Permit GopherAlberta and B.C. property, permit and zoning records

595 Burrard St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 128 building permits are on file, most recently “27th and 28th floors - 595 Burrard St Interior alterations to the existing office space #…” (issued 21 October 2026). The City's 2026 assessed value is $279,298,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
128
Assessed value (2026)
$279,298,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 595 Burrard St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150850, 2,626 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
2,626
Households
1,435
Median age
37.2
Median household income (2020)
$82,000
Own their home
45%
Vancouver: 45%
Average household size
1.9
Under 15
8%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-10-21 27th and 28th floors - 595 Burrard St Interior alterations to the existing office space #2700 on 27th and 28th floor of the existing mixed-use building on this site. Scope includes minor alterations to the whole-floor tenant on the 27th floor, installing new demising walls to the 28th floor to create 2 additional office suites (#2823 & #2843). No alteration to the interconnecting stairs between floors within #2700. Notes: - AL-2024-00169 to be maintained. - Separate permits are required for the newly created suites. *** Reviewed under the VBBL 2025 *** · $800,000
    Fusion Project Management Ltd
    Issued
  2. 2026-09-24 18th floor Interior alterations to provide tenant improvements for the Office (Group D) tenant on the 18th floor of this existing commercial building on this site. · $1,100,000
    no contractor listed
    Issued
  3. 2026-06-22 #1600 - 16th floor Interior alterations to provide improvements for a new full floor office tenant on the 16th floor (#1600) of this existing commercial building on this site. Scope of work: to remove partition walls and doors/frames to select areas to alter layout to create open floor plan and add a First aid room , milllwork, finishes. Electrical, Plumbing/Mechanical, & Sprinklers to suit. · $1,030,000
    PB Management Group Inc
    Issued
  4. 2026-06-05 #1200 - 12th floor Interior alterations to provide improvements for a new full floor office tenant on the 12th floor (#1200) of this existing commercial building on this site. Scope of work: to remove partition walls and doors/frames to select areas to alter layout and create an open floor plan. New card reader, milllwork. Electrical, Plumbing/Mechanical, & Sprinklers to suit. · $1,025,000
    PB Management Group Inc
    Issued
  5. 2026-05-22 14th & 15th Floor - 595 Burrard St Interior alterations to provide tenant improvement to this existing 2 level full floor office spaces on the 14th and 15th floor in this existing commercial building on this site. Scope of work: Demolition and construction of partition walls, new millwork, finishes, electrical, mechanical, plumbing, sprinkler work to suit Existing interconnecting stairs on the 14th floor to the 15th floor not part of scope of work. · $1,025,000
    PB Management Group Inc
    Issued
  6. 2026-03-31 #400 - 4th floor Interior alterations to provide improvements to this existing vacant full floor office show suite on the 4th floor (#400) of this existing commercial building on this site. Scope of work: demo/remove and renovate reception and lunchroom. Electrical to suit. *In accordance with VBBL 2025 * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $5,000
    no contractor listed
    Issued
  7. 2026-01-14 #1800 - 18th floor & partial 17th flr (interconnection) Interior alterations to remove all interior walls at unit #1800 and partial demolition of interconnection area between level 17 and 18 (retaining staircase), of an Existing General Office to bring the space to an Office-Shell, on the 18th floor of this existing commercial building. Scope of work: remove interior partitions,doors/frames, millwork, wall finishes, lighting, t-bar, guardrails, stringer and flooring. Retaining staircase. REVISION #1 - removal of interconnecting stairs between the 17th and 18th floors. May 29/25 mk okay for Field Review as per City staff · $209,000
    no contractor listed
    Issued
  8. 2026-01-13 32nd Floor - 595 Burrard St Interior alterations to provide tenant improvement to this existing full floor office space on the 32nd floor in this existing commercial building on this site. Scope of work: Demolition and construction of partition walls, new millwork, finishes, electrical, mechanical, plumbing, sprinkler work to suit Existing interconnecting stairs from reception area on the 31st floor to the 32nd floor not part of scope of work. Ok for Field Review as per City stafftems Ltd Contractor to have a valid Vancouver Business Licence or Intermunicpal Business Licence · $2,000,000
    no contractor listed
    Issued
  9. 2025-12-08 #893 - 8th Floor Interior alterations to provide improvements to this new tenant on the 8th floor (#893) in this existing commercial building on site. Scope of work: ... electrical and sprinkler work to suit. TENANT: Hyundai Canada Inc · $50,000
    Boas Construction Ltd
    Issued
  10. 2025-12-02 Interior alterations to provide tenant improvements on the 12th, 14th, 15th and 16th level of this existing commercial use building on this site. Scope of work includes renovation of interconnecting stairs with existing alterative solution remaining intact. (Revised plans to be uploaded as discussed with DBI) OK for field review per City staff · $200,000
    no contractor listed
    Issued
  11. 2025-11-03 Pavilion & Concourse (Basement) levels Exterior and interior alterations to provide tenant improvements for this existing financial institution tenant in this existing commercial building. Scope of work includes: interior demolition, new interior partitions and furnishings, new elevator, new lighting, HVAC, plumbing, new vestibule. Exterior scope includes replace exterior doors/hardware, relocate the night deposit, removal of headers, remove signage structure, new canopies, new cane detectable guard, new metal cover for existing exterior curb, update glazing film. Notes: 1). Asbestos has been encapsulated in fire rated assembly of plenum. This note is to warn future renovations of existing hazardous materials. See report uploaded to application documents of BP-2016-00487. 2). The basement level has existing non-conforming Travel Distance. However, comparing to the previously approved, TD and OL are not worsened. · $11,300,000
    no contractor listed
    Issued
  12. 2025-10-09 #505 - 5th floor Interior alterations to provide improvements for a new office tenant space on the 5th floor (#505) of this existing commercial building. Scope of work: new partitions, door/frames, millwork, finishes. Electrical, mechanical/plumbing, and sprinklers to suit. See BP-2025-03833 for demo. Ok for F/R per City staff required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $403,000
    no contractor listed
    Issued
  13. 2025-10-03 #800 - 8th floor Interior alterations to remove all non load bearing partition walls and return to office - shell space on the 8th floor (#800) of this existing commercial building. Scope of work: Remove all non-base building walls, doors, and ceilings. Remove all existing tenant finishes and floor coverings. Remove mechanical, electrical, and plumbing components. Cap all services back to base building connection points. Return space to base building shell condition. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $187,773
    Reotech Construction Ltd
    Issued
  14. 2025-10-01 #1085 - 10th floor Interior alterations to provide improvements for an existing office tenant on the 10th floor (#1085) of this existing commercial building on this site. Scope of work; remove a pony wall at the entrance and construct partitions for new closet and storage, doors. Electrical to suit. District Building Inspector to determine if a Special Sprinkler inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $85,000
    VPAC Construction Group Ltd
    Issued
  15. 2025-09-23 #525 & #505 - 5th Floor Interior alterations to provide improvement to these existing offices on the 5th floor (#505 and #525) in this existing commercial building on site. Scope of work: Full demolition to both suites, remove and re-construct the demising wall between 2 suites (moved it to the east). Tenant fit-out to suite #525. Electrical, mechanical/plumbing and sprinkler work to suit. REVISION #1: Adding suite #505 to scope. Existing suite walls being extended to increase unit square footage, reducing exit door down to 1. Increase of $14,500 in projec value. - Mar 31/26 - LLL REVISION #2 - layout changes to unit #525. May 1/26 mk OK For TIPS per City staff: Separate permit is required for future tenant improvement to suite #505 or to change the use. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $635,000
