Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
595 Howe St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 19 building permits are on file, most recently “Ground Floor - 595 Howe St. Interior alterations to provide tenant improvements to the gr…” (issued 11 March 2026). The City's 2026 assessed value is $28,731,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154146, 1,156 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-03-11
Ground Floor - 595 Howe St. Interior alterations to provide tenant improvements to the ground floor washroom facilities in this existing commercial building on this site. Scope of work: Limited to the ground floor washroom facilities. Demising and construction of partition walls, new plumbing fixtures, millwork, electrical, plumbing, mechanical and sprinkler work to suit. Ok for Field Review as per City staff · $40,000
Mansouri Enterprises Inc Issued -
2025-07-18
#1400 - 14th Floor Interior alterations to provide improvements to this new office tenant on the 14th floor (#1400) of this existing commercial building on site. Scope of work: Demo/construct interior walls. New millwork, glazing, paint, electrical and plumbing work to suit. REVISION #1: Remove walls, doors, maglock and all door hardware at the elevator lobby. Add new glazing at office hallway and new frameless glass door with electric strike/fob card. Increase of $4,000 in project cost. - Sept 2/25 - LLL TENANT: Larlee Rosenberg, Barrister & Solicitors Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $154,000
Gibraltar Holdings Ltd Issued -
2024-07-24
#501 - 5th Floor Interior alterations to provide improvements to this existing general office on the 5th Floor (#501) in this existing commercial building on site. Scope of work: Demolish/construct partition walls for new layout, new kitchenette, electrical, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $80,000
Gibraltar Holdings Ltd Issued -
2023-06-16
#902 - 9th Floor Interior alterations to provide tenant improvement to an existing general office on the 9th floor (#902) of this existing commercial building on site. Scope of work: Remove existing partitions, doors, millwork, floor and electrical fixtures. Install new flooring, kitchenette, an open space concept and plumbing work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $30,000
no contractor listed Issued -
2022-10-25
#704 - 7th Floor Interior alterations to provide tenant improvement to an existing office tenant on the 7th floor (#704) of this existing commercial building on site. Scope of work: Construct new partition for new offices and file room. New doors, sidelite, electrical and sprinkler work. TENANT: O'Niell Law LLP Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. ENERGY UPGRADE - UPGRADE TO INCORPORATE AUTOMATIC PARTIAL SHUT-OFF PER City staff.4.1.1.(g) OF ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $30,000
KERN BSG MANAGEMENT LTD Issued -
2021-06-11
#1000 - 10th floor (full floor tenant) Interior alterations to provide improvements for existing full floor General Office tenant on the 10th floor (#1000) in this existing commercial building. Scope of Work: remove 3 partition walls that enclose copy room, finishes and electrical work. TENANT: DuMoulin Black LLP OK for Field Review per City staff · $1,650
Aura Office Environments Inc Issued -
2020-10-07
To install acoustic baffle assemblies to an existing office on the 8th storey of this existing mixed-use commercial high-rise building. Note: Permit related to AL-2020-00075. · $25,000
no contractor listed Issued -
2020-01-31
#800 - 8th floor - 595 Howe St Interior alterations to suite #800 on the 8th floor (whole floor tenant) to renovate for new office tenant in this existing commercial building. · $400,000
Counterpoint Interiors Inc Issued -
2019-08-27
#1205-12th floor Interior alterations to provide tenant improvements for a new tenant in this existing office "shell" suite #1205 on the 12th floor of this existing commercial building on this site. Scope of work: construct interior partition walls, glazing, lighting, finishes, power/data, mechanical, electrical, plumbing and sprinkler work to create 5 offices, kitchenette and open lobby. REVISION #1: Revise lighting, electrical, mechanical plans Remove internal glazed window from office partition. Changes to ASHRAE. Jan 7, 2020 mlh TENANT: DuMoulin Black Management Ltd. · $250,000
Fusion Project Management Ltd Issued -
2019-06-04
#600, entire 6th floor Interior alterations to provide improvements for new full floor office tenant on the 6th floor, relocating from the 8th floor. REVISION #1: Remove electric lock set and replace with maglock. Increase project value from 540,000.00 to $547,000.00. No change to ASHRAE. Maglock condition (Term #47) added and also Occupancy Permit required for new tenant. Oct 16, 2019 mlh · $547,000
