Permit GopherAlberta and B.C. property, permit and zoning records

650 W Georgia St, Vancouver

An address in Downtown, Vancouver, zoned CD-1 (667) (Comprehensive Development). 133 building permits are on file, most recently “#3100 - 31st Floor Interior alterations to provide tenant improvements to this existing g…” (issued 2 November 2026). The City's 2026 assessed value is $545,205,000.

Zoning
CD-1 (667) · Comprehensive Development
Neighbourhood
Downtown
Permits on file
133
Assessed value (2026)
$545,205,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 650 W Georgia St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154143, 844 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
844
Households
530
Median age
34
Median household income (2020)
$82,000
Own their home
24%
Vancouver: 45%
Average household size
1.7
Under 15
5%
65 and over
7%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-11-02 #3100 - 31st Floor Interior alterations to provide tenant improvements to this existing general office on the 31st floor (#3100) of this existing commercial building on site. Scope of work: Select demo to convert 2 rooms into a meeting room, remove carpet tiles and millwork. Construct new millwork, reception desk, aligned kitchenette, mechanical and plumbing work to suit. TENANT: Ero Copper Corp Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $100,000
    Framework Projects Ltd
    Issued
  2. 2026-10-30 #1805 and 18th floor - elevator lobby and corridor Interior alterations to 18th floor to provide improvements to the elevator lobby, corridors and to unit #1805 for a new office tenant in this existing commercial building. Scope of work: complete tenant fit out to shell space at #1805 and elevator lobby and corridor. Electrical, mechanical/plumbing and sprinklers to suit. * See BP-2026-01475 for demo work. · $1,200,000
    Reotech Construction Ltd
    Issued
  3. 2026-07-29 #2020 - 20th floor Interior alterations to install a modular privacy encloser in this existing office tenant space on the 20th floor (#2020) of this existing commercial building. * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $13,000
    BC Coastal Projects Ltd.
    Issued
  4. 2026-06-22 28th floor - Common washrooms Interior alterations to provide improvements to the 28th floor common washrooms in this existing building on this site. Scope of work - Remove and replace with new washroom fixtures, finishes, ceiling. *District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $95,000
    Gibraltar Holdings Ltd
    Issued
  5. 2026-06-03 #2900 & #2940 Combining/ retaining #2900 Interior alterations to the 29th floor to provide improvements and combine units #2900 and #2940 into one unit (retain #2900) in this existing commercial building on this site. * All work in accordance with VBBL 2025 · $148,800
    no contractor listed
    Issued
  6. 2026-05-13 #1805 - 18th Floor Interior demolition of the existing layout on the 18th floor (#1805), removing all existing partitions and finishes to return the space to shell for future tenant use in this existing commercial building. Scope of work: Remove all interior walls, doors, flooring, millwork, electrical, mechanical/plumbing and sprinkler work to suit. Separate Building Permit (BP) and Occupancy Permit (OC) is required for future tenant improvement or to change the use. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $115,000
    Gibraltar Holdings Ltd
    Issued
  7. 2026-05-11 Interior alterations to install glass walls and doors for security around the convenience stairs on level 30, 31 and 33 of this existing office space in this existing commercial building on this site. Ok for field review per City staff: International Royalty Corporation · $30,000
    Framework Projects Ltd
    Issued
  8. 2026-04-30 13th and 14th floor Interior alterations to provide improvements for this existing full floor office tenant on the 13th and 14th floors of this existing commercial building on this site. Scope of work: Install one glass door on the 13th floor and two glass doors on the 14th floor to separate the Elevator lobbies from open work station areas. * All work in accordance with VBBL 2025 * District Building Inspector to determine if a Special Sprinkler Inspection is required. · $25,000
    Gibraltar Holdings Ltd
    Issued
  9. 2026-03-31 11th and 12th Floor #1100 & #1200 - Interior alterations to demise #1100 on the 11th floor and #1200 on the 12th floor and to provide tenant improvements for a new office tenant on the 11th and 12th floors in this existing commercial building on this site. Scope of work: Add a demising wall to create separate office units, construction of partition walls, new finishes and millwork, electrical, plumbing, mechanical and sprinkler work to suit. Ok for Field Review as per City staff · $1,200,000
    no contractor listed
    Issued
  10. 2025-12-12 11th floor Interior alterations to provide improvements for a full floor office tenant on the 11th floor of this existing commercial building on this site. Scope of work: complete tenant fit out to shell space. See BP-2025-01984 for interior demo. See BP-2024-03440 for work to interconnecting stairs from 9th to 11th floors. · $2,100,000
    Reotech Construction Ltd
    Issued
  11. 2025-11-28 UNIT #750, 780 & common lobby/corridors - 650 W Georgia Street Interior alterations to combine units 750 and 780 <700> for existing offices for a new office space on the 7th floor of this existing commercial building on this site. Scope of work includes: new universal bathroom, new partitions, millwork, cladding, lighting, ceiling, mechanical, plumbing, sprinkler, flooring and elevator lobby redesign. Okay for Field Review as per City staff2025. · $850,000
    Reotech Construction Ltd
    Issued
  12. 2025-11-04 #2800 - 28th floor (#2800 expanding into a portion of #2840)*cancelled * See Revision #1 Interior alterations to provide improvements for this existing office tenant on the 28th floor (#2800) to expand into a portion of the adjacent unit (#2840) of this existing commercial building on this site. Scope of work: remove and construct demising wall to expand into a portion of #2840 , demo/ construct partition walls, doors/frames, ceiling, millwork, and finishes to alter layout in #2800, & minor alterations to #2840. Electrical, Plumbing, mechanical, sprinklers to suit. * REVISION #1 - Cancel proposed work to expand #2800 into a portion of #2840, No demo work to this area. #2840 will be demised into #2840 and #2810. #2840 will remain as the smaller unit and #2810 is assigned to the new unit. Electrical, & Mechanical revised to suit. Jan 16/26 mk * In compliance with VBBL 2025. · $200,000
    Elevation Ventures Inc
    Issued
  13. 2025-10-09 #1500 - 15th Floor Interior alterations by the landlord to provide a first tenant improvement to this existing office (shell) on the 15th floor (#1500) in this existing commercial building on this site. Scope of work: Complete tenant fit-out with finishes, electrical, mechanical/plumbing and sprinkler work. TENANT: McEwan Partners · $1,800,000
    Reotech Construction Ltd
    Issued
  14. 2025-10-09 Unit #1600 - 733 Seymour Interior alterations to provide first tenant improvements and change of use from General Office Shell to General Office to unit #1600 on the 16th floor (full floor tenant) at 733 Seymour Street of this commercial building on this site. · $920,000
    no contractor listed
    Issued
  15. 2025-10-01 #2310 & #2320 - 23rd floor (same tenant) Interior alterations to provide improvement for this existing tenant on the 23rd floor (units #2310 & #2320) of this existing commercial building on this site. Scope of work; complete tenant fit out to shell space in #2320 and minor renovation to finishes , upgrade security devices and appliances in #2310. Units will remain separate. * See BP-2024-05231 for interior demo to #2320. · $250,000
