercial building on site. Scope of work: Demo/construct partition walls, glass door to create some private offices and a new pantry. Relocate the demising wall to expand to the adjacent suite, thus increasing the size of suite #2020, electrical, mechanical and plumbing work. TENANT: ORLA Mining · $400,000
    no contractor listed
    Issued
  16. 2025-06-18 Interior alterations to provide tenant improvements for a single tenant located on Levels 26 to 28 in this existing office tower. The spaces will contain offices, meeting rooms, and staff lounges. A convenience stairway will interconnect Levels 26 and 27. Notes: 1. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511) with amendments effective on March 1, 2025. 2. Part 11 upgrade triggers for major renovation: F2, S2, N3, and A3. · $13,250,000
    Reotech Construction Ltd
    Issued
  17. 2025-05-15 interior demo to this existing two office space on the 29th and 30th floor of this existing commercial building creating two office shell spaces in this site. the scope includes to remove the interconnecting stairs and infill the opening between the 29th & 30th floors. Revision 1 - minor relocation of tenant entry and egress doors. · $502,500
    no contractor listed
    Issued
  18. 2025-05-08 #1200 - 12th Floor (demise) Interior alterations on the 12th floor to demise the existing office #1200 into two units to be #1200 and #1260 and to provide tenant improvements to suite #1200 only, in this existing commercial building on this site. Scope of work: Construct a demising wall to create 2 suites, demolish private offices, furnitures, new suite entry door for unit #1260. Construct new partitions, finishes, millwork (suite #1200), electrical, plumbing and sprinkler work to suit TENANT: ZLC Financial Inc · $250,000
    Reotech Construction Ltd
    Issued
  19. 2025-04-09 31st floor - #3100 Interior alterations to remove all non load bearing partition walls in the vacant office space on the 31st floor of this existing commercial building on this site. Scope of work: remove all partitions, doors, millwork, finishes ,and return to shell. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $250,000
    no contractor listed
    Issued
  20. 2024-11-14 Interior alterations to reduce the unit size of this existing Retail Limited Food Service and add a service room on the B1 Concourse level at this commercial building on this site. Scope of work includes BP - field review per City staff · $70,000
    no contractor listed
    Issued
  21. 2024-03-19 #740 - 7th Floor Interior alterations to provide improvements to this existing general office (vacant) on the 7th floor (#740) of this existing commercial building on site. Scope of work: New partition to build two (2) rooms, new millwork, ceiling tile, lighting. Sprinklers to remain as is. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $60,000
    no contractor listed
    Issued
  22. 2024-03-01 #1900 - 19th Floor Interior alterations to provide tenant improvement to this new tenant on the 19th floor (#1900) of this existing commercial building on site. Scope of work: Improvement from shell, construct new partitions for new offices, workstations and meeting rooms, HVAC, electrical, plumbing and sprinkler work. TENANT: BC Investment Management Corp · $3,300,000
    no contractor listed
    Issued
  23. 2023-12-13 Interior alterations to combine this existing two commercial units and change the use to tenant amenity area (other commercial) on the concourse level - B1 of this existing commercial building. Scope of work includes: removal of demising wall removal of glazing door and sidelights new finishes new electrical to support arcade games · $80,000
    no contractor listed
    Issued
  24. 2023-11-08 #2010 - 20th Floor Interior alterations to provide tenant improvements to an existing office unit on the 20th floor (#2010) in this existing commercial building on this site. Scope of work: Full demo to base condition, electrical, plumbing and sprinkler work. Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $170,000
    no contractor listed
    Issued
  25. 2023-10-18 #1900 - 19th floor Interior alterations to remove all non load bearing partition walls and return to shell space in this vacant full floor office tenant space on the 19th floor of this existing commercial building on this site. Scope of work: remove all partition walls, doors/frames, glass, millwork, finishes. Electrical, plumbing, sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $225,000
    no contractor listed
    Issued
  26. 2023-10-11 #1200- 12th floor (demised into #1200 & #1250) Interior alterations to demise unit #1200 into two units, to be #1200 and #1250 on the 12th floor of this existing commercial building. Scope of work: construct a demising wall to reduce the size of #1200 and create new unit (#1250) Separate permit(s) will be required for further improvements to these units. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $10,000
    Reotech Construction Ltd
    Issued
