Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
609 Granville St, Vancouver
An address in Downtown, Vancouver, zoned CD-1 (455) (Comprehensive Development). 259 building permits are on file, most recently “#D038A - lower level mall Interior alterations to provide improvements for a new retail t…” (issued 2 November 2026). The City's 2026 assessed value is $805,542,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154146, 1,156 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-11-02
#D038A - lower level mall Interior alterations to provide improvements for a new retail tenant on the lower level mall (#D038A) of this existing commercial building (Pacific Center Mall) Scope of work: Demolition and complete tenant fit out for new jewelry store. Electrical, Plumbing, mechanical, & sprinklers to suit. Ok For Field Review per City staff · $268,000
applicant withheld (individual) Issued -
2026-10-30
#D005 Interior alterations to provide tenant improvements to this retail space on the lower level (#D005) of this existing Pacific Center Mall building. OK for field review per City staff. DBI to determine if sprinkler drawings is required. · $300,000
no contractor listed Issued -
2026-09-15
Common Washrooms - 14th floor Interior alterations to provide improvements to the common washrooms on the 14th floor of this commercial building on this site. Ok for Field Review as per City staff · $200,000
no contractor listed Issued -
2026-09-10
#880 - 8th floor Interior alterations to demolish non load bearing partition walls, glass partitions, doors/frames, and kitchenettte in this vacant office space on the 8th floor (#880) of this existing commercial building on this site. Scope of work: remove one office and and one of the kitchenettes. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $22,000
Central West Project Management Inc. Issued -
2026-08-14
#1200 - 12th floor Interior alterations to the 12th (#1200) to provide improvements to the elevator lobby, corridors, reception and meeting room areas of this existing full floor office tenant in existing commercial building on this site. Scope of work: demo to select areas and new drywall and Tbar ceilings, new finishes, new millwork with sink and new meeting room glass front and doors. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $150,000
Reotech Construction Ltd Issued -
2026-07-28
R118-701 W Georgia St Interior alterations to provide tenant improvements for this existing Retail (Group E) tenant at unit R118, in the lower mall level this existing Pacific Centre mall building. Scope of work includes: partitions, doors, bathroom updates, millwork, electrical, plumbing, mechanical, sprinklers, storefront, fixtures and finishes. Okay for Field Review as per City staff clear and unobstructed. No translucent or opaque film, artwork, shelving, display case, curtains or similar elements are to be installed on or directly outside or inside of the approved glazing. Separate permit is required for exterior signage. · $40,000
no contractor listed Issued -
2026-06-22
Interior alterations to install 2hr fire-rated wall in the food court area to the retail area (former Hudson Bay store) on the lower level of this existing Pacific Center Mall building. Ok for Field Review as per City staff · $15,000
Central West Project Management Inc. Issued -
2026-06-01
#R106 - 701 W Georgia St Interior alterations to provide tenant improvements to this existing retail space for existing retail tenant on the lower level (#R106) of this existing Pacific Centre Mall building OK for Field Review per City staff · $180,000
no contractor listed Issued -
2026-05-08
#D001 - 701 W Georgia Street Interior alterations to provide tenant improvements to this existing retail space for a new retail tenant on the lower level (#D001) of this existing Pacific Center Mall building. Revision #1: 1. To demolish back of house wall and racking. 2. Storefront line to align with lease line. Revision #2: 1. To add wire shelving in back of house. Okay for Field Review as per City staff · $506,000
no contractor listed Issued -
2026-04-20
701 W Georgia Interior alterations for voluntary fire alarm upgrade to this existing Office building on this site. BP - Enquiry Centre. As per City staff · $540,000
no contractor listed Issued -
2026-04-07
#420 - 4th floor Interior alterations to provide improvements for this existing office space on the 4th floor (#420) of this existing commercial building Scope of work: demo to select areas, patch/repair, new partition walls, tempered glass walls, millwork, finishes. Electrical, mechanical, sprinklers to suit. * All work in accordance with VBBL 2025 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $60,000
Concrete Cashmere Ltd Issued -
2026-03-20
#700 - 7th floor Interior alterations to provide improvements for this existing full floor office tenant on the 7th floor (#700) of this existing commercial building on this site. Scope of work: demo/removeal of millwork, finishes, potlights, wall coverings to select areas, replace/upgrade kitchenette, reception, elevator lobby, new multi media room. Electrical, plumbing, sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $110,000
Central West Project Management Inc. Issued -
2026-03-03
#540 - 5th floor Interior alterations to provide improvements for this existing office tenant on the 5th floor (#540) of this existing commercial building on this site. Scope of work: demo to select areas and construct/install new partitions to alter layout. Electrical, Plumbing/mechanical, sprinklers to suit. * In accordance with VBBL 2025. · $150,000
no contractor listed Issued -
2026-02-11
D053 & D054- 701 W Georgia St Interior alterations to combine units D053 & D054 and to retain D054 and provide tenant improvements for this existing Retail (Group E) tenant, in the lower mall level this existing Pacific Centre mall building. Okay for Field Review as per City staff: 1. Updated cover sheet and revised door schedule 2. Revised life safety plans and revised demolition plan. 3. Revised construction floorplans and reflected ceiling plans. 4. Revised finish and fixture plans. 5. Revised interior elevations and storefront details. Tenant: Victoria's Secret & Co · $40,000
no contractor listed Issued -
2025-12-05
#450 - 4th Floor Interior alterations only to provide improvement to this existing general office on the 4th floor (#450) in this existing commercial building on site. Scope of work: Demo existing walls, door, electrical, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $25,000
no contractor listed Issued -
2025-12-05
#225 - 2nd Floor Interior alterations to provide improvement to this existing general office on the 2nd floor (#225) in this existing commercial building on site. Scope of work: Remove minor wall. Construct new kitchenette, new finishes, millwork, electrical and plumbing work to suit. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $65,000
Central West Project Management Inc. Issued -
2025-11-28
609 Granville St Common Washrooms - 7th floor Interior alterations to provide improvements to the common washrooms on the 7th floor of this commercial building on this site. · $170,000
no contractor listed Issued -
2025-11-26
16th Floor - common corridor and elevator lobby Interior alterations to provide improvements to the lobby area and corridors on the 16th floor of this existing commercial building on this site. Scope of work: Upgrade flooring, wall finishes, new paint, new partition wall infill, electrical and sprinkler work to suit. OK for TIPS per City staff · $230,000
no contractor listed Issued -
2025-11-24
#800 - 8th Floor - (lobby/corridors) Interior alterations to provide improvements to the lobby area and corridors on the 8th floor (#800) of this existing commercial building on this site. Scope of work: Upgrade flooring, wall finishes, new paint, millwork, electrical and sprinkler work to suit. OK for TIPS per City staff · $230,000
no contractor listed Issued -
2025-11-19
Unit D002 & Unit D003 701 W Georgia Interior alteration to provide tenant improvement and combine 2 units (unit D002 & unit D003) to create one new retail unit (unit D011D) (6,529 S.F.) in the lower mall level in this existing Pacific Centre mall building at 701 W Georgia St OK for field review as per City staff · $725,000
no contractor listed Issued -
2025-11-04
#1650 - 16th floor Interior alterations to provide improvements for a new office show suite, on the 16th floor (#1650) of this existing commercial building on this site. Scope of work: demo of all interior partition walls and install new partition walls, doors , millwork, finishes for new layout. Electrical , Mechanical/plumbing, and sprinklers to suit. REVISION #1: · $169,000
no contractor listed Issued -
2025-10-27
#1430 - 14th Floor Interior alterations to provide landlord improvements to this existing general office on the 14th floor (#1430) in this existing commercial building on site. Scope of work: Demolish existing partitions, flooring, millwork. Construct new private offices, kitchenette, new finishes, electrical, plumbing and sprinkler work to suit. OK for TIPS per City staffkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
no contractor listed Issued -
2025-10-16
Ground CRU - Unit #101 Interior alterations including alterations to the existing commercial kitchen in retail unit 101 (Group E) of the commercial building on this site with existing kitchen exhaust but new cookline and fire suppression. Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). · $450,000
no contractor listed Issued -
2025-09-12
Exterior and interior alterations to add 65.7 sf for a horizontal addition for a new vestibule at this commercial building on this site. Building Review Branch - Application is reviewed under VBBL 2019. - Part 11 Voluntary Upgrade. Revision #1- 2026-04-22- S.Le · $1,000,000
no contractor listed Issued -
2025-09-10
Interior alteration to provide tenant improvements for this existing retail store unit D026 in the lower mall level this existing Pacific Centre mall building at 701 W Georgia St Revision #1: To remove existing fire rated wall and build new 2 hour fire rated shaft bulkhead to enclose existing fire rated shaft. · $551,500
no contractor listed Issued -
2025-09-08
Unit 102 Interior alterations at 609 Granville Street to renovate this existing Restaurant Class 1 (A2) and to provide tenant improvement for a new tenant on the ground floor of this existing commercial building on this site. Revision #1: To adjust interior plans to match site conditions. Tenant: SLO Coffee Ok for field review per City staff. · $115,000
no contractor listed Issued -
2025-08-26
Interior alterations to provide tenant improvements in the lower level of this Pacific Centre Mall (common corridor) building at 701 W Georgia Street. Scope of work includes: Repairs to ceiling. New/ relocated ceiling lighting, fire alarm speaker and sprinkler heads. OK for field review as per City staff · $1,000,000
no contractor listed Issued -
2025-08-26
701 W Georgia D0052 Interior alterations to provide for a new tenant in existing retail store unit D0052 in the lower mall level in this existing Pacific Centre mall building. Scope of work: Interior alterations for new tenant OK for Field Review per City staff · $100,000
no contractor listed Issued -
2025-07-09
D0012 - 701 W Georgia Interior alteration to provide improvements for a new tenant in existing retail store unit D0012 in the lower mall level this existing Pacific Centre mall building. Scope of work: interior wall alteration, electrical & plumbing upgrade, HVAC work. · $200,000
no contractor listed Issued -
2025-06-25
G031 - 701 W Georgia Interior alterations to the retail store in unit G031 of Pacific Centre Mall at 701 W Georgia. OK for DTI per City staff · $252,500
no contractor listed Issued -
2025-06-04
D039 – 701 W Georgia St Interior alterations to provide tenant improvements for this existing retail tenant (Telus) to unit D039 on the lower level of this existing Pacific Centre Mall building on this site. Scope of work: Demising and reconstructing interior partition walls, electrical, plumbing, millwork & finishes · $370,000
no contractor listed Issued -
2025-05-30
#D026 Interior alterations to expand the existing retail store D026 into portion of D025 and change the existing retail space for storage room for one of the retail tenant in the lower mall level this existing Pacific Centre mall building. Scope of work: Demising and reconstructing interior partition walls, electrical, plumbing & finishes. NOTE: - This building is sprinklered. A separate sprinkler permit is required for all related work. · $80,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2025-05-23
Interior alterations to construct an elevated maintenance steel platform (10x9'10") above the office space on the southwest corner of the level 24th of this existing commercial building. OK to process as DTI as per City staff · $15,000
Central West Project Management Inc. Issued -
2025-05-16
Interior alterations to provide tenant improvements for this existing retail tenant (Ann Louise Jewellers) to unit D011 on the lower level of this existing Pacific Centre Mall building on this site. Scope of work: Demising and reconstructing interior partition walls, electrical, plumbing, millwork & finishes · $20,000
no contractor listed Issued -
2025-04-30
#G046B Interior alterations to provide improvements for a new Retail tenant at unit #G046B on the upper mall level of this commercial building on this site. Scope of work: - Install new partition, millwork, ceiling finishes, lighting, new mechanical duct. OK for Field Review per City staff · $225,000
no contractor listed Issued -
2025-04-22
Common Washrooms - 17th floor Interior alterations to provide improvements to the common washrooms on the 17th floor of this commercial building on this site. · $65,000
no contractor listed Issued -
2025-03-18
#D033 Interior alterations to provide tenant improvements to this retail space for a new retail tenant on the lower level (#D033) of this existing Pacific Center Mall building. · $325,000
no contractor listed Issued -
2025-03-12