    no contractor listed
    Issued
  16. 2025-09-16 Exterior alterations to add storefront glazing, maglock door and enclosure to the Granville street entrance to the second floor of 650 W Georgia. OK for Field Review per City staff. · $20,000
    no contractor listed
    Issued
  17. 2025-08-15 #2650 - 26th Floor Interior alterations to provide improvements to this existing general office on the 26th floor (#2650) of this commercial building on site. Scope of work: Demolish ALL existing partitions, millwork, ceiling grid upgrades AND doors to create a new office layout, electrical and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $315,000
    VPAC Construction Group Ltd
    Issued
  18. 2025-07-31 #1510 - 15th Floor Interior alterations by the landlord to provide tenant improvements to this new office tenant on the 15th floor (#1510) of this existing commercial building on site. Scope of work: Complete demo of the existing layout for new office concept, electrical and sprinkler work to suit. TENANT: Great West Life Realty Advisors Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $130,000
    TotalPlan Inc
    Issued
  19. 2025-07-16 #1300 - 13th floor AND #1400 - 14th floor (demising from #800 for 7th to 4th flrs) Interior alterations to demise and provide improvements for a new office tenant on the 13th and 14th floor (#1300 & #1400) of this existing commercial building on this site. Scope of work: DEMISING EXISTING SUITE #800 INTO 2 UNITS (LEVELS 7-12 #800 AND LEVELS 13-14 #1300 &#1400) . Interior demo and construction of partition walls, door/frames, ceiling, millwork, finishes for new layout. Electrical, Mech/Plumbing, Sprinklers to suit. REVISION #1- removal of two Elevator Lobby glass doors (with mag locks and card reader access) on both levels. Revised door handles on level 14. Jan 30/25mk Ok for Field Review per City staff: ATKINS REALIS IS SUB-LEASING LEVELS 13 TO 14 flrs · $300,000
    no contractor listed
    Issued
  20. 2025-05-08 #780 - 7th Floor Interior alterations to provide improvements to this existing office on the 7th Floor (#780) in this existing commercial building on site. Scope of work: Demo existing partition walls, millwork, flooring, ceiling and return to vacant (shell) space. Some electrical, plumbing and sprinkler work to suit. Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $62,000
    Gibraltar Holdings Ltd
    Issued
  21. 2025-05-02 11th floor Interior alterations to the entire 11th floor to demolish all non load bearing partition walls and return to shell in this existing commercial building on this site. Scope of work: Demo all interior walls, tee-bar ceiling and ceiling tiles, existing lights and plumbing. Construct new tee-bar ceiling. Supply and install new LED lights and ceiling tiles. Sprinkler modification to suit. * BP-2024-03479 will be issued for tenant improvements under separate permit. * See BP-2024-03440 for work to interconnecting stairs from 9th to 11th floors. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing · $90,000
    Gibraltar Holdings Ltd
    Issued
  22. 2025-04-30 B40 Interior alterations to provide change of use from Fitness Centre (A2) to Health Care Office (D) (dentist) at B40 on the lower concourse level of this commercial building on this site. · $250,000
    no contractor listed
    Issued
  23. 2025-04-24 #1595 - 15th floor (expanding into a portion of (#1510) Interior alterations to this existing office space on the 15th floor, to expand unit #1595 into a portion of #1510 and provide improvement in this existing commercial building on this site. Scope of work; remove and relocate demising wall between unit#1595 and #1510 and provide improvement to the expanded area. Electrical and sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $165,000
    TotalPlan Inc
    Issued
  24. 2025-04-24 10th floor Interior alterations to provide tenant improvements to General Office space on the 10th Floor of this existing commercial building on this site. The scope of work includes: renovate the existing interconnecting stairs from 9th floor to 11th Floor. Note: 1.0. Application is reviewed under VBBL2019. · $2,800,000
    no contractor listed
    Issued
  25. 2025-02-21 #1600 - 16th Floor Interior alterations to provide improvement to this existing office tenant on the 16th floor (#1600) of this existing commercial building on site. Scope of work: Demo/construct partition walls, new millwork, ceilings, finishes, electrical and sprinkler work to suit. TENANT: GWL Realty Advisors · $325,000
    Gibraltar Holdings Ltd
    Issued
  26. 2025-01-13 #2320 - 23rd floor Interior alterations to provide improvements for an existing office on the 23rd floor (#2320) of this existing commercial building on this site. Scope of work: Demolish all existing partitions, plumbing fixtures, millwork, flooring carpet to return to shell, electrical and plumbing work to suit. Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $20,000
    Gibraltar Holdings Ltd
    Issued
  27. 2024-11-22 #2700 - 27th flr (full floor) Interior alterations to provide a first tenant improvement for a new full floor office tenant to this shell space the 27th floor (#2700) of this existing commercial building on this site. Scope of work; complete tenant fit out to shell space. Electrical, Plumbing, Mechanical, & Sprinklers to suit. · $3,250,000
    no contractor listed
    Issued
  28. 2024-11-05 #2700 - 27th floor Interior alterations to provide improvements to this existing full floor office space on the 27th floor of this existing commercial building on this site. Scope of work: complete tenant fit out to shell space. See BP-2024-01550 for interior demo work. *REVISION #1 - add two collaboration rooms. April 7/25. mk · $2,325,000
    Reotech Construction Ltd
    Issued
  29. 2024-11-04 #2650 - 26th Floor Interior alterations to provide tenant improvement to this new office tenant on the 26th floor (#2650) in this existing commercial building on site. Scope of work: Complete tenant fit out, new partition walls, doors for private offices, new boardroom, kitchen, electrical, plumbing and sprinkler work to suit. REVISION #1: Minor layout changes to accommodate an extra office. Some electrical and mechanical/plumbing work. Increase in project cost by $5,000.00 - Mar 20/25 - LLL TENANT: Stern Partners Inc · $505,000
    Elevation Ventures Inc
    Issued
  30. 2024-10-30 2350 - 23rd floor Interior alterations to provide improvements for an existing office tenant on the 23rd floor (#2350) of this existing commercial building on this site. Scope of work: Demo/New suspended & bulkhead drywall ceiling. District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $25,000
    Gibraltar Holdings Ltd
    Issued
  31. 2024-10-25 Interior alterations to provide tenant improvements to the lunch room for the existing Financial Institution on the P1 mezzanine level in this existing commercial building on this site. Scope of work - New kitchenette fittings with new appliances, interior walls & doors, new closet & storage, millwork, finishes, T-bar ceiling, lighting, plumbing & sprinkler work. Ok for Field Review per City staff · $365,000
    Matra Construction Inc
    Issued
  32. 2024-10-10 #1710 - 17th floor Interior alterations to provide improvements for a new office tenant on the 17th floor (#1710) of this existing commercial building. Scope of work: demo/ construct partition walls, doors/frames, millwork, T-bar ceiling, lighting, finishes for new layout. Electrical, Plumbing & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $150,000
    Gibraltar Holdings Ltd
    Issued