  27. 2023-10-05 #740 - 7th Floor Interior alterations to provide improvements to this existing general office on the 7th floor (#740) of this existing commercial building. Scope of work: Full demolition including kitchenette, ramp, access floor, workstations, furniture, appliances, sprinkler and electrical work. Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $25,580
    Gibraltar Holdings Ltd
    Issued
  28. 2023-08-28 Interior alterations to provide improvements by installing electric water heaters throughout this commercial building on this site. · $375,000
    KERN BSG MANAGEMENT LTD
    Issued
  29. 2023-08-03 #2020 - 20th floor Interior alterations to provide improvements to an existing office unit on the 20th floor (#2020) in this existing commercial building on this site. Scope of work: remove doors, finishes, millwork and construct new partition walls, doors, finishes, millwork to create new boardroom, office, kitchenette, electrical, plumbing and sprinkler work. REVISION #1 - reduced scope; lunch room to remain as is. Nov 14/24 OK for Office TI per City staff required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $210,000
    no contractor listed
    Issued
  30. 2023-08-03 #770 - 7th floor Interior alterations to provide improvements to an existing office unit on the 7th floor (#770) in this existing commercial building on this site. Scope of work: construct new partition walls, doors, finishes, millwork to create offices, boardroom, reception area, kitchenette to act as office show suite for the building. Electrical, plumbing work and sprinkler work. REVISION #1: Change of scope - adding 13-offices to existing space, lighting and sprinkler upgrade. Increase in project cost of $375,000 (from $275,000 to $650,000) - June 19/24 - LLL OK for Office TI Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $650,000
    no contractor listed
    Issued
  31. 2023-04-27 Interior alterations to provide improvements for a new Retail (Limited Food Service) Bakery tenant at this existing Retail (Limited Food Service) unit B09 in the B1 Concourse level at this commercial building on this site. Work to include a new Type II kitchen hood exhaust. One class 2 cooking operation. Note: This application is reviewed under VBBL 2019. · $150,000
    no contractor listed
    Issued
  32. 2023-01-12 #2348 - 23rd Floor (#2348 & #2358 combined) Interior alterations to provide tenant improvements to an existing office tenant to expand into an adjacent unit on the 23rd floor, combining #2348 & #2358, in this existing commercial building building on the site. Scope of work: demo demising wall and partition walls, and construct new partition walls, glazed panels, doors for new layout. Electrical, plumbing, sprinklers to suit. OK For Field Review as per City staff · $350,000
    Reotech Construction Ltd
    Issued
  33. 2022-10-25 #300 - 3rd Floor Interior alterations to provide tenant improvements to an existing office tenant on the 3rd floor (#300) in this existing commercial building on site. Scope of work: Remove/construct a partition wall, reconfigure 2 offices into meeting rooms, remove doors/frame, new paint, electrical and sprinkler work. TENANT: Long View Systems · $290,000
    no contractor listed
    Issued
  34. 2022-10-04 #2200 - 22nd floor (full floor) Interior alterations to remove all non load bearing partition walls and finishes to return this existing vacant full floor office space to base building (shell) on the 22nd floor (#2200) in this existing commercial building on this site. OK for Field Review for Office Shell TI E2 Upgrade - Lighting #9 - Upgrade to incorporate Scheduled Shutoff. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $165,000
    no contractor listed
    Issued
  35. 2022-07-19 #100- Main Floor (demised and changed to #105 & 110 *See Rev #1) Interior alterations to remove all non loadbearing partitions and finishes to create a shell space in this existing financial institution on the main floor (#100) in this existing commercial building on site. REVISION #1: demising #100 into two units to be #105 and #110 glazing partition, coffered ceiling, downlights to be removed, extend handrail, ceiling grid, lighting and increase project value from $285,000.00 to $470,750.00 Mar. 27, 2023 mlh REVISION #2 - Maintain glazing wall and stair railing on west side of lobby. - Construct 2 hr rated demising wall. - Remove glazing wall on Hornby street side of the lobby. - Increase project value from $470,750.00 to $552,750.00. Aug.10/23.mk REVISION #3: - Retain existing interior store front glazing in unit #110. May 16/24 mk OK For Field Review per City staff(s) required for an future tenant improvements to this space. E2 - Retrofit Path (BOMA BESt (Path 1) - No Additional Upgrades Required · $552,750
    no contractor listed
    Issued
  36. 2022-07-19 #3100 - 31st Floor (Full Floor) Interior alterations to provide a full floor tenant improvements for an existing office tenant at on the 31st floor (#3100) of this existing commercial building on this site. Scope of work: Demolish all interior/partition walls, glass, existing doors and frames. Construct new partition walls, new millwork, electrical and sprinkler work to suit. TENANT: Masimo Canada ULC · $600,000
