570 E King Edward Av, Vancouver

An address in Riley Park, Vancouver, zoned RR-2B (Residential Rental). 18 building permits are on file, most recently “Building 3 - To construct a 3-storey townhouse building containing 12 dwelling units. Ref…” (issued 14 April 2025). The City's 2026 assessed value is $16,938,000.

Zoning
RR-2B · Residential Rental
Neighbourhood
Riley Park
Permits on file
18
Assessed value (2026)
$16,938,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 570 E King Edward Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150697, 647 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
647
Households
255
Median age
41.6
Median household income (2020)
$90,000
Own their home
61%
Vancouver: 45%
Average household size
2.5
Under 15
14%
65 and over
16%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-04-14 Building 3 - To construct a 3-storey townhouse building containing 12 dwelling units. Refer to BP-2024-00179 for site work, below-grade facilities, and common underground parking. VBBL 2019
    no contractor listed
    Issued
  2. 2025-04-14 Building 2 - To construct a 3-storey townhouse building containing 4 dwelling units. Refer to BP-2024-00179 for site work, below-grade facilities, and common underground parking. VBBL 2019
    no contractor listed
    Issued
  3. 2025-04-14 Building 1 - To construct a 6-storey apartment building containing 109 dwelling units. Refer to BP-2024-00179 for site work, below-grade facilities, and common underground parking. VBBL 2019
    no contractor listed
    Issued
  4. 2025-04-14 To construct one 6-storey apartment building and two 3-storey townhouse buildings of combustible construction containing 125 secured market rental units on top of 1 level of non-combustible (3.2.1.2) below-grade parking having vehicular access from the lane. VBBL 2019 - NFPA 13 - with Radio Antenna. This permit covers site work, below-grade facilities, and common underground parking per the Stage request. The following are spinoff permits for each building above grade. Building 1 (North) - BP-2024-00957 Building 2 (South-East) - BP-2024-00958 Building 3 (South-West) - BP-2024-00959 Stage 1 - Excavation and Shoring issued on Nov. 22, 2024. Stage 2 - Full Construction issued on Apr. 14, 2015. · $41,000,000
    Ventana Construction Corporation
    Issued
  5. 2025-01-30 570 E King Edward Avenue To demolish to grade this existing Single Detached House (1977) on this site. Demolition Contractor: Garett Gilchrist of Fleck Contracting Ltd. Related to: DP-2023-00663: Issued BP-2024-00179: Issued BP-2024-00957: In Review - Building 1 (North) BP-2024-00958: In Review - Building 2 (South-East) BP-2024-00959: In Review - Building 3 (South-West) Note: 1. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
    Fleck Contracting Ltd
    Issued
  6. 2025-01-15 576 E King Edward Avenue To demolish to grade this existing Single Detached House with Secondary Suite (1910) on this site. Demolition Contractor: Garett Gilchrist of Fleck Contracting Ltd. Related to: DP-2023-00663: Issued BP-2024-00179: Issued BP-2024-00957: In Review - Building 1 (North) BP-2024-00958: In Review - Building 2 (South-East) BP-2024-00959: In Review - Building 3 (South-West) Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $30,000
    Fleck Contracting Ltd
    Issued
  7. 2025-01-07 586 E King Edward Avenue To demolish to grade this existing Single Detached House (1910) on this site. Demolition Contractor: Garett Gilchrist of Fleck Contracting Ltd. Related to: DP-2023-00663: Issued BP-2024-00179: Issued BP-2024-00957: In Review - Building 1 (North) BP-2024-00958: In Review - Building 2 (South-East) BP-2024-00959: In Review - Building 3 (South-West) Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $30,000
    Fleck Contracting Ltd
    Issued
  8. 2025-01-07 560 E King Edward Avenue To demolish to grade this existing Single Detached House (1977) on this site. Demolition Contractor: Garett Gilchrist of Fleck Contracting Ltd. Related to: DP-2023-00663: Issued BP-2024-00179: Issued BP-2024-00957: In Review - Building 1 (North) BP-2024-00958: In Review - Building 2 (South-East) BP-2024-00959: In Review - Building 3 (South-West) Note: 1. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