  33. 2024-09-18 #1000 - 10th Floor (Full Floor) Interior alterations to combine all units (#1088, #1010, #1015, #1018, #1020 and #1050) into one unit (#1000) to become a full floor office tenant in this existing commercial building on this site. Scope of work: Complete demolition of all existing interior partitions, flooring, millwork, finishes and return to shell. Some electrical, plumbing and sprinkler work. REVISION #1: To remove the existing common corridor complete with all walls, ceiling and fixtures - Increase in project cost of $18,000. - December 4/24 - LLL Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $218,000
    Gibraltar Holdings Ltd
    Issued
  34. 2024-08-30 #2800 - 28th Floor Interior alterations to provide improvements to this existing office tenant on the 28th floor (#2800) in this existing commercial building on site. Scope of work: Demo/construct partition walls, install new glass door and sprinkler work. TENANT: Terra Law Corp Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $25,000
    no contractor listed
    Issued
  35. 2024-08-14 #320 - 3rd floor ( expanding into a portion of #305) Interior alterations to this existing vacant office space on the 3rd floor (#320) to expand into unit #305 (retain #320) and provide improvements to the expanded area in this existing commercial building. Scope of work; remove a demising wall and partitions in unit #305 and add new partition for a copy room. * see also BP-2024-02727, also expanding into #305 · $56,800
    no contractor listed
    Issued
  36. 2024-08-13 #310 - 3rd floor (expanded into a portion of #305) Interior alterations to provide improvements to this existing office space on the 3rd floor to expand #310 into a portion of #305 in this existing commercial building. Scope of work; relocate a demising wall between #310 and #305, demo partitions throughout, and install new partitions for new layout. Electrical, plumbing, & Sprinklers to suit. * See BP-2024-02755, also expanding into #305 · $56,800
    no contractor listed
    Issued
  37. 2024-08-01 30th Floor - **This is a multi floor tenant with access between 30-33rd floors (all addressed at #3200 and reception is on 32/F) Interior alterations to expand suite #3200 to #3030 and to provide tenant improvements to this existing tenant on the 30th floor (#3200) in this existing commercial building. Scope of work: Remove the demising wall between the 2 suites retaining #3200, demolish select partitions to create more open concept workstation, electrical and sprinkler work. TENANT: Harper Grey LLP Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $140,000
    Aura Office Environments Inc
    Issued
  38. 2024-07-31 #3200 - 32nd Floor Interior alterations to provide improvements for an existing office tenant on the 32nd floor (#3200) of this existing commercial building. Scope of work: Convert the existing phone room into a new universal washroom, HVAC, electrical, plumbing and sprinkler work. TENANT: Harper Grey LLP Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $80,000
    Aura Office Environments Inc
    Issued
  39. 2024-07-15 #2350 - 23rd floor Interior alterations to provide improvements to this existing office space on the 23rd floor (#2350) of this existing commercial building on this site Scope of work: remove a partition wall to create a larger meeting room and remove millwork/reception desk. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $30,000
    Gibraltar Holdings Ltd
    Issued
  40. 2024-06-14 #1705 - 17th floor (demised from #1710 and expanding into a portion of #1760) Interior alterations to this existing vacant office space on the 17th floor to demise #1710 into two units (#1710/#1705)and expand into a portion of #1760 and to provide improvements to newly created #1705 in this existing commercial building on this site. Scope of work: demo of partitions, new demising walls, new partition walls, doors/frames, millwork, finishes. Electrical, Plumbing, Sprinklers to suit. · $56,800
    no contractor listed
    Issued
  41. 2024-05-30 #2700 - 27th Floor Interior alterations to provide improvement to this existing general office on the 27th floor (#2700) of this existing commercial building on site. Scope of work: Demolish tenant build out to return to shell space, electrical, plumbing and sprinkler work to suit. Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $420,000
    Gibraltar Holdings Ltd
    Issued
  42. 2024-04-19 #1900 and #2000 (19th and 20th Floor) Interior alterations to provide the First Tenant Improvements to the existing full floor office (shell) space on the 19th and 20th floors in this existing mixed use high rise building on this site. Scope of work: Complete tenant-fit out, HVAC, electrical, plumbing, mechanical and sprinkler work. TENANT: CAPSERVCO Limited Partnership · $2,000,000
    no contractor listed
    Issued
  43. 2024-04-15 #1218 - 12th Floor Interior alterations to provide tenant improvements for an existing general office on the 12th floor (#1218) of this commercial building. Scope of work: Demo and construction to alter layout for new offices and open area concept, electrical, plumbing and sprinkler work. · $275,000
    Syncor Solutions Limited
    Issued
  44. 2024-02-20 #1410 - 14th floor Interior alterations to provide improvements for an existing office tenant on the 14th floor (#1410) of this exiting commercial building. Scope of work: demo and construction to select areas to alter layout for 4 new offices and reconfigure door to meeting room and kitchen area. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $175,000
    BC Coastal Projects Ltd.
    Issued
  45. 2024-02-14 6th floor - #640 demised into #640 and #650 Interior alterations to the 6th floor, to demised the existing office space on the 6th floor (unit #640) into two units to be #640 and #650 of this existing commercial building on this site. Scope of work; demising wall to separate units only. Separate permit(s) required for any further work to these units. * District Building Inspector to determine if a Special Sprinkler Inspection Permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $10,000
    Reotech Construction Ltd
    Issued
  46. 2024-01-12 Lobby Area Interior alterations and a change of use from shell to Retail (Limited Food Service) in a portion of the office lobby on the ground floor of this commercial building on this site. Scope of work - Adding millwork, interior signage, finishes, plumbing and electrical work. OK for Field Review per City staff(no hood required) Appliances are less than or equal to 6 kW · $120,000
    Renovo Properties Inc
    Issued
  47. 2023-12-18 Interior alterations to add card readers to the existing exit doors in this existing office space from Level 9 to Level 11 in this existing commercial building on this site. OK to process as DTI as per City staff · $5,000
    Ainsworth Inc
    Issued
  48. 2023-11-20 Interior alterations to provide improvements to the elevator lobby on Level 12 to Level 17 in this existing commercial building on this site. OK to process as DTI as per City staff · $460,000
    Matra Construction Inc
    Issued
  49. 2023-09-13 #1910 - 19th floor Interior alterations to provide improvements for a new office display unit on the 19th floor (#1910) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, power & data, finishes, millwork, electrical, plumbing and sprinkler work. · $135,000
    no contractor listed
    Issued
  50. 2023-08-22 #1595 - 15th Floor (expanding to #1510) Interior alterations on the 15th floor for a new office tenant to expand a portion into unit #1510 and provide tenant improvements in this existing commercial Building. Scope of work: Demo select partition walls, doors/frames. Remove all ceiling tiles and flooring. Construct interior walls for new private offices, new paint, flooring, electrical, plumbing and sprinkler work TENANT: SITTINGS Realty Ltd Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $107,230