    VPAC Construction Group Ltd
    Issued
  37. 2022-07-19 #2368 - 23rd Floor Interior alterations to provide tenant improvements for a new office tenant on the 23rd floor (#2368) of this existing commercial building on this site. Scope of work: Demolish interior walls and glazing, remove existing doors and frames, construct new partition walls, new sliding glass doors, millwork, card reader, new t-bar ceiling, new paint and electric work to suit. TENANT: Keltic Development OK for Field Review per City staffnkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $64,750
    no contractor listed
    Issued
  38. 2022-07-13 #1560 - 15th Floor (#1560 & #1570 combined) Interior alterations to provide tenant improvements to an existing office tenant to expand into an adjacent unit on the 15th floor, combining #1560 & #1570 (retaining #1560), in this existing commercial building building on the site. Scope of work: demo demising wall and partition walls, and construct new partition walls, glazed panels, doors for new layout. Relocate kitchen, and install new millwork, sink, appliances. HVAC, electrical, plumbing, sprinklers to suit. TENANT: Marcon Development Ltd OK For Field Review for Office TI; June 9, 2022 · $250,000
    Reotech Construction Ltd
    Issued
  39. 2022-05-26 #1520 - 15th floor Interior alterations to provide tenant improvements for an existing office tenant on the 15th floor (#1520) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, millwork, finishes, electrical, mechanical, plumbing and sprinkler work. TENANT: Stikeman Elliot · $200,000
    Reotech Construction Ltd
    Issued
  40. 2022-05-19 #2368 & #2358 Interior alterations to provide improvements to demise office unit #2368 into two office units #2368 and #2358 on the 23rd floor of this commercial building on this site. E2 Upgrade: HVAC, Clean and balance all air systems (per City staff.7.2.3.2 of Ashrae 90.1-2016) OK to process as DTI as per City staff · $31,450
    no contractor listed
    Issued
  41. 2022-04-29 Interior alterations: Interior alterations to provide tenant improvement for this office tenant on the 35th floor and providing 3 mag. lock to 3 interior door. · $100,000
    no contractor listed
    Issued
  42. 2022-03-11 #770 - 7th floor Interior demolition of non load-bearing partition walls on the 7th floor ((#770) to this vacant office space in this existing commercial building. Scope of work: demolish all partition walls, doors, ceiling, finishes to return to a "shell" office space. Energy upgrade exempt: Interior demolition Separate permit(s) and energy upgrade will be required for any tenant improvements to this space. OK per City staff; Feb 23, 2022 · $65,410
    no contractor listed
    Issued
  43. 2021-06-02 #400 - 4th floor (full floor) Interior alterations only to provide for the partial demolition of interior partitions for existing office rooms and also for the retention of a number of the existing office rooms at this existing General Office tenant space on the 4th floor (#400) in this existing commercial building. · $80,000
    no contractor listed
    Issued
  44. 2021-05-21 1590 - 15th floor (demising into #1520 & #1590) **TI to #1590 Interior alterations to demise unit #1590 into two units (to be #1520 & #1590) and to provide tenant improvements for a new office tenant in #1590 on the 15th floor of this commercial building on this site. Scope of work: remove existing millwork/fixtures, construct new demising wall, partition walls, doors, millwork, lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: Marcon Development · $115,000
    Reotech Construction Ltd
    Issued
  45. 2021-03-02 #1560 - 15th floor (#1560,#1550,#1530 combined) Interior alterations to combine the existing office unit #1560, #1550 and #1530 into one unit (to be #1560) on the 15th floor of this existing commercial building on this site. Scope of work: remove demising walls between #1560, #1550, & #1530 to create one large unit and remove/construct partition walls, doors, electrical, mechanical, plumbing, sprinkler modifications. OK for field review as per City staff · $475,000
    Reotech Construction Ltd
    Issued
  46. 2020-12-14 #3500 - 35th floor Interior alterations to provide improvements for a new multi, full floor office tenant on the 35th floor (#3500) of this commercial building on this site. Scope of work: demo/construct partition walls, doors, electrical, plumbing and sprinkler work for new layout. Note: existing inter-connecting stairs between 34th and 35th floors REVISION #1 - March 11/21 mk · $758,520
    no contractor listed
    Issued
  47. 2020-12-14 #3400 - 34th floor Interior alterations to provide improvements for a new multi-full floor office tenant at on the 34th floor (#3400) of this commercial building on this site. Scope of work: demo/construct partition walls, doors, electrical, plumbing and sprinkler work for new layout. Note: existing inter-connecting stairs to the 35th floor · $284,400
    no contractor listed
    Issued
