Permit GopherAlberta and B.C. property, permit and zoning records

5212 Cambie St, Vancouver

An address in Riley Park, Vancouver, zoned CD-1 (755) (Comprehensive Development). 8 building permits are on file, most recently “To demolish by deconstruction this existing one-family dwelling building on this site to …” (issued 28 July 2022). The City's 2026 assessed value for the 82 accounts at this address is $88,246,000.

Zoning
CD-1 (755) · Comprehensive Development
Neighbourhood
Riley Park
Permits on file
8
Assessed value (2026)
$88,246,000
82 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 5212 Cambie St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153250, 493 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
493
Households
210
Median age
38
Median household income (2020)
$95,000
Own their home
55%
Vancouver: 45%
Average household size
2.5
Under 15
14%
65 and over
17%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2022-07-28 To demolish by deconstruction this existing one-family dwelling building on this site to grade. No excavation or shoring is permitted under this permit, separate permits are required. Okay for SIPS per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
    3-in-1 Demolition and Excavation Ltd
    Issued
  2. 2022-07-28 To demolish by deconstruction this existing one-family dwelling building on this site to grade. No excavation or shoring is permitted under this permit, separate permits are required. Okay for SIPS per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
    3-in-1 Demolition and Excavation Ltd
    Issued
  3. 2022-07-21 To demolish by deconstruction this existing one-family dwelling building on this site to grade. No excavation or shoring is permitted under this permit, separate permits are required. Okay for SIPS per City staff: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
    3-in-1 Demolition and Excavation Ltd
    Issued
  4. 2022-07-04 To build a 6 storey mixed use building of concrete construction comprising of 80 market strata condominiums and a privately operated childcare over two levels of underground parking. VBBL 2019 - NFPA 13 · $24,500,000
    ITC Projects Inc
    Issued
  5. 2022-06-14 S&A Interior alterations to allow salvage of non-structural building components prior to or during the abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Related to Demo Permit: DB-2022-01143 Related to 5190 Cambie Street – Demo: DB-2022-01139 / BP-2022-01140 5208 Cambie Street – Demo: DB-2022-01141 / BP-2022-01142
    no contractor listed
    Issued
  6. 2022-06-14 S&A Interior alterations to allow salvage of non-structural building components prior to or during the abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Related to Demo Permit: DB-2022-01141 Related to 5190 Cambie Street – Demo: DB-2022-01139 / BP-2022-01140 5226 Cambie Street – Demo: DB-2022-01143 / BP-2022-01144
    no contractor listed
    Issued
  7. 2022-06-14 S&A Interior alterations to allow salvage of non-structural building components prior to or during the abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Related to Demo Permit: DB-2022-01139 Related to 5208 Cambie Street – Demo: DB-2022-01141 / BP-2022-01142 5226 Cambie Street – Demo: DB-2022-01143 / BP-2022-01144
    no contractor listed
    Issued
  8. 2017-05-01 Interior alterations to remove the kitchen and illegal suite from the basement and return the use of the building to a one family dwelling. OK for SIPS per City staff · $2,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Riley Park

488 W 40TH Av
5628 CAMBIE ST. Interior alterations to provide improvement to this existing Office (D) at 5628 Cambie St. on the first floor of this existing mixed-use building on the site. Okay for DTI per City staff · no contractor listed
2026-11-05
6 W 17TH Av
#12 - 10 W 17TH AV - Building 3 Interior alterations to provide improvements to this TH #12 - 10 of this existing multiple dwelling building on this site Project scope: relocation of kitchen from level 3 to level 1, bedroom and bathroom reno Okay for DTI as per City staff · AMC Project Management Ltd
2026-11-04
268 E 16TH Av
Interior alterations to renovate one of the dwelling units of this existing duplex. OK to process as DTI as per City staff · Diseno Development Corporation
2026-11-03
Something wrong on this page? Tell us and we'll check it against the City's records.