    no contractor listed
    Issued
  16. 2025-08-27 #3083 - 30th Floor Interior alterations to provide improvement to this existing office tenant on the 30th floor (#3083) in this existing commercial building on this site. Scope of work: Construct 2 new private offices. TENANT: Artemis Gold Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $18,920
    Epic Spaces Inc
    Issued
  17. 2025-08-12 #900-9th floor Interior alterations only to provide improvements for a new General Office tenant on the 9th floor (#900) of this existing Bentall Two commercial building. Scope of work: Construct new partitions for 3 newly created phonebooths, private offices, door and glazing, paint, finishes and electrical work to suit. TENANT: Harbour Air · $100,000
    Concrete Cashmere Ltd
    Issued
  18. 2025-07-30 Main Floor Interior alterations to provide improvement to an existing financial institution on the ground floor of this commercial building. Scope of work: Remove existing vault and finishes, repair/repatch surrounding walls to match existing conditions TENANT: BMO Financial Group · $30,000
    no contractor listed
    Issued
  19. 2025-07-07 #3113 - 31st Floor Interior alterations to provide tenant improvements to this existing office tenant on the 31st floor (#3113) of this existing commercial building on site. Scope of work: Convert and alter existing open workstations to new private offices, electrical and sprinker work to suit TENANT: Fiore Management & Advisory Corp Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
    Reotech Construction Ltd
    Issued
  20. 2025-05-15 #1100 - 11th floor Interior alterations to provide improvement to this existing full floor office space on the 11th floor (#1100) of this existing commercial building on this site. Scope of work: demo/construct partition walls, doors/frames, glazing, millwork, finishes. Electrical, Mechanical, plumbing, Sprinklers to suit. · $3,200,000
    Matra Construction Inc
    Issued
  21. 2025-02-25 31st and 32nd Floor Interior alterations to provide improvement to this existing office on the 31st and 32nd floors in this existing commercial building on site. Scope of work: Refinishing the existing staircase, new millwork, fixtures, electrical and plumbing. * Existing interconnecting stairs from reception area on the 31st floor to the 32nd floor. · $300,000
    no contractor listed
    Issued
  22. 2025-02-24 Bentall 2 - Lobby Exterior and interior alterations to interior main level lobby of this existing commercial building. Note: 1). The 15m max travel distance within the exit lobby is an existing deficiency. See Code Consultant Letter. 2). The proposed breakaway doors need to be identified as per City staff.3.1.12. · $200,000
    no contractor listed
    Issued
  23. 2025-02-12 Interior alteration to provide tenant improvements to #205 existing health care office on the concourse floor of this existing commercial building on this site. Work to include new interior partition wall, millwork upgrades, lighting, 2 new sprinkler heads, finishing. This building is sprinklered. A separate sprinkler permit is required for all related work. Ok for field review per City staff · $50,000
    no contractor listed
    Issued
  24. 2025-02-04 #1065 - 10th floor Interior alterations to provide improvement to this existing office tenant space on the 10th floor (#1065) of this existing commercial building on this site. Scope of work; demo to select areas, new partitions for four new offices and a meeting room with demountable glass fronts to underside of ceiling with glass sliding doors, millwork, sink and finishes. Electrical, plumbing, & sprinklers to suit. REVISION #1 - increase office depth and add partitions. Feb 25/25 mk Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $189,000
    no contractor listed
    Issued
  25. 2025-02-03 CRU #309 Interior alterations to provide improvements to this existing Financial Institution tenant at CRU #309 on the concourse level of this commercial building on this site. Scope of work includes new interior walls and finishes. OK for Field Review per City staff · $30,000
    no contractor listed
    Issued
  26. 2025-01-07 #120-exterior alterations to remove the Class-B bicycle parking, and the addition of approximately 1,880.0 square feet for enclosed outdoor seating areas, to be used in conjunction with the existing Restaurant Class-1 use on the site, for a limited period of time expiring on September 11, 2025, unless extended in writing by the Director of Planning. Notes: 1. Permit reviewed and approved to VBBL #12511 (2019) · $200,000
    no contractor listed
    Issued
  27. 2024-12-05 Elevator modernization Interior alterations to provide elevator modernization to the existing addressable two-stage fire alarm system to incorporate emergency recall of 11 elevators to meet the requirements of CSA-B44 in Bentall 3 commercial building. Scope of work: - Addition of new addressable smoke detectors in elevator lobbies - Replacement of elevator controller and cab light fusible disconnect switches - Replacement of existing elevator machine room and elevator pit receptacles with GFCI type receptacles. - Replacement of elevator machine room and elevator pit luminaires with new LED luminaires c/w wireguard. - Provision of new exit signs (green pictogram) along the egress path on the Main and Alternate Recall Levels. - Provision of “elevator of emergency power” and “pre/post-transfer” signals from the existing ATS to the new elevator controllers. ******THIS PERMIT HAS BEEN REVIEWED AND ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 ******** Building Review Branch Notes: · $5,170,100
    Modern Niagara Vancouver Inc
    Issued
  28. 2024-12-04 Interior alterations to install a door with electric strike in this existing office unit #1465 on the 14th floor of this existing commercial building on this site. OKAY FOR DTI BY J. ZHANG. · $10,000
    no contractor listed
    Issued
  29. 2024-11-14 #3123 - 31st floor Interior alterations to provide improvements to an existing office space on the 31st floor (#3123) of this existing commercial building. Scope of work: divide one room into two. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $5,000
    Reotech Construction Ltd
    Issued
  30. 2024-11-07 #2700 Interior alterations to provide improvements on the existing vacant general office (Group D) tenant space on the 27th and 28th floor of this existing commercial building. Scope includes installation of an interconnecting stairs between level 27 to 28. Notes: - Reviewed under VBBL 2019 - Part 11, Major Renovation - Sprinklered to NFPA 13 - AL-2024-00169 for interconnecting stairs is accepted. · $6,000,000
    Fusion Project Management Ltd
    Issued
  31. 2024-09-27 #3113 - 31st Floor Interior alterations to provide tenant improvements to this new office tenant on the 31st floor (#3113) of this existing commercial building on site. Scope of work: Construct new partition walls to create new offices, electrical and sprinkler work to suit. REVISION #1: To remove office room #1402 (door and wall separation) to create larger office rooms for #1401 & 1403, and new electrical and removing light fixtures at #1401 & 1403. Increase in project cost of $3,000. - Nov 15/24 - LLL TENANT: Fiore Management & Advisory Corp Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $453,000
    Reotech Construction Ltd
    Issued
  32. 2024-09-19 #600 - 6th Floor Interior alterations to provide tenant improvements for this existing full floor office tenant on the 6th floor (#600) of this existing commercial building. Scope of work: Replace an existing air cooled heat pump air conditioning unit (2-ton cooling), electrical and plumbing work to suit. TENANT: BMO · $55,000
    no contractor listed
    Issued
  33. 2024-09-16 #2863 - 28th Floor Interior alterations to remove all non-load bearing partition walls and return to shell office space on the 28th floor (#2863) of this existing commercial building on this site. Scope of work: Remove all partition walls/doors , t-bar ceiling, millwork, finishes to return to base building and electrical work. TENANT: 117745 B.C. LTD Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $130,000
    Fusion Project Management Ltd
    Issued
