Permit GopherAlberta and B.C. property, permit and zoning records

639 Hornby St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 62 building permits are on file, most recently “#520 - 5th floor Interior alterations to provide improvements for this existing office te…” (issued 15 September 2026). The City's 2026 assessed value is $189,004,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
62
Assessed value (2026)
$189,004,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 639 Hornby St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154146, 1,156 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,156
Households
490
Median age
37.6
Median household income (2020)
$74,000
Own their home
32%
Vancouver: 45%
Average household size
1.6
Under 15
3%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-09-15 #520 - 5th floor Interior alterations to provide improvements for this existing office tenant on the 5th floor of this existing commercial building on this site. Scope of work - To infill the interconnecting stairs between level 4 & 5 Ok for Field Review as per City staff · $25,000
    Vestacon Limited
    Issued
  2. 2026-08-28 #1120 - 11th Floor Interior alterations to provide improvements to this existing office tenant on the 11th floor (#1120) in this existing commercial building on site. Scope of work: Construct new partitions and doors to convert 4 private offices into 6 offices, electrical and sprinkler work to suit. TENANT: Singleton Urquhart Reynolds Vogel LLP Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $15,800
    Gibraltar Holdings Ltd
    Issued
  3. 2026-08-25 #300 – Level 3 (full floor tenant) Interior alterations to provide tenant improvements to this existing full floor office tenant in this existing commercial building on this site. Ok for Field Review as per City staff · $3,200,000
    no contractor listed
    Issued
  4. 2026-06-22 Interior alterations to remove the interconnecting stairs from 7th floor to 8th floor in this existing commercial building on this site. OK for Field Review per City staff · $25,000
    Vestacon Limited
    Issued
  5. 2026-05-25 #700 - 7th floor Interior alterations to provide improvement for this exisiting full (multi) floor office teant on the 7th floor (#700) of this existing commercial building on this site. Scope of work: Demolition and construction of non-structural partitions, ceilings, finishes and furniture/equipment. Electrical, Plumbing/Mechanical, & Sprinklers to suit. * Note: Existing interconnection to the 8th floor being removed under, BP-2026-01485. * All work in accordance wih VBBL 2025. Letters of Assurnace ; · $500,000
    Vestacon Limited
    Issued
  6. 2026-05-25 #400 - 4th floor Interior alterations to provide improvements for this existing full (multi) floor office tenant on the 4th floor of this existing commercial building on this site. Scope of work: demolition and construction of non-structural partitions, ceilings, finishes and furniture/equipment for new layout, including the slab infill at interconnecting stairs. Electrical, mechanical/plumbing, and sprinklers to suit. All work in accordance with VBBL 2025. · $500,000
    Vestacon Limited
    Issued
  7. 2026-02-02 #550 - 5th floor Interior alterations to provide improvements for this existing office tenant on the 5th floor (#550) of this existing commercial building on this site. Scope of work: enclose an open work area with two enclosed offices, including framing, new doors/frames, glazing and paint. Electrical to suit. In accordance with VBBL 2025. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $18,000
    Clavo Construction Ltd
    Issued
  8. 2025-10-09 Unit #2100 – 21st Floor Interior alterations at 925 W Georgia to provide tenant improvement to this existing full floor office on the 21st floor (Unit #2100) of this existing commercial building on this site. Scope of work: Demo/construct partition walls, ceiling, finishes, millwork, electrical, plumbing, mechanical, sprinkler work to suit. · $4,775,860
    Vestacon Limited
    Issued
  9. 2025-10-09 Unit #2000 – 20th Floor Interior alterations at 925 W Georgia to provide tenant improvement to this existing full floor office on the 20th floor (Unit #2000) of this existing commercial building on this site. · $4,518,381
    Vestacon Limited
    Issued