#505 - 5th floor (#505 and #560 combining/retaining #505) - Interior alterations to the 5th floor of this existing vacant office space to remove a non load bearing demising wall between unit #505 and #560 (retain #505) in this existing commercial building on this site. No tenant improvement work included in this scope. * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $11,500
Central West Project Management Inc. Issued -
2025-03-11
#410 - 4th Floor Interior alterations to provide improvement to this existing general office on the 4th floor (#410) of this existing commercial building on site. Scope of work: Demolish partition walls and a door in the common area to become part of the unit. Construct new wall to the door opening. REVISION #1: Increase scope to demolish an additional 3 rooms and increase the project cost by $15,000. - July 22/25 - LLL OK For Field Review per City staffector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $24,000
Central West Project Management Inc. Issued -
2025-03-11
#D043 - 701 W Georgia St Interior alterations to provide improvements for this existing Retail tenant (Sephora) unit #D043 on the lower level of this existing Pacific Center Mall building on this site. Scope of work includes new interior walls, electrical, plumbing, millwork, & finishes. OK for Field Review per City staff · $125,000
no contractor listed Issued -
2025-02-18
#910 and #915 - 9th floor Interior alterations to provide improvements to existing office spaces on the 9th floor (unit #910 and #915) in this existing commercial building on this site. Scope of work: relocate a demising walls to reduce the size of #910 and enlarge unit #815, Two new partitions, a door, & 1 glass slider to create 2 new offices, and a work station in unit #910. 1 new partition with door to close off one room in #915, Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $35,000
no contractor listed Issued -
2025-02-11
#1420 - 14th Floor Interior alterations to provide landlord improvement to a new office tenant on the 14th floor (#1420) of this existing commercial building on site. Scope of work: Construct new partition walls for new boardroom, staff kitchen, new millwork and electrical work. TENANT: Maxim Limited Partnership Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
Aura Office Environments Inc Issued -
2025-01-17
Interior alterations to install shelving in this room to used as a remote storage room for one of the retail stores (Canada goose located on unit G031) on the lower level of this existing Pacific Center Mall building. · $60,000
no contractor listed Issued -
2025-01-15
791 W Georgia St To deconstruct the upper floors from top to level 5 of the hotel building on this site. Involves removal of concrete facade, columns, and slabs, as well as asbestos abatement. New construction or other alterations are not approved under this permit. · $12,355,300
PCL CONSTRUCTORS WESTCOAST INC Issued -
2025-01-13
#R127 Interior alterations to provide improvements for a new Retail tenant at this existing Retail unit #R127 on the lower level of this existing Pacific Center Mall commercial building on this site. Work involves relocation/replacement of furring walls, partition walls, shelving. New lighting fixtures. · $95,000
no contractor listed Issued -
2024-11-28
#2400 - 24th floor Interior alterations to provide improvements for a new multiple floor office tenant on the 24th floor (#2400) of this existing commercial building. Scope of work: full tenant fit out to shell space. See BP-2023-04269 or demo work. Tenant occupying 16th to 24th floors (except the 18th) · $1,620,820
SPL PROJECTS LTD Issued -
2024-11-28
#2300 - 23rd floor Interior alterations to provide improvements for a new multiple floor office tenant on the 23th floor (#2300) of this existing commercial building. Scope of work: full tenant fit out to shell space. See BP-2023-04264 or demo work. Tenant occupying 16th to 24th floors (except the 18th) · $2,170,406
SPL PROJECTS LTD Issued -
2024-11-28
#2200 - 22nd floor Interior alterations to provide improvements for a new multiple floor office tenant on the 22nd floor (#2200) of this existing commercial building. Scope of work: full tenant fit out to shell space. See BP-2023-04257 for demo work. Tenant occupying 16th to 24th floors (except the 18th) · $2,170,406
SPL PROJECTS LTD Issued -
2024-11-28
#2100 - 21st floor Interior alterations to provide improvements for a new multiple floor office tenant on the 21st floor (#2100) of this existing commercial building. Scope of work: full tenant fit out to shell space. See BP-2023-04258 for demo work. Tenant occupying 16th to 24th floors (except the 18th) · $2,170,406
SPL PROJECTS LTD Issued -
2024-11-28
#2000 - 20th floor Interior alterations to provide improvements for a new multiple floor office tenant on the 20th floor (#2000) of this existing commercial building. Scope of work: full tenant fit out to shell space. See BP-2023-04255 for demo work. Tenant occupying 16th to 24th floors (except the 18th) · $2,170,406
SPL PROJECTS LTD Issued -
2024-11-28
#1900 - 19th floor Interior alterations to provide improvements for a new multiple floor office tenant on the 19th floor (#1900) of this existing commercial building Scope of work: full tenant fit out to shell space. See BP-2023-04252 for demo work. Tenant occupying 16th to 24th floors (except the 18th) · $2,170,406
SPL PROJECTS LTD Issued -
2024-11-27
#D005 Interior alterations to provide tenant improvements to this retail space on the lower level (#D005) of this existing Pacific Center Mall building. · $150,000
no contractor listed Issued -
2024-11-22
#1600 - 16th floor (consolidate #1600, #1630, & #1675) Interior alterations to the 16th floor to combine #1600, #1630, & #1675 and provide improvements for a new full floor office tenant in this existing commercial building. Scope of work; to remove demising walls, partition walls and construct new partition walls, doors/frames, millwork, finishes. Electrical, plumbing, mechanical & Sprinklers to suit. * Tenant occupying 16th to 24th floors (except the 18th) · $460,180
SPL PROJECTS LTD Issued -
2024-11-22
#1700 - 17th floor Interior alterations to provide improvements for a new multiple floor office tenant on the 17th floor (#1700) of this existing commercial building Scope of work: demo/construct partitions to select areas. Millwork, finishes. Plumbing/Mechanical, Electrical, Sprinklers to suit. REVISION #1 - Decrease scope of work. Feb.26/25. mk Tenant occupying 16th to 24th floors (except the 18th) · $230,090
SPL PROJECTS LTD Issued -
2024-10-24
G051 - Georgia St Level (Pacific Centre Mall) Interior alterations to provide tenant improvements for a new retail tenant (#G051) on the Georgia St Level in this existing commercial building (Pacific Center Mall). OK for Field Review per City staff · $100,000
CE Miles Construction Ltd Issued -
2024-10-04
#D001 Interior alterations to provide tenant improvements to this retail space for a new retail tenant on the lower level (#D001) of this existing Pacific Center Mall building. · $45,000
no contractor listed Issued -
2024-09-26
1150 - 11th floor Interior alterations to provide improvement for a new office tenant on 11th floor (#1150) of this exiting commercial building on this site. Scope of work: remove two rooms to create open work space. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing · $18,000
Makcom Construction Ltd Issued -
2024-09-26
#1200 - 12th Floor Interior alterations to provide improvements for this existing multi-floor office tenant on the 12th floor (#1200) in this existing commercial building. Scope of work: Demo/construct interior walls, new door, finishes (in room 1222 & 1224), electrical and sprinkler work to suit. NOTE: Existing interconnecting stairs TENANT: British Columbia Securities Commission · $40,000
no contractor listed Issued -
2024-09-24
15th Floor - common corridor and elevator lobby Interior alterations to provide improvements to the lobby area and corridors on the 15th floor of this existing commercial building on this site. Scope of work: Aesthetic upgrade to existing elevator lobby and corridors including ceiling replacement, floor and wall finishes, fixtures, and sprinkler work. · $200,000
no contractor listed Issued -
2024-09-24
2nd Floor (Elevator lobby and corridors) Interior alterations to provide improvements to the lobby area and corridors on the 2nd floor of this existing commercial building on this site. Scope of work: Aesthetic upgrade to existing elevator lobby and corridors including ceiling replacement, floor and wall finishes, fixtures, and sprinkler work · $200,000
no contractor listed Issued -
2024-09-18
R122 - lower level mall Interior alterations to provide improvements for a new retail tenant (R122) on the lower mall level of this existing commercial building on this site. Scope of work; New security grille, wall partitions, ceiling, sales floor, change rooms, back of house area including accessible universal washroom. Plumbing, ductwork, lighting and electrical all connecting to existing mall services. Sprinkler services to be modified/added to suit. interior demo permit under BP-2022-01272 REVISION #1 - Add Maglocks. Jan 8/25 mk · $500,000
3469051 Canada Inc Issued -
2024-08-28
#910 - 9th Floor Interior alterations to provide tenant improvements for this existing general office tenant on the 9th floor (#910) of this existing commercial building. Scope of work: Select demo of existing walls, door, furniture and relocate existing data. TENANT: Pacific Centre c/o Cadillar Fairview Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $14,000
Central West Project Management Inc. Issued -
2024-07-10
D402A - lower mall level Interior alterations to provide improvements to the existing security breakroom on the lower mall level of this commercial building on this site. Scope of work: Upgrade finishes, new kitchenette, and washroom. Electrical, plumbing, and sprinklers to suit. Ok for Field Review per City staffr required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $99,560
Central West Project Management Inc. Issued -
2024-07-03
#1420 - 14th floor interior alterations to remove some non-load bearing partition walls in this vacant office space on the 14th floor (#1420) of this existing commercial building on this site. Scope of work: select demo to remove partition walls, and plumbing & electrical. *District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $30,000
Central West Project Management Inc. Issued -
2024-05-21
#560 - 5th floor Interior alterations to provide improvements for this existing office space on the 5th floor (#560) of this existing commercial building on this site. Scope of work: removing the existing glass partitions and modular partitions. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing · $28,000
Gibraltar Holdings Ltd Issued -
2024-05-01
#D054A Interior alterations to provide tenant improvement to an existing retail unit on the lower mall level (#D054A) of this existing commercial building. Scope of Work includes remodeling of the existing retail tenant space Tenant: Victoria Secret OK for Field Review as per City staff · $400,000
no contractor listed Issued -
2024-04-29
1875 - 18th floor Interior alterations to provide improvements for an existing office tenant on the 18th floor (#1875) of this existing commercial building on this site. Scope of work: divide one room into two and add a door. * District Building inspector to determine if a Special sprinkler Permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $20,000
Central West Project Management Inc. Issued -
2024-04-11
#300 - 3rd floor Interior alterations to provide improvements to the entrance doors to this existing full floor office tenant space on the 3rd floor (#300) of this existing commercial building on this site. Scope of work: upgrade court registry entrance doors and hardware, including automatic door operator. Ok for F/R per City staffrequired with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $30,000
no contractor listed Issued -
2024-02-27
#810 - 8th floor Interior alterations to provide improvements for a new office tenant on the 8th floor (#810) of this existing commercial building on this site. Scope of work; new kitchenette, millwork, vinyl flooring, and wall base. District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $18,000
Central West Project Management Inc. Issued -
2024-02-09
Interior alterations to provide improvements for a new retail (Limited Food Service) tenant in the food court (#FC-02) on the lower level of this mixed-use commercial high-rise building (Pacific Centre 1) on this site. Work to add a kitchen exhaust to remove heat and steam. Notes: 1. Premise has a low occupant load (< 25 people). 2. Washrooms for this premise are in the common area of this level. 3. A special sprinkler permit may be required if sprinkler heads are required to be removed, added, or relocated within this premise. 4. Permit reviewed and approved to VBBL #12511 (2019) · $70,000
no contractor listed Issued -
2024-01-15
G044 - upper mall Interior alterations to provide improvements for a new retail tenant on the upper mall level of this existing commercial building. Scope of work: demo /construct new partition walls, doors, millwork, finishes. Electrical, Mechanical, Sprinkler to suit. · $714,000
no contractor listed Issued -
2024-01-04
#D069 - "D" Lower Mall Level Interior alterations to the existing Retail unit #D069 and its associated storage room at 701 W Georgia Street, the lower level of Pacific Centre Mall. Scope of work includes coring of the slab for new plumbing and electrical, new storefront, finishes, interior walls and ceilings. Existing Tenant: Bath & Body Works Ok for Field Review as per City staff: - This building is sprinklered. A separate permit is required for all related work. · $342,000
no contractor listed Issued -
2023-12-21
Interior alterations to provide tenant improvements for this existing retail space on the 1st floor (D004-Dunsmuir Level) in this existing commercial building. Scope of work: demolish/construct partition walls, new fitting room area, new finishes, lighting, electrical, plumbing, sprinkler and mechanical work for new tenant layout. TENANT: Sketchers · $250,000
no contractor listed Issued -
2023-12-07