    TotalPlan Inc
    Issued
  51. 2023-07-12 #2350 - 23rd floor Interior alterations to provide a First Tenant Improvement to an existing office (shell) on the 23rd floor (#2350) in this existing commercial building on this site. Scope of work: construct partition walls, doors, HVAC, finishes, lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: Transca Real Estate Development (Canada) Ltd. REVISION #1: new reception desk layout with additional glazing wall and (2) glass doors, front door removed from scope, new security turnstile added, new lighting layour as per electrical drawings and modified diffuser layout as per mechanical drawings. · $850,000
    no contractor listed
    Issued
  52. 2023-07-11 Interior alterations to provide improvements to level 21 and 22, office spaces in this existing commercial building on this site. Scope of work includes minor removal of all interior walls. New walls, doors, millwork, finishes mechanical, electrical, plumbing and life safety. New Interconnected stairs between Floor 21 and 22. This project is related to AL-2023-00114 & AL-2023-00115 2019 VBBL · $6,900,000
    Govan Brown Ltd
    Issued
  53. 2023-06-09 #1400 - 14th floor Interior alterations to provide improvements for this new office tenant on the 14th floor (#1400) of this existing building. Scope of work: demo existing glass partition, doors, & flooring. Construct two interior offices, relocate millwork replace flooring with new. Electrical to suit. *District Building Inspector to determine if a Special Sprinkler Inspection permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $85,000
    no contractor listed
    Issued
  54. 2023-04-26 #2340- 23rd floor and #2800- 28th floor * (#2330 & #2340 combining; retaining #2340) *SEE REVISION #1 Interior alterations to the 23rd and 28th floor to provide improvements for this existing multi floor office tenant in this existing commercial building. Scope of work: remove a portion of demising wall between #2330 & #2340 (retain #2340) on the 23rd floor and reconfigure to accommodate a new work station. For the 28th floor (#2800) ; converting open area into two offices and enlarging two existing offices. * REVISION #1 - Delete 28th floor from scope of work. May 20/25 mk Ok for 2 floors on one permit per City staffrequired with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $66,000
    Omicron Construction Ltd
    Issued
  55. 2023-03-27 Interior alterations to create a public corridor and demise this existing office space into two office units on the 23rd floor of this existing commercial building. Revision#1 to provide the application form for the amendment of doors. OK for field review per City staff · $170,565
    no contractor listed
    Issued
  56. 2023-02-22 #3200 - 32nd floor Interior alterations to provide improvements for an existing office tenant on the 32nd floor (#3200) of this existing commercial building. Scope of work: demo/construction of partition walls, doors for new layout. Electrical & Sprinklers to suit. Ok to open BP for DTI, per City staffguration of the two corner offices for cost savings. 11/08/23 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $190,000
    Aura Office Environments Inc
    Issued
  57. 2023-02-22 #3300 - 33rd floor Interior alterations to provide improvements for an existing office tenant on the 33rd floor (#3300) of this existing commercial building. Scope of work: demo/construction of partition walls, doors for new layout. Electrical, plumbing & Sprinklers to suit. Ok to open BP for DTI, per City staffy no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $136,000
    Aura Office Environments Inc
    Issued
  58. 2023-02-16 #2490 - 24th floor Interior alterations to provide improvements for a new office tenant on the 24th floor (#2490) of this existing commercial building. Scope of work: demo and construct partition, doors, for new layout. Relocate lighting, power & data. New door entry. · $90,000
    BC Coastal Projects Ltd.
    Issued
  59. 2023-01-20 #2940 - 29th floor Interior alterations to provide improvements for an existing office tenant on the 29th floor (#2940) of this existing commercial building. Scope of work: demo/construction of partition walls, doors for new layout. Electrical, plumbing, & Sprinklers to suit. Note: this is an existing tenant on the 30th floor that is expanding into #2940. No interconnection between floors. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $350,000
    no contractor listed
    Issued
  60. 2023-01-18 Interior alterations to part of the 23rd floor of the new office building at 733 Seymour street, for a new office tenant space (Group D occupancy). 2019 VBBL · $1,600,000
    no contractor listed
    Issued
  61. 2022-12-08 Lunchroom - 2nd Level Basement Interior alterations to to provide for a new staff lunchroom on 2nd level basement in this existing commercial building on this site. Scope of work: construct partition walls to create two change rooms, lunchroom, new kitchenette, ceiling, lighting, electrical and plumbing work. OK for Field Review per City staff; Nov 28, 2022 L2 - Lighting - Upgrade to Local Control (per City staff.4.1.1(a) of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $10,000
    no contractor listed
    Issued
  62. 2022-12-08 #2420 - 24th floor Interior alterations to the 24th floor (#2420) to demolish all non load bearing partition walls and return to shell space in this existing commercial building. Scope of work: demo and return to shell. Replace existing ceiling and lighting. Sprinkler Permit is required. · $50,000
    no contractor listed
    Issued
  63. 2022-11-14 #2350 - 23rd floor (combining #2350 & 2370) Interior alterations to the 23rd floor to combine #2350 and #2370 (retaining #2350) and to provide tenant improvements for a new office tenant in this existing commercial building on this site. Scope of work: remove demising wall, glass partition, ceiling tiles and flooring. Construct new partition walls for interior office and boardroom, millwork, new lighting, electrical, plumbing and sprinkler work. L2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) Schedules submitted: · $210,000
    no contractor listed
    Issued
  64. 2022-10-11 Interior Tenant Improvements to levels 30-33 for new tenant, Sandstrom's, office. This is a first TI to an existing office shell space in this existing mixed use high rise building. Scope of work includes a convenience stair connecting all 4 floors (related to AL-2022-00114). Stage 1 - full construction accepted Oct.11/22 Erv · $8,650,000
    no contractor listed
    Issued
  65. 2022-08-16 22nd Floor - Lobby & Washrooms Interior alterations to provide improvements to the common corridors and washroom on the 22nd floor of this existing commercial building. Scope of work: Replace finishes to the elevator lobby and washroom. New floor tile, millwork, paint and electrical and plumbing work. No change to existing walls. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. L1 - Lighting - Upgrade internal Exit Signs to not exceed 5W per City staffith your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $30,000
    no contractor listed
    Issued
  66. 2022-08-16 21st Floor - Lobby and Washroom Interior alterations to provide improvements to the common corridors and washroom on the 21st floor of this existing commercial building. (See BP-2022-03827 for the Site Plan) Scope of work: Replace finishes to the elevator lobby and washroom. New floor tile, millwork, paint and electrical and plumbing work. No change to existing walls. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. L1 - Lighting - Upgrade internal Exit Signs to not exceed 5W per City staff Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $30,000