  10. 2025-10-09 Unit #600 – 6th Floor Interior alterations at 925 W Georgia to provide tenant improvement to this existing full floor office on the 6th floor (Unit #600) of this existing commercial building on this site. Revision #1: 1. Plan update - Slab Infill on Level 6 was found after demolition of walls surrounding stairs Revision #2 1. Level 6 MDF room layout change 2. Fire-rated bulkhead provided in MDF room. · $5,049,202
    Vestacon Limited
    Issued
  11. 2025-10-03 #902 & #906 - 9th Floor Interior alterations to expand office #902 to adjacent suite #906 (retaining #902) on the 9th floor and to provide improvements for this new tenant in this existing commercial building. Scope of work: Demolish the demising wall between #902 & #906 to create a larger space, demo/construct partition walls to create new private offices, electrical and sprinkler work to suit. TENANT: Alvarez & Marsal Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $56,000
    no contractor listed
    Issued
  12. 2025-07-23 #1000 - 10th floor Interior alterations to provide improvement to this new tenant in this existing office on the 10th floor (#1000) of this commercial building on site. Scope of work: Demo/construct drywall partitions, new glazing, finishes, electrical, plumbing and sprinkler work to suit. TENANT: Veritext Litigation Solutions · $300,000
    no contractor listed
    Issued
  13. 2025-06-04 #800 - 8th floor Interior alterations to provide improvements to this existing office space on the 8th floor (#800) of this existing commercial building on this site. Scope of work: demolish interior partition, build new to add new private offices and open areas. Electrical, plumbing, HVAC and sprinkler modifications to suit. New finishes and lighting to suit. New millwork/cabinetry. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $350,000
    no contractor listed
    Issued
  14. 2024-04-16 #1700 - 17th Floor Interior alterations to provide improvement for an existing full floor office tenant on the 17th floor (#1700) of this existing commercial building on this site. Scope of work: Construct 6 enclosed offices, new drywall partitions, doors/frames, glazing, finishes, electrical and sprinkler work to suit. TENANT: Lawson Lundell Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $65,000
    no contractor listed
    Issued
  15. 2024-01-12 #810 (expanding to #800) Interior alterations to provide improvements for an existing office tenant on the 8th floor (#810) to expand into a portion of the adjacent unit at #800 in this existing commercial building on this site. Scope of work: remove demising wall to expand into a portion of #800 to enlarge staffroom. Work includes partition walls, millwork, finishes. Electical and plumbing to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $25,000
    no contractor listed
    Issued
  16. 2023-10-18 Minor renovation Interior alterations to provide interconnecting stairs between the 14th and 13th floor (both floors are single tenant spaces having office use and major occupancy classification D) in this existing commercial building on this site for the existing tenant who also occupies floors 15th to 17th of the building. Included in the scope of the work is installation of a glazed door separating the north part of the level 13 elevator lobby from the rest of the floor area. The said door will be equipped with electromagnetic lock. Notes: 1- The permit is related to AL-2023-00071 and AL-2023-00154 2- Reviewed for compliance with VBBL 2019 · $1,775,000
    no contractor listed
    Issued
  17. 2023-07-19 #510 and #520 - 5th floor (*TI to #520) Interior alterations to demise office unit #520 into two units to be #510 and #520 and to provide tenant improvements for a new office tenant in #520 in this existing commercial building on this site. Scope of work: construct demising wall, partition walls for enclosed offices, meeting room, staff kitchen, electrical, plumbing and sprinkler work. TENANT: Robbie Fleming Lawyers OK for Office TI Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $120,000
    no contractor listed
    Issued
  18. 2023-06-28 #909 - 9th floor Interior alterations to provide tenant improvements for a new office tenant on the 9th floor (#909) in this existing commercial building on this site. Scope of work: construct new partition wall and doors to create two new small enclosed meeting rooms, electrical and sprinkler work. TENANT: InBC OK for Office TI Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $25,000