  34. 2024-09-16 #2700 - 27th floor Interior alterations to remove all non-load bearing partition walls only and return to shell office space on the 27th floor (#2700) of this existing commercial building on this site. Scope of work; remove all partition walls/doors , t-bar ceiling, millwork, finishes to return to base building. * SEPARATE PERMIT(S) REQUIRED FOR FUTURE TENANT IMPROVEMENTS TO THIS SPACE. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $450,000
    Fusion Project Management Ltd
    Issued
  35. 2024-07-29 #120 Interior and exterior alterations and a change of use and major occupancy from Office (Grp D) to Restaurant Class 1 (Grp A-2) to provide improvements for a new tenant at unit #120 on the ground floor of this existing commercial building. One class 1 cooking operation. Occupant load - 89 inside and 163 on future patio. Exterior duct work accepted by C.Profili. Exterior patios require separate building permit application. N3 upgrade deferred as per City staffncouver Building By-law (#12511) with amendments effective on February 26, 2024. · $2,000,000
    no contractor listed
    Issued
  36. 2024-05-21 Interior alterations to install electromagnetic locks to the doors to the elevators lobby on levels 23rd to 26th floor in this existing commercial building. OK for field review per City staff · $80,000
    no contractor listed
    Issued
  37. 2024-05-06 #2600 - 26th floor Interior alterations to provide improvements to this shell office space for a new office tenant on the 26th floor (#2600) of this existing commercial building. Scope of work: complete tenant fit out. Electrical, mechanical, plumbing, sprinklers, HVAC to suit. See BP-2023-04654 for demo for 23rd to 26th floors. * existing interconnecting stairs. · $2,698,920
    no contractor listed
    Issued
  38. 2024-05-03 #2300 - 23rd floor Interior alterations to provide improvements to this shell office space for a new office tenant on the 23rd floor (#2300) of this existing commercial building. Scope of work: complete tenant fit out. Electrical, mechanical, plumbing, sprinklers, HVAC to suit. See BP-2023-04654 for demo for 23rd to 26th floors. · $2,675,700
    no contractor listed
    Issued
  39. 2024-05-03 #2400 - 24th floor Interior alterations to provide improvements to this shell office space for a new office tenant on the 24th floor (#2400) of this existing commercial building. Scope of work: complete tenant fit out. Electrical, mechanical, plumbing, sprinklers, HVAC to suit. See BP-2023-04654 for demo for 23rd to 26th floors. * existing interconnecting stairs. · $2,675,700
    no contractor listed
    Issued
  40. 2024-05-03 #2500 - 25th floor Interior alterations to provide improvements to this shell office space for a new office tenant on the 25th floor (#2500) of this existing commercial building. Scope of work: complete tenant fit out. Electrical, mechanical, plumbing, sprinklers, HVAC to suit. See BP-2023-04654 for demo for 23rd to 26th floors. * existing interconnecting stairs. · $2,698,920
    no contractor listed
    Issued
  41. 2024-03-05 #1755 - 17th floor Interior alterations to provide tenant improvement to this existing office space on the 17th floor (#1755) of this existing commercial building on site. Scope of work: remove partition walls, doors, glazing, flooring and millwork. Construct partitions for new office layout with new kitchenette, electrical, plumbing and sprinkler work to suit. REVISION #1 - June 13/24 mk - reduced scope of work. - layout changes Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $287,000
    no contractor listed
    Issued
  42. 2024-02-21 SPECIAL EVENT: To erect and install 1 - 20' x 60' and 1 - 30' x 60' tents for the Rugby 7 Activation event for a limited period of time expiring February 23, 2024. Note: permit reviewed and approved to VBBL #12511 (2019) · $5,000
    no contractor listed
    Issued
  43. 2024-01-25 #2300, #2400, #2500 and #2600 Interior alterations to demolish all interior walls from this existing office space on the 23rd, 24th, 25th and 26th floor (#2300, #2400, #2500, #2600) and put the unit back into base building structure in this mixed use building on this site. Scope: Demolish entire suite, remove all walls, flooring, door frames, millwork, finishes, electrical and plumbing work. Separate permit required for future tenant improvements. · $569,200
    no contractor listed
    Issued
  44. 2024-01-24 #1185 - 11th Floor Interior alterations to provide tenant improvement to this existing office space on the 11th floor (#1185) of this existing commercial building on site. Scope of work: Demolish partition walls, door, glazing, flooring and millwork. Construct partitions for new office layout with new kitchenette, electrical, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. REVISION#1: Change in scope to revise interior layout, keep ceiling and lighting, revise door schedule, alter furniture layout. (EV) July 4, 2024 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $234,000
    no contractor listed
    Issued
  45. 2023-12-19 #1055 - 10th floor Interior alterations to provide improvements for an existing office tenant on the 10th floor (#1055) of this existing commercial building . Scope of work; select demo and new partitions to alter layout to three areas Electrical and Sprinkler to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $75,000
    no contractor listed
    Issued
  46. 2023-10-17 #1723 - 17th floor Interior alterations to provide improvements for a new office tenant on the 17th floor (#1723) of this existing commercial building. Scope of work; demo and construction of partition walls to select areas to alter layout. Electrical to suit. Revision #1 - Layout changes. Dec 12/23 mk District Building inspector to determine if a Special Sprinkler Permit is required. · $75,000
    Fusion Project Management Ltd
    Issued
  47. 2023-10-06 #3118 - 31st Floor Interior alterations to provide improvements to an existing office for a new office tenant on the 31st floor (#3118) of this existing commercial building on site. Scope of work: Demo/construct interior partitions, doors, replace flooring, new paint finish, electrical and sprinkler work. TENANT: Fiore Management & Advisory Corp Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $75,000
    Reotech Construction Ltd
    Issued
  48. 2023-09-29 CRU #312 - mall level Interior alterations to the CRU #312 in the mall level to remove all non load bearing partition walls and return to base building in this existing commercial building. Scope of work: removal of all partitions, plumbing, HVAC, Lighting, finishes. REVISION #1 - add tenant improvement work to scope for new retail food coffee bar tenant. · $241,000
    Matra Construction Inc
    Issued
  49. 2023-05-26 re#1735 - 17th Floor Interior alteration to provide tenant improvements to this existing general office on the 17th floor (#1735) of this existing commercial building on site. Scope of work: Demolish t-bar and light fixtures. Construct new partitions to build new offices, new millwork, kitchenette, doors/frames, card reader, electrical, plumbing and sprinkler work to suit. REVISION #1: Travel distance updated, reduction in room construction, lighting and power locations updated, changes to proposed millwork/finishing's - Mar 4/24 - LLL Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $300,000
    Fusion Project Management Ltd
    Issued
  50. 2023-04-04 #311- Bental 3 (Upper Mall Level) Interior alterations to provide improvements to this existing retail space on the upper mall level (#311) at this existing Bentall Three commercial building Scope of work includes creating 3 change rooms and to cap off 2 sprinkler heads. Ok for DTI as per City staff · $50,000
    no contractor listed
    Issued
  51. 2023-03-29 #453 - 4th floor Interior alterations to provide improvements for a new office tenant on the 4th floor (#453) in this existing commercial building. Scope of work: remove 24" in width interior wall from floor to u/s of grid ceiling. TENANT: HH Angus and Associates Limited * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $10,000
    VPAC Construction Group Ltd
    Issued
  52. 2023-02-21 #3083 - 30th floor (#3083 & #3043 Combined) Interior alterations to the existing office tenant in #3083 to expand into #3043 (retaining #3083) in this existing commercial building on this site. Scope of work: remove demising wall between between the two units and sprinkler work. REVISION #1 - Leave one door to the corridor as is and not remove it. TENANT: Artemis Gold OK for Office TI Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $20,000
    Epic Spaces Inc
    Issued