#2400 - 24th Floor (interconnecting stairs to 23rd floor) Interior alterations to remove all non loadbearing partitions and finishes on the 24th floor (#2400) and return to office 'vacant' space in this existing mixed-use building. Scope of work: Interior demo only of all tenant build out to return to shell condition, electrical, plumbing and sprinkler work. Retain the interconnecting stairs. · $150,000
no contractor listed Issued -
2023-12-07
#2300 - 23rd floor (interconnecting stairs to 24th floor) Interior alterations to remove all non loadbearing partitions and finishes on the 23rd floor (#2300) and return to office 'vacant' space in this existing mixed-use building. Scope of work: Interior demo only of all tenant build out to return to shell condition, electrical, plumbing and sprinkler work. Retain the interconnecting stairs. · $150,000
no contractor listed Issued -
2023-12-05
#2100 -21st floor Interior alterations to demolish all non load bearing partition walls in this vacant office space on the entire 21th floor (#2100) of this existing commercial building on this site. Scope of work: Interior demo only of all tenant build out to return to shell condition. * SEPARATE PERMIT(S) REQUIRED FOR ANY FUTURE IMPROVEMENTS TO THIS SPACE. · $150,000
no contractor listed Issued -
2023-12-05
#2200 - 22nd Floor (full floor tenant) Interior alterations to remove all non loadbearing partitions and finishes on the 22nd floor (#2200) and return to office 'vacant' space in this existing mixed-use building. Scope of work: Interior demo only of all tenant build out to return to shell condition, electrical, plumbing and sprinkler work. · $150,000
no contractor listed Issued -
2023-12-05
#2000 - 20th floor Interior alterations to demolish all non load bearing partition walls in this vacant office space on the entire 20th floor (#2000) of this existing commercial building on this site. Scope of work: Interior demo only of all tenant build out to return to shell condition. * SEPARATE PERMIT(S) REQUIRED FOR ANY FUTURE IMPROVEMENTS TO THIS SPACE. · $150,000
no contractor listed Issued -
2023-12-05
#1900 - 19th floor Interior alterations to demolish all non load bearing partition walls in this vacant office space on the entire 19th floor (#1900) of this existing commercial building on this site. Scope of work: Interior demo only of all tenant build out to return to shell condition. * SEPARATE PERMIT(S) REQUIRED FOR ANY FUTURE IMPROVEMENTS TO THIS SPACE. · $150,000
no contractor listed Issued -
2023-11-16
D054 expand/combine into D058 and demising and adding D053 - mall level Interior alterations to provide improvements to an existing retail unit on the lower mall level (D054) of this existing commercial building. Scope of work: demo to shell and remove demising walls to D054 and expand/combine into D058 (retain D054) and relocate demising wall on the adjacent side to divide and create D053. New partition wall/door in D053. * Separate permit(s) required for further improvements to these units. · $400,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2023-09-21
Exterior alterations to replace the cooling tower on the roof top of this existing commercial building. NOTE: no changes to building envelope as the existing roof piping penetrations will be reused · $1,042,400
Black & McDonald Limited Issued -
2023-09-18
#340 - 3rd Floor Interior alterations to provide tenant improvements for a new office tenant on the 3rd floor (#340) in this existing commercial building on this site. Scope of work: Demolish/construct partition wall, new kitchen pantry and closet, millwork, new dishwasher, electrical, plumbing and sprinkler work. TENANT: First Insurance Funding Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $35,000
Central West Project Management Inc. Issued -
2023-09-11
#200 - 2nd Floor Interior alterations to provide tenant improvements to this existing general office on the 2nd floor (#200) of this existing commercial building on site. Scope of work: Demolish select partitions to make an open concept, sprinkler and electrical work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $8,500
Gibraltar Holdings Ltd Issued -
2023-07-12
#D008 - Lower Level Mall Interior alterations to provide improvements for a new retail tenant on the lower level (#D008) of this existing Pacific Center Mall building. Scope of work: Demolish walls, ceilings, doors, millwork, flooring, shelving, light fixtures. Construct new walls for fitting rooms, new washroom, HVAC, electrical, plumbing and sprinkler work. TENANT: Psycho Bunny · $520,000
no contractor listed Issued -
2023-07-11
17th floor (full floor) Interior alterations to provide improvements for a new full floor office tenant on the 17th floor this existing commercial building Scope of work: construct new partition walls, doors, millwork, finishes, lighting, HVAC, fire alarm. Electrical, plumbing, sprinklers to suit. *REVISION #1 - add maglock hardware set for the south lobby doors. Feb2/24. mk See BP-2023-01980 for interior demolition Related to BP-2023-01891 for 16th floor (#1630) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $1,315,960
Central West Project Management Inc. Issued -
2023-07-11
#1630 - 16th floor Interior alterations to provide improvements to for a new office tenant on the 16th floor (#1630) of this existing commercial building. Scope of work: construct new partition walls, doors, millwork, finishes, lighting, HVAC, fire alarm. Electrical, plumbing, sprinklers to suit. TENANT: 609 Granville Vancouver Limited See BP-2023-01963 for interior demolition See related BP2023-01900 for the 17th floor Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $465,772
Central West Project Management Inc. Issued -
2023-06-30
#1675 - 16th floor Interior demolition of non load-bearing partition walls on the 16th floor (#1675) to create a "shell" office space. Scope of work: remove all partition walls, doors, flooring, T-Bar ceiling grid and tile, electrical and sprinkler work. Separate permit will be required for any tenant improvements to this space. · $90,000
Central West Project Management Inc. Issued -
2023-06-26
#D059A Interior alterations to provide improvements for existing retail tenant "Purdy Chocolatier" at CRU D059A in this existing commercial building. Scope of work: Remove/replace existing millwork, flooring, electrical, replacing existing HWT and plumbing, finishes, and interior signage TENANT: Purdy's Chocolatier · $80,000
no contractor listed Issued -
2023-06-15
17th floor ( full floor) Interior alterations to the 17th floor to remove all existing T-bar grid, GWB ceiling, exit signs, electrical communication and security equipment not essential to building operations in this existing commercial building. See BP-2023-01900 for tenant improvement work. · $90,000
Central West Project Management Inc. Issued -
2023-06-15
#1630 - 16th floor Interior demolition of non loading bearing partition walls on the 16th floor (#1630) to create a "shell" office space. Scope of work: remove all existing partition walls, doors, T-Bar ceiling grid and tile, finishes Separate permit(s) will be required for any tenant improvements to this space. See BP-2023-01891 for tenant improvements Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work · $75,000
Central West Project Management Inc. Issued -
2023-06-06
9th, 11th, 12th, & 16th floor - #1200 Interior alterations to provide improvements for this existing multi floor office tenant on the 9th, 11th, 12th, and 16th floors in this existing commercial building. Scope of work: demo and construction to select areas of the 9th,11th, 12th & 16th floors, including millwork, and finishes. Electrical, plumbing, mechanical sprinklers to suit. NOTE: * Reception on the 12th floor (#1200) · $2,050,000
no contractor listed Issued -
2023-06-06
10th floor - #1200 Interior alterations to provide improvements for this existing multi-floor office tenant on the 10th floor (#1200) in this existing commercial building. Scope of work: select demo/construction of partition walls, doors, millwork, finishes, & mechanical, electrical and plumbing to suit. * Reception on 12th floor * Existing interconnecting stairs · $950,000
no contractor listed Issued -
2023-05-10
CRU#G030 (upper level) Interior alterations to provide tenant improvements to retail unit#G030 on the upper level of this existing retail (Pacific Center Building). New tenant: Alo Yoga Canada, Inc. OK for field review as per City staff. Revision #1 · $1,194,450
no contractor listed Issued -
2023-03-07
#1700 - 17th floor (full floor) Interior alterations to demolish 17th floor vacant full floor office space and return to shell and to provide improvements to the elevator lobby in this existing commercial building. Scope of work: demo tenant space to return to shell for future tenant. New elevator lobby finishes & ceiling, ceiling mounted devices & fixtures in shell space. · $500,000
no contractor listed Issued -
2023-03-03
#G044 - upper mall level Interior alterations to provide improvements for a vacant retail space on the upper mall (#G044) level of this existing commercial building (Pacific Centre Mall) Scope of work: remove alter existing corner portion of demising wall, fixtures, ceiling, tiles and finishes. Construct a 2-hr fire rated wall, reinstate part of the ceiling. * Separate permit required for future proposed steel column. REVISION #1: Change applicant role from Contractor to Agent for Owner. Change of scope to full demolition of retail fixtures and finishes (return to shell). Increase of $20,000K in project value (from $15,035 to $35,035) Sept 5/23 - LLL Separate permit(s) required for an future tenant improvements * District Building Inspector to determine if a Special Sprinkler is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $35,035
Central West Project Management Inc. Issued -
2023-02-17
24th floor - Common Washrooms Interior alterations to provide improvements to common washrooms only on the 24th floor of this existing commercial building. Scope of work: remove/construct finishes, fixtures, ceilings, flooring, lighting, electrical, plumbing, mechanical and sprinkler work. · $150,000
no contractor listed Issued -
2023-02-17
23rd floor - Common Washrooms Interior alterations to provide improvements to common washrooms only on the 23rd floor in this existing commercial building. Scope of work: remove/construct finishes, fixtures, ceilings, flooring, lighting, electrical, plumbing, mechanical and sprinkler work. · $150,000
no contractor listed Issued -
2023-02-17
22nd floor - Common Washrooms Interior alterations to provide improvements to common washrooms only on the 22nd floor in this existing commercial building. Scope of work: remove/construct finishes, fixtures, ceilings, flooring, lighting, electrical, plumbing, mechanical and sprinkler work. · $150,000
no contractor listed Issued -
2023-02-17
21st floor - Common Washrooms Interior alterations to provide improvements to common washrooms only on the 21st floor of this existing commercial building. Scope of work: remove/construct finishes, fixtures, ceilings, flooring, lighting, electrical, plumbing, mechanical and sprinkler work. · $150,000
no contractor listed Issued -
2023-02-17
20th floor - Common Washrooms Interior alterations to provide improvements to common washrooms only on the 20th floor of this existing commercial building. Scope of work: remove/construct partitions, finishes, fixtures, ceilings, flooring, lighting, electrical, plumbing, mechanical and sprinkler work. · $150,000
no contractor listed Issued -
2023-02-14
19th floor - Common Washrooms Interior alterations to provide improvements to common washrooms only on the 19th floor in this existing commercial building. Scope of work: remove/construct finishes, fixtures, ceilings, flooring, lighting, electrical, plumbing, mechanical and sprinkler work. · $150,000
no contractor listed Issued -
2023-02-09
#1650 - 16th floor Interior alterations to demolish non load bearing partition walls in this existing vacant office space on the 16th floor (#1650) of this existing commercial building. Scope of work: demo existing feature walls, partition walls, doors/frames, carpets, flooring and baseboards. paint and repair damaged ceiling tiles. * District Building Inspector to determine if a Special Sprinkler Permit is required. · $25,000
Central West Project Management Inc. Issued -
2023-02-09
(FC-010) Interior alterations to unit FC-010 in the food court on Level D of this existing retail building to provide tenant improvements for a new tenant (Cazba Persian Grill) retail food Kiosk. Notes: - Part 11 upgrade to levels F1, S2, N1, A2 and E2 - Class 1 cooking operation - This permit has been reviewed under the requirement of VBBL #12511 (2019) · $85,000
no contractor listed Issued -
2023-01-20
#1200 - 12th floor Interior alterations to provide improvements for an existing full floor office tenant on the 12th floor of this existing commercial building on this site. Scope of work: work will be done in 3 phases. Demo/construct partition walls, doors for new layout. Electrical, plumbing, & sprinkler work to suit. E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $950,000
no contractor listed Issued -
2022-12-06
R124 - Lower Mall Level Interior alterations to provide improvements for a new retail tenant in the lower mall level (R124) in this existing commercial building. Scope of work: construct new partition walls, doors, lighting, millwork, flooring, finishes, new storefront, electrical and plumbing work. REVISION #1: to add one accessible washroom at back of house and increase in project value from $405,000.00 to $408,800.00 Feb. 3, 2023 mlh REVISION #2: add power for water cooler, remove duct smoke detector, remove fire alarm note. Update panel wiring Schedules per City staffto restroom ceiling grid, revise note for return openings in light cove. Remove duct smoke detector from supply duct, remove associated DSD coded note. Remove DSD from Responsibility Schedule. Remove DSD Schematic "E". Add coded note for water cooler and add to plan. Remove sprinkler drawings. and increase in project value from $408,800.00 to $411,300.00 Apr. 26, 2023 mlh TENANT: Michael Kors · $411,300
no contractor listed Issued -
2022-12-06