    no contractor listed
    Issued
  19. 2023-05-12 #1300 - 13th Floor (full floor) Interior alterations to provide tenant improvements for a new office tenant on the 13th floor (#1300) of this existing commercial building on site. Scope of work: Select demo of interior walls, demolish/build some offices, remove and relocate doors. Construct partition walls for new staff lounge, exercise room, new millwork and maglocks. Electrical, plumbing and sprinkler work to suit. TENANT: Lawson Lundell LLP NOTE: SEPARATE PERMIT FOR INTERCONNECTING STAIRS. SEE BP-2023-00856 · $655,000
    Aura Office Environments Inc
    Issued
  20. 2023-01-19 #1120 - 11th floor Interior alterations to provide improvements to the existing office unit on the 11th floor (#1120) in this existing commercial building on this site. Scope of work: remove partition walls, doors and construct new partition walls, doors, glazing, millwork, electrical and sprinkler work. TENANT: Singleton Urquhart Reynolds Vogel OK for FIT Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
    Counterpoint Interiors Inc
    Issued
  21. 2023-01-19 #1128 - 11th floor Interior alterations to provide tenant improvements for a new office tenant on the 11th floor (#1128) in this existing commercial building on this site. Scope of work: remove/construct partition walls, new lighting, power and communication, ceiling work, electrical, plumbing and sprinkler work. TENANT: Singleton Urquhart Reynolds Vogel OK for FIT Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $90,000
    Counterpoint Interiors Inc
    Issued
  22. 2022-12-02 Exterior alterations to provide improvements to this existing commercial building on this site. Scope of work includes to replace cooling tower on the roof. · $400,000
    no contractor listed
    Issued
  23. 2022-11-29 #105- Ground Floor Interior alterations to provide improvements for a new retail tenant at unit #105 on the ground floor of this commercial building on this site. OK for DTI per City staff; BOMA BESt building. Note: Storefront glazing is to remain clear and unobstructed. No translucent or opaque film, artwork, shelving, display case, curtains or similar elements are to be installed on or directly outside or inside of the approved glazing. Separate permit is required for all signage. · $15,000
    no contractor listed
    Issued
  24. 2022-11-02 #600 - 6th Floor Interior alterations to the existing office space on the 6th floor (#600) in this existing commercial building on site. Scope of work: remove partition walls, doors, T-Bar ceiling, millwork, finishes, add new finishes, new coffee counter, new lighting, electrical and sprinkler work. · $375,000
    no contractor listed
    Issued
  25. 2022-10-18 #1010 - 10th Floor Interior alterations to provide improvements to this existing vacant office space on the 10th floor (#1010) in this existing commercial building on site. Scope of work: remove/construct partition walls, doors, glazing, millwork, finishes, electrical, plumbing and sprinkler work. OK for Field Review for Office TI E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $105,000
    no contractor listed
    Issued
  26. 2022-07-19 #125 - Interior alterations only and change of use from the existing Retail Store to provide tenant fitout for a new Health Care Office use for a Dental Office in this 2,262.5 sq.ft. tenant space at unit #125 at this existing Cathedral Place commercial building. Note: Unit #120, #125, and #130 are combined with unit #125 being retained for this new Health Care Office use for a Dental Office. Note: OK for planning and to utilize the Downtown District, Section 2 - Retail Use Continuity 1.(c) for this proposed Health Care Office use for a Dental Office as per City staff. OK for field review as per City staff. E2 - lighting - upgrade to incorporate auto FULL off (per City staff.4.1.1.(h) of ASHRAE 90.1-2016 · $700,000
    no contractor listed
    Issued
  27. 2022-04-28 Interior and exterior alterations for N3 Upgrades in all exit routes and common areas for this existing commercial building. OK for field review per City staff · $10,000
    no contractor listed
    Issued