  53. 2023-02-01 #3063- 30th floor Interior alterations to provide improvements for an existing office tenant on the 30th floor (#3063) of this existing commercial building. Scope of work: demo/construction of partition walls, doors for new layout. Electrical, plumbing, & Sprinklers to suit. OK to open BP for DTI per City staff no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $348,000
    Matra Construction Inc
    Issued
  54. 2023-01-26 #1200 - 12th floor (full floor tenant) Interior alterations to this existing full floor office tenant on the 12th floor (#1200) in this existing commercial building on this site. Scope of work: construct select partition walls for new offices, doors, finishes, card reader and electrical work. TENANT: WeWork · $80,000
    no contractor listed
    Issued
  55. 2023-01-26 #1100 - 11th floor (full floor tenant) Interior alterations to this existing full floor office tenant on the 11th floor (#1100) in this existing commercial building on this site. Scope of work: construct select partition walls for new offices, doors, finishes, card reader and electrical work. TENANT: WeWork · $80,000
    no contractor listed
    Issued
  56. 2022-12-15 #1735 - 17th Floor Interior alterations to demolish all non-load bearing partition walls and fixtures from this existing general office space on the 17th floor (#1735) of this existing commercial building. Scope of work: Interior demolition to create a shell space. Remove all existing partition walls, millwork, door frames, flooring, electrical, plumbing and sprinkler work. Separate permit(s) required for an future tenant improvements Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Note: Energy trigger not required BOMA BEST building. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $30,000
    no contractor listed
    Issued
  57. 2022-11-18 #2800 - 28th Floor Interior alterations to remove all non loadbearing partitions and finishes on the 28th floor (#2800) and return to office 'vacant' space in this existing commercial building. Scope of work: Demolish all partition walls, existing floorings, millwork, plumbing fixtures, remove entry door, t-bar ceiling. Install new lighting and finishes, electrical, plumbing and sprinkler work. OK for Field Review for interior demolition Separate permit(s) and ASHRAE checklist will be required for future tenant improvements. E2 - Lighting - Upgrade to Bilevel Lighting Control (per City staff.4.1.1.(d) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $177,400
    no contractor listed
    Issued
  58. 2022-09-26 #2900 - 29th floor (full floor tenant) Interior alterations to provide tenant improvements for a new full floor office tenant on the 29th floor (#2900) in this existing commercial building. Scope of work: remove/construct partition walls, doors, staff kitchen area, washroom, millwork, finishes, HVAC, lighting, electrical, plumbing, mechanical and sprinkler work. REVISION #1: interior layout changes. March 21, 2023 mlh TENANT: Wesgroup Properties Ltd. · $100,000
    Reotech Construction Ltd
    Issued
  59. 2022-08-19 Voluntary upgrade Installation of maglocks on the entrance doors to the office areas of the 2nd and 3rd floor elevator lobbies in this existing high rise office building. · $25,000
    no contractor listed
    Issued
  60. 2022-08-18 #700 - 7th floor Interior alterations to provide improvements for an existing office tenant on the 7th floor (#700) of this existing commercial building on this site. Scope of work: remove/construct partition walls to reconfigure layout to convert storage area to open office and enlarging staff lounge. E2 upgrade: Lighting #4 Upgrade to Bilevel lighting control per (9.4.1.1 (c) of ASHRAE 90.1.2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $680,000
    Aura Office Environments Inc
    Issued
  61. 2022-07-26 #875 - 8th floor Interior alterations to provide tenant improvements to this existing office on the 8th floor (#875) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, finishes, power & data, electrical, plumbing and sprinkler work. REVISION #1 Sept. 28/22 mk - changes to interior partition layout - lighting, power/data, furniture to suit layout changes. - No increase to project value. E2 - Retrofit Path: BOMA BEST (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $153,000
    no contractor listed
    Issued
  62. 2022-07-15 #1055 - 10th Floor Interior alterations to provide improvements to this existing office space on the 10th Floor (#1055) of this existing commercial building on this site. Scope of work: remove/construct interior partition walls, doors, finishes, t-bar ceiling, power and data, electrical, plumbing and sprinkler work to suit. REVISION #1: Sept 28/22 mk - reconfigure interior partition wall layout. - reconfigure lighting, power/data, furniture to suit changes. - increase project value by $40,000.00; from $592,000.00 to $632,000.00 *********************************************************** OK For Field Review by Andrew W - June 20/22 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $632,000
    no contractor listed
    Issued
  63. 2022-05-06 31st and 32nd Floor Interior alterations to this existing vacant full floor office space on the 31st and 32nd floors, to demolish the reception area only on the 31st floor and to remove all non loadbearing partitions, ceiling and finishes to return to base building on the 32nd floor in this existing commercial building. Scope of work: demolish reception desk, flooring, & wall sconces on the 31st floor only. Demo entire 32nd floor and return to base building. Separate permit(s) required for an future tenant improvements * Existing interconnecting stairs from reception area on the 31st floor to the 32nd floor. OK For Field Review per City staff · $150,000
    no contractor listed
    Issued
  64. 2022-03-14 #423 - 4th floor Interior alterations to provide tenant improvements in this existing office space for a new office tenant on the 4th floor (#423) of this existing commercial building. Scope of work: demo/construct partition walls, doors, millwork, finishes for new layout, open workstation, staff amenity spaces, file storage, Electrical, Plumbing, Mechanical and sprinklers to suit. REVISION #1: to delete the suspended ceiling beams from Corridor 406 due to a conflict with the sprinkler line, which would be replaced with a gypsum wall board ceiling with recessed linear LED lights. May 6/22 mk TENANT: Vantage Airport Group OK for Field Review per City staff · $300,000
    no contractor listed
    Issued
  65. 2021-11-24 #2000 - 20th floor Interior alterations to provide improvements for an existing full floor office tenant on the 20th floor (#2000) of this existing commercial building on this site. Scope of work: remove portions of floor finish & adjust wall finish as required for new glazed and non-glazed demountable wall system for three new offices. Lighting, HVAC diffusers, sprinklers and fire alarms to suit. TENANT: Wesgroup Properties Ltd. * Boma Best building. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $60,000
    no contractor listed
    Issued
  66. 2021-10-01 Change of Major Occupancy: Convert the existing Bank of China space (financial institution, D) to a hall(A2) for the tenants of the Bentall towers in this existing office building with a Kitchen operated by commercial vendor. Scope of work includes demolition of existing partitions and ceilings; and construction of new partitions, ceilings, millwork and finishes. Plumbing, HVAC, lighting and power to be updated to suite the new layout. Note: 1.0. Application is reviewed under VBBL 2019 and issued during health pandemic 2020 and 2021. 2.0. One class 5 cooking is permitted. 3.0. Food primary requires a separate permit. 4.0. This project requires S3 and N3 upgrade and is deferred based on property-wide work underway per City staff. Please refer her parcel note. It is not an exempt. 5.0. Final inspection of BP-2020-03264 prior to occupancy. Revision 1: · $1,050,000
    no contractor listed
    Issued
  67. 2021-08-16 #3083 Interior alterations to provide improvements to existing office tenant at office unit #3083 on the 30th floor of this commercial building on this site. Work to close off a door to the common corridor. Scope of work: - Demolish one exit door - 3 exist doors to remain - Construct New walls - New finishes OK for Field Review per City staff: - Sprinklered building. No sprinkler permit required per City staff · $5,000
    Core Projects Ltd
    Issued
  68. 2021-07-05 #1055 - 10th Floor Interior alterations to demolish all non load bearing partition walls in this existing office and return to shell space in this existing commercial building. Separate Building Permit and ASHRAE checklist required for future tenant improvements. OK for Field Review - R. Astorino Energy upgrade exempt: Interior Demolition · $67,000
