Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
510 Burrard St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 43 building permits are on file, most recently “#700 - 7th floor demised and changing to #760 & #770. Interior alterations to the 7th flo…” (issued 18 September 2026). The City's 2026 assessed value is $89,325,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154146, 1,156 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-09-18
#700 - 7th floor demised and changing to #760 & #770. Interior alterations to the 7th floor to demise the existing office space in #700 into two units to be (#760 and #770) and provide improvements to both units in this existing commercial building. Scope of work: demo and construction of demising wall, partition walls, doors/frames, millwork, finishes. Electrical, mechanical/plumbing, & sprinklers to suit. · $900,000
no contractor listed Issued -
2026-09-08
Level 7 & Level 11 - Elevator Lobby Interior alterations only to provide improvements to the elevator lobby and partial common area on the 7th (#700) and 11th (#1100) floor in this existing commercial building on site. Scope of work: .. electrical, plumbing and sprinkler work to suit. · $250,000
no contractor listed Issued -
2026-09-04
#230 - 2nd Floor Interior alterations to provide tenant improvements to this existing general office on the 2nd floor (#230) of this existing commercial building on site. Scope of work: Construct new interior walls, doors to create private offices, meeting rooms, staff area, limited millwork, electrical, plumbing and sprinkler work to suit. · $500,000
no contractor listed Issued -
2026-03-20
Ground level (1st floor) Interior alterations to provide improvement for this existing financial institution tenant on the ground level of this existing building on this site. Scope of work; convert meeting room into two offices. * In accordance with VBBL 2025 · $60,000
no contractor listed Issued -
2025-10-23
#240 (demised from #230) Interior alterations to the 2nd floor to demise the existing office space unit #230 into two units (to be #230 & #240) and provide improvements to unit #240 in this existing commercial building. Scope of work: Construct a demising wall to create 2 suites, new partitions for private offices and meeting rooms, new millwork, electrical, mechanical/plumbing and sprinkler work to suit. TENANT: JLL Properties Reviewed under VBBL 2019 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $166,588
TotalPlan Inc Issued -
2024-11-21
#800 - 8th Floor (demise into 3) - multi floor tenant Interior alterations on the 8th floor to demise the existing office #800 into three units to be #810, #820 and #805 and to provide tenant improvements in this existing commercial building on this site. Scope of work: Construct a demising wall to create 3 suites, electrical and sprinkler work to suit. TENANT: Legal Services Society ***Reception on 4th (#400) · $375,000
no contractor listed Issued -
2024-10-17
#400 - 4th Floor (full floor) Interior alterations to provide improvements to this existing full floor office tenant on the 4th floorr (#400) of this existing commercial building on site. Scope of work: Demolish 2 existing offices to create an open area, electrical and sprinkler work. TENANT: Legal Services Society Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $25,000
no contractor listed Issued -
2024-03-12
#220 - 2nd floor Interior alterations to the 2nd floor (#220) to convert the existing office space into shared Amenity Space in this existing commercial building on this site. Scope of work; select demolition of partial interior walls, gwb ceiling, tbar ceiling, existing power & lighting. New walls, fixtures, finishes, ceiling finishes and millwork. New changerooms, washrooms. REVISION #1 - July11/24 mk - add two pot lights. - universal shower room; modify door, shower, sink, and toilet. *Including the operational letter from Madeline Clement, dated February 14, 2023 to permit interior alterations and a change of use to Ancillary Amenity Space to the existing Office building at unit #220 on the second floor of this commercial building on this site. OK for FIT per City staff · $776,000
no contractor listed Issued -
2024-01-29
2nd floor (#200 demising into 3 units. to be; #210, #220, #230) *TI to #210 Only - Interior alterations to the 2nd floor to demise this full floor vacant office space into 3 units (to be #210 #220, #230) and provide improvements to unit #210 only, in this existing commercial building on this site. Scope of work: demolish all non load bearing partitions to return to shell and to demise this floor into 3 units with new corridors. Tenant improvements to finish unit #210 only. Revision #1 - move demising wall to align with existing wall. July8/24mk *Separate permit(s) required for further improvements to #220 & #230. · $450,000