  28. 2022-02-09 Unit 1918 - 19th Floor Interior alterations to expand this existing office (Unit 1918) into a portion of the adjacent empty space (Unit 1925) in this existing mixed use building. Scope of work to include: construct new demising/partition walls to accomodate new layout, new doors/glazing, t-bar/ceiling work, finishes, electrical/lighting, hvac and sprinkler work. Building Sprinklered - Sprinkler permit required for proposed sprinkler work. · $85,000
    no contractor listed
    Issued
  29. 2022-02-07 Unit 1905 - 19th Floor Interior alterations to create six (6) office spaces in this existing office unit (1905) on the 19th floor of this existing mixed use building. Building (Cathedral Place) is required to have N3 upgrades. Commitment letter has been provided and reviewed under (BP-2021-02477) to have the majority of upgrades completed by early 2023. · $60,000
    no contractor listed
    Issued
  30. 2022-01-24 #1310 - 13th (full floor tenant) Interior alterations to provide improvements for this existing full floor office tenant on the 13th floor (#1310) of this existing commercial building. Scope of work: remove/construct partition walls, doors, millwork, finishes, electrical and sprinkler work TENANT: Singleton Urquhart Reynolds Vogal LLP **Tenant also occupies the entire 12th floor (#1200) NOTE: See related BP- 2021-05778 for interior alterations to #1200 Sprinklered Building - Separate sprinkler permit is required for proposed sprinkler work. OK for Field Review per City staff; Nov 8, 2021 E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $50,000
    Counterpoint Interiors Inc
    Issued
  31. 2022-01-13 #1200 - 12th (full floor tenant) Interior alterations to provide improvements for this existing full floor office tenant on the 12th floor (#1200) of this existing commercial building. Scope of work: remove/construct partition walls, doors, millwork, finishes, electrical and sprinkler work. TENANT: Singleton Urquhart Reynolds Vogal LLP **Tenant also occupies the entire 13th floor (#1310) NOTE: See related BP-2021-05799 for interior alterations to #1310. Sprinklered Building - Separate sprinkler permit is required for proposed sprinkler work. OK for Field Review per City staff; Nov 8, 2021 E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $50,000
    Counterpoint Interiors Inc
    Issued
  32. 2021-11-24 #520 & #550 - 5th floor Interior alterations (major upgrade) to demise #550 into two units to be #520 and #550 and for tenant improvements for a new office tenant in #550 in this existing commercial building on this site. Scope of work: construct demising wall, new partition walls, glazing, doors, millwork, finishes in #550, replace existing HVAC, electrical, plumbing, mechanical and sprinkler work. TENANT: RLG International Inc. · $415,000
    no contractor listed
    Issued
  33. 2021-09-01 #906 & #902- 9th floor Interior alterations to provide improvements for this new General Office tenant on the 9th floor (#906) in this existing commercial building. Scope of work: Demise #906 into # 906 and #902 , demo and construct new interior partition walls, doors, finishes, reflective ceiling, electrical, sprinkler work. OK for field review as per City staff. Energy Upgrade Exempt: BOMA BEST Building. · $65,000
    no contractor listed
    Issued
  34. 2021-08-05 #2300 - Floor 23 Interior alterations to provide improvements to this existing office tenant (Floor 23) in this existing commercial building on this site. Scope of work: deconstruct interior wall and door (single office), construct interior walls and two doors to create two offices. Electrical and sprinkler to suit. OK for field review as per City staffBI. · $15,000
    no contractor listed
    Issued
  35. 2021-07-19 #1600 - 16th floor Interior alterations to provide improvements to this existing full floor office tenant on the 16th floor (#1600) of this existing commercial building on this site. Scope of Work: construct partition walls to create work stations to a select area. Note: Energy trigger not required BOMA BEST building. · $25,000
    Omicron Construction Ltd
    Issued
  36. 2021-06-29 #910 - 9th Floor Major renovation to demise existing General Office (910) into two general office spaces (909 and 910) in this exciting commercial building on this site. Scope of work: Construct Demising wall. · $12,000
    no contractor listed
    Issued