    no contractor listed
    Issued
  67. 2022-05-05 #1215 - 12th floor Interior alterations to provide improvements for an existing office tenant on the 12th floor (#1215) of this existing commercial building. Scope of work: remove/construct new partition walls and doors to create 3 new office spaces, finishes, electrical and sprinkler work. NOTE: Relocation of demising wall under BP-2021-01846 (#1218) Ok for Field Review per City staff: BOMA BESt (Path 1) - No Additional Upgrades Req'd\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $40,000
    Epic Spaces Inc
    Issued
  68. 2022-04-19 Tenant Improvement (first TI) for the offices of Owen Bird Law Corporation on the 28th and part of the 29th floors of this existing high rise mixed use building. The main entrance and reception desks will be on Level 29. No DP required as per City staffage 1 - full construction - accepted April 14/22 Erv · $2,774,132
    no contractor listed
    Issued
  69. 2022-02-22 #3200 - 30th floor **this is a multi floor tenant with access between 30th to 33rd floors. (Reception is on 32nd floor) Interior alterations to expand the existing office tenant #3200 (30th floor) into adjacent units #3000 and #3015 (retaining #3200) and to provide tenant improvements in this existing commercial building. Scope of work: remove a portion of the demising wall to expand into #3015 and validate removal of demising wall to expand into #3000, remove select partition walls/door, construct one partition wall/door, finishes, electrical and sprinkler work. TENANT: Harper Grey LLP Building Sprinkler - Separate sprinkler permit required for proposed sprinkler work. OK for Field Review per City staff(Path 2) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $48,000
    Aura Office Environments Inc
    Issued
  70. 2022-02-07 #640 - 6th floor Interior alterations to the existing office tenant and to combine #640 and #699 (retaining #640) in this existing commercial building on this site. Scope of work: remove a portion of the demising wall to combine #640 and #699, remove/construct partition wall, finishes, lighting, electrical, plumbing and sprinkler work. OK For Field Review per City staff ASHRAE 90.1-2016 (L2 upgrades) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $15,000
    Gibraltar Holdings Ltd
    Issued
  71. 2022-01-21 #2100 - 21st floor Interior alterations to provide improvements for the existing office tenant on the 21st floor (#2100) in this existing commercial building on this site. Scope of work: partial removal/construction of partition walls/doors, millwork, finishes, sink for new layout, plumbing, mechanical, electrical and sprinkler work. OK for TIPS per City staff · $260,000
    CDC Construction Ltd
    Issued
  72. 2021-12-21 Interior tenant improvement work to 24th, 25th, and part of 26th floor in a new commercial office tower (first TI). · $6,670,000
    no contractor listed
    Issued
  73. 2021-12-08 Interior renovations for Kabam (first TI) on the 7th through 14th floors. Reception is on Level 800. Revision #1: to create a floor opening between levels 7 and 8 Revision #2 to remove the sprinkler-protected glazing system due to the removal of the open stairs from Levels 11 to 13. Revision #3: Pressurization of Level 8 vestibules. · $19,500,000
    no contractor listed
    Issued
  74. 2021-10-12 #1800 and #1850 - 18th floor (T.I to #1800) Interior alterations to demise #1800 into two office units to be #1800 and #1850 and to provide interior alterations to the existing office tenant in #1800 in this existing commercial building on this site. Scope of work: construct new demising walls and remove/construct partition walls, doors, finishes, millwork, lighting, card reader, electrical, mechanical, plumbing and sprinkler work. TENANT: Bank of Nova Scotia Rev #4 - To correct job description to demise #1800 into two office units to be #1800 and #1805 per City staff) Revise wellness room to universal washroom b) Revise reception layout - delete custom millwork & revise lighting to suite c) Relocate electrical panel to inside of wall (Lan room side) d) Change room 1803 from "phone booth 1 to Office, Furniture & lighting only e) Add additional wave activated automatic door operations f) Revise door hardware spec g) Delete print room (1812) equipment & door h) mirror door location room 1819 i) Increase construction cost of 10,000.00 Revision #2 - Reinstate spray-applied fire resistive material to underside of ceiling and support columns where was removed during asbestos abatement process - Increase construction cost of 27,500.00 Revision #1 · $1,296,500
    no contractor listed
    Issued
  75. 2021-08-12 #2110 - 21st floor Interior alterations to provide improvements for this existing office tenant on the 21st floor (unit #2110) of this existing commercial building on this site. Scope of work: Replace entrance doors with new glazing door. OK for Field Review per City staff: Energy trigger not required BOMA BEST building. · $10,000
    Gibraltar Holdings Ltd
    Issued
  76. 2021-06-23 #1218 - 12th floor Interior alterations to provide improvements for an existing office tenant on the 12th floor (#1218) of this commercial building. Scope of work: move the demising wall to reduce the size of #1218, (& increase the size of #1215) remove a partition wall/door, mechanical and electrical work. REVISION #1: to remove the existing T-Bar Grid System, sprinkler heads in the affected area are to be turned up and the project value increased from $12,000.00 to $17,000.00. July 25, 2022 mlh TENANT: GWL Realty Advisors OK for Field Review per City staffnkler permit required. Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) · $17,000
    Gibraltar Holdings Ltd
    Issued
  77. 2021-06-14 #750 - 7th floor Interior alterations to provide tenant improvements for a new office tenant on the 7th floor (#750) in this existing commercial building on this site. Scope of work: To replace and install the entrance door. OK for Field Review per City staffkler permit required. Note: Energy trigger not required BOMA BEST building. · $7,500
    no contractor listed
    Issued
  78. 2021-06-04 #1-B15 Interior alterations to provide improvements to this existing limited retail food (E) tenant (Tim Hortons) of this existing commercial building on this site. Scope of work: Store renovation, Construct interior walls in kitchen. Re and re service area. Some equipment to remain, some relocate and some new. Plumbing, HVAC and Electrical work. · $180,000
    no contractor listed
    Issued
  79. 2021-01-26 #305 - 3rd floor Interior alterations to demise and provide improvements to this existing office tenant on the 3rd floor (#305) in this existing commercial building. Scope of work: demise #305 so that unit #320 can expand into the demised space (see BP-2020-03511), also to infill the floor between the 2nd floor mezzanine and this floor. Work includes removing interior partition walls, doors, finishes, relocating lighting, ceiling work, electrical, mechanical and sprinkler work. · $110,000
    BC Coastal Projects Ltd.
    Issued
  80. 2020-12-24 #320 - 3rd floor Interior alterations to expand #320 into a portion of #305 and to provide improvements to this existing office tenant space on the 3rd floor (unit #320) in this existing commercial building. Scope of work: #320 expanding in to the adjacent demised space created by unit #305 (See BP-2020-03508), and to infill the floor between the 2nd floor mezzanine and this floor. Work also includes removing a portion of an existing demising wall/door, construct new partition walls for staff kitchen and meeting room, ceiling work, finishes, power and data, HVAC, electrical, mechanical, plumbing work and sprinkler work. · $150,000
    BC Coastal Projects Ltd.