#D0002B & #D0003 - "D" Lower Mall Level To divide unit D0002B on the lower level of Pacific Centre mall into 2 units (#D0002B and #D0003), and to provide tenant improvements to both Retail Store units for the two new tenants. Scope of work includes new storefront, finishes, interior walls and ceilings. REVISION #1: - To provide structural drawings - Suite #D0002B (Garage): *Add rear exit vestibule *Change back stockroom layout *Change storefront - Suite #D0003 (Dynamite): *Change storefront layout *Change back stockroom layout *Change storefront B.Wong - June 2/23 New Tenants: #D0002B - Garage #D0003 - Dynamite Ok for field review per City staff: · $920,000
Soma Interiors Ltd Issued -
2022-11-29
#225, #230, #235 - 2nd Floor (demised from #225) Interior alterations on the 2nd floor unit #225 providing tenant improvements to this existing office space in this existing commercial building. Scope of work: Remove existing partitions and doors to build new walls, doors, relocate kitchenette and provide electrical work. REVISION #1 - Feb. 8/23 mk - Add the demising of unit #225 into 3 units (to be #225, #230 & #235) - Update plans to show correct placement of corridor doors. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy Upgrade: E4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1.1 of ASHRAE 90.1-2016) Ok for Field Review as per City staff · $35,000
Central West Project Management Inc. Issued -
2022-11-09
#910 - 9th Floor Interior alterations to demise the existing office on the 9th floor (#910) into two units (to be #910 & #915) of this existing commercial building on site. Scope of work: Infill door to create new tenant suite (#915), construct new wall and door for the storage, new kitchenette, electrical, plumbing and sprinkler work. TENANT: The Cadillac Fairview Corporation Limited Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1.1 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $25,000
Central West Project Management Inc. Issued -
2022-09-26
#1460 -14th Floor (#1460 expanding to #1470) Interior alterations on the 14th floor for an existing office tenant to expand unit to #1470 (retaining #1460) and provide tenant improvements in this existing commercial Building. Scope of work: Remove a portion of the demising wall to create an opening between #1470 & #1460. Construct new partitions for new offices, new flooring and some electrical work. Revision #1 - Revise reflected ceiling plans to add pot lights. TENANT: Stirling LLP Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $120,000
no contractor listed Issued -
2022-09-21
#D043 -"D" Lower Level Mall Interior alterations to provide improvements for existing retail tenant in the lower mall level (D043) in this existing commercial building. Scope of work: Demolish/relocate existing fixtures, install new sided light box, new floor and wall outlets. TENANT: Sephora Beauty Canada Inc · $13,000
no contractor listed Issued -
2022-09-02
#615 - 6th floor (demised from #630) Interior alterations to the 6th floor to demise unit #630 into two units (to be #630 & #615) and provide tenant improvements for new office tenant in #615 in this existing commercial building Scope of work: construct new demising wall, partition walls, doors, finishes and electrical work. * District Building Inspector to determine if a Special Sprinkler permit is required. Revision #1: Change Applicant from Rayson Tse to Carlos Soriano. - reduced scope of work. Some walls that were to be removed will now remain as is. Power and data will remain as is for these walls. New closet near entrance. Sept.18/23 mk E2 - Lighting - Upgrade to Restricted to Manual ON (per City staff.4.1.1.(b) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $61,000
VPAC Construction Group Ltd Issued -
2022-08-30
#580 - 5th Floor Interior alterations to provide tenant improvements to this existing office on the 5th floor (#580) of this existing commercial building. Scope of work: Construct new partition walls (drywall and glass) for new office, storage, boardroom, kitchen, new doors, electrical, plumbing and sprinkler work. TENANT: Vantek Web Solutions Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $98,100
Central West Project Management Inc. Issued -
2022-07-13
#200 - 2nd floor Interior alterations to remove a single, non full-height freestanding partition to this existing office tenant on the 2nd floor (#200) in this existing commercial building on the site. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $1,000
no contractor listed Issued -
2022-06-20
#D031 - lower level mall Interior alterations to provide improvements for a new retail tenant at retail unit #D031 on the lower mall level of this commercial building on this site. TENANT: Oak and Fort REVISION #1 - Revised A000- Cover sheet and A004-Code Plan (no change to scope of work. ) - HWT relocation due to site conditions affecting sheets TM-1.2 & TE-1.2. Aug.10, 2022 mk Okay for DTI Processing by Wayland W. May 25, 2022. · $300,000
no contractor listed Issued -
2022-04-20
#340 - 3rd Floor Interior alterations to provide tenant improvements for a new office tenant in this shell space on the 3rd floor (#340) in this existing commercial building on this site. Scope of work: construct new drywall and glass partitions, flooring, kitchenette, electrical and sprinkler work. REVISION #1: Interior layout changes and to increase the project value from $68,500.00 to $83,500.00. June 22, 2022 mlh OK For Field Review per City staff) Upgrade to local control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $83,500
Central West Project Management Inc. Issued -
2022-04-11
#R122 & #R124 Interior alterations to demolish and demise this existing retail space into two retail shell spaces on the Lower Mall Level of this existing commercial building. Scope of work includes: new wall and rear exit door in #R122 Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. No energy upgrade required Separate permit required for any future tenant improvement in #R122 and #R124 · $4,000
Gibraltar Holdings Ltd Issued -
2022-03-15
Exterior alterations on the 4th floor deck to remove the landscaping, demolish all the existing raised slabs and knee walls. Interior alterations to remove selected structural and non- structural elements for this entire Hotel Building on this site. Revision #1 Reduce demolition scope to only removing landscaping and demolishing all existing raised slabs and knee walls. · $4,750,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2022-03-15
#540 - 5th Floor Interior alterations to provide tenant improvements to an existing office tenant on the 5th floor (#540) in this existing commercial building on site. Scope of work includes: remove a partition wall and a door to create an open space. TENANT: Insight Global Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK For Field Review per City staff: 1 @ E2 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $20,000
no contractor listed Issued -
2022-03-08
Unit R120 Interior alterations to provide tenant fit out of unit R120 at the Lower Mall Level at this existing commercial building at this site. Note: BP-2021-03153 must be completed prior to the issuance of this permit. · $300,000
no contractor listed Issued -
2022-02-25
#700 - 7th floor Interior alterations to provide improvements to this existing office space unit #700 on the 7th floor in this existing commercial building. Scope of work includes the removal of partition walls and the construction of new partition walls. DBI to determine if SP is required · $14,000
Matra Construction Inc Issued -
2022-02-22
D050 - Lower level Interior alterations to provide tenant improvements to this existing retail space unit D050 on the lower level for a new retail tenant in this existing commercial building. Scope of work to include: recladding the storefront with new entry door, new partitions to suit new layout, finishes, fixtures, hvac, sprinkler lighting · $150,000
no contractor listed Issued -
2021-12-22
#G061 - 701 W Georgia St Interior alterations to provide tenant improvements for a new retail tenant (#G061) on the Georgia St Level in this existing commercial building (Pacific Center Mall). No exterior alterations being proposed. TENANT: Sunglass Hut c/o Luxottica Canada Inc OK for Field Review per City staff · $150,000
no contractor listed Issued -
2021-11-24
R127 Interior alterations to provide improvements for new retail tenant in this existing commercial building. Scope of work includes: -Construction of new interior partition walls. · $220,000
Pagliaro Projects Ltd Issued -
2021-10-12
#1010- 10th floor (full floor tenant) Interior alterations to this existing full floor office tenant on the 10th floor (#1010) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, finishes, new lighting, T-Bar ceiling, electrical, plumbing and sprinkler work. TENANT: Davidson & Company · $845,000
Aura Office Environments Inc Issued -
2021-09-29
17th Floor - Common Washrooms Interior alterations to provide improvements to the common washrooms on the 17th floor in this existing commercial building. Scope of work: remove/construct toilet partition walls, doors, plumbing fixtures, millwork, finishes, lighting, electrical, plumbing and sprinkler work. OK for Field Review per City staffed per City staff(Path 1) - No Additional Upgrades Required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $98,500
no contractor listed Issued -
2021-08-12
#R120, #R122, #R124 - Lower Mall Level *(Now #R120 and #R124A as per City staff) Interior alterations to remove all partitions and fixtures from this existing retail unit to create a shell space and to demise the space into three (3) smaller units to be #120, #122 and #124 in this existing commercial building. Scope of work: remove finishes, partition walls, ceilings, millwork, doors and construct two new demising walls, two rear exit doors, electrical, plumbing and sprinkler work. REVISION #1: to demise #R120 into two (2) "shell units" (#R120 and #R124A) instead of the previously approved three (3) "shell units (#R120, #R122 and #R124) by removing one (1) demising partition wall. Oct 26, 2021 mlh OK For Field Review by Rob Rattray - June 22/21 Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy Upgrade: Boma Best Building E4 - HVAC - (Re-)Commission all systems (per City staff.7.2.4 of ASHRAE 90.1-2016) Revision # 2 - to change the applicant/contractor from Central West Project Management to Gibraltar Holdings Ltd. and to retain existing layout in Unit No. 124A. A separate Building Permit is required for #124 to demolish the interior layout and provide tenant improvements. A separate Building Permit is also required for tenant improvements to Unit No. 120. · $149,000
no contractor listed Issued -
2021-07-22
#2300 - 23rd floor (full floor tenant) Interior alterations to provide improvements to an existing full floor office tenant on the 23rd floor (#2300) of this existing commercial building on this site. Scope or work: remove/construct select partition walls, doors, millwork, finishes, electrical, mechanical and sprinkler work. REVISION #1: remove additional partition walls to create a more open workstation area and increase project value from $235,000.00 to $270,000.00 Sept 27, 2021 mlh TENANT: Canaccord Genuity Corp. · $270,000
Priority Projects Limited Issued -
2021-07-22
#2100 - 21st Floor (full floor tenant) Interior alterations to provide improvements to an existing full floor office tenant on the 21st floor (#2100) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, millwork, finishes, lighting, electrical, mechanical and sprinkler work. REVISION #1: new mechanical equipment and lighting. Increase project value from $600,000.00 to $630,000.00 Oct 5, 2021 mlh TENANT: Canaccord Genuity Corp. · $630,000
Priority Projects Limited Issued -
2021-07-22
#2200 - 22nd floor (full floor tenant) Interior alterations to provide improvements to this existing full floor office tenant on the 22nd floor (#2200) in this existing mixed use building. Scope of work: remove/construct partition walls/doors to select areas to reconfigure floor plan, finishes, lighting, electrical, mechanical and sprinkler work. TENANT: Canaccord Genuity Corp. · $125,000
Priority Projects Limited Issued -
2021-06-23
G054C - Upper Mall Level To alter the interior of this existing retail store to provide improvements for a new retail store on the upper mall level (#G054C) in this existing commercial building (Pacific Center Mall). Scope of work: remove interior partition wall, new millwork, fixtures, lighting, electrical and mechanical work. TENANT: APM Monaco · $600,000
no contractor listed Issued -
2021-05-25
Interior alterations for the replacement of one escalator in this existing commercial building (Pacific Center Mall) Scope of work includes: replacement of escalator and related electrical work. · $1,210,346
PCL CONSTRUCTORS WESTCOAST INC Issued -
2021-04-30
#R128 lower mall (demising into #R127 & #R128) Interior alterations to the lower mall level for interior demo of all finishes and partition walls and construct a new demising wall to demise unit (R128) to be made into two retail store units (R127 and R128) of this existing commercial building. Scope of Work: to include interior demolition of all previous tenant improvement including interior walls, millwork and separations. Construct demising wall to create two new units. Sprinkler Permit required * SEPARATE PERMIT(S) REQUIRED FOR ALL FUTURE TENANT IMPROVEMENTS TO THESE UNITS. Energy Upgrade: Boma Best Building E4 - HVAC - (Re-)Commission all systems (per City staff.7.2.4 of ASHRAE 90.1-2016) Tenant : N/A · $98,500
no contractor listed Issued -
2021-04-21
G057 To alter the exterior and interior of this existing retail store and to change the use to Vehicle Dealer to provide improvements for a new tenant at#G057 on the Georgia St Level in this existing commercial building (Pacific Center Mall). Scope of work includes demolition of previous walls and fixtures, construction of new walls, fixtures, minor envelope alterations and related mechanical and electrical work. OK for DB as per City staff · $1,212,000
Sajo Inc Issued -
2021-04-07