  37. 2021-06-01 #908 - 9th floor Interior alterations to expand the existing office tenant in #908 into a portion of #910 in this existing commercial building on this site. Scope of Work: Relocate demising wall, remove interior/construct partition walls, doors, ceiling, millwork, finishes, lighting, electrical and sprinkler work. TENANT: McCurdy Financial Planning Inc. Note: Energy trigger not required BOMA BEST building. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. · $75,000
    no contractor listed
    Issued
  38. 2021-04-14 #1900 & #1905 - 19th floor *t.i. work to #1900 only Interior alterations to this existing office tenant to demise #1900 into two units to be #1900 and #1905 on the 19th floor of this existing commercial building on this site. Scope of work: remove interior door/frame, construct new demising wall, new glass entry door, relocate light fixtures, t-bar/ceiling work, finishes, electrical and sprinkler work. Building Sprinklered - Sprinkler permit required for proposed sprinkler work. Energy exemption: N/A (BOMA BESt (Path 2)) · $15,000
    no contractor listed
    Issued
  39. 2021-02-24 #800 - 8th floor Interior alterations to provide improvements for this existing office tenant on the 8th floor (#800) of this existing commercial building. Scope of work: add a partition wall, relocate 1 light fixture, add 3 new outlets. OK for field review per City staff.9.20 Selected Energy Upgrade: E4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1.1 of ASHRAE 90.1-2016) NOTE: Building sprinklered – Sprinkler Permit is not required. · $17,000
    Syncor Solutions Limited
    Issued
  40. 2020-12-15 Interior alterations, a change of use to the existing 7th floor (full floor single tenant office suite) & their 8th floor Southeast corner office space (same tenant as 7th floor which has an existing 7th - 8th floor interconnecting stair, removal of an existing interconnecting stair and infilling of the remaining existing floor opening (approx. 128 sq. ft.) between the 7th floor office suite and this same tenant`s office space at the Southeast corner of the 6th floor in order to create a new separate office suite at this 6th floor corner suite within this existing building (Cathedral Place). The existing interconnecting stair between the 7th and 8th floor will be retained. NOTE: The 2019 VBBL applies to this permit application which has been reviewed during the 2019 Covid-19 Pandemic. · $250,000
    no contractor listed
    Issued
  41. 2020-11-02 To replace the existing cooling tower on the rooftop level of this existing commercial building. Ok for field review per City staff · $880,000
    DAVIDSON BROS MECHANICAL CONTRACTORS
    Issued
  42. 2020-07-14 #550 - 5th floor *** Unit changed to #550 per City staffn area and interior demolition to unit #500 on the 5th floor of this existing commercial building on this site. Scope of work includes demolition of interior, create new common access corridor for egress to exit stairs, lobby and washrooms, revisions to layout, all finishes, sprinkler work · $150,000
    no contractor listed
    Issued
  43. 2020-04-28 Interior alterations only to provide tenant improvements for a new Retail Store use at unit #125 at this existing commercial Cathedral Place building. Tenant: Oro Eyewear Inc. OK for field review and district building inspector to determine if a sprinkler permit would be required as per City staff. Note: Energy trigger not required BOMA BEST building. · $3,000
    no contractor listed
    Issued
  44. 2020-03-23 #125 and #130 Interior alterations to relocate the demising wall between these two retail units in the ground floor of this existing building. OK for Field Review per City staff: 1. Building Sprinklered – a separate sprinkler permit is required. 2. Energy Upgrade Exempt - BOMA best · $2,000
    no contractor listed
    Issued
  45. 2019-11-01 Ground Level Exterior alterations to replace entry doors at both existing commercial buildings on this site. OK for Field Review per City staff11/19 Energy Upgrade exempt: BOMA best Building · $175,000
    no contractor listed
    Issued