no contractor listed Issued -
2023-12-07
#909 - 9th Floor Interior alterations to provide tenant improvements to this existing general office on the 9th floor (#909) of this existing commercial building on site. Scope of work: Select demo of non structural interior walls, flooring, doors, coffee counter. Construct new walls and relocate door for new office, new millwork, electrical, plumbing and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $72,000
TotalPlan Inc Issued -
2023-09-08
#905 - 9th floor Interior alterations to provide tenant improvements for the existing office tenant on the 9th floor (#905) in this existing commercial building on this site. Scope of work: construct new partition walls for a new storage room, new willwork in kitchen area, power and data. OK for Office TI per City staff; Aug. 28, 2023 Building Sprinklered - District Building Inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
VPAC Construction Group Ltd Issued -
2022-12-20
6th flr- #610, #620, #630, #640 and elevator lobby * SEE REVISION #1 *UNIT NO'S HAVE BEEN CANCELLED. #600 WILL REMAIN. Interior alterations to demise the existing full floor office on the 6th floor (#600) into four office shell units to be #610, #620, #630, #640 and provide improvements to the elevator lobby in this existing commercial building. Scope of work: remove all partition walls, finishes, lighting and millwork, and to construct demising walls, new lighting through out, elevator ceiling work, electrical, mechanical, plumbing and sprinkler work. REVISION #1 - REDUCE SCOPE OF WORK TO; DEMO AND CEILING TILES ONLY. Electrical, mechanical, & sprinklers to suit. *FLOOR WILL REMIAN AS SHELL. · $300,000
no contractor listed Issued -
2022-10-18
#200 - 2nd Floor Interior alterations to provide tenant improvement to an existing general office on the 2nd floor (#200) in this existing commercial building on site. Scope of work: Demolish partition walls, t-bar ceiling, millwork, electrical and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $20,000
Sawatzky Contracting Ltd Issued -
2022-05-09
#105 - Ground Floor Interior alterations to provide tenant improvements for a new Sales Presentation Centre (Office) on the ground floor (#150) in this existing commercial building on this site. Scope of work: construct partition walls, doors for new offices, show kitchen, show bathroom, two accessible washrooms, lighting, HVAC, electrical, plumbing and sprinkler work. REVISION #1: Interior layout changes. Sept. 20, 2022 mlh TENANT: Brivia Group · $200,000
no contractor listed Issued -
2022-03-04
Unit 1000 and 1010 - 10th Floor Interior alterations to expand the existing office tenant located in unit 1000 into the adjacent office space in unit 1010 and provide tenant improvements. Scope of work: demo demising wall between #1000 and #1010, new partitions/doors, relocate staff kitchen millwork, finishes, plumbing, sprinkler, HVAC, lighting, power and data. · $205,000
VPAC Construction Group Ltd Issued -
2022-02-11
#1175 - 11th floor Interior alterations to provide improvements for a new office tenant on the 11th floor (#1175) of this existing commercial building. Scope of work: construct 3 partition walls/doors to create 4 new offices, flooring, finishes, electrical and sprinkler work. TENANT: Pender Litigation IFP Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. OK for Field Review per City staffklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $85,000
Reotech Construction Ltd Issued -
2022-02-07
#902 - 510 Burrard Street Interior alterations to provide tenant improvements for a new office tenant on the 9th floor (#902) in this existing commercial building. TENANT: CAI Capital Partners Scope of work includes: 1) Relocating interior partition walls. 2) Re and Re new sink and millwork in lunch room. 3) New carpet and vinyl flooring OK for Field Review per City staff · $150,000
no contractor listed Issued -
2021-10-28
