Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
565 Smithe St, Vancouver
An address in Downtown, Vancouver, zoned CD-1 (442) (Comprehensive Development). 2 building permits are on file, most recently “#503 Interior alterations to provide improvements to unit #503 in this existing mixed use…” (issued 18 November 2025). The City's 2026 assessed value for the 146 accounts at this address is $119,586,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154144, 1,309 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-11-18
#503 Interior alterations to provide improvements to unit #503 in this existing mixed use building on this site Scope of work: Kitchen and bathroom renovation and new flooring OK for DTI per City staff: 2025 Sch E requested · $80,000
Level One Construction Ltd Issued -
2021-07-06
#2802 - Floor 28 Interior alterations to provide improvements to this unit (#2802) in this existing multiple dwelling building on this site. Scope of Work: Deconstruct interior wall. Re and re flooring, cabinets throughout. Master Bathroom complete reno. Plumbing and electrical to suit. Note: Energy upgrade option not shown on drawings, applicant confirmed by email will conduct E2 - Appliances - Upgrade to an Energuide/Energy Star appliance (washer; dryer) OK for Field Review - Rosa A. SP required per City staff · $150,000
Gallery Homes Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc2026-10-30
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd2026-10-30
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.2026-10-30