  46. 2019-08-06 #1200 - 12th floor (full floor tenant) Interior alterations to provide improvements for this existing office tenant on the 12th floor (#1200) in this existing commercial building on this site. Scope of work: replacing boardroom partition and doors, demolish reception desk, replace servery counter and sink, power/communication alterations, new millwork, carpet and ceramic tile, electrical and plumbing work. TENANT: Singleton Urquhart Reynolds Vogel LLP OK for field review per City staff. Notes: 1. Building inspector to determine on site if a separate sprinkler permit is required. 2. Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $80,000
    Counterpoint Interiors Inc
    Issued
  47. 2019-06-05 Ground floor - 925 W Georgia St Interior alterations of approximately 1,279sf to change this existing office space to an end-of-trip bike facility for the use of the existing tenants in this existing commercial building on this site. Work to include men and women's showers, laundry facility and storage lockers. Bicycles are not to be stored in this area. · $450,000
    no contractor listed
    Issued
  48. 2019-04-03 #1310 - 13th floor Interior alterations to provide improvements to this existing full floor general office tenant on the 13th floor (unit #1310) of this existing commercial building. Scope of work: demolish walls and construct a new partition wall, to convert three offices into two, & relocate lighting, doors, glazing,electrical and data. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016) · $20,000
    Gibraltar Holdings Ltd
    Issued
  49. 2019-02-25 #1120-11th floor Interior alterations to relocate a demising wall between unit #1100 and #1120 to make suite #1120 slightly larger in this existing office unit in this existing commercial building. *tenant improvement work to newly expanded area of #1120 only Scope of work: demolish/construct demising wall, remove partition walls and door to create an open storage space, electrical and sprinkler work. TENANT: Singleton Urquhart Reynolds Vogl LLP REVISION #1-New glass wall (full height) at t-bar ceiling. Increase in value of $1,000. ASHRAE unaffected./May 28, 2019 jm Ok for field review per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $51,000
    no contractor listed
    Issued
  50. 2018-12-17 #800 & 810-8th floor Interior alterations to relocate the demising wall to make unit #800 larger and unit #810 smaller and other minor interior alterations including creation of a staff lunch area in this existing administrative office space (#810) in existing commercial building. Scope of work includes demolition of a section of existing demising wall for #800 to expand into a portion of #810, new millwork, electrical, plumbing and sprinkler work (#810). TENANT: #800 - AHIP (American Hotel Income Properties) #810 - O'Neill Hotels & Resorts Ltd. Ok for field review per City staff(see notes) No energy upgrade required. BOMA BESt building. · $35,000
    Syncor Solutions Limited
    Issued
  51. 2018-08-08 17th floor Interior alterations to provide tenant improvements for an existing office tenant. Scope of work: demolish/construct partition walls, doors, glazing, finishes, millwork, ceiling, lighting, mechanical, plumbing, electrical and sprinkler work. Revision #1-Add GWB partition and bulkhead at Work Stations 1764. ASHRAE review not required./September 28, 2018 jm Revision #2-To remove existing offices and add new walls, doors, lighting and mechanical to new offices. Increasing project value by $95,000.00 (original fees under BP-2018-02466). Changes to ASHRAE./Aug. 28, 2019 mlh TENANT: Lawson Lundell LLP (Reception-#1600) This tenant occupies interconnected floors 14 to 17. · $95,000
    Omicron Construction Ltd
    Issued
  52. 2018-08-08 16th floor Interior alterations to provide tenant improvements for an existing office tenant. Scope of work: demolish/construct partition walls, doors, glazing, finishes, millwork, ceiling, lighting, mechanical, plumbing, electrical and sprinkler work. TENANT: Lawson Lundell LLP (Reception-#1600) This tenant occupies interconnected floors 14 to 17.
    Omicron Construction Ltd
    Issued
  53. 2018-08-08 15th floor Interior alterations to provide tenant improvements for an existing office tenant. Scope of work: demolish/construct partition walls, doors, glazing, finishes, millwork, ceiling, lighting, mechanical, plumbing, electrical and sprinkler work. Revision #1-Delete GWB partition and bulkhead at Corporate Records 1522/Corridor 1526, ASHRAE review not required. September 28, 2018 jm TENANT: Lawson Lundell LLP (Reception-#1600) This tenant occupies interconnected floors 14 to 17.