  48. 2020-12-14 #3300 - 33rd floor Interior alterations to provide improvements for a new multi-full floor office tenant at office unit #3300 on the 33rd floor of this commercial building on this site. Scope of work: demo/construct partition walls, doors, electrical, plumbing and sprinkler work for new layout. · $950,220
    no contractor listed
    Issued
  49. 2020-10-09 B9 - B1 Concourse Level Interior alterations to install a walk-in cooler with new sprinkler heads in this existing retail limited food unit (unit B9) on the B1 level in this existing commercial building on this site. OK for field review as per City staff · $8,000
    Gibraltar Holdings Ltd
    Issued
  50. 2020-07-21 #2100 - 21st floor Per the 2019 VBBL to provide interior alterations only to provide a new air conditioning system in the existing server room with one (1) sprinkler head to be relocated, and also to provide new condenser water piping, condensate drain piping, and electrical wiring that will require fire-stopping through existing fire-rated partitions at this existing General Office on the 21st floor (#2100) in this existing commercial building. Tenant: RBC Dominion Securities · $57,000
    Ainsworth Inc
    Issued
  51. 2020-05-15 #800 - 8th floor Interior alterations for tenant improvement for this existing full floor office tenant on the 8th floor (#800) of this existing commercial building. Scope of work: interior renovations to 3 areas of the floor including ceiling modifications, new flooring and finishes, lighting upgrades & electrical alterations. Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) OK for Field Review per City staff · $100,000
    Govan Brown Ltd
    Issued
  52. 2020-05-11 #340 - 3rd floor Interior alterations only to provide tenant improvement on the 3rd floor (#340) for a new office tenant in this existing commercial building. Scope of Work per VBBL 2019: demolish partition walls and doors, construct new partition walls to create more office rooms and a boardroom, new sliding doors, millwork, lighting, mechanical, electrical, plumbing and sprinkler work. Selected Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) Tenant: AIG Insurance Company of Canada. OK for field review as per City staff. · $200,000
    no contractor listed
    Issued
  53. 2020-02-12 #1800-18th floor (full floor) Interior alterations to provide improvements for a new office tenant and to combine office units #1800, #1820, #1830 & #1850 retaining #1800 (full floor) on the 18th floor of this commercial building on this site. Scope of work per VBBL 2019: demolish demising walls, partition walls, remove doors, finishes, construct new partition walls, new doors, millwork, finishes, convenience/universal washroom, lighting and HVAC, ceiling, electrical, plumbing, sprinkler and mechanical work for new layout. TENANT: IG Wealth Management OK for field review per City staffsprinkler permit required for proposed sprinkler work. · $2,000,000
    Govan Brown Ltd
    Issued
  54. 2019-11-08 #300 & #340-3rd floor Interior alterations to demise suite #300 on the third floor (to be #300 & #340) in this existing commercial building. Scope of work includes the construction of demising walls to create two suites, some demolition, new partition walls, doors, reinstate public corridors, new corridor lighting, electrical, mechanical and sprinkler work. Separate permit(s) and ASHRAE checklist required for any future tenant improvements to these suites. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. · $127,000
    no contractor listed
    Issued
  55. 2019-10-18 Unit# B9 in concourse level, minor Renovation To install a double stalk combi-oven with ventless hood attachment and to modify existing kitchen exhaust ventilation system by installing heat recovery system in exhaust duct to heat up the fresh air intake to this unit located on the lower level (B1, Concourse Level) of this existing commercial high building. Notes: 1. One Class-2 and one Class-4 Cooking operation. 2. Zoning OK to clear hood location and addition of extra air shafts at lane alongside the existing per City staff. General contractor is required to have a valid COV business licence. · $28,000
    no contractor listed
    Issued
  56. 2019-08-21 #B18 - Interior alterations and change of use from Health care office shell (D) to Health care office (D) to provide tenant improvements to #B18 on the ground floor of this existing commercial building on this site. Scope of work include: Adding in new partition walls to create physio rooms and a reception area. Update the electrical and add a sink in the rear room. OK for Field Review as per City staff.2019 DB-2019-01238 To be completed prior to completion of this permit · $123,500
    no contractor listed
    Issued
  57. 2019-08-21 #B20 - Interior alterations and change of use from Health care office shell (D) to Health care office (D) to provide tenant improvements to #B20 on the ground floor of this existing commercial building on this site. Scope of work include: Adding in new partition walls to create rooms and a reception area for vaccinations. Update the electrical and add a sink in the rear 2 room. · $129,200