CRU #G060 - Levels 1, 2 and 3 Interior and Exterior alteration to provide First TI for a new retail unit consists of 3 storeys. Work includes exterior finish materials, non-structural partitions, ceilings, finishes, furniture, and related HVAC, electrical, and plumbing work. Structural frame and shell/core work are by Landlord under separate permit. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511). Reviewed during the 2020 pandemic crisis. Stage 1 - CP First TI - issued April 7, 2021 Revision 1 - Change of CRP - issued November 8, 2022 · $15,477,647
PCL CONSTRUCTORS WESTCOAST INC Issued -
2021-02-17
#330 - 3rd floor (demising into #330 and #340) Interior alterations to demise unit #330 into two units (to be #330 and #340 and provide improvements to unit #330 only in this existing commercial building. Scope of work: to construct a new demising wall and interior partitions for new tenant in #330. *TI work in #330 only. Sprinkler Permit is required. *Separate permit(s) and ASHRAE checklist required for future improvements to unit unit #340. Ok for Field Review per City staff: E4 - Lighting - Upgrade all lighting controls per City staff.4.1.1 of ASHRAE 90.1-2016 · $100,000
VPAC Construction Group Ltd Issued -
2021-01-05
D060 - Dunsmuir/Lower Level Mall Interior alterations to provide improvements for a new retail tenant at unit D060 on the lower mall level (Pacific Centre) in this commercial building on this site. Scope of work: new interior partition, ceiling, storefront, electrical, & plumbing work. Sprinkler Permit is required. Related to base building CP permit BP-2019-01782. Selected Energy Upgrade: E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) OK for Field Review as per City staff · $250,000
no contractor listed Issued -
2020-10-19
#800 - 8th Floor Interior alterations to provide tenant improvements on the 8th floor (#800) for an existing tenant in this existing commercial building. Scope of work per VBBL 2019: remove non-loadbearing partition walls, ceiling work, electrical & sprinkler work. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements. Building Sprinklered – A separate sprinkler permit is required. OK for Field Review per City staff · $48,000
no contractor listed Issued -
2020-08-28
D062 - Dunsmuir/Lower Level Mall Interior alterations to provide improvements for this existing retail unit D062 on the lower mall level (Pacific Centre) in this commercial building on this site. Scope of work per VBBL 2019: Alter floor plan and refinishing to return a portion of floor space to landlord. (Landlord work under separate permit) TENANT: Banana Republic/Gap Canada Inc · $424,000
no contractor listed Issued -
2020-08-11
#420 - 4th floor (#420 & #430 combined) Interior alterations to the 4th floor to combine two units (#420 & #430/ retain #420) and provide improvements for a new General Office tenant in this existing commercial building. Scope of work: demo demising wall, partition walls, a kitchen, and construct new partitions to alter layout to create new meeting room and boardroom. OK for field review as per City staff: 1. No sprinkler head alterations proposed. Selected Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) · $60,000
Concrete Cashmere Ltd Issued -
2020-06-30
To deconstruct the existing rotunda from Pacific Centre. The Rotunda is located at the Southeast corner of Howe St and W Georgia St. "Notice of Deconstruction must be provided to District Building Inspector 24 hours in advance of deconstruction by calling 3-1-1 or [contact removed] outside of Vancouver."\t The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. \t Related to DP-2018-01011 and BP-2019-01782. Salvage and Abatement Permit BP-2020-00530. Reviewed during the 2020 pandemic crisis. · $1,500,000
Matcon Demolition Ltd Issued -
2020-06-19
To construct a new pavilion addition, retail shell only, to replace existing Pacific Center Mall rotunda. New construction includes: 1. Main mall entrance, canopy and interior corridor fronting on West Georgia Street, connecting to the new retail addition and existing mall circulation. 2. New canopy over the existing Howe Street entrance to the lower mall concourse. 3. New plaza and landscape. · $23,335,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2020-06-10
#G020 - Georgia St Level (Pacific Centre Mall) Interior alterations to provide improvements for a new Retail tenant at #G020 on the upper mall level (Pacific Centre) in this commercial building on this site. Scope of work per VBBL 2019: interior partition walls, millwork, finishes and ceiling, electrical, plumbing, mechanical and sprinkler work. Energy Exemption: N/A (BOMA BESt (Path 1)) OK for Field Review as per City staff · $250,000
Parkwood Construction Ltd Issued -
2020-05-22
Interior alterations to replace ceiling drywall, other selected interior finishes, and light fixtures due to water damage on the main floor of the existing highrise commercial building on this site. OK for FLD RVW per City staff: E2 - Lighting - Upgrade to Bilevel Lighting Control (per City staff.4.1.1.(d) of ASHRAE 90.1-2016) · $200,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2020-04-30
#1430 - 14th Floor Interior alterations to provide tenant improvements on the 14th floor (#1430) for a new office tenant in this existing commercial building. Scope of work per VBBL 2019:demolish partition wall, construct interior partition walls, new doors, glazing, lighting, finishes, electrical, plumbing and sprinkler work. TENANT: Davidson & Company LLP Selected Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) · $130,000
Aura Office Environments Inc Issued -
2020-04-21
Interior alterations only to provide for the Salvage and Abatement of hazardous materials and interior finishes throughout this former existing Four Seasons Hotel building. OK for SIPS processing as per City staff. · $10,000,000
Dallas Watt Demo Ltd Issued -
2020-04-08
G051 - Georgia St Level (Pacific Centre Mall) Interior alterations to provide tenant improvements for a new retail tenant (#G051) on the Georgia St Level in this existing commercial building (Pacific Center Mall). Scope of work includes: Interior demolition for the removal of interior partitions. New partitions, doors and painting) OK Per City staff.2020 Separate Permit required for Signage. Energy Upgrade: E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Required. · $85,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2020-03-23
#D0014 - "D" Dunsmuir/Lower Level Mall Interior alterations to provide improvements for a new Retail tenant at #D0014 on the lower mall level (Pacific Centre) in this commercial building on this site. Scope of work per VBBL 2019: new storefront, interior partition walls, barrier-free washroom, millwork, finishes and ceiling, electrical, plumbing, mechanical and sprinkler work. TENANT: La Vie en Rose/James Barba OK for Field Review per City staff · $275,000
Soma Interiors Ltd Issued -
2020-03-11
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Rotunda at Pacific Centre. QP is Emma Gibson with Enviro-Vac (Div of Paragon Remediation Grp Ltd.) Building Permit for BP-2020-00528 to partially deconstruct the existing Rotunda.
Matcon Demolition Ltd Issued -
2020-03-11
#D0013 Interior alterations for new retail tenant on the lower level in this existing commercial mall (Pacific Centre) OK for Field Review per City staffe shell space; Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) · $275,000
no contractor listed Issued -
2020-03-11
Interior alterations to replace existing escalator in the Pacific Centre mall and to add a convenience stair next to it. The escalator serves the first floor (Dunsmuir level floor) and the level above it (Georgia level floor). This permit is reviewed under the requirements of VBBL 2019. · $1,500,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2020-02-27
#1570 - 15th Floor Interior alterations to provide tenant improvements on the 15th floor (#1570) of this existing commercial building on this site. Scope of work: per the VBBL to remove partition walls, door, millwork, cap plumbing and construct partition walls, sliding doors, millwork, finishes, ceiling work, lighting, electrical, plumbing and sprinkler work. TENANT: Aura Office Environments Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work Selected Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) OK for Field Review Jan. 27, 2020 Processed THRU Fit · $245,000
Aura Office Environments Inc Issued -
2020-02-24
16th Floor - Common Washrooms Interior alterations to provide improvement to the 16th floor common washrooms of this existing mixed use building. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work Selected Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) OK for Field Review Dec 19, 2019 Processed THRU Fit · $99,700
Central West Project Management Inc. Issued -
2020-01-31
#630 - 6th floor Interior alterations to provide improvements for this existing office tenant and combining office units #610, #615 and #630 (retaining #630) on the 6th floor in this commercial building on this site. Scope of work: remove/construct demising wall, partition walls, doors, millwork, staff kitchen, finishes, HVAC, power and lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: TC Energy OK for field review per City staff · $532,500
CDC Construction Ltd Issued -
2019-12-19
#D026 Interior alterations to provide tenant improvements to the existing retail tenant. Ok for field review as per City staff VBBL 2019. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) · $255,000
no contractor listed Issued -
2019-11-07
To erect and install one steel 45' Christmas tree structure for the Christmas Tree Lighting event for a limited period of time expiring December 29, 2019. · $5,000
no contractor listed Issued -
2019-10-25
#D043 Interior alterations to combine two suites #D071 & D043, retaining D043, to expand the existing retail tenant space at the lower level of CF Pacific Centre. Scope of work includes removing all existing floor finishes, doors, furniture, interior storefront elevation, lighting fixtures and plumbing fixtures in the basement stockroom area and install new. Create trenches for floor power throughout. OK for field review per City staffnot be operating phase 1 side while phase 2 is under construction and to be finalized together as per City staff · $2,100,000
applicant withheld (individual) Issued -
2019-10-16
#D006 Interior alterations for tenant improvement in this shell space Suite #D006 and change of use for new retail tenant in conjunction with hair salon in this existing mall. REVISION #1: 1) Revise with and length of storefront column. 2) Revise storefront opening dimensions. 3) Revise width and entrance opening. 4) Revise size and location of signage. Increase project value from $500,000.00 to $502,000.00 Feb 18, 2020 mk OK for field review per City staff: Permit BP-2019-02529 to demise Suites #D006 and #D008 to be complete prior to completion of this permit. Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016) · $502,000
no contractor listed Issued -
2019-10-03
#D072 - "D" Dunsmuir/Lower Mall Level Interior alterations and change of use from Retail Shell to Retail in the lower mall level (#D072) in this existing commercial building on this site. Scope of work: construct new partition walls, door, new storefront, glazing, millwork, lighting, ceiling work, finishes, power and data, mechanical and electrical work TENANT: Rogers Communications · $80,000
no contractor listed Issued -
2019-09-27
#G027 Interior alterations to provide improvements for new Retail Store tenant in unit #G027 at 701 W Georgia St in this existing commercial building. · $70,000
CE Miles Construction Ltd Issued -
2019-09-24
#D0013 & #D0014 - Lower Mall Level Interior demolition of non load-bearing partition walls on the lower mall level (#D0013) to create a shell retail space in this existing building. *See REVISION #1-space now demised Scope of work: remove partition walls, doors, ceiling, millwork, finishes electrical and sprinkler work. *See REVISION #1-space now demised REVISION #1- To add a demising partition and one (1) rear door, thereby creating an additional Retail Store 'shell' tenant space (to be D0014), value increase of $13,000 (now $78,000), ASHRAE reviewed (BOMA BESt)-HVAC system to be cleaned and balanced for newly created unit #D0014. Addressing and Occupancy Permit information updated accordingly. Jan.14/20 jm Energy upgrade exempt: Demising wall and interior demolition. BOMA BESt building. Separate permit(s), ASHRAE checklist and separate Occupancy Permits will be required for future tenant improvements to both of these "shell" spaces. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work OK for Field Review Sept 9, 2019 Processed Thru FIT. · $78,000
no contractor listed Issued -
2019-09-16
D026-"D" Dunsmuir/Lower Mall Level Interior demolition to bring unit D026 back to "shell" space in the lower mall level this existing Pacific Centre mall building. Scope of work: demolish partition walls, remove finishes, ceilings, millwork storefronts, doors, electrical and sprinkler work. Separate permit(s) and ASHRAE checklist will be required for tenant improvements to this space. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for Field Review Aug 29, 2019 Processed Thru FIT. · $43,000
no contractor listed Issued -
2019-09-12
#D045 (Dunsmuir) - Lower Level Mall Interior alterations to provide improvements for a new Retail tenant at unit #D405 on the lower mall level of this existing commercial building, Pacific Center Mall. Scope of work: partition walls, entry door/store front, finishes, RCP, lighting, new washroom. * See separate permit BP-2019-01753 for interior demo. NOTE: Related Building Permits BP-2019-01753 & BP-2019-01756 for demising walls to create #D045, MUST be 'Completed' prior to Final Completion of this permit. TENANT: Ever New (Melbourne) OK for field review per City staff. · $150,000
no contractor listed Issued -
2019-09-03
Main Retail - Suite #g027 Interior alterations to provide tenant improvements on this existing tenant space by bringing the space back to a pre-lease shell conditon of this existing mixed use building. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. OK for Field Review Aug 7/19 Processed Thru FIT · $30,000
no contractor listed Issued -
2019-08-30