#1400 - 14th floor (full floor) Interior demolition of non load-bearing partition walls on the 14th floor (#1400) to create a "shell" office space. (Now Office See Rev. #1) Scope of work: remove all partition walls, doors, suspended ceiling, finishes, fixtures, millwork and electrical work. TENANT: Chard Development REVISION #1: to change the scope of work to include tenant improvements for a new office tenant. Alterations include construction of new partition walls, sidelights/doors, new staff kitchen, finishes, lighting, T-Bar ceilings, HVAC, electrical, mechanical, plumbing and sprinkler work. Also increase project value from $45,000.00 to $612,000.00. Revision #1 paid and issued on January 4, 2022 mlh REVISION #2: interior layout revised, Mechanical and Electrical drawings updated to reflect revised interior, room numbers updated and project value increased from $612,000.00 to $632,000.00. · $632,000
CDC Construction Ltd Issued -
2021-04-30
#1010 - 10th Floor Interior alterations to provide improvements to an existing office tenant on the 10th floor (#1010) of this existing commercial building on this site. Scope of work: construct partition wall to create three rooms. TENANT: Fort Capital Partners OK for Field Review per City staff: Energy trigger not required BOMA BEST building. · $15,000
VPAC Construction Group Ltd Issued -
2020-11-24
To permit interior alterations to the existing main floor lobby on the ground floor of this commercial building on this site. Scope to Include: Remove and replace the existing concierge/security desk. Adding access doors from the existing South retail unit to the lobby of 510 Burrard . OK For Field Review per City staff.2020 Energy Upgrade exempted: BOMA BESt · $65,000
no contractor listed Issued -
2020-07-10
#1150 - 11th floor Interior alterations to provide improvements to this new office tenant on the 11th floor (#1150) in this existing commercial building. Scope of work: Per the 2019 VBBL to remove several partition walls/door and construct 2 new partition walls, glazing, finishes and electrical work. TENANT: Carevest Capital Inc. OK for field review per City staff inspector to determine on site if a separate sprinkler permit is required. SP Req'd as per City staff. Selected energy upgrade: E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) · $17,000
Space in Time Project Management Ltd Issued -
2020-05-04
#560 Interior alterations to provide improvements to this existing General Office tenant at unit #560 at this existing Manulife commercial building. Tenant: mCloud Technolgies Corp. OK for field review as per City staff. Separate Sprinkler Permit required for proposed sprinkler work. Scope of work includes installing drywall and glass partitions, electrical, lighting, plumbing and sprinkler work This is a BOMA best building - Energy Checklist submitted - no additional upgrades required · $25,000
Allspaces Design & Management Ltd Issued -
2020-04-30
510 Burrard - Ground level Interior alterations to provide improvements to this existing Financial Institution tenant at 510 Burrard Street on the ground level of this existing commercial building. Scope of work per VBBL 2019: Interior demo and alterations to reduce the size of existing tenant space. South portion will be vacated and returned to Landlord. North portion will be altered to accommodate the consolidation of both sides. REVISION #1 - Sept. 18/20 mk - remove existing drywall bulkhead over teller line, continue ceiling tile across area. - convert previous storage room area to small meeting room. - increase project value from $200,000 to $210,000. Note: The shaded area on the plans to be returned to the landlord. Tenant: Bank of Nova Scotia - Trust Co. Selected energy upgrade: E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) OK for field review and district building inspector to confirm if a sprinkler permit would be required as per City staff. DBI confirmed no SP required April 29, 2020 · $210,000
no contractor listed Issued -
2019-11-25
#1200 - 12th floor (full floor tenant) Interior alterations to provide tenant improvements for the existing General Office tenant on the 12th floor (#1200) in this existing commercial building. Scope of work: remove/construct partition walls, doors, glazing, finishes, staff kitchen area, millwork, lighting, ceiling work, electrical, plumbing, mechanical and sprinkler work TENANT: Destination British Columbia · $600,000
VPAC Construction Group Ltd Issued -
2019-11-25
#705-7th floor Interior alterations to the 7th floor (suite #705) to provide improvements for the existing General Office tenant. Scope of work includes removal of non-loadbearing partition walls, new partitions, glazing, finishes, millwork, electric strike/card reader and mechanical, plumbing, sprinkler and electrical work. TENANT: Destination British Columbia · $45,000
VPAC Construction Group Ltd Issued -
2019-04-10
#700 Interior alterations to provide improvements for new General Office tenant in this existing commercial building. OK for field review as per City staff: BOMA BESt (Path 1) · $150,000