    no contractor listed
    Issued
  58. 2019-07-10 #720-7th floor Interior alterations to provide tenant improvements for this existing office tenant #720 on the 7th floor of this existing mixed use building. Scope of work: demolish partition walls and doors, remove carpet, construct new partition and glazing walls, doors, millwork, finishes, electrical and sprinkler work. TENANT: Hayward Sheppard Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for Field Review - June 26/19 Processed Thru FIT L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $110,000
    TotalPlan Inc
    Issued
  59. 2019-05-23 Interior alterations to reconfigure the concourse level (B1) in the basement of this existing commercial building on this site to the following tenancies: 1. Revise open corridor layout (BC01), thereby reducing the size of unit B10, and change the use from general office to beauty salon/barber shop (shell). 2. Combine units B8, B7, B25 and B6 to provide open seating area for B11 (A2 occupancy) to serve the concourse level (changing the use from office/retail to food service seating area). 3. Demise Unit B17, divide it into two separate shell spaces (B18 and B20), and change the use from general office to healthcare office for each shell space. 4. Readdress B10 to B13 Note: Change of use cleared for DB as per City staff: - Change B13 from a shell hair-dressing shop to an office flex space, - Reduce the number of seats in B11 (open seating area) and reinstate B06, and retain it as an existing hair salon, - Install new floor finish to the SE convenience stair (at Hornby St access), service corridor, and existing exit corridor. P Volpi, Nov. 28, 2019. Revision #2: - Restore/repair storefront to existing vacant tenant B05, - Restore/repair storefront only to existing hair-dressing tenant B06. P Volpi, Feb. 12, 2020. Revision #3: - Correct the project descriptions including Revisions #1 and #2 and remove requirement for occupancy permit for B06 prior to completion. - Readdress B13 back to B10 and retain as office flex space. P Volpi, Oct. 28, 2020. · $1,200,000
    no contractor listed
    Issued
  60. 2019-04-17 *NOW #2010 & #2020* /CANCEL #2000-20th floor (full floor) *SEE REVISION #1 Interior alterations to combine two units into one unit (to be a full floor tenant) and to provide improvements for existing office tenant on the 20th floor (#2000) of this existing commercial building. *SEE REV.#1 Scope of work: demolish demising walls to create a full floor tenant space (#2010 & #2020 combining and changing to #2000), demolish/construct partition walls for meeting/conference rooms, private offices, new lunch rooms, doors and glazing, remove/relocate millwork, new finishes, suspended t-bar ceiling, lighting, electrical, mechanical, plumbing and sprinkler work. *SEE REV.#1 · $500,000
    no contractor listed
    Issued
  61. 2019-02-28 #1580 (to be #1580 & #1590) - 15th floor Interior alterations to the 15th floor (#1580) to remove partition walls in and demise this existing vacant office space into two units (to be#1580 and #1590) of this existing commercial building on this site. Scope of work: to remove partitions and construct new demising wall to create two units and extend existing common corridor to access new unit ONLY. Separate permits required for tenant improvements to these units. REVISION #1: change demo scope - two (2) offices in #1580 to remain as is. New set of plans including stamped electrical and mechanical plans. New schedules submitted. Mar 29/19 mk · $15,000
    Reotech Construction Ltd
    Issued
  62. 2019-02-21 #1575-15th floor Interior alterations to provide tenant improvements in the office "shell" space at #1575 on the 15th Floor for a new office tenant at this existing commercial building on this site. Scope of work: demolish wall and entry door to allow new double door, remove all ceiling tiles, construct new partition walls, new doors, millwork, ceiling, lighting, electrical, plumbing and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for Field Review per City staff. · $35,000
    Reotech Construction Ltd
    Issued
  63. 2019-02-21 B9-Concourse Level Interior alterations and change of use from restaurant to retail food in this existing mixed use building. Scope of Work: - Install new stainless equipment, hand sinks, refrigerated prep station, custom millwork, storage room, finishes, interior partitions REVISION #1-Storefront glazing added, partition walls removed, ASHRAE reviewed, no change in value. Concourse Level added to Specific Location./October 10, 2019 jm Ok for field review per City staff · $175,000
    no contractor listed
    Issued
  64. 2019-02-04 #1570 and # 1575 - 15th Floor *tenant improvement work to #1570 only Interior alterations to demise the existing office on the 15th floor (#1570) into 2 units to be #1570 and #1575 and to provide tenant improvements for a new office tenant in #1570 in this existing commercial building on this site. Scope of work: remove ceiling tiles, lighting, finishes and construct new demising wall, interior partitions, doors, millwork in new staff kitchen, ceiling work, card reader, electrical, plumbing, mechanical and sprinkler work. · $150,000