D047 - "D" Dunsmuir/Lower Mall Level Interior alterations to provide improvements for a new retail tenant at this existing retail (shell) unit #D047 on the lower mall level of this commercial building on this site. Scope of work: construct new partition walls, display window, sliding grille door, suspended drywall ceiling, millwork, finishes, ceiling work, lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: Softmoc OK for field review per City staff · $250,000
applicant withheld (individual) Issued -
2019-08-01
#450-4th floor Interior alterations only to provide improvements to create a new lunchroom and lounge area for the existing General Office tenant at unit #450 in this existing commercial building. Scope of work: demolish/construct partition walls, remove/relocate/new doors, relocate glazing, new/relocated millwork, fixtures and equipment, power/data, finishes, electrical, plumbing and sprinkler work. TENANT: Hollis Wealth c/o IA Securities OK for field review as per City staff. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $30,000
Central West Project Management Inc. Issued -
2019-08-01
#D008 - Lower level mall Interior alterations to provide improvements for a new retail tenant on the lower level (#D008) of Pacific Center Mall. Scope of work: new partition walls, new accessible washroom, shelving, rolling shelf track, millwork, lighting, finishes, RCP, new interior storefront. Note: interior demo under separate permit BP-2019-02529. · $225,000
no contractor listed Issued -
2019-07-30
#D006 - Lower Mall Level Interior alterations for structural upgrades only to a column in Cru #D006 on the lower mall level in preparation for the future Rotunda Pavilion Project of this existing commercial building on this site. Scope of work: to add steel reinforcing to existing column, and to upgrade the connection between existing column and girder. * No tenant improvements included in this scope. OK for field review per City staff · $25,000
PCL CONSTRUCTORS WESTCOAST INC Issued -
2019-07-10
#540 & #560-5th floor Interior alterations to provide improvements and demise Office shell unit #540 on the 5th floor into two units in this existing commercial building on site. Tenant improvement work to #540 only. Scope of work: remove partition walls, remove doors, construct demising wall to divide #540 into 2 units (to be #540 & #560), construct new partition walls, glazing, doors, millwork, power/data, lighting, ceiling work, electrical, mechanical and sprinkler work. TENANT: Insight Global Separate permit(s) and ASHRAE checklist required for any future tenant improvements to these units. NOTE : Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. · $450,000
no contractor listed Issued -
2019-06-26
Unit 200 - 2nd floor Interior alterations to provide improvements for this existing office tenant on the 2nd floor (#200) in this existing commercial building. Scope of work: removing some partition walls, adding some partitions and refurbishing the lunch room area. *DBI to determine if Sprinkler Permit is required. Ok for field review per City staffate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $35,000
Gibraltar Holdings Ltd Issued -
2019-06-20
#D006 & #D008 - "D" Dunsmuir/Lower Mall Level Interior alterations and to demise the existing retail unit #D008 into two units to be #D006 and #D008 in this existing Pacific Centre commercial mall building. Scope of work: remove all finishes, partitions, and ceilings to bring tenant space back to shell condition and to construct a new demising wall, electrical, plumbing and sprinkler work. Both are shell spaces. Energy upgrade exempt: Interior demolition only. Separate permit(s) and ASHRAE checklist will be required for any tenant improvements to these spaces. · $65,000
no contractor listed Issued -
2019-05-06
D071- "D" Dunsmuir/Lower Level Mall Interior demolition of this existing retail space on the lower mall level of this existing commercial building on this site. Scope of work includes demolition of demising wall (D071 expanding into previous D045; retaining/reassigning D071), remove storefront, removal of all finishes, walls, ceilings, electrical and sprinkler work. This permit relates to BP-2019-01753 to demise D045 into three spaces (D045, D071 and D072). Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements. Energy upgrade exempt: Interior demolition and demising wall. OK for field review as per City staff · $65,000
no contractor listed Issued -
2019-05-06
D045, D071 & D072-"D" Dunsmuir/Lower Level Mall Interior alterations to demolish all the interior partition walls, ceilings and finishing and install demising walls and removal of demising wall between D045 and D047 tenants creating 3 retail shell spaces on the lower mall level of this existing commercial building on this site. Note: The new demising wall between D045 and D047 is under related BP-2019-01560. Scope of work includes electrical and sprinkler work. This permit also relates to BP-2019-01756 for interior demolition of D071 and to remove the demising wall between D071 and D045 to create "shell" retail space. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements. Energy upgrade exempt: Interior demolition and demising walls. OK for field review per City staff · $85,000
no contractor listed Issued -
2019-05-06
D047 - "D" Dunsmuir/Lower Mall Level To permit interior alterations to this existing retail space, to create a retail shell space in this existing commercial mall (Pacific Centre). Scope of work: demolish all interior finishes and storefront and build a new demising wall to re-demise unit D047, electrical and sprinkler work. See BP-2019-01753 for old demising wall removal. OK For Field Review as per City staff.2019 No Energy Upgrade Required, Shell Space Created. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Separate permit(s) and ASHRAE review required for any future tenant improvements. · $58,000
no contractor listed Issued -
2019-04-04
CRU D012 - Lower mall level Interior alterations to provide improvements for a new retail tenant at unit CRU D012 on the lower mall level of this existing commercial building on this site. Scope of work: demo and construct new partition walls, install floor, wall, and ceiling finishes, Hvac & fire protection distribution, electrical services, equipment & fixtures. OK For Field Review as Per City staff.2019 · $400,000
Deborah Lewin & Nilton Tavares Issued -
2019-02-21
#560-5th floor Interior alterations only to provide tenant improvements for a new General Office use unit #560 on the 5th floor of this existing commercial Pacific Centre 1 building. Scope of work: remove/dispose of cabinets and sink, construct new partition walls, doors, glazing, millwork, power/data, electrical, plumbing and sprinkler work for new office layout. TENANT: SUSE Software Solutions Canada ULC OK for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1-2016) · $250,000
Fusion Project Management Ltd Issued -
2019-01-31
#2400-24th floor (tenant occupies the full floor) Interior alterations only to remove non-loadbearing walls and to provide tenant improvements for the existing general office tenant (occupying the full floor) on the 24th floor of this existing commercial building on this site. Scope of work: remove a portion of demising partition for new double door with card reader, remove single door and infill with demising partition, demolish partition walls, millwork and remove doors, construct new partition walls, glazing, sound baffle, relocate card reader, doors, finishes, electrical work. TENANT: Canaccord Genuity Corporation · $100,000
Priority Fire Systems Ltd Issued -
2019-01-25
#D041 - Lower Mall level Interior alterations to provide tenant improvements for a new Retail tenant in the lower mall level (#D041) in this existing commercial building. Tenant: Swarovski Canada Ltd. OK for field review as per City staff. · $93,064
no contractor listed Issued -
2019-01-23
#1800 - 18th floor Interior alterations to provide improvements for this existing office tenant on the 18th floor (#1800) of this existing commercial building on this site. Scope of work: demo a partition wall and side lite. Install new wall to divide one office into two smaller offices. Add new door, full height glass partition. OK for field review per City staff. Note: No energy trigger required; BOMA BESt building · $11,000
Gibraltar Holdings Ltd Issued -
2018-11-30
#540 & #580 - 5th floor Interior alterations to demise Office shell unit #510 on the 5th floor to be Office Shell units in this existing commercial building. Scope of work: construct two demising walls (#510 being demised into two units; to be #540 & #580). REVISION #1-To provide a double door at the suite entry instead of a single door. Increase in value of $2,500. No change to ASHRAE. January 4, 2019 jm Separate permit(s) and ASHRAE checklist required for any tenant improvements to these units. Okay for Field Review per City staffe: Interior demolition to this shell space completed under BP-2016-04203. · $17,075
Central West Project Management Inc. Issued -
2018-11-26
#1801 & #1875 -18th floor Interior alterations to provide improvements for a new office tenant on the 18th floor (#1801) of this existing commercial building on this site. Scope of work to include: minor demo of 2 interior walls & a door, replace one entrance door, install new partition walls and doors, electrical, plumbing, and sprinkler updates for complete tenant fit out. Note: Separate demo permit BP-2016-02860 *SEE REVISION #2 FOR NEW DEMISING WALL (WWOP)/May 23/19 jm · $470,000
Curve Construction Inc Issued -
2018-11-21
#1700 - 17th floor (full floor Interior alterations to remove all interior partitions and finishes to this vacant office space on the entire 17th floor (unit #1700) to return to Office 'Shell' in this existing commercial building. Separate permit(s) and ASHRAE checklist will be required for future tenant improvements. · $66,000
Central West Project Management Inc. Issued -
2018-11-20
#1818-18th floor Interior alterations to provide improvements for this existing office tenant at office unit #1818 on the 18th floor of this existing commercial building on this site. Scope of work: addition of two offices using demountable partitions, ceiling grid modifications, relocate lights, add one sprinkler head. REVISION #1-Applicant's drawings lost. Replacement set submitted and stamped. Feb.14/19 jm TENANT: Pacific Reach Properties OK for field review per City staff. Note: Energy trigger chosen; L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2010) · $30,000
Unison Construction Management Ltd Issued -
2018-11-13
#D038B-Mall "D' Dunsmuir (Lower Level) Interior alterations to install 3'-0" H. railing in the entrance area (exterior storefront on existing step-up) in this retail unit #D038B on the lower mall level of this existing Pacific Centre mall commercial building. TENANT: David's Tea · $10,000
no contractor listed Issued -
2018-11-05
14th floor - Common Lobby/Corridors Interior alterations to provide improvement to the common lobby/corridors on the 14th floor in this existing commercial building on this site. Scope of work: remove wall finish, carpet, flooring, GWB ceiling, etc., replace finishes, refresh wall finishes, flooring and new ceilings, new furr out glass panel walls, new unrated demising walls baffle, millwork, card readers, lighting, electrical and sprinkler work. REVISION #1-Revise lobby layout, ceiling height (bulkhead at ceiling deleted) and relocate 2 doors to suit site conditions. Increase in value of $5,000 (now $103,626). ASHRAE reviewed. Oct.17/19 jm OK for field review as per City staffbuilding. · $103,626
Central West Project Management Inc. Issued -
2018-10-09
#2200-22nd floor (full floor) Interior alterations to a portion of #2200 on the 22nd floor of this existing mixed use building for an existing office tenant. Note: This is a full floor tenant occupying multiple floors in the building. Scope of work: remove millwork, glazing, construct new partition wall, lighting changes, mechanical, electrical and sprinkler work. TENANT: Canaccord Genuity Corp. · $10,000
Priority Projects Limited Issued -
2018-10-05
CRU#D005 - Lower Level Mall Interior alterations to provide improvements for this existing retail tenant in unit #D005 on the lower mall level of this existing commercial building. Scope of work: full interior demo and install new walls, new interior storefront, finishes, shelviing system, millwork, lighting, RCP, HVAC, & Sprinkler work. OK for field review per City staffbuilding. · $174,000
no contractor listed Issued -
2018-09-10
#410 - 609 Granville St Interior alterations to the 4th floor (suite #410) of this existing commercial building to add new offices for the existing General Office tenant. Okay for Field Review per City staff: L2 - Lighting - Upgrade to incorporate Space Control Systems (per City staff.4.1.2 of Ashrae 90.1-2010) · $50,000
no contractor listed Issued -
2018-08-23
#300-3rd floor (full floor tenant) Interior alterations to provide improvements for this existing office tenant at office #300 on the 3rd floor of this existing commercial building on this site. Scope of work: replace interior partition and services counter glazing with bullet-resistant partition and glazing, add one new sprinkler head. · $220,000
no contractor listed Issued -
2018-08-15
#1400 Interior alteration in this existing office suite #1400 on the 14th floor of this existing commercial building on this site. Scope of Work: New demising wall between existing Computer Maintenance/ Parts Storage Room and Server Room Okay for field review as per City staff: Energy upgrade exempted · $4,000
Central West Project Management Inc. Issued -
2018-08-13
#1590 Interior alterations to provide improvements for a new office tenant at office unit #1590 on the 15th floor of this commercial building on this site. OK for field review per City staff. Scope of Work: - construct new interior partition walls to alter layout for new staff room, meeting room, offices and reception area - demolish existing kitchen and additional suite entry door - relocate and remove existing lighting to fit new layout - Add new flooring throughout Note: Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $25,000