Aura Office Environments Inc Issued -
2019-01-23
#1150-11th floor Interior alterations to provide improvements for a new office tenant at office unit #1150 on the 11th floor of this commercial building on this site. Scope of work: demolish 4 existing offices and construct 3 new offices, new data closet, (new partition walls, glazing, millwork, doors), new power/data, finishes, lighting, electrical, mechanical and sprinkler work. TENANT: Legal Services Society OK for field review per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $200,000
Fusion Project Management Ltd Issued -
2018-11-16
#400-4th floor (full floor tenant) Interior alterations to provide improvements to this office unit #400 on the 4th floor in this existing commercial building on this site. Scope of work: demolish/construct partition walls, doors, glazing, millwork, new sound baffle partition, power/voice/data, ceiling work, new finishes, lighting, HVAC, mechanical and electrical work. TENANT: Legal Services Society (Reception on 4th-#400) · $90,000
Fusion Project Management Ltd Issued -
2018-11-01
#800 - 8th floor (full floor tenant) Interior alterations to provide improvements to this office unit #800 on the 8th floor in this existing commercial building on this site. Scope of work: demolish partition walls, glazing, door/frame, millwork, new partition walls, sound baffle partition, glazing, doors, power/voice/data, ceiling work, lighting, millwork, finishes, HVAC, electrical and mechanical work. TENANT: Legal Services Society *Reception on 4th (#400) See related Special Sprinkler Inspection No. IA-2018-01393. · $95,000
Fusion Project Management Ltd Issued -
2018-11-01
#1300-13th floor (full floor tenant) Interior alterations to provide improvements for this existing office tenant at office unit #1300 on the 13th floor of this commercial building on this site. Scope of work: demolish partition walls, glazing, door/frame, millwork, new partition walls, sound baffle partition, glazing, doors, power/voice/data, ceiling work, lighting, millwork, finishes, HVAC, electrical and mechanical work. REVISION #1-Interior layout changes. ASHRAE-new reflected ceiling plan. Value increase of $20,000.00 (now $95,000.00). Jan.14/19 jm TENANT: Legal Services Society *Reception on 4th (#400) See related Special Sprinkler Inspection No. IA-2018-01390. OK for field review per City staff. · $95,000
Fusion Project Management Ltd Issued -
2018-07-06
#1090 - 10th floor Interior alterations to provide tenant improvements for a new office tenant on the 10th floor (#1090) in this existing commercial building on this site. Scope of work: construct new partition walls, doors, ceiling work, finishes, power voice and date, electrical, plumbing and sprinkler work. Energy upgrade selected: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) TENANT: Capital Events OK for Field Review per City staff · $52,000
TotalPlan Inc Issued -
2018-06-26
#560 - 5th Floor Interior alteration to provide tenant improvements for this new office tenant in this existing office space #560 on the 5th floor of this existing commercial Building on this site. OK for Field review per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $50,000
Allspaces Design & Management Ltd Issued -
2018-05-28
#709 - 7th floor Interior alterations to provide improvements for a new office tenant on the 7th floor (#709) of this existing commercial building on this site. Scope of work: alter layout by demolishing and installing partition walls, RCP, doors, millwork, finishes, electrical, plumbing, & sprinkler. Okay for Field review per City staff: L2 - Lighting - Upgrade all hard wired Lighting within an occupied space to High Efficiency light systems · $55,000
no contractor listed Issued -
2018-03-14
#200 - 2nd floor (full floor tenant) Interior alterations for a new office tenant on the 2nd floor #200) of this existing commercial building on this site. Scope of work: construct new partition walls, doors, millwork, add 2 new sinks, ceiling work, electrical, plumbing and sprinkler work. TENANT: xMatters · $650,000
no contractor listed Issued -
2018-02-06
#1125 - 11th floor Interior alteration to provide tenant improvement for a new office tenant on the 11th floor (unit #1125) of this existing commercial building on this site. Scope of work: demolish/construct partition walls, ceiling, new glass entry doors, finishing, electrical, plumbing, sprinkler. Okay for Field Review as per City staff. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010). · $145,000