    Issued
  81. 2020-09-24 #750 - 7th floor interior alterations to provide improvements and to combine existing office space #750 and #710 while retaining suite #750 of this existing commercial building on the site. Scope of work includes new interior doors and walls, relocate exit door (D705B), electrical & sprinkler work. TENANT: Scotiabank · $250,000
    no contractor listed
    Issued
  82. 2020-03-05 #3300 - 33rd Floor Interior alterations to provide tenant improvements on the 33rd floor (#3300) of this existing mixed use building. Building Sprinklered – Separate sprinkler permit may required for proposed sprinkler work as per City staff020 Processed THRU Fit Energy upgrade exempt (BOMA BESt). · $260,130
    Aura Office Environments Inc
    Issued
  83. 2020-02-21 #710-7th floor Interior alterations to provide interior non load-bearing demolition to existing office space #710 on the 7th floor, leaving it as "shell office" space of this existing commercial building on this site. Scope of work per VBBL 2019 includes removal of GWB ceiling, bulkheads, lighting, HVAC, emergency lighting, etc. and also sprinkler work. OK for field review as per City staff: Interior Demolition Separate permit(s) and ASHRAE checklist will be required for future tenant improvements to this space. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. · $26,800
    no contractor listed
    Issued
  84. 2020-02-21 #1018 Interior alterations to provide tenant improvements of approx. 1,175 sq ft on the 10th Level (#1018) for a new General Office tenant in this existing office space in this commercial building on this site. Scope to include: Removal of entry doors and replace with new Interior Glass entry door, construct drywall and glazed interior partitions for new offices, meeting room, reception, lunchroom and IT closet. Lunchroom - Install a sink, dishwasher and new vinyl plank flooring. Reconfigure the existing HVAC, replace ceiling tiles, Fluorescent fixtures with new grid, tiles and LED fixtures throughout. Tenant: Crabtree Law OK For Field Review per City staff.2020 Notes: Energy Upgrade: E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Building Sprinklered – Separate Sprinkler permit required for proposed sprinkler work (Priority Fire - Sprinkler Contractor) · $150,000
    Gibraltar Holdings Ltd
    Issued
  85. 2019-11-12 Construction of New Office high-rise building (shell) with below and above grade parking. The new structure will be connected to the existing building at 650 West Georgia on the ground floor and first basement (mall) level. Project includes renovations to the existing main entrance lobby of 650 West Georgia with replacement of the existing lobby canopy and glazing. STAGED CONSTRUCTION Stage I (excavation/shoring) issued March 16, 2018. Stage II (foundation to grade) issued March 28, 2019. Stage III (full structure) issued November 12, 2019. Stage IV (full construction ) issued February 27, 2020. Revision 1: to coordinate work in the area of the existing main entrance lobby of 650 W Georgia (issued August 25, 2020). Revision 2: to provide an interconnection between 7 and 8 floor level. Revision #3: changes on Levels 24, 25 and 26 to accommodate a future tenant. Revision #4: To revise ground floor vestibule at bank (VCI) and bicycle storage areas. (related DPMA DP-2022-00423) · $145,650,000
    Ledcor Construction Limited
    Issued
  86. 2019-10-08 #1020 - Interior alterations to demise this existing unit (#1020) in to two separate units. #1020 to remain with interior alternations to provide tenant improvements for a new office and unit #1018 for a office shell in this existing commercial building. Scope of work to include: Add a demising wall to create two units. Unit #1020 to build new interior walls for a new office tenant and add a kitchenette. Unit #1018 to be a Office Shell, future permits required for any tenant improvements. Selected energy upgrade: N/A (BOMA BESt (Path 2)) OK For Field Review as per City staff.2019 · $100,000
    Gibraltar Holdings Ltd
    Issued
  87. 2019-09-25 #3000 - 30th Floor Interior alterations to provide tenant improvements on the 30th floor (#3000) of this existing mixed use building. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK for Field Review as per City staffbuilding. · $324,075
    no contractor listed
    Issued
  88. 2019-09-13 Unit #620 Interior alterations to provide improvements for new General Office tenant in unit #620 in this existing commercial building. · $250,000
    no contractor listed
    Issued
  89. 2019-08-26 #1550-15th floor Interior alterations to provide tenant improvements to unit #1550 on the 15th floor for an existing General office tenant in this existing commercial building on this site. Scope of work: demolish/construct partition walls, glazing and doors, new lighting and electrical and sprinkler work. TENANT: Columbia Pacific Consulting Ltd. Energy Upgrade Exempt: BOMA Best OK for field review as per City staff · $27,000
    Epic Spaces Inc
    Issued
  90. 2019-08-15 #B11 Interior alteration and change of use from Retail to Financial institution and construct a kitchenette for staff in suite #B11 in this existing commercial building on this site. Okay to accept ASHRAE as per City staff9 Okay for field review as per City staff: BOMA BESt · $50,000
    no contractor listed
    Issued
  91. 2019-07-19 #2330 & #2340 - 23rd floor Interior alterations to demise this existing office unit #2340 into two units to be #2330 and #2340 on the 23rd floor of this existing commercial building on this site. Scope of work: remove portion of wall, flooring, finishes, millwork, dishwasher/sink, construct new demising wall, finishes, ceiling work, new countertop/sink in #**** and electrical work. TENANT: Terra Law Corp OK for field review per City staffg inspector to determine on site if a separate sprinkler permit is required Energy upgrade exemption: BOMA BESt · $50,000
    no contractor listed
    Issued
  92. 2019-07-12 #1015-10th Floor Interior alterations to provide tenant improvements on the 10th floor (#1015) for an existing tenant in this existing mixed use building. Scope of work: demolish partition walls and door, electrical work. TENANT: Day-Lee Foods Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK for Field Review - June 28/19 Processed Thru FIT Energy upgrade exemption-BOMA BESt · $5,000
    Gibraltar Holdings Ltd
    Issued
  93. 2019-07-04 #800 - 8th floor Interior alterations to provide tenant improvements to the east portion of the 8th floor unit (#800) for this existing full floor General Office tenant in this existing commercial building on this site. Scope of work includes : demo/construct new partition walls and doors for new reception, kitchen, meeting rooms. Note: existing interconnecting stairs to the 9th floor. · $200,000
    VPAC Construction Group Ltd
    Issued
  94. 2018-12-18 #680 - 6th floor Interior alterations only to provide an additional office room in this existing General Office tenant on the 6th floor (#680) at this existing commercial building. Scope of work: construct two interior partition walls/door for additional office room and sprinkler work. TENANT: Great West Life OK for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $15,000
    Gibraltar Holdings Ltd
    Issued
  95. 2018-11-28 #2670 - 650 West Gerogia Street To permit interior alterations to provide tenant improvements to this existing office space. Scope of work to include: Add 4 new offices, new paint, install new carpet tiles. Lighting and kitchen to remain as is, add auto sensors to offices. OK For Field Review as per City staff.2018 · $55,000
    Epic Spaces Inc
    Issued
  96. 2018-09-18 #1900 -19th floor Interior alterations to provide improvements to this shell space for new general office tenant on the 19th floor (#1900) of this existing commercial building. Scope of work: new partition layout, new finishes, adding 2 sinks, HVAC, electrical. and sprinkler work. Separate permit for demo work BP-2017-03923. ***REVISION #1: - Ceiling plan revised to new grid and new lighting. - Break room revised to T-bar. - Lighting and mechanical revised to suit changes. - Several pieces of millwork deleted from scope of work. - Revised ASHRAE. Feb 14/19 mk ******************************************** Ok for field review per City staffbuilding. · $600,000
    Reotech Construction Ltd
    Issued
  97. 2018-09-10 24th floor Interior alterations to existing common washrooms on the 24th floor of this existing commercial building on this site to provide upgrades. Scope of work includes remove/replace tile walls and flooring, lighting, fixtures, finishes, electrical, plumbing and sprinkler work. Okay for field review as per City staff. Energy Upgrade Exempt: BOMA best building · $40,000
    BC Coastal Projects Ltd.