Allspaces Design & Management Ltd Issued -
2018-06-13
Suite G031 Interior alteration to provide tenant improvement for a new tenant (Canada Goose) in this existing retail space in this existing commercial building on this site. Okay for field review as per City staffth: BOMA BESt (Path 1) - No Additional Upgrades Req'd Revision requested dated 26 June 2018 has been updated with the updated drawings received 13 August 2018. This set will be a new permitted set of drawings. · $2,000,000
no contractor listed Issued -
2018-06-08
#G021A - "G" Upper Mall Level Interior alterations to provide tenant improvements to this existing retail tenant in unit #G021A in this existing Pacific Centre mall commercial building. Scope of work: Demolish/construct millwork, floor, ceiling work, lighting, storefront glass window and doors, electrical, plumbing, mechanical and sprinkler work. TENANT: Ermenegildo Zegna · $350,000
no contractor listed Issued -
2018-05-17
633 Granville St Interior alterations to the existing retail store at 633 Granville Street to modify the floor lay out, expand into retail unit D-029 in the basement, and to install and alter elevator and escalator to access basement retail unit. In new proposal the passenger elevator and the escalator in H&M retail space serve all 3 retail floors. No exterior work is proposed under this permit. Note: 1. Occupant load is 843 persons. 2. This permit is related to the work of DB-2018-00030. 3. Interior storefront treatments cleared for DB per City staff. Storefront glazing to remain clear and unobstructed · $7,000,000
no contractor listed Issued -
2018-05-15
CRU D058 - Lower mall level Interior alterations to provide improvements for a new retail tenant at unit CRU D058 on the lower mall level of this existing commercial building on this site. Scope of work: demo and construct new partition walls, finishes, lighting, ductwork. Tenant: Ecco Shoes OK for field review per City staff. Note: No energy trigger required; BOMA BESt building. · $80,000
no contractor listed Issued -
2018-05-11
2nd Level-Building Permit for DB-2017-06547 Exterior and interior alterations to provide new facade on the second level and to replace canopies at the existing H&M Store. Scope of work includes alterations at the store entrance and interior stairs. Notes: 1. OK for exterior alterations per City staff. 2. OK for DB as per City staff. Revisions #1: Changes to components and assemblies to exterior wall assembly and wall parapet, and reconfigure entrance stair. · $2,000,000
no contractor listed Issued -
2018-05-08
#1818 - Interior alterations to this existing office space for a new office tenant in this commercial building. Scope of work include new partition walls, millwork, finishes. Energy Upgrade: Boma Best Bldg · $1,025,000
no contractor listed Issued -
2018-04-27
#1818 Interior alterations to provide non load-bearing demolition and minor alterations to the entrances to this existing office unit #1818 of this commercial building Note: Energy trigger not required BOMA BEST building. · $42,000
Unison Construction Management Ltd Issued -
2018-04-23
#1450 - 14th floor (previously issued as #1440) Interior alterations to provide tenant improvements for new new office tenant on the 14th floor (#1450) in this existing commercial building. Scope of work: demolish partition wall/glass/door, construct new partitions, glazed partitions, new staff coffee area, new sink, finishes, electrical, plumbing and sprinkler work. REVISION #1: #1440 changed to #1450 as per City staff: FinCanna Corp. *NOTE: DBI to verify all demising walls/suite numbers on this floor. This is BOMA BEST building. · $40,000
Epic Spaces Inc Issued -
2018-04-20
633 Granville - Lower level (basement) Interior alterations to demolish all non load bearing partitions in the lower level (basement) of this existing retail unit at 633 Granville to provide a shell space for future development. TENANT: H & M Hennes & Mauritz Inc. See related Special Sprinkler Inspection No. IA-2018-00739. OK for SIPS process per City staff. *Separate permit(s) and ASHRAE checklist required for future Tenant Improvements to this space . · $60,000
Deborah Lewin & Nilton Tavares Issued -
2018-04-18
#D0006C-"Dunsmuir" lower mall level Interior alterations to provide improvements for a new retail tenant at #D0006C on the ground level of this existing commercial building on this site. Scope of work: replace existing demising walls (same locations), construct partition walls, new storefront glazing, doors, ceiling, floors, finishes, lighting, mechanical, electrical, plumbing and sprinkler work, includes one staff washroom. TENANT: Sandro Pacific Centre (SMCP Canada, Inc.) OK for field review per City staff. · $119,784
no contractor listed Issued -
2018-04-18
#G030A - "Georgia" upper level mall Interior alterations to provide improvements for a new retail tenant on the upper mall level (# G030A) of of this existing commercial building on this site. Scope of work: demolish existing storefront and finishes, construct new partition walls, new store front, finishes, ceiling, lighting, mechanical distribution ducts, plumbing fixtures for one staff washroom. REVISION #1 - reconfigure washroom layout. Oct 4/18 mk TENANT: Maje Pacific Centre (SMCP Canada Inc.) OK for field review per City staff. Note: No energy trigger required; BOMA BESt building · $89,780
no contractor listed Issued -
2018-04-05
#1400 and #1430 - 14th floor Interior alterations to demise the 14th floor from one unit to 2 units in this existing commercial building Scope of work: demolish partition walls and doors, construct new demising wall, electrical work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to #1430. Note: Upgrade triggers per Part 11 will be required. Okay for Field Review per City staff. Related to Special Sprinkler Inspection No. IA-2018-00616. · $23,000
Central West Project Management Inc. Issued -
2018-03-12
#1450 Interior alterations to erect a demising wall, to demise unit 1450 into two units, on the 14th floor of this existing commercial building. OK for Field Review per City staff. Energy Upgrade exempted. Note: Major Renovation upgrades to be incorporated under Tenant Improvement permit applications (to follow). · $18,250
Central West Project Management Inc. Issued -
2018-03-05
Minor Renovation (#FC05 - New York Fries) To replace the existing kitchen exhaust system with new equipment and new UV type hood for the existing tenant located in the food court of Pacific Centre building. Building Review Notes: · $100,000
no contractor listed Issued -
2018-02-27
#D0008C - "D" Lower Mall Level (Dunsmuir) Interior alterations to provide improvements to Unit #D0008C for a new retail tenant in this existing existing Pacific Centre Mall commercial building. Scope of work: new millwork, rack storage system, sliding door, finishes, lighting, electrical, mechanical, plumbing and sprinkler work. TENANT: Browns Shoes Inc. · $450,000
no contractor listed Issued -
2018-02-14
#1460 - 14th floor Interior alterations to provide tenant improvements to this existing General Office use tenant on the 14th floor (unit #1460) to expand into remainder of #1455 of this existing commercial building (Pacific Center 1) . Scope of work: Remove a demising wall to expand into newly demised adjacent suite (#1455), construct new partitions, doors, relocate/new lights, & alter sprinklers. REVISION #1: #1460 expanding into remainder of #1455 (previously issued as #1450). B. Lee May 9, 2018 TENANT: DAM Law Corporation OK for field review as per City staff. No energy upgrade required. · $50,000
no contractor listed Issued -
2018-02-01
#1550 Interior alterations to provide a renovation to the suite 1550 of 15th floor for tenant improvement. Scope of work includes a new demising wall construction to split the existing office unit #1550 into two units. OK for field review as per City staff: 1. addressing department has assigned suite number to new suite - #1590 2. No Energy Upgrade · $7,500
Central West Project Management Inc. Issued -
2018-01-16
#2000 Interior alterations to this existing office tenant at unit #2000 on the 20th floor to provide minor tenant improvements in this existing commercial building. · $75,000
Priority Projects Limited Issued -
2018-01-16
#1900 Interior alterations to provide tenant improvements to the for this existing office tenant at unit 1900 on the 19th floor in this existing commercial building. · $75,000
Priority Projects Limited Issued -
2018-01-04
Rooftop cooling towers (evaporative condensers) To replace four cooling towers on the roof of this existing office tower. Acceptable for BP only, no DP required, no affect on exterior appearance. C Sudiro, Nov 14, 2017 Acceptable for field review per City staff · $780,000
Black & McDonald Limited Issued -
2017-11-23
To erect and install a Christmas tree approximately 35 feet high, 1 - 4' x 8' x 16" high stage, and 20' x 20' tent for the Tree Lighting Ceremony for a limited period of time expiring November 22, 2017. · $20,000
no contractor listed Issued -
2017-11-21
#D0006C & #D0008C - "D" Lower Mall Level Interior demolition of this existing retail tenancy and install a demising wall to split this unit into two units in this existing Pacific Centre Mall commercial building. Scope of work includes the removal of storefront, all finishes, walls and ceilings and construction of a new demising wall, electrical and sprinkler work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Ok for field review as per City staff(s) and ASHRAE compliance will be required for any future tenant improvements to either suite. Energy upgrade exempt: Interior demolition and demising wall. · $90,000
no contractor listed Issued -
2017-10-05
D048B Interior alterations to existing retail space to provide improvements for new retail tenant. OK for field review per City staff · $153,000
no contractor listed Issued -
2017-09-08
# G020 - upper level mall Interior alterations to provide tenant improvements for a new retail tenant on the upper level mall (unit G020) of this existing commercial building. Scope of work: new partition walls and interior storefront as well as millwork and other minor interior work. Ok for field review per City staff · $200,000
no contractor listed Issued -
2017-08-16
Interior alterations to replace two domestic cold water risers, two domestic hot water risers and one common recirculation riser and to provide firestopping, and repair walls in conjunction with repiping to this existing commercial building. Scope of work includes installation of new hot water tanks in the storage room on the 25th floor. OK for field review as per City staff: · $950,000
Black & McDonald Limited Issued -
2017-08-15
D050b - Interior alterations to this existing retail store by doing minor alterations to the interior storefront to provide new signage in this existing retail (mall) building. Extent of work does not warrant sprinkler inspection. OK for SIPS per City staff: Exempt - BOMA BEST · $21,000
no contractor listed Issued -
2017-08-03
8th Floor Interior alterations to provide security upgrades only with card readers added to existing doors as identified on the plan for this existing Public Authority Use tenant on the 8th floor of this existing mixed-use (commercial/institutional) building. OK for field review as per City staff · $35,000
no contractor listed Issued -
2017-08-03
7th Floor Interior alterations to provide improvements by adding scan area and consulting room to the lobby area for this existing Public Authority Use tenant on the 7rd floor of this existing mixed-use (commercial/institutional) building. Scope of work includes security upgrades with card readers added to existing doors as identified on the plan. OK for field review as per City staff · $52,000
no contractor listed Issued -
2017-08-03
6th Floor Interior alterations to provide improvements by adding scan area and consulting room to the reception area for this existing Public Authority Use tenant on the 6th floor of this existing mixed-use (commercial/institutional) building. Scope of work includes security upgrades with card readers added to existing doors as identified on the plan. OK for field review as per City staff · $54,000
no contractor listed Issued -
2017-08-03
3rd floor Interior alterations to provide improvements by adding scan area to the existing mailroom area for this existing Public Authority Use tenant on the 3rd floor of this existing mixed-use (commercial/institutional) building. Scope of work includes security upgrades with card readers added to existing doors as identified on the plan. OK for field review as per City staff · $35,000
no contractor listed Issued -
2017-08-03
#D406-"D" Lower Level Mall Minor interior alterations to provide improvements to this accessory storage space (stock room) #D406 on the lower level of this commercial building on this site. Scope of work: remove/replace flooring, new electric strike/card reader, lighting, electrical and sprinkler work. TENANT: Mackage (retail unit in mall-G029) Related to BP-2017-03490 (retail store location). · $10,000
3469051 Canada Inc Issued -
2017-08-03
#G029-"G" Upper Level Mall Interior alterations to provide improvements for a new retail tenant at this retail unit #G029 on the upper level of this commercial building on this site. Scope of work: remove partition walls, millwork, doors, flooring, construct new partition walls, millwork, doors, finishes, lighting, new card reader/electric strike, electrical, plumbing and sprinkler work. Related to BP-2017-03491 (storage for this tenant) · $390,000
3469051 Canada Inc Issued -
2017-07-25
#D042 -Lower level Interior alterations to provide improvements for a new retail tenant in unit #D042 on the lower level mall of this existing commercial building on this site. Scope of work: demo/remove millwork, walls, ceiling. Install/construct new partition walls, store front entry, ceiling, finishes, millwork, electrical, plumbing, & sprinklers. OK for field review per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) Note: 1) Sprinkler permit application to be submitted prior to permit issuance. · $375,000
no contractor listed Issued -
2017-07-19