    no contractor listed
    Issued
  69. 2021-06-22 #2123 - 21st Floor Interior alterations to demolish a partition wall and door in this existing office tenant space on the 21st floor (#2123) of this existing commercial building on this site. Scope of work: Deconstruct interior wall. Finish to match existing. Ok for Field Review per City staff: Energy trigger not required BOMA BEST building. · $25,000
    no contractor listed
    Issued
  70. 2021-05-25 #302 and #302B - Bentall 3 (Upper Mall Level) Interior alterations to this existing retail unit #302 to demise it into two smaller retail units to be #302 and #302B within the existing retail unit and a shared storage space in the back that both retail units have access to (to get to the rear corridor for exiting reasons). The storage space is intended for the retail units ONLY. Scope of work: Construct demising wall, interior partition walls, doors, electrical and sprinkler work. OK for Field Review per City stafflered - Separate sprinkler permit required for proposed sprinkler work. Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) · $135,000
    Epic Spaces Inc
    Issued
  71. 2021-02-22 #3083 - 30th floor (expanding into #3093 & #3013) Interior alterations to remove demising walls to combine #3083,#3093, & #3013 (retaining #3083) and provide improvements for this existing office tenant on the 30th floor of this commercial building on this site. Scope of work: remove demising and partition walls and construct new partition walls to reconfigure layout, relocate kitchen by 5 feet, new carpet and paint. Selected Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) OK for Field Review per City staff · $200,000
    no contractor listed
    Issued
  72. 2021-01-22 (# 2000) Interior alterations on the 21st floor for this partial floor tenant. Scope of work includes a convenience stair connecting to the 20th floor which is being processed under permit BP-2020-03468. This project is related to AL-2020-00123 for interconnected floors. The N3 upgrade triggered by this project has been deferred as per City staffevision #1 - Changes to interior layout and doors and refinement of location of convenience stair opening. - accepted March 16/21 Revision #2 - to change the electrical consultant from N Bains to J Dupuis effective Mar.13/21 - accepted Mar.24/21 · $602,600
    no contractor listed
    Issued
  73. 2021-01-14 Building Envelope Repair; Exterior alterations to provide waterproofing membrane repair at plaza over the underground shopping mall. Scope of work includes: Replacement of existing fountain with planter, new planted trees for the existing planters, new terrazzo finishes over a cement bed, existing vertical stone cladding panels replaced with new panels (colour and texture to match the existing panels), and existing handrails replaced with new stainless steel handrails. The existing interior finishes below the plaza will remain as is. Building Review Branch Notes: · $5,200,000
    no contractor listed
    Issued
  74. 2020-12-08 #2000 - 20th floor Interior alterations to provide improvements for a new full floor office tenant in this shell (office) space on the 20th floor of this existing office building on this site. Scope of work includes: new partition walls and doors, new washroom, and electrical, sprinkler, and plumbing work. Demo work under BP-2020-02374 · $1,447,100
    no contractor listed
    Issued
  75. 2020-12-01 #1225 - 12th floor Interior alterations to provide tenant improvements to this existing office tenant on the 12th floor (#1225) of this existing commercial building. Scope of work: interior alterations to reconfigure kitchen area to create a copy area and new partitions/pony walls to open office area create new work space. energy upgrade exemption: N/A (BOMA BESt (Path 1)) Ok for Field Review per City staff · $50,000
    Matra Construction Inc
    Issued
  76. 2020-11-10 1025 Dunsmuir St (Bentall Four) - ground level Interior alterations to demolish all interior partitions in this vacant Financial Institution of this existing commercial building, Bentall Four on the site. REVISION #1 to leave the existing bulkhead in place instead of removing as part of the original interior demolition. Aug 30, 2021 mlh Separate permit(s) and ASHRAE checklist will be required for future tenant improvements. OK for Field Review as per City staff · $55,762
    Matra Construction Inc
    Issued
  77. 2020-11-03 The installation of a locking device at a door which provides access to the 2nd exit from an elevator lobby on single tenant suite on the 11th, 12th, 15th, and 22nd story of this existing 32 story Bentall Three commercial building. Building is sprinklered. Note: This application is reviewed under VBBL 2019 and issued during 2020 Health pandemic. · $30,000
    no contractor listed
    Issued
  78. 2020-08-20 #2000 - 20th floor Interior alterations for demolition only of all interior partitions in this existing full floor General Office space on the 20th (unit #2000) of this existing commercial building. Scope of work: Remove all non load bearing partition walls to leave a shell space. OK for SIPS processing as per City staff. · $200,000
    VPAC Construction Group Ltd
    Issued
  79. 2020-08-17 Bentall 3 - Floor 4, 8, 17, 21, 28, 30, 31 common washrooms/lobbies/ corridors ( *see Revisions #1 & #2 and #3) Interior alterations to provide landlord improvements to floors 4, 8, 17, 21, 28, 30, & 31st to the common washrooms &/or lobbies &/or corridors of this existing commercial building. REVISION #1 Nov.18/21 mk - ADD the 20th floor common washroom/lobbies/corridors to scope of work. - complete new set submitted with 5 additional pages, and also renumbered/relabeled pages. - project value increased by $155,000.; from $3,101,000.00 to 3,256,000.00 REVISION #2 Aug.11/22 mk -Add the 29th floor common washroom/lobbies/corridors to scope of work. - Increase project value from $3,256,000.00 to $3,451,000.00 (increased by $195,000.00. REVISION #3 - Add 32nd floor renovation to washrooms to scope of work. Increase project value from $3,451,000.00 to $3,601,000.00. ****************************************************** · $3,601,000
    Matra Construction Inc
    Issued
  80. 2020-08-17 Bentall 2 - Floors 5, 8, 9, 10, 11, 12, 17 common washrooms/lobbies/corridors (* See REVISION #1 and #2) Interior alterations to provide landlord improvements on floors 5,8,9,10,11,12,& 17 to the existing common washrooms &/or lobbies &/or corridors of this existing commercial building. *REVISION #1:July 21,2022 mk - Add 7th floor washroom/lobby to scope of work. - Increase project value from $2,197,512.00 to $ 2,597,512.00 REVISION #2 - Nov.2/23 mk · $2,897,512
    Matra Construction Inc
    Issued
  81. 2020-06-23 #2600 - 26th Floor (full floor tenant) Interior alterations to provide tenant improvements for this existing full floor office space (#2600) on the 26th floor of this existing mixed use building. REVISION #1: July 23/21 mk - Delete the following work areas on revised plans from original scope of work: 2646, 2645, 2666, 2640, 2638, 2623, 2670. - Add room 2642. - revised ASHRAE - Reduce Scope of work from $195,000 to $97,500. Selected energy upgrade: N/A (BOMA BESt (Path 1) OK for Field Review as per City staff · $195,000
    Priority Projects Limited
    Issued
  82. 2020-04-28 Interior alterations to provide improvements to this existing office unit #1400 on the 14th floor in this existing commercial building on this site. Scope of work to repair floor, repair drywall on bulkhead, and relocate existing electrical outlets. OK for field review as per City staff · $150,000
    Canadian Turner Construction Company Ltd
    Issued
  83. 2020-02-20 #310 - Including operational letter from Nick Joosten of Hudson Pacific Properties, date-stamped "Received" on November 18, 2019 to provide interior alterations to expand unit #310 (Retail Shell) into a portion of Bentall III (includes the Custodial storage area, mechanical service room, and washrooms) and to combine #308 (Retail Shell), retaining #310 and a change of use from Retail Shell (E) to Fitness Centre (D) at this existing mixed use building on this site. Okay for Field Review per City staffSt building Note: 1) The fitness centre is an amenity space for tenants of 595 Burrard Street only. The Fitness Centre Amenity Space is subsidiary to the Group D major occupancy classification of this building. 2) Maximum occupant load including staff = 60 People. 3) Signage is to be posted and permanently maintained in a visible location identifying "Maximum Occupant Load = 60 Persons" and "Fitness Centre for tenants of 595 Burrard only" 4) Okay for BP only per City staff) Future Building Permits and additional clearances will be required IF this space is no longer treated as an subsidiary occupancy/fitness amenity space. 6) No Business License is required as this unit is considered an amenity space. 7) Interior alterations to remove all partition walls for #310 completed under BP-2019-03086 and for #308 completed under BP-2019-03161 8) Permit application under VBBL 2014. · $624,430