    Reotech Construction Ltd
    Issued
  65. 2019-01-29 #200 (expanding into #270 & #280) Change of use of General Office in unit #270 & #280 to School- Self –Improvement and interior alterations to expand existing unit #200 into these units. The whole 2nd floor is to be one unit for School of self improvement in this existing 36 storey commercial building. No exterior alterations proposed. Total Occupant load of students will be 293 at any time and total number of staff will be 44. Note: No DP is required for change of use and validating open balcony and exterior door done without permit as per City staff · $120,000
    no contractor listed
    Issued
  66. 2019-01-21 #2650-26th floor Interior alterations to provide improvements for new office tenant in existing office space in this existing commercial building. Scope of work: minor demolition, construct new partition walls, glazing, doors, ceiling, lighting, finishes, electrical, plumbing, mechanical and sprinkler work. No energy upgrade required. BOMA BESt building. TENANT: Willis Towers Watson · $1,425,000
    no contractor listed
    Issued
  67. 2019-01-10 #900 (9th to 11th Floor) - Interior Alterations to install an inter-connected stairs connecting 9th, 10th and 11th floor, and provide tenant improvement on the 10th floor for this Office (Group D) tenant leasing 8th to 11th floor in this 35-storey commercial building. Building Review Notes: - See Alternative Solution AL-2018-00195 for interconnected stairs. - See BP-2017-01098 and AL-2017-00139 for the interconnected stairs connecting 8th & 9th floor. · $1,650,000
    Govan Brown Ltd
    Issued
  68. 2018-12-17 #1560 - 15th floor Interior alterations to provide improvements for a new office tenant at this office unit #1560 on the 15th floor of this existing commercial building on this site. Scope of work: Complete tenant fit out to this office shell space. Related to BP-2018-05561 OK for field review per City staff. · $110,000
    Marcon Project (609) Ltd
    Issued
  69. 2018-12-07 #1560 & #1570-15th floor Interior alterations to demise office unit #1570 into #1560 and #1570 and to provide improvements for a new office tenant at unit #1560 on the 15th floor of this existing commercial building on this site. Scope of work: construct partition walls for new boardroom/coffee room/storage, doors, millwork, finishes, ceiling work, electrical, plumbing, mechanical and sprinkler work. Tenant improvement work to #1560 only. REVISION #1-Reduce scope of work for #1560 still includes demising wall but now to be shell space only (no partition walls). No change to ASHRAE. Separate permit(s) and ASHRAE checklist required for any tenant improvement to this space. No increase to project value. Plans reduced from 12 to 10 pages. Dec.7, 2018 jm OK for field review per City staffilding. · $100,000
    Reotech Construction Ltd
    Issued
  70. 2018-12-03 #2338 - 23rd floor Interior alterations to provide improvements to this office unit #2338 for a new tenant on the 23rd floor in this existing office building on this site. Scope of work: demolish partition walls, remove doors, millwork, lighting, plumbing, t-bar ceiling, flooring, construct new partition walls, glazing, doors, card reader, lighting, finishes, electrical, plumbing, mechanical and sprinkler work. TENANT: Keltic Canada Development · $500,000
    Kindred Construction Ltd
    Issued
  71. 2018-11-29 #3210 Interior alterations to provide tenant improvements for a new office unit #3210 on the 32nd floor in this commercial building. BU439497 Was for the corridor to be altered, this was completed already Scope of work to Include: To demolish the existing interior partitions, remove finishes and Millwork. Construct new interior office partition walls, provide power and data, and alter the lighting layout throughout the suite. OK for Field Review as Per City staff.2018 · $500,000
    Fusion Project Management Ltd
    Issued
  72. 2018-11-20 #1400-14th floor (full floor) Interior alterations to provide improvements for existing office tenant on the 14th floor (#1400) of this existing commercial building. Scope of work: construct partition walls, doors and glazing, new finishes, lighting, electrical and mechanical work. Energy upgrade: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1-2016) TENANT: Powerex Corporation Address Note: This floor is interconnected to the 13th floor and is occupied by a single tenant. Reception is located on the 13th floor. See related Special Sprinkler Inspection No. IA-2018-01708. See BP-2018-05824 for tenant improvements to the 13th floor (#1300). · $200,000
    Hodgson King & Marble Ltd
    Issued