(CRU D025 / FC14)Interior alterations to provide improvements for new ltd service food tenant in existing CRO D025 in the food court of Pacific Centre Mall in existing commercial building. Scope of work includes millwork, lighting, finishes. OK for field review as per City staff · $200,000
no contractor listed Issued -
2017-07-18
#D032-"D" Dunsmuir/Lower Level Mall Interior alterations to existing retail unit to provide improvements for new retail tenant in this existing Pacific Centre Mall commercial building. Scope of work: demolish/construct partition walls, doors, finishes, glazing (replace interior storefront), new sink in existing washroom, new finishes, ceiling work, relocate existing fan coil to the back, plumbing and sprinkler work. TENANT: Roots Canada Ltd. (Howard Pollack) · $193,000
no contractor listed Issued -
2017-07-06
#650 - 6th floor Interior alterations to provide improvements for a new office tenant at this existing office unit #650 on the 6th floor of this existing commercial building on this site. Scope of work: demo and construction of partition walls ,doors, to alter 4 offices suite new layout. OK for field review per City staff. Note: Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $30,000
Gibraltar Holdings Ltd Issued -
2017-06-29
#310 Interior alteration to construct non-loadbearing partition walls to this existing office (vacant shell) unit #310 on the 3rd floor of this existing commercial building on this site. Okay for field review as per City staff: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) · $175,000
no contractor listed Issued -
2017-06-29
Minor Renovation - To replace the existing cooking equipment and the kitchen exhaust system with new equipment and new UV type hood for the existing tenant (Flaming Wok) located at the existing food court unit #FC01 in the Pacific Centre Mall building. Building Review Branch Notes: - One class-1 cooking operations - Contractor shall have a valid business license · $150,000
no contractor listed Issued -
2017-06-28
Minor Renovation - To replace the existing cooking equipment and the kitchen exhaust system with new equipment and new UV type hood for the existing tenant (Umi Sushi) located at the existing food court unit #03B in the Pacific Centre Mall building. Building Review Branch Notes: - One class-1 cooking operations - Contractor shall have a valid business license · $150,000
no contractor listed Issued -
2017-06-22
#630 demising into two units Interior alterations only to demise #630 into two units and to provide improvements (including new door to common corridor) for the existing general office tenant at #630 on the 6th floor of this existing commercial building on this site. OK for field review per City staff · $30,000
no contractor listed Issued -
2017-06-09
Exterior alterations of building envelope repairs and decorative work to this existing commercial building on this site. Repairs proposed on all four sides of the building for replacement of all glazing and mullions. Scope of work includes installation of new vertical 12"-wide aluminum fins to north and east exterior walls, new 12" horizontal aluminum parapet extensions as shading devices on all four sides of the building, and new exterior decorative lighting and replacement existing mechanical louvres to match colour scheme. All new glazing and louvres to be no larger than the existing unprotected opening dimensions at site. No landscape work proposed. ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2014******** · $19,365,971
PCL CONSTRUCTORS WESTCOAST INC Issued -
2017-06-07
#200-2nd floor Interior alterations to provide tenant improvements for this existing office tenant on the second floor (#200) of this existing commercial building on this site. Scope of work: Demolition/construction of partition walls/doors creating new offices, enlarge staff room with glass partition, finishes, electrical, sprinkler work. TENANT: Randstad Interim Inc. OK for field review per City staff. Note: No energy trigger required BOMA BESt building · $85,000
TotalPlan Inc Issued -
2017-06-06
Interior alterations and replacement of the exhaust hood and cooking equipment for this existing Retail Ltd Food tenant (OPA Souvlaki of Greece) in unit FC#12 in this existing commercial (retail/office) building. Note: 1- Class-1 Cooking Operation 2- Existing exhaust duct to remain in place. · $150,000
no contractor listed Issued -
2017-05-26
#D067-"D" (Dunsmuir) Lower Level Mall Interior alterations to provide tenant improvement for this new retail tenant Babaton (Aritzia) in unit #D067 in this Pacific Centre mall building on this site. Scope of work includes removal and construction of non-loading partition walls, doors, new finishes, new millwork, ceiling, lighting, electrical, plumbing and sprinkler work. TENANT: Babaton (Aritizia LP) · $470,000
no contractor listed Issued -
2017-05-24
#1600 - 16th floor Interior alterations to provide improvements for a new office tenant on the 16th floor (#1600) of this existing commercial building on this site. Scope of work: new staff lunch room, new plumbing, relocate electrical, furring out walls to provide a chase for plumbing pipes to run in. Ok for field review per City staff: 1) BU467188 to be completed prior to completion of this permit 2) Special sprinkler inspection may be required (tbd by District Building Inspector) Energy Upgrade Exempt: BOMA BESt Building. · $8,000
Central West Project Management Inc. Issued -
2017-05-10
#D043-"D" Dunsmuir/Lower Level Mall Interior alterations to provide improvements for existing retail tenant in the lower mall level (D043) in this existing commercial building. Scope of work: addition of a small sink and millwork, remove/relocate/ install new floor fixtures, electrical and plumbing work. TENANT: Sephora USA, Inc. See related Special Sprinkler Permit No. IA-2017-00515. · $10,000
no contractor listed Issued -
2017-04-24
(FC006) - Interior alterations to provide tenant improvements to FC006 kiosk in this existing food fair in this shopping mall for existing tenant. Scope of work includes demolish existing to base finish and install new partitions, appliances, finishes, lighting. OK for field review as per City staff: · $700,000
no contractor listed Issued -
2017-04-07
Minor Renovation (A&W) - To replace the existing cooking equipment and the kitchen exhaust system with new equipment and new UV type hood for the existing tenant (A&W) located at the existing food court unit #FC-13 in the Pacific Centre Mall building. Building Review Branch Notes: - Two class-1 cooking operations · $150,000
TSG Construction Ltd Issued -
2017-04-05
Mall level - CRU-#Z013 Interior alterations to provide tenant improvements to the existing BC lottery kiosk (Unit Z013) in this existing mall (Pacific Centre) building on this site. Scope of work: new wall against existing base building walls, new floor, millwork, hydralic lift, ceiling, electrical. Tenant: BC Lottery Corporation Ltd. · $150,000
no contractor listed Issued -
2017-03-31
Minor Renovation (Taco Time) - To replace the existing kitchen exhaust system with new equipment and new UV type hood for existing tenant (Taco Time) located at the existing food court unit #FC08 in the Pacific Centre Mall building. Building Review Branch Notes: - Class-1 Cooking operation · $124,500
TSG Construction Ltd Issued -
2017-03-13
interior alterations to provide improvements for new General Office tenant in unit #1150 on the 11th floor of this existing commercial building OK for field review as per City staff · $330,000
TotalPlan Inc Issued -
2017-03-13
Interior renovation and installation of new cooking equipment and kitchen ventilation system for the food court retail unit FC#07 in this existing building on this site. 2 x Class- 1 Cooking Operation. · $200,000
no contractor listed Issued -
2017-03-08
(#11) Interior alterations to demolish the existing retail food tenant fittings and fixtures and replace with all new ones for existing retail food tenant (Dairy Queen/Orange Julius) in this existing commercial building. Ok for field review per City staff: · $80,000
no contractor listed Issued -
2017-03-08
FC-09 - Interior alterations to this existing kiosk in the existing food fair to provide tenant improvements for a new retail food tenant in this existing mall. OK for field review as per City staff: A/B (Arch) by Paul Chiu, [contact removed] · $200,000
Cirjak Construction Ltd Issued -
2017-03-08
#FC-03A - Interior alterations to provide improvements for existing an Retail Limited Food tenant in unit #FC-03A in this existing commercial building. Scope of work includes: new waterproof membrane on the floor and new millwork. OK for field review as per City staffInspection No. IA-2016-00896 Energy Upgrade Exempt: BOMA BESt Building. · $70,000
Dynamic Business Development Ltd Issued -
2017-02-27
Interior renovation and replacing the existing cooking equipment and the kitchen exhaust system with new equipment and new UV type hood for the existing tenant at food court unit #04 in the Pacific Centre Mall building. Class-1 Cooking operation · $200,000
no contractor listed Issued -
2017-02-16
#1130 - 11TH FLR Interior alterations to provide tenant improvements for a new general office tenant on the 11th floor (#1130) of this existing commercial building. Scope of Work: Demolition/construction of partition walls/doors to create new office layout and relocate kitchen, millwork, finishes, electrical, plumbing, sprinkler work. TENANT: Endeavour Silver Corp. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $298,000
TotalPlan Inc Issued -
2017-02-01
#1150 - Interior alterations to remove a demising wall and non-load bearing partition walls to combine units #1100 and #1150 (retaining #1150) on the 11th floor for this office space in this existing commercial building on this site. · $18,000
no contractor listed Issued -
2017-02-01
Interior alterations only to revitalize the Food Court Common area and Washrooms in 3 phases at the existing food court and washroom in this existing mixed-use building (Pacific Centre Mall) on this site. OK for field review and the mechanical inspector is to determine if an IA Special Inspection would be required as per City staff. Schedules Submitted: · $597,000
no contractor listed Issued -
2017-01-31
#FC-02 & P122 (mall food court and storage on P1) Interior alterations to provide tenant improvement for a new retail (limited food) tenant in the food court at unit # FC-02 on the lower level of Pacific Centre 1. Scope of work includes alterations to the tenants storage room on Parking level P1 (room P122.) Tenant: Chachi's · $180,000
no contractor listed Issued -
2017-01-27
(FC-010) Interior alterations to unit FC-010 in the food court on Level D of this existing retail building to provide tenant improvements for an existing retail food Kiosk. Schedules submitted: A/B (Mech/Plumb/Fire) by Dusan Pristach, [contact removed] B (Electrical) by Kevin Sekhon, [contact removed] Energy upgrade exempt: BOMA Best Building · $120,000
Golden Chateau Building Materials Inc Issued -
2017-01-25
#950 Interior alterations to combine #940 & #950 into one unit (#950) and provide tenant improvements for existing general office tenant at #950 in existing commercial building on this site. Ok for field review per City staff: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) · $210,000
no contractor listed Issued -
2017-01-24
(#1130) Interior alterations to remove two demising walls and construct two new demising walls to allow for expansion of unit 1130 and reduce the size of units 1100 and 1150 in this existing office space in this existing commercial building. OK for field review L Clarke Dec 16, 2016 Energy Upgrade Exempt: Subdividing Commercial Space / BOMA Best Building · $16,000
no contractor listed Issued -
2017-01-19
Interior alterations to provide tenant improvements for a new Retail tenant, on the lower mall level (unit #D003) of this existing commercial building (Pacific Center Mall) on this site. OK for field review as per City staff. Tenant; Lululemon Athletica · $250,000
no contractor listed Issued -
2017-01-18
Interior alterations to unit D001B to provide improvements for new retail tenant. Scope includes new fixtures, new electrical, plumbing and fire alarm work. Schedules submitted: · $250,000
no contractor listed Issued -
2017-01-12
#D002 and #D003-Main mall level Interior alterations to provide interior demolition and a new demising wall to separate unit #D002 into two units (to be #D002 and #D003) on the main mall level of this existing commercial building. Scope of work: removal of all finishes, walls, ceilings to bring this back to "shell" space, add a new door for rear access, (#D002) electrical and sprinkler work. Energy upgrade exempt: Interior Demolition and a demising wall. Separate permit(s) and ASHRAE checklist will be required for future tenant improvements for both units. · $49,000
no contractor listed Issued -
2017-01-12
Unit #D067-Main mall level Interior demolition of non-load bearing partition walls only to create a retail "shell" unit in #D067 (main mall level) in this existing commercial building. Scope of work: removal of all finishes, walls, ceilings to bring this back to "shell" space, electrical, plumbing and sprinkler work. Energy upgrade exempt: Interior Demolition. Separate permit(s) and ASHRAE checklist will be required for future tenant improvements to this unit. OK for Field review as per City staff. · $45,000
no contractor listed Issued -
2017-01-11
24th floor - lobby and north side Interior alterations only to remove non-loadbearing walls and to provide tenant improvements for the existing general office tenant (full floor) on the 24th floor of this existing commercial building on this site. OK for field review per City staff: A/B (Arch) by William Harrison - [contact removed] · $75,000
no contractor listed Issued -
2017-01-11
24th floor - south office Interior alterations only to remove non-loadbearing walls and to provide tenant improvements for the existing general office tenant (full floor) on the 24th floor of this existing commercial building on this site. OK for field review per City staff: A/B (Arch) by William Harrison - [contact removed] · $75,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05