    Canadian Turner Construction Company Ltd
    Issued
  84. 2019-12-10 Exterior alterations for membrane replacement at this existing plaza for commercial building at this site. Scope of work includes remove and replace existing planters and vegetation. Note: Landscape to be cleared under DP-2020-00733 - Minor Amendment. Note: Fire Departments path of travel accepted by Boris Turishev. OK for field review per City staffpt.26/19 · $1,500,000
    Ledcor Construction Limited
    Issued
  85. 2019-08-12 #2500 - 25th Floor (full floor tenant) Interior alterations to provide tenant improvements for this existing full floor office space (#2500) on the 25th floor of this existing mixed use building. Scope of work: remove bulkhead and plinths at file and bookcase openings, remove interior partitions, doors and millwork, remove/reuse door (new frame and sidelite), new partition walls and plenum baffle, new finishes, electrical and sprinkler work. TENANT: Blake Services Inc. (Blake, Cassels & Graydon LLP) *Main Reception #2600 · $125,000
    Priority Projects Limited
    Issued
  86. 2019-07-25 #308 - Bentall 3 (Upper Mall Level) Interior alterations to this existing retail space on the upper mall level (#308) and return to a shell tenant space at this existing Bentall Three commercial building. Scope of work: remove two partition walls, fixtures, flooring and ceiling tiles. Separate permits and ASHRAE checklist will be required for any future tenant improvements. Energy upgrade exempt: Interior demolition OK for field review processing as per City staff. · $5,000
    Adriatic Demolition and Disposal Ltd
    Issued
  87. 2019-07-24 #700-7th floor (Bentall Three) *full floor tenant Interior alterations to provide improvements to this office unit #700 on the 7th floor in this existing commercial building on this site. Scope of work: demolish partition walls and construct new partition walls, glazing, sliding door, finishes, ceiling work, mechanical, electrical and sprinkler work. TENANT: Boughton Law Corporation · $170,000
    Omicron Construction Ltd
    Issued
  88. 2019-07-16 #310 - Bental 3 (Upper Mall Level) Interior alterations to this existing retail space on the upper mall level (#310) and return to a shell tenant space at this existing Bentall Three commercial building. Scope of work: remove two partition walls, fixtures, flooring and ceiling tiles. Separate permits and ASHRAE checklist will be required for any future tenant improvements. Energy upgrade exempt: Interior demolition OK for SIPS processing as per City staff. · $5,000
    Adriatic Demolition and Disposal Ltd
    Issued
  89. 2019-04-17 #1723 - 17th floor Interior alterations to this existing office space for existing office tenant on the 17th floor (#1723) to provide layout changes by altering partition walls in this existing commercial building. Scope of work: construct interior partition wall, glazing and doors for new office, copy and file room, new finishes, ceiling work, power & data, electrical, mechanical and sprinkler work. TENANT: B2 Gold Corp. · $88,013
    Omicron Construction Ltd
    Issued
  90. 2019-04-17 #3100 - 32nd floor Interior alterations to this existing office space for existing office tenant on the 32nd floor (#3100) to provide layout changes by altering partition walls in this existing commercial building. Scope of work includes demolition and relocation of partition wall, new power/data, ceiling and electrical work. · $67,257
    Omicron Construction Ltd
    Issued
  91. 2019-04-10 #1155 - 11th floor Interior alterations to provide improvements for this existing office tenant on the 11th floor (#1155) in this existing commercial building on this site. Scope of work: remove interior partition walls, doors, millwork, sink/faucet and construct new partition walls, glass door and sidelights, closet doors, new staff kitchen, millwork, ceiling work, lighting, electrical, plumbing and sprinkler work. REVISION #1 - To re-stamp and replace approved applicant drawing set./July 5, 2019 jm TENANT: Devencore · $118,000
    no contractor listed
    Issued
  92. 2019-02-19 Ground floor Interior alterations to provide improvements for this existing Financial Institution tenant on the ground floor of this commercial building on this site. Scope of work: install two demountable partitions in open space, install two ceiling lights, electrical and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. TENANT: Bank of Montreal OK for field review per City staff. Note: No energy upgrade required; BOMA BESt building · $60,000
    Novacom Building Partners Ltd.
    Issued
  93. 2019-02-06 #2800 & #2823 Interior alterations to expanding unit #2800 into unit #2823 by providing new 4' wide opening on the existing demising wall and provide improvements for existing General Office tenant in this existing commercial building. Related Sprinkler IA-2019-00296 OK for field review as per City staff: BOMA Best · $24,262
    Matra Construction Inc
    Issued
  94. 2019-01-31 5th Floor - Common Washrooms Interior alterations to the 5th floor common washrooms in this existing commercial building. No change to existing layout Ok for field review as per City staff · $90,000
    Omicron Construction Ltd
    Issued
  95. 2019-01-25 #2200 Interior alterations to provide improvements for existing General Office tenant in unit #2200 in this existing commercial building. Scope of work includes installation of suspended ceiling. OK for field review as per City staff · $7,500
    IDM Systems Ltd
    Issued
  96. 2019-01-22 #1600 - 16th floor (15th storey) Tower/Mall (full floor) Interior alterations to provide improvements for this existing full floor office tenant on the 16th floor (#1600) of this existing commercial building on this site. Scope of work: Installation of suspended ceiling in office 16:127, 16:B and in hallway outside 16B. OK for field review per City staff. No energy upgrade required. BOMA BESt building. · $10,000
    no contractor listed
    Issued
  97. 2018-10-24 #833- 595 Burrard Street To permit interior alterations to provide tenant improvement to this existing office space to create a new office space in this existing commercial building on site. Scope of work to include: to demolish existing interior partitions, remove all finishes and mill work. Construct new interior office partitions, provide new power and data, alter lighting layout to suit. OK for Field Review as per City staff.2018 Selected Energy Upgrade : L2- Lighting - Upgrade to incorporate Space Control Systems (per City staff.4.1.2. of ASHRAE 90.1 - 2010) · $250,000
    Fusion Project Management Ltd
    Issued
  98. 2018-08-22 Main Floor - Lobby Interior alterations to provide upgrades to the existing main floor elevator lobby at this existing commercial building. Scope of work: construct one partition wall (video wall), millwork, finishes, ceiling work, lighting and electrical work. OK for field review as per City staff. Related to Special Sprinkler Inspection IA-2018-01051 Energy Upgrade Exempted: BOMA BESt Building · $400,000
    no contractor listed
    Issued
  99. 2018-07-31 #500-5th floor (full floor tenant) Interior alterations to provide improvements for this existing office tenant at office unit #500 on the 5th floor of this commercial building on this site. Scope of work: minor demolition, addition of a new meeting room, new lighting, electrical, HVAC and sprinkler work for new layout. · $400,000
    Omicron Construction Ltd
    Issued