  73. 2018-11-20 #1300-13th floor (full floor) Interior alterations to provide improvements for existing office tenant on the 13th floor (#1300) of this existing commercial building. Scope of work: demolish/construct partition walls, doors and glazing, remove/relocate millwork, remove/replace card reader, new finishes, lighting, electrical and mechanical work. TENANT: Powerex Corporation Address Note: This floor is interconnected to the 14th floor and is occupied by a single tenant. Reception is located on the 13th floor. See related Special Sprinkler Inspection No. IA-2018-01709. See BP-2018-05825 for tenant improvements to the 14th floor (#1400). Energy upgrade: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1-2016) · $150,000
    Hodgson King & Marble Ltd
    Issued
  74. 2018-11-16 Unit B9 - B1 Concourse Level Interior alterations to remove the existing finishes, millwork and equipment in this existing Restaurant - Class 1 unit on the B1 level in this existing commercial building on this site. OK for Field Review as per City staff. Note: 1) Separate permit is required for future tenant improvements. All structural walls and columns to remain. · $25,000
    no contractor listed
    Issued
  75. 2018-11-01 #2650 - 666 Burrard Street Interior alterations to demolish the existing Office #2650 and to create Office (Shell) on the 26th floor of this commercial building on this site. OK for field review per City staff. · $100,000
    Canadian Turner Construction Company Ltd
    Issued
  76. 2018-10-31 #2500 - 25th floor (full floor tenant) Interior alterations to provide improvement to this office unit #2500 on the 25th floor for a new tenant in this existing commercial building on this site. Scope of work: demolish partition walls, remove doors, t-bar/GWB ceiling, millwork, finishes, construct new partition walls, new doors, millwork, card reader, glazing, finishes, ceiling work, electrical, plumbing, mechanical and sprinkler work. TENANT: Bennett Jones SLP (#2500-Reception)
    Reotech Construction Ltd
    Issued
  77. 2018-10-09 24th floor (full floor) Interior alterations to provide improvements for new office tenant (full floor tenant). Scope of work: demolish partition walls, remove doors, new partition walls, doors, millwork, card reader, ceiling work, finishes, electrical, mechanical, plumbing and sprinkler work for new tenant fit-out. TENANT: Bennett Jones SLP *Reception located on 25th floor (#2500) Note: Floors 24 and 25 are interconnected by internal convenience stairs which was approved under BU432249. This office tenant will be occupying both floors 24 and 25 with reception on the 25th floor. A separate BP will be coming in for the 25th floor. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $420,000
    Reotech Construction Ltd
    Issued
  78. 2018-09-24 Ground floor - elevator lobby Interior alterations to provide upgrades to the existing ground floor elevator lobby ceiling with lighting, panels, drywall, and paint at this existing commercial building. OK for field review as per City staff. No energy upgrade required. BOMA BESt building. Letters of Assurnace:
    Reotech Construction Ltd
    Issued
  79. 2018-08-16 #1000 - 10th floor (full floor) Interior alterations to demolish all interior partition walls in this existing office on the 10th floor (#1000) in this existing commercial building on this site. Scope of work: demolish all interior partition walls, doors, glazing, millwork and plumbing and remove flooring and wall covering from elevator lobby and common corridors. Remove and replace lighting, electrical, plumbing and sprinkler work. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $115,000
    Govan Brown Ltd
    Issued
  80. 2018-07-11 34th floor Interior alterations to remove and construct partition walls to this existing office tenant on the 34th floor of this existing mixed-use commercial high-rise building. Note: An interconnecting stairs is proposed between this floor and the 33rd floor. · $2,200,000
    no contractor listed
    Issued
  81. 2018-07-11 33rd floor Interior alterations to remove and construct partition walls to this existing office tenant on the 33rd floor of this existing mixed-use commercial high-rise building. Note: An interconnecting stairs is proposed between this floor and the 34th floor. Revision #1: Change the layouts to offices 3318, 3317, 3319, 3316, 3312 and adjust diffusers and lighting to suit the layout changes. · $1,800,000
    no contractor listed
    Issued
  82. 2018-06-15 #200 Change of Major Occupancy from Office (Group D) to Self-improvement School (Group A2) and provide interior alterations to this suite on the second floor of this existing high-rise commercial building. Note: - Upgrade levels: F2, S3, N3, A3, E3. Structural Letter provided for S3 & N3. - Energy Upgrade E3: Select one L2: Meet the interior lighting power allowance by the Building area Method, of the suite (per City staff.5 of ASHRAE 90.1 - 2010) - Proposed occupant load is 227 persons. A permanent sign indicating that occupant load shall be posted in a conspicuous location. · $500,000
    Counterpoint Interiors Inc
    Issued
  83. 2018-06-04 Elevator upgrade in this existing commercial building. “THIS PERMIT HAS BEEN CONVERTED FROM PRISM”. Building Review Branch Notes: Refer to building permit number BU457063 for all drawings and documents.