    Issued
  98. 2018-09-10 3rd floor-common washrooms Interior alterations to existing common washrooms on the 3rd floor of this existing commercial building on this site to provide upgrades. Scope of work includes remove/replace tile walls and flooring, lighting, fixtures, finishes, electrical, plumbing and sprinkler work. Okay for field review as per City staff. Energy Upgrade Exempt: BOMA best building · $40,000
    BC Coastal Projects Ltd.
    Issued
  99. 2018-09-10 2nd floor-common washrooms Interior alterations to existing common washrooms on the 2nd floor of this existing commercial building on this site to provide upgrades. Scope of work includes remove/replace tile walls and flooring, lighting, fixtures, finishes, electrical, plumbing and sprinkler work. Okay for field review as per City staff. Energy Upgrade Exempt: BOMA best building · $40,000
    BC Coastal Projects Ltd.
    Issued
  100. 2018-08-29 #1300 - 13th floor (full floor) Interior alterations to provide improvements for a new office tenant and to combine office units #1300 and #1350 (retaining #1300) on the 13th floor of this commercial building on this site. Scope of work: demolish demising wall, partition walls (coffee area), doors, construct new partition walls (coffee area, reception, boardroom), millwork, finishes, lighting, power and data and electrical work TENANT: Groundwell Cloud Solutions · $65,000
    Fusion Project Management Ltd
    Issued
  101. 2018-08-01 #750 - 7th floor Interior alterations to provide tenant improvements for a new office tenant on the 7th floor (#750) in this existing commercial building on this site. Scope of work: construct new partition walls, doors, finishes, ceiling work, power voice and data plan, electrical, plumbing and sprinkler work. TENANT: Scotiabank OK for field review as per City staff: Energy Upgrade Exempted · $750,000
    no contractor listed
    Issued
  102. 2018-07-18 #2360 - 23rd floor Interior alterations only to provide improvements for a new General Office tenant on the 23rd floor (#2360) at this existing commercial building. Scope of work: demolish partition wall and two doors, construct partition walls for new offices, doors, ceiling work, finishes, electrical and sprinkler work. TENANT: Great West Life Assurance Company. OK for field review as per City staff. · $35,000
    Gibraltar Holdings Ltd
    Issued
  103. 2018-06-25 #2650 Interior alterations to relocate the demising wall to enlarge this existing office tenant into a portion of the adjacent office tenant (#2670). This is considered a minor renovation per City staff · $60,000
    Syncor Solutions Limited
    Issued
  104. 2018-06-18 #2800 - 28th floor Interior alterations to provide improvements for existing general office tenant on the 28th floor (#2800) to include new partition walls in this existing commercial building. Scope of work: demolish partition wall, construct new partition walls/glazing for 2 offices and accounting area, finishes, new lighting, electrical and sprinkler work. TENANT: Terra Law Corp. OK for field review per City staffilding. · $45,000
    Reotech Construction Ltd
    Issued
  105. 2018-05-30 #750 & #780-7th floor Interior alterations to expand this existing office unit #750 into a portion of existing office unit #780 and tenant improvements to #780 only in this existing commercial building on this site. Scope of work: demolish existing demising wall between #750 & #780, demolish partition walls, doors, remove existing sink, faucet and dishwasher, construct new demising wall (thereby decreasing size of #780), new glass entry door to #780, new kitchen layout (including new partition walls, sink, dishwasher, microwave, fridge), millwork, doors, lighting, power voice/data, electrical and plumbing work. See related Special Sprinkler Inspection No. IA-2018-00859. Separate building permit will be required for #750. Okay for field review as per City staff. No energy upgrade required. · $50,000
    Ledcor Construction Limited
    Issued
  106. 2018-05-01 #1218 - 12th floor Interior alterations to provide improvements for an new office tenant on the 12th floor (#1218) of this commercial building. Scope of work: to create a new server room. OK for field review as per City staff. No energy upgrade required. · $17,130
    Fusion Project Management Ltd
    Issued
  107. 2018-03-23 2nd Floor Interior alterations to provide renovation to the 2nd floor for the retail area. Scope of work includes changing storage room layout to create an office/sales counter area. OK for field review as per City staff. Energy upgrade: L2-lighting-upgrade to incorporate automatic lighting shutoff (per City staff.4.1.1 of ASHARE 90.1-2010) · $70,000
    Dogwood Maintenance Ltd
    Issued
  108. 2018-03-06 #1720-17th floor Interior alteration to provide tenant improvement in this existing office suite #1720 by demolishing all interior non-load-bearing partition walls and constructing new non-load-bearing partition walls in this existing commercial building on this site. Scope of work: demolish/construct partition walls, doors, millwork, new glazing, kitchen sink, card reader and finishes, electrical and sprinkler work. TENANT: Everbright Properties Okay for field review as per City staffting within an occupied space to High Efficiency light systems · $50,000
    Allspaces Design & Management Ltd
    Issued
  109. 2018-02-28 #2350 & #2360-23rd floor Interior alterations only to provide tenant improvements for a new General Office (presentation centre without vignette suite) use at unit #2350, which includes a new demising partition at this existing Vancouver Centre commercial building. Scope of work: demolish partition walls, remove plumbing fixtures, millwork, finishes, door, create new opening for entry door to #2360, construct new demising wall (#2350 demising into two units; to be #2350 and #2360), new partition walls, doors, glazing, millwork, card reader, finishes, ceiling work, electrical, mechanical, plumbing and sprinkler work. *T.I. work to #2350 only (#2360-new entry door only) Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to these units. · $300,000
    no contractor listed
    Issued
  110. 2018-02-27 #2840 - 28th floor Interior alterations to provide improvements for the existing office tenant on the 28th floor (#2840) of this existing commercial building on this site. Scope of work: demolish partition walls, doors, millwork, construct new partition walls, doors, glazing, finishes, electrical and sprinkler work. TENANT: McKinsey & Co OK for field review per City staff. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $235,000
    Govan Brown Ltd
    Issued
  111. 2018-02-26 #B12 Interior alterations only and change of use of 1483 sq.ft. from Retail 'shell' to provide tenant improvements for a new Fitness Centre-Class 1 at unit #B12 at this existing Vancouver Centre commercial mall building. Scope of work also includes a new access corridor to the washrooms. Note: Retail 'shell' space approved under BP-2016-03499. Note: The new Fitness Centre-Class 1 use is for the tenants' of Vancouver Centre Mall and the employees of GWL Realty Advisors Inc. only and are not to be utilized by the general public at any time. OK for field review as per City staff. No energy upgrade required. · $80,000
    no contractor listed
    Issued
  112. 2017-10-13 To remove 2 levels of the parkade and above grade terraces, and to prepare for future relocation of services and interface with the new building. This permit is related to Phase 1 only as indicated on drawings submitted. Phase 2 (demolition of the existing loading dock) is indicated for reference only. Note: BP fees paid for the entire project including 2nd demo phase. · $550,000
    Ledcor Construction Limited
    Issued
  113. 2017-10-11 23rd floor common washrooms Interior alterations only to provide improvements to the common washrooms (replacing fixtures and finishes) on the 23rd floor of this existing commercial building on this site. OK for field review per City staff · $37,000