Counterpoint Interiors Inc Issued -
2017-12-12
#1010 - 10TH FLR Interior alterations to provide improvements to expand an existing office tenant at #1010 into the adjacent #1020 on the 10th floor (retain #1010) of this existing commercial building on this site. Scope of work: demo demising wall between #1010 and #1020, new partitions, millwork, finishes, plumbing, alter sprinkler, HVAC, lighting, power and data. OK for field review per City staff. · $400,000
VPAC Construction Group Ltd Issued -
2017-12-07
#200 - 2nd floor Interior alterations to remove all partition walls at unit #200 on the 2nd floor of this existing commercial building on this site. OK for field review per City staff. * Separate permit(s) and ASHRAE checklist required for future Tenant Improvements to this space. Note: No energy trigger required; Interior demolition only · $120,000
TotalPlan Inc Issued -
2017-11-21
#575- 5th floor Interior alterations to provide tenant improvements for this existing office tenant on the 5th floor (#575) of this existing commercial building. Scope of work: demo and construct partition walls, glazing, doors, to create larger offices and new boardroom.. Ok for Field Review per City staff · $60,000
no contractor listed Issued -
2017-07-05
#1100 - 11th floor Interior alterations to provide improvements to this existing General Office tenant on the 11th floor (#1100) of this existing commercial building. Scope of work: demolish/construct partition walls, millwork to relocate kitchen, new finishes, lighting, plumbing, sprinkler. Note: Demising wall between #1100 and #1125 and relocated server room done by others under BP-2017-02709. OK for field review as per City staff. Selected energy upgrade: L3 - Lighting - Meet the interior lighting power allowance by the Space-by-Space Method (per City staff.6 of ASHRAE 90.1 - 2010) · $175,000
no contractor listed Issued -
2017-06-23
Unit #1125 - 11th Floor Interior alterations to demise unit #1100 into two units (to be #1100 and #1125) on the 11th floor in this existing commercial building. Scope of work: Construct demising wall to create 2 separate units #1100 & #1125. Demolition of all non-load bearing walls/doors to bring to shell in newly created vacant office space Unit #1125. ADDRESS NOTE: Suite numbers to be posted by suite entry prior to final building inspection. TENANT: #1100 Paine Edmonds #1125 VACANT Energy Upgrade Exempt: Subdivision. Separate permit(s) and ASHRAE checklist will be required for newly demised unit #1125. · $25,000
Sawatzky Contracting Ltd Issued -
2017-04-21
#1400 - 14th floor Interior alterations to provide tenant improvements for this existing office tenant on the 14th floor (#1400) of this existing commercial building. Scope of work; demolition and construction of interior partition walls, relocate 3 doors, alter reflective ceiling, electrical, & sprinkler. TENANT: Lexco Management Corp. OK for field review processing as per City staff. Selected energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $21,950
Aura Office Environments Inc Issued -
2017-03-30
#501 - 510 Burrard Street Interior alterations to provide tenant improvements for new office tenant on the 5th floor of this existing commercial building. Scope of work: Includes demolition/construction of demising walls to combine units #501, #530 and expand into portion of #560, retaining #501. Tenant improvement work includes construction of partition walls/doors to create new office layout, kitchen and accessible washroom, new finishes, lighting, electrical, plumbing and sprinkler work. ADDRESS NOTE: #530 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #501 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: #501 - Bryson Markulin Zickmantel #560 - Vacant Separate permit(s) and ASHRAE will be required for any tenant improvements for newly demised (reduced size) unit #560. OK for field review per City staff; L2 - HVAC - Clean and balance all air systems (per City staff.7.2.3.2 of ASHRAE 90.1-2010) · $80,000
All Spaces Project Management Ltd Issued -
2017-03-13
**SPRINKLER PERMIT REQUIRED* Unit #908 - 9th floor Interior alterations to provide tenant improvements for new General Office tenant in unit #908 on the 9th floor of this existing commercial building. Scope of work: new partition walls to create a storage room, new finishes, electrical work. OK for field review as per City staff BP-2016-00400 (completed) & Special Sprinkler No. IA-2017-00240 Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $13,000
RenBui Construction Group Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05