    Fleck Contracting Ltd
    Issued
  9. 2025-01-07 550 E King Edward Avenue To demolish to grade this existing Single Detached House (1975) on this site. Demolition Contractor: Garett Gilchrist of Fleck Contracting Ltd. Related to: DP-2023-00663: Issued BP-2024-00179: Issued BP-2024-00957: In Review - Building 1 (North) BP-2024-00958: In Review - Building 2 (South-East) BP-2024-00959: In Review - Building 3 (South-West) Note: 1. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $25,000
    Fleck Contracting Ltd
    Issued
  10. 2024-12-13 606 E King Edward Avenue To demolish to grade this existing Single Detached House (1911) on this site. Demolition Contractor: Garett Gilchrist of Fleck Contracting Ltd. Related to: DP-2023-00663: Issued BP-2024-00179: In Review BP-2024-00957: In Review - Building 1 (North) BP-2024-00958: In Review - Building 2 (South-East) BP-2024-00959: In Review - Building 3 (South-West) Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $30,000
    Fleck Contracting Ltd
    Issued
  11. 2024-12-13 596 E King Edward Avenue To demolish to grade this existing Single Detached House (1910) on this site. Demolition Contractor: Garett Gilchrist of Fleck Contracting Ltd. Related to: DP-2023-00663: Issued BP-2024-00179: In Review BP-2024-00957: In Review - Building 1 (North) BP-2024-00958: In Review - Building 2 (South-East) BP-2024-00959: In Review - Building 3 (South-West) Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $30,000
    Fleck Contracting Ltd
    Issued
  12. 2024-11-20 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2024-01101. Issued separately QP: Ramin Hamidnejad, CRSP of Kinetic OHS Services Ltd.
    Fleck Contracting Ltd
    Issued
  13. 2024-11-20 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2024-01099. Issued separately QP: Ramin Hamidnejad, CRSP of Kinetic OHS Services Ltd.
    Fleck Contracting Ltd
    Issued
  14. 2024-11-20 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2024-01097. Issued separately QP: Ramin Hamidnejad, CRSP of Kinetic OHS Services Ltd.
    Fleck Contracting Ltd
    Issued
  15. 2024-11-20 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House with Secondary Suite; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2024-01095 QP: Ramin Hamidnejad, CRSP of Kinetic OHS Services Ltd. Building Permit for
    Fleck Contracting Ltd
    Issued
  16. 2024-11-20 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2024-01093. Issued separately QP: Ramin Hamidnejad, CRSP of Kinetic OHS Services Ltd.
    Fleck Contracting Ltd
    Issued
  17. 2024-11-20 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2024-01091. Issued separately QP: Ramin Hamidnejad, CRSP of Kinetic OHS Services Ltd.
    Fleck Contracting Ltd
    Issued
  18. 2024-11-20 Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing Single Detached House; to be completed under the supervision of a Qualified Professional. Related to demolition permit DB-2024-01089. Issued separately QP: Ramin Hamidnejad, CRSP of Kinetic OHS Services Ltd.
    Fleck Contracting Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Riley Park

4488 Main St
Exterior and interior alterations to provide tenant improvements for this existing Restaurant - Class 1 (Group A2) for a new tenant in this existing one-storey with basement commercial building on this site. Scope includes adding partition walls, replacing exhaust hoods and cooking equipment, re-configuring male washroom and removing two windows facing south. Notes: - CF-2026-003230 - Class 1 Cooking Operation (Grease-Laden Vapours): Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - Proposed occupant load: 100 persons. · 1010541 BC Ltd
2026-10-26
195 E 33RD Av
Interior alterations to change the use from Beauty Salon to Retail Store in this existing commercial building on this site. · no contractor listed
2026-10-19
4175 Fraser St
4171 Fraser St Interior alterations and change of use and major occupancy from Retail (Group E) to Health Care Office (Group D) for a new physiotherapy tenant on the round floor of this existing mixed use commercial building on this site. OK For Field Review per City staff. · no contractor listed
2026-10-19