  100. 2018-04-06 Unit #100, #200 & #325 - 555 Burrard St Including the Operational letter dated March 28, 2018 submitted by wework to provide an exterior alteration to the east elevation on the 1st floor by replacing an existing glazing panel with a new double door, and to provide interior alterations to 1st, 2nd and 3rd floors for a new office tenant (wework) in this existing office building. Notes: 1- Any proposed outdoor seating requires a separate Development Permit. 2- Exterior alteration cleared for DB, new door to match existing glazing, cleared per City stafffy first floor layout Revision-2 Revision to modify 1st, 2nd, and 3rd floor layouts, add a mezzanine level on the first floor (approx 195 SF), and to provide interconnecting stairs between the first, 2nd, and 3rd floors. Related to AL-2018-00076. Revision-3 April 8, 2019 AL-2018-00076 is revised hence modifying the followings: 1- Smoke baffle dividing the 2nd floor to two smoke compartment is removed. 2- Draft stops are installed underneath the stairs openings on the 2nd and 3rd floors. 3- Related drawings are revised to show the said changes. Revision-4 · $2,060,000
    no contractor listed
    Issued
  101. 2018-04-06 #1465, #1525, #1600-14th, 15th & 16th floors Interior alteration to the 14th, 15th and 16th floors of this existing office building for a new tenant (WEWORK). Note: This permit is the Tenant Improvement permit for BP-2017-04987 to convert the office shell to General Office on all 3 floors namely 14, 15, and 16 floors. Revision-1, May 18, 2018 To modify layout of 14th floor Revision-2, August 17, 2018 Changing layout of 14 and 15 floors Revision-3, November 27, 2018 To change the layout of 16th floor and install power operation for Universal Toilet Room on the 15th floor · $2,500,000
    no contractor listed
    Issued
  102. 2018-02-05 10th floor - Common Washrooms Interior alterations to the 10th floor of this existing office building to provide updates to the men's and women's common washroom areas. Scope of work: new interior walls, new finishes and fixtures, ceiling, plumbing and electrical work. · $90,000
    no contractor listed
    Issued
  103. 2017-12-12 #2200 Interior alterations to the entire 22nd floor (suite #2200) to provide tenant improvements for the new tenant (weworks) in this existing General Office suite. Note: a permanent sign indicating that occupant load (max 280 Persons) shall be posted in a conspicuous location. OK for Field review per City staff · $700,000
    Sajo Inc
    Issued
  104. 2017-11-24 #433 - 4th floor (Tower/Mall) Interior alterations to provide improvements for a new office tenant on the 4th floor (#433) of this existing commercial building on this site. Scope of work: to demolish and construct new partition walls, relocate doors, remove glazing, new finishes, ceiling, and electrical work. OK for field review per City staff. Note: No energy trigger required; BOMA BESt building Related to Special Sprinkler Permit No. IA-2017-01382 · $49,000
    no contractor listed
    Issued
  105. 2017-10-17 8th Floor - Elevator Lobby and Public Corridor Interior alterations to provide cosmetic upgrade to the 8th floor Elevator Lobby and Public corridor in this existing building. Ok for field review per City staff: Exempt - BOMA BEST · $140,000
    no contractor listed
    Issued
  106. 2017-10-17 12th and 17th Fl Elevator Lobbies and Public Corridors Interior alterations to provide cosmetic upgrade to the 12th and 17th floor Elevator Lobbies and Public corridors in this existing building. Ok for field review per City staff: Exempt - BOMA BEST Revision #1: Reduced scope of work to only 17th floor. · $220,000
    no contractor listed
    Issued
  107. 2017-10-05 14th, 15th, 16th floors Interior alterations to demolish all interior demising and partition walls, doors, glazing, and suspended ceiling systems and return to shell space on the 14th, 15th, & 16th floors of this existing commercial building. Scope of work: internal demo for 14th/15th/16th floors. Combining #1465 & 1485; retaining #1465; combining #1525, 1555 & 1565; retaining #1525; and #1600 remains. Addressing Note: #1485, #1555, #1565 - 555 Burrard St to be CANCELLED and REMOVED from the building prior to final inspection. Separate building permit(s) and ASHRAE Checklists will be required for future tenant improvements. OK for SIPS processing as per City staff. · $316,000
    no contractor listed
    Issued
  108. 2017-10-05 mall level vault , #100-1st, #200-2nd, and #325-3rd floors Interior alterations to demolish interior partitions, doors, glazing, finishings and suspended ceiling systems in these vacant office spaces on the 1st, 2nd and 3rd floors of this existing commercial building on this site. Scope of work includes removal to demising walls, electrical, mechanical, plumbing and sprinkler work. REVISION #1 - add to scope of work to include demo of vault on the retail (mall) level. Dec 19/17 mk Separate permit(s) and ASHRAE checklist will be required for future tenant improvements. Address Note: #120, #255 and #375 will be cancelled upon permit issuance and are to be removed from the building/suite entry. #100, #200 and #325 are to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. OK for SIPS processing as per City staff. ASHRAE exempt: interior demolition only and demising walls. · $586,000
    no contractor listed
    Issued
  109. 2017-08-30 #900-9th floor Interior alterations only to provide tenant fitout for a new General Office use at unit #900 on the 9th floor of this existing Bentall Two commercial building. Scope of work: construct partition walls, new doors, millwork, finishes, lighting, electrical, plumbing and sprinkler work. Note: See BP-2017-00261 for interior demolition of this tenant space. TENANT: Sojitz OK for field review as per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $150,000
    no contractor listed
    Issued
  110. 2017-08-25 #3100-32nd floor Interior alterations to this existing office space for existing office tenant on the 32nd floor (#3100) to provide layout changes by altering partition walls in this existing commercial building. Scope of work: demolish/construct partition walls, glazing, millwork, doors, new finishes, ceiling, electrical, mechanical and sprinkler work to create 3 new office spaces. **REVISION #1: to alter the floor plan layout to change 2 offices into 3 offices. Oct 17, 2017 mlh TENANT: B2 Gold Corp. (Reception on 31st floor-#3100) · $60,000
    Omicron Construction Ltd
    Issued
  111. 2017-07-27 #2900 - 29th floor Interior alterations to provide improvements to this existing General Office tenant on the 29th floor (unit #2900) of this existing commercial building. Scope of work: demo partition walls/doors/finishes in the north west corner of this floor and to construct new partitions to change layout for meeting rooms, kitchen, reception. Alter plumbing, electrical, sprinkler. OK for field review as per City staff. Energy upgrade exempt: BOMA Best Building · $173,000
    Aura Office Environments Inc
    Issued
  112. 2017-06-27 (Unit #300-Ground) - Interior alterations to this existing retail tenant space (Canada Post) to provide tenant improvements in this existing Bentall Centre Mall. Scope of work includes add new storage room,upgrade counters and cabinetry, electrical, finishes OK for field review as per City staff: BOMA Best Building · $51,000
    Glacier Fixture Installation Inc
    Issued
  113. 2017-06-20 #413-4th floor Interior alterations to provide tenant improvements to this existing office unit on the 4th floor (#413) of this existing commercial building on this site. Scope of work: demolish partition/glazing, remove door, new glazing. TENANT: Calibre Mining Corp. See related Special Sprinkler Inspection Permit No. IA-2017-00727. OK for field review per City staff. Note: Energy trigger not required BOMO BESt building. · $10,000
    Pagliaro Projects Ltd
    Issued
  114. 2017-06-08 #453-4th floor (Tower) Interior alterations to provide tenant improvements for new office tenant in existing office space by expanding #453 into a portion of #433 on the 4th floor of this existing commercial building. Scope of work: construct new demising wall thereby decreasing size of #433, demolish/construct partition walls, new millwork, doors, finishes, drywall bulkhead, lighting, mechanical, electrical, plumbing and sprinkler work for new tenant layout (#453 only). TENANT: Norbord · $253,000
    Unison Construction Management Ltd
    Issued
  115. 2017-05-25 #1723 -595 Burrard St (tower/mall building) Interior alterations to combine two units #1723 & #1793 and provide improvement for an existing General Office tenant on the 17th floor (#1723) of this existing commercial building. Scope of work: includes demolition of portion of demising wall to combine #1723 and #1793 (retain #1723), demolish millwork, new finishes, electrical, plumbing and sprinkler work. Address Note: #1793 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #1723 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. OK for field review as per City staff. Energy upgrade exempt: BOMA best Building. No changes to lighting proposed. · $15,000