Fusion Project Management Ltd Issued -
2019-01-22
#303-3rd floor Interior alterations to combine office units #303 & #307 into one unit on the 3rd floor (retain #303) in this existing commercial building on this site. Scope of work: remove partitions to create opening to combine two units, remove doors and glazing, new door. TENANT: Petrichor Energy Inc. See related Special Sprinkler Inspection No. IA-2018-01668. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $11,500
Pacific One Contracting Issued -
2018-08-03
#502 Interior alterations to provide improvements for this Existing General Office tenant in unit #502 in this commercial building. Work to include: New partitions and one (1) new office front including new door and side light, new staff room sink and new electrical outlets. OK for field review as per City staff · $38,000
Syncor Solutions Limited Issued -
2018-05-29
#1205 and corridor/lobby Interior demolition of all non load-bearing partition walls in unit #1205 and to provide new lighting in this unit and the corridor of the 12th floor in this existing commercial building. Scope of work: demolish partition walls, remove doors, glazing, millwork, flooring, electrical and plumbing work in unit #1205. To provide new lighting in #1205 and the corridor. See related Special Sprinkler Inspection No. IA-2018-00581. Separate permits will be required for any future tenant improvements or demising. · $140,000
Pacific One Contracting Issued -
2018-04-10
#400 - 4th floor (full floor tenant) Interior alterations to provide tenant improvements for a new office tenant in this existing office unit on the 4th floor (#400) in this existing commercial building on this site. Scope of work: construct partition walls, doors, glazing, millwork, finishes, ceiling work, electrical, plumbing and sprinkler work. REVISION #1: Reconfigure lobby, eliminate one corridor, add a new server room and meeting room, reconfigure existing kitchen and add one electric strike door. No change to ASHRAE. June 6, 2018 mh TENANT: Celayix Inc. · $164,300
Aura Office Environments Inc Issued -
2018-03-20
#400-4th floor (full floor) Interior demolition to the 4th flloor of this existing office suite to remove all non-loadbearing partitions to create a shell space for future office tenant in this existing commercial building. Scope of work: demolish partition walls, doors, glazing, t-bar ceiling, floor finishings, millwork, electrical and plumbing work. See related Special Sprinkler Inspection No. IA-2018-00619. Energy upgrade exempt: Interior demolition only. OK for field review per City staff. Sprinkler system to remain in place. · $45,000
Pacific One Contracting Issued -
2018-02-22
#506 - 5th floor Interior alterations to provide tenant improvements to this vacant General Office unit on the 5th floor (#506) in this existing commercial building. Scope of work: demolish interior partitions, doors, millwork, ceiling work, replace one sink, new finishes and countertops in kitchen area, electrical, plumbing and sprinkler work. REVISION #1: interior layout changes to include the addition of 2 phone booths, 1 closet and minor revision to kitchen wall. No change to ASHRAE. M. Henderson, May 11, 2018 Note: L2 - Lighting - upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) OK for field review as per City staff. · $70,000
Pacific One Contracting Issued -
2018-02-06
#1205 & #1220-12th floor Interior alterations only to provide a new demising partition and a tenant improvement at this existing General Office use at unit #1220 at this existing commercial Good Earth Building. Scope of work: demolish partition walls, doors, millwork and plumbing, remove carpet and power/data, construct demising wall (#1205 dividing into two units; to be #1205 and #1220), new partition walls, doors, millwork, glazing, power/data, lighting, ceiling, electrical, plumbing and sprinkler work. Tenant improvement work to #1220 only. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. · $300,000
no contractor listed Issued -
2017-07-10
Interior alteration to remove partition walls and install one kitchenette in this existing office #700 on the 7th floor of this existing commercial building on this site. Okay for field review as per City staff: Clean and balance all air systems (6.7.2.3.2 of ASHRAE 90.1-2010) · $40,000
Pacific One Contracting Issued -
2017-05-02
(#900) Interior alterations to unit #900 to provide tenant improvements for new office tenant in this existing commercial building. OK for field review as per City staff: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems · $40,000
Pacific One Contracting Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc2026-10-30
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd2026-10-30
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.2026-10-30