    no contractor listed
    Issued
  114. 2017-10-11 19th floor common washrooms Interior alterations only to provide improvements to the common washrooms (replacing fixtures and finishes) on the 19th floor of this existing commercial building on this site. OK for field review per City staff · $37,000
    no contractor listed
    Issued
  115. 2017-10-11 15th floor common washrooms Interior alterations only to provide improvements to the common washrooms (replacing fixtures and finishes) on the 15th floor of this existing commercial building on this site. OK for field review per City staff · $37,000
    no contractor listed
    Issued
  116. 2017-10-11 14th floor common washrooms Interior alterations only to provide improvements to the common washrooms (replacing fixtures and finishes) on the 14th floor of this existing commercial building on this site. OK for field review per City staff · $37,000
    no contractor listed
    Issued
  117. 2017-10-11 7th floor common washrooms Interior alterations only to provide improvements to the common washrooms (replacing fixtures and finishes) on the 7th floor of this existing commercial building on this site. OK for field review per City staff · $37,000
    no contractor listed
    Issued
  118. 2017-10-11 6th floor common washrooms Interior alterations only to provide improvements to the common washrooms (replacing fixtures and finishes) on the 6th floor of this existing commercial building on this site. OK for field review per City staff · $37,000
    no contractor listed
    Issued
  119. 2017-10-06 #1-B20 - Lower Concourse Level Interior alterations to provide improvements to the Canada Post inside this retail tenant (London Drugs) at unit #1-B20 on the lower concourse level of this existing commercial building on this site. Scope of work: interior demolition to walls and ceiling and replace with new. OK for field review per City staff. · $60,000
    no contractor listed
    Issued
  120. 2017-09-27 Temporary construction of rated hoarding walls and new exit stair, and renovations to facilitate connection of the existing building located at 650 W Georgia to new office tower. Revision 1: Minor changes to the proposed mailroom layout. (issued Dec. 3, 2018). Revision 2: changes to the existing lobby including removal of limited section of Levels 2 floor slab to increase double height lobby space (issued August 25, 2020). Demolition work is under separate permit (BP-2017-03745). Related to BP-2017-02775 (new construction). BP fees paid under BP-2017-02775.
    Ledcor Construction Limited
    Issued
  121. 2017-09-26 Demolition of an existing above-grade parkade structure only at 753 Seymour St for this existing commercial building. No excavation greater than 4' or shoring permitted. OK for SIPS per City staff: BP-2017-03501 for the salvage and abatement Separate permit is required for below grade parkade. Landscape Note: No tree protection barriers required per City staff · $1,000,000
    Pacific Blasting & Demolition Ltd
    Issued
  122. 2017-08-23 #1900 Interior alterations only to remove non-loadbearing partition walls in this existing general office on the 19th floor of this existing commercial building on this site. OK for SIPS per City staff: 1) Shell space only, separate permits will be required for tenant improvements. · $15,000
    no contractor listed
    Issued
  123. 2017-07-27 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this above-grade parkade structure only at 753 Seymour St for this existing commercial building. Separate permit is required for below grade parkade.
    Ledcor Construction Limited
    Issued
  124. 2017-07-24 To allow salvage and abatement of hazardous materials. (for BP-2017-03745).
    Ledcor Construction Limited
    Issued
  125. 2017-06-07 #1410-14th floor Interior alterations to provide improvements for a new office tenant at this existing "shell" office unit #1410 on the 14th floor of this existing commercial building on this site. Scope of work: construct partition walls, new glazing, doors, finishes, ceiling tiles, lighting, mechanical, electrical, plumbing and sprinkler work. TENANT: Square One Insurance Services Inc. · $250,000
    no contractor listed
    Issued
  126. 2017-06-07 #1900 & #1910-19th floor Interior alterations only to reduce the existing General Office tenant space at unit #1900 and to install a new demising partition to create a new General Office tenant space to be addressed as unit #1910 at this existing commercial building. Tenant improvements to #1910 only. Scope of work: remove interior partitions, doors, glazing, millwork, construct new demising wall to divide #1900 into two units (#1900 & #1910), new glazing, doors, kitchenette, lighting, finishes, electrical, plumbing and sprinkler work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. TENANT: GWL Realty Advisors Inc. (main reception: #1600) OK for field review as per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $100,000
    Pacific One Contracting
    Issued
  127. 2017-04-06 #1510 - 15th floor Interior alterations for this existing office tenant in unit #1510 on the 15th floor of this existing commercial building on this site. Scope of work: demo and construct partition walls, doors, for new layout including kitchen. Alter Electrical for new lighting and communication, as well as plumbing, & sprinkler alterations. TENANT: Enoxtension Technologies OK for field review per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $80,000
    All Spaces Project Management Ltd
    Issued
  128. 2017-04-06 Unit#1595 & #1510-15th floor Interior alterations to provide tenant improvements for this existing office tenant on the 15th floor (#1595) of this existing commercial building. Scope of work: Construction of new demising wall to expand into portion of #1510. Demolition of all non load bearing partition walls/doors in vacant unit #1510 to bring back to original shell, electrical, plumbing work. TENANT: #1595 - Sittings Realty Ltd. #1510 - Vacant Separate permit(s) and ASHRAE will be required for any future tenant improvements to Unit #1510. Related to IA-2017-00384 OK for field review as per City staff: BOMA BESt Building. · $20,000
    Pacific One Contracting
    Issued
  129. 2017-03-06 Interior alterations to provide tenant improvements for an existing office tenant by expanding unit #1215 into unit #1210, retaining #1215 on the 12th floor of this existing commercial building. Scope includes new millwork, minor electrical work, the removal of some partition walls and new partition walls. OK for field review as per City staff: BOMA Best · $65,000
    no contractor listed
    Issued
  130. 2017-02-02 #2800 Interior alterations to remove non-loadbearing walls and to provide tenant improvements for the existing general office tenant on the 28th floor of this existing commercial building. Ok for field review per City staff: BOMA Best · $93,000
    Aura Office Environments Inc
    Issued
  131. 2017-02-01 #2450 - 24th floor Interior alterations to provide improvements to existing office space for new office tenant on the 24th floor (#2450) of this existing commercial building. Scope of work; demo and construction of partition walls to change office layout, alter electrical, and sprinkler. OK for Field Review per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $18,000
    BC Coastal Projects Ltd.
    Issued
  132. 2017-01-09 Interior alterations for tenant improvement work within existing shell retail tenant space. Shell created under BP-2016-03674. OK for BP as per City staff · $460,000
    Ledcor Construction Limited
    Issued
  133. 2017-01-09 Interior and exterior alterations to change the major occupancy of the 2nd floor from school (A2) to retail (E) creating a shell space triggering upgrades of F2,S3,N3,A3, and E3. Stage 1 is for full permit. OK for BP as per City staff · $750,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05