    Omicron Construction Ltd
    Issued
  116. 2017-05-18 #3043-30th floor Interior alterations to provide improvements for a new office tenant and combining office units #3023 and #3043 (retaining #3043) on the 30th floor of this existing commercial building on this site. Scope of work: demolish/construct interior walls, glazing, doors/frames, millwork and finishes, new drywall ceiling, lighting, electrical and sprinkler work. REVISION #1 - Reflective ceiling in boardroom changed from T-bar grid to drywall. July 25/17 Address Note: #3023 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #3043 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: Leagold Mining OK for field review per City staff. Note: No energy trigger required BOMA BESt building. · $60,000
    All Spaces Project Management Ltd
    Issued
  117. 2017-05-16 #1600-16th floor/15th storey Tower/Mall (full floor) Interior alterations to provide improvements for a new office tenant in this existing office unit #1100 on the 16th floor of this existing commercial building on this site. Scope of work: demolish/construct new partition walls, doors, glazing, mechanical, electrical, plumbing and sprinkler work to add new offices, renovate existing common washrooms and add new office amenity spaces. See related BP-2016-00533 for interior demolition work on this floor. TENANT: weworks Note: This building does not have a 13th floor. See Building Permit No. BU430545 which permitted interconnecting stairs between floors 12, 14, 15 and 16. No reception (tenant occupies the 11th, 12th, 14th, 15th and 16th floors). · $700,000
    Sajo Inc
    Issued
  118. 2017-05-16 #1500-15th floor/14th storey Tower/Mall (full floor) Interior alterations to provide improvements for a new office tenant in this existing office unit #1500 on the 15th floor of this existing commercial building on this site. Scope of work: demolish/construct new partition walls, doors, glazing, mechanical, electrical, plumbing and sprinkler work to add new offices, renovate existing common washrooms and add new office amenity spaces. See related BP-2016-00533 for interior demolition work on this floor. TENANT: weworks Note: This building does not have a 13th floor. See Building Permit No. BU430545 which permitted interconnecting stairs between floors 12, 14, 15 and 16. No reception (tenant occupies the 11th, 12th, 14th, 15th and 16th floors). · $700,000
    Sajo Inc
    Issued
  119. 2017-05-16 #1400-14th floor/13th storey Tower/Mall (full floor) Interior alterations to provide improvements for a new office tenant in this existing office unit #1400 on the 14th floor of this existing commercial building on this site. Scope of work: demolish/construct new partition walls, doors, glazing, mechanical, electrical, plumbing and sprinkler work to add new offices, renovate existing common washrooms and add new office amenity spaces. REVISION #1: Restamp lost set and interior layout changes. ASHRAE reviewed. Feb. 20, 2020 mlh See related BP-2016-00533 for interior demolition work on this floor. TENANT: weworks Note: This building does not have a 13th floor. See Building Permit No. BU430545 which permitted interconnecting stairs between floors 12, 14, 15 and 16. No reception (tenant occupies the 11th, 12th, 14th, 15th and 16th floors). · $700,000
    Sajo Inc
    Issued
  120. 2017-05-16 #1200-12th floor Tower/Mall (full floor) Interior alterations to provide improvements for a new office tenant in this existing office unit #1200 on the 12th floor of this existing commercial building on this site. Scope of work: demolish/construct new partition walls, doors, glazing, mechanical, electrical, plumbing and sprinkler work to add new offices, renovate existing common washrooms and add new office amenity spaces. See related BP-2016-00533 for interior demolition work on this floor. TENANT: weworks Note: This building does not have a 13th floor. See Building Permit No. BU430545 which permitted interconnecting stairs between floors 12, 14, 15 and 16. No reception (tenant occupies the 11th, 12th, 14th, 15th and 16th floors). · $700,000
    Sajo Inc
    Issued
  121. 2017-05-16 #1100-11th floor-Tower/Mall (full floor) Interior alterations to provide improvements for a new office tenant in this existing office unit #1100 on the 11th floor of this existing commercial building on this site. Scope of work: demolish/construct new partition walls, doors, glazing, mechanical, electrical, plumbing and sprinkler work to add new offices, renovate existing common washrooms and add new office amenity spaces. REVISION #1: Restamp lost set and interior layout changes. Feb. 19, 2020 mlh See related BP-2017-00258 for interior demolition work on this floor. TENANT: weworks Note: This building does not have a 13th floor. No reception (tenant occupies the 11th, 12th, 14th, 15th and 16th floors). · $700,000
    Sajo Inc
    Issued
  122. 2017-05-10 #1225 and #1255 Interior alterations to expand the existing office tenant in #1225 into the adjacent office space #1255 and retaining #1225 on the 12th floor of this existing commercial building. Addressing Note: #1255 will be cancelled upon permit issuance. #1225 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. OK for field review per City staff: Exempt - Boma Best · $40,000
    no contractor listed
    Issued
  123. 2017-04-18 #1795- 17th Floor Interior alterations to provide tenant improvement for a new office tenant in unit #1795 on the 17th floor of this existing commercial building. Scope of work: Demolition/contruction of partition walls/doors to create new office layout and staff lounge, millwork, electrical, plumbing, sprinkler work. TENANT: AP Capital MIC Management Corp. Energy Upgrade Exempt: BOMA BESt Building. · $80,000
    no contractor listed
    Issued
  124. 2017-03-23 #400-4th floor (full floor tenant) Interior alterations on the 4th floor (#400) for a new office tenant in this existing office "shell" space. Note: Adaptable washroom is being provided off of the elevator area. Scope of work: remove partition/doors in elevator lobby, new corridor partitions at north end of elevator lobby, new partition walls, glazing, doors, millwork, lighting, finishes, mechanical, electrical, plumbing and sprinkler work for new tenant (including one large boardroom, 3 meeting rooms, 10 offices, one staff/lounge room, open work areas). TENANT: Shaw Sabey & Associates Ltd. · $600,000
    TotalPlan Inc
    Issued
  125. 2017-01-27 #900-9th Floor Interior demolition of non-load bearing partition walls on the 9th floor (#900) to create a "shell space" to this existing Bentall Tower 2 office/retail/restaurant building. Scope of work: Demolition of all partition walls, t-bar ceilings and finishes, electrical, plumbing, and sprinkler work. Energy upgrade exempt: Interior demolition. Separate permit(s) and ASHRAE checklist will be required for any tenant improvements to this space. OK for SIPS processing as per City staff · $25,000
    no contractor listed
    Issued
  126. 2017-01-25 #1100-11th Floor Interior demolition of non-load bearing partition walls on the 11th floor (#1100) to create a "shell space" to this existing Bentall Tower 3 office/retail/restaurant building. Scope of work: Demolition of all partition walls, t-bar ceilings and finishes, electrical, plumbing, and sprinkler work. Energy upgrade exempt: Interior demolition. Separate permit(s) and ASHRAE checklist will be required for any tenant improvements to this space. OK for SIPS processing as per City staff · $75,000
    no contractor listed
    Issued
  127. 2017-01-25 #2200-22nd Floor Interior demolition of non-load bearing partition walls on the 22nd floor (#2200) to create a "shell space" to this existing Bentall Tower 3 office/retail/restaurant building. Scope of work: Demolition of all partition walls, t-bar ceilings and finishes, electrical, plumbing, and sprinkler work. Energy upgrade exempt: Interior demolition. Separate permit(s) and ASHRAE checklist will be required for any tenant improvements to this space. OK for SIPS processing as per City staff · $99,000
    no contractor listed
    Issued
  128. 2017-01-03 #2823 Interior alterations to provide improvements for an existing office tenant on the 28th floor of this existing commercial building. Scope includes: new partition walls to create reception, copy room, meeting room, coffee area and open office space, new glazing, doors, finishes, millwork, lighting, electrical work. See related Special Sprinkler Permit No. IA-2016-00902. Energy Upgrade Exempt: BOMA Best · $34,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.