    Omicron Construction Ltd
    Issued
  54. 2018-08-08 14th floor Interior alterations to provide tenant improvements for an existing office tenant. Scope of work: demolish/construct partition walls, doors, glazing, finishes, millwork, ceiling, lighting, mechanical, plumbing, electrical and sprinkler work. TENANT: Lawson Lundell LLP (Reception-#1600) This tenant occupies interconnected floors 14 to 17. · $6,126,700
    Omicron Construction Ltd
    Issued
  55. 2018-07-10 To provide exterior alterations to the existing outdoor courtyard in this existing Art Gallery (Bill Reid Gallery) on this site consisting of: 1. Removal of existing benches; 2. Patching and repairing; 3. Addition of a fabricated steel and glass pavilion; 4. Addition of glass panels to existing concrete fence. Notes: - See related DP-2018-00241. · $150,000
    Scott Special Projects Ltd
    Issued
  56. 2018-03-13 #101 - Ground floor Interior alterations to provide improvements for this existing retail tenant on the ground floor (unit #101) of this existing commercial building on this site. Scope of work: Change interior storefront. Remove interior perimeter glazing and glazed door. Remove overhead steel structure. Replace with new tempered glass glazing, tiles, drywall, sprinkler work. TENANT: Black Goat Cashmere Inc. · $70,000
    no contractor listed
    Issued
  57. 2017-11-24 Interior alterations to all 3 levels of the existing art gallery/museum space in this existing commercial building to provide improvements by relocating partition walls and other minor interior alterations. OK for field review per City staff · $1,300,000
    Scott Special Projects Ltd
    Issued
  58. 2017-07-24 #1908-19th floor Interior alterations only to provide a full tenant improvement of 206.2 m2. for a new General Office use on the 19th floor (#1908) in this existing Cathedral Place commercial building on this site. Scope of work: demolish/construct partition walls and millwork, remove/replace and new doors, remove glazing, new card reader/electric strike, new finishes, electrical and sprinkler work. Relocate less than 10% lighting. OK for field review as per City staff. Selected energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $70,000
    Fusion Project Management Ltd
    Issued
  59. 2017-06-06 #810-8th floor Interior alterations to provide improvements for a new office tenant on the 8th floor (#810) in this existing commercial building. Scope of work: construct partition walls, new glazing, doors, millwork, lighting, ceiling, electrical, plumbing and sprinkler work. Note: #800 and #810 will share a server room and new staff lunch area (located in #810). See related BP-2017-01942 to demise #800 into these two units. These units are connected by a door with electronic strike/card reader. Address Note: Suite number to be posted by suite entry prior to final building inspection. TENANT: O'Neill Hotels & Resorts Ltd. ok for field review per City staff: BOMA BESt Building. · $300,000
    Syncor Solutions Limited
    Issued
  60. 2017-06-06 #800 and #810-8th floor Interior alterations to provide improvements for a new office tenant and to demise this tenant space on the 8th floor (#800) in this existing commercial building. Scope of work: construct demising wall with a new interconnecting (electronic strike/card reader) door creating #800 and #810, tenant improvements to #800 only including to demolish/construct partition walls, new glazing, doors, millwork, lighting, ceiling, electrical, gas, plumbing and sprinkler work. Note: The two offices will share a server room and new staff lunch area located in newly created #810. See BP-2017-01944 for tenant improvements to #810. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. TENANT: #800-AHIP (American Hotel Income Properties) Reid LP ok for field review per City staff: BOMA BESt Building. · $220,000
    Syncor Solutions Limited
    Issued
  61. 2017-05-30 #105 Interior alterations to remove and construct glazing partitions to the unit 105 on the first floor of this existing commercial building on this site. Scope of work includes removal of interior interconnection to the lobby. Okay for field review as per City staff · $400,000
    no contractor listed
    Issued
  62. 2017-05-01 #1800-18th Floor Interior alterations to provide tenant improvements for this existing office tenant on the 18th floor (#1805) of this existing commercial building. Scope of work: Includes demolition of demising wall for unit #1805 to expand into adjacent unit #1820 and to be readdressed as #1800 (full floor tenant). Demolition/construct partition walls/doors to create new office layout. Remove and relocate existing kitchens to new location, electrical, plumbing and sprinkler work. ADDRESS NOTE: #1805 & #1820 to be cancelled upon permit issuance and is to be removed from the building/suite entry. #1800 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: First Majestic Silver Corp. Selected Energy Upgrade: L2 - SWH - Upgrade SWH system Temperature Controls (per City staff.4.4.1 of ASHRAE 90.1 - 2010) · $330,000
    Syncor Solutions Limited
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.