    no contractor listed
    Issued
  84. 2018-02-14 #1238 - 12th floor Interior alterations to provide improvements for a new office tenant on the 12th floor (#1238) of this existing commercial building on this site. Scope of work: demolish and construct new partition walls, glazing, doors, new reception area, millwork, for storage, cabinetry, kitchen, finishes, electrical, plumbing, sprinkler. REVISION #1 - electrical panel to remain in original location. Minor changes to floor plan. Mar. 8/18 mk See related Special Sprinkler Inspection No. IA-2018-00107. OK for field review per City staff. This is a BOMA BESt building. · $150,000
    no contractor listed
    Issued
  85. 2017-12-05 #3500 - 35th floor (full floor tenant) Interior alterations to provide tenant improvements for this full floor office tenant on the 35th floor (#3500) of this commercial building on this site. Scope of work: demolish partition walls, cabinets, millwork, doors and construct new partition walls, millwork, doors, finishes, ceiling work, mechanical, electrical, plumbing and sprinkler work. REVISION #1-Minor wall/layout changes. March 5/18 jm TENANT: Goldcorp Inc. OK for field review per City staff. · $1,505,000
    Priority Projects Limited
    Issued
  86. 2017-11-03 #1800, #1820, #1830-18th floor Interior alterations to demise the 18th floor from two units into 4 units in this existing commercial building. Scope of work: fill in wall to demise one tenant space into two and to validate a 3rd tenant space (#1800 demising into #1800, #1820 & #1830). Note: no changes to lighting, all light fixtures to remain as is. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to these spaces. TENANT: Richardson GMP See related Special Sprinkler Inspection No. IA-2017-01247. Energy Upgrade Exempt: BOMA BESt Building. · $6,000
    All Spaces Project Management Ltd
    Issued
  87. 2017-10-18 #2388-23rd floor Interior alterations to provide improvements for a new office tenant at this existing office (shell) unit #2388 on the 23rd floor of this existing commercial building on this site. Scope of work: new partition walls, millwork, card reader/electric strike, plumbing fixtures and finishes, new lighting, power/data and HVAC, ceiling, electrical, plumbing and sprinkler work to suit new layout. TENANT: Royal Bank of Canada OK for field review per City staff. · $267,000
    no contractor listed
    Issued
  88. 2017-10-13 #200 - 2nd floor Interior alterations to demolish non-load bearing partition walls in this existing vacant office space on the 2nd floor (#200) of this existing commercial building on this site. Scope of work: select demolition of partition walls, doors, glazing, millwork, finishes and to cap off plumbing, electrical and sprinkler work. OK for field review per City staff. Notes: 1. Separate permit(s) and ASHRAE checklist required for future tenant improvements. 2. No energy trigger required interior demolition only. · $40,000
    Reotech Construction Ltd
    Issued
  89. 2017-07-27 #2368 - 23rd floor Interior alterations to provide improvements for a new General Office tenant on the 23rd floor (unit #2368) of this existing commercial building. Scope of work: Select demo of non load bearing partitions. Build 2 offices, boardroom, 1 meeting room, finishes, electrical & sprinkler alterations. OK for field review as per City staff. Energy upgrade exempt: BOMA best Building · $85,000
    TotalPlan Inc
    Issued
  90. 2017-06-14 8th/9th floors Interior Alteration - to install an interconnected stairs connecting the 8th and 9th floor for single tenant within the commercial building on the site. Building Review Branch Notes: - See Related Alternative solutions AL-2017-00139 for protection of floor opening of convenient stairs. Closed-spaced sprinklers at stair floor opening with increased sprinkler density of 27 USGPM per sprinkler is required. - Related TI permits: BP-2016-01891(8th floor), BP-2017-00671(9th floor) · $200,000
    Ledcor Construction Limited
    Issued
  91. 2017-03-24 #900-9th floor (full floor) Interior alterations to provide tenant improvements for a new office tenant occupying the entire 9th floor in this existing commercial building. Scope of work: demolish demising walls to combine #900 and #950 (retain #900), demolish/construct partition walls, new glazing, doors, millwork, finishes, lighting, mechanical, electrical, plumbing and sprinkler work. Revision #1- Add glass door & revise lighting in lunchroom. Change in ceiling design. Relocate existing pull station. Nov.16/17mk NOTE: A separate permit will be required for future interconnecting stairs and will be processed by the Building Review Branch. Address Note: #950 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #900 is to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: QuadReal Property Group · $1,284,885
    Ledcor Industries Inc
    Issued
  92. 2017-01-06 #800 - 8th floor Interior alterations to provide tenant improvements for a new office tenant occupying the entire 8th floor in this existing commercial building. April 1st - Revision to show 2hr wall enclosure for future interconnecting staircase (Separate application submitted for interconnection - BP-2017-01098) L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $928,373
    Ledcor Construction Limited
    Issued
  93. 2017-01-06 #1100 Interior alterations to provide tenant improvements for a new office tenant occupying the entire 11th floor of this existing commercial building. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010)\t · $928,373
    Ledcor Construction Limited
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

347 W Pender St
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc
2026-10-30
180 Keefer St
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd
2026-10-30
885 W Georgia St
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.