Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
505 Burrard St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 82 building permits are on file, most recently “#1070 - 10th floor Interior alterations to the 10th floor in unit #1070 to remove all non…” (issued 30 October 2026). The City's 2026 assessed value is $254,456,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150850, 2,626 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-10-30
#1070 - 10th floor Interior alterations to the 10th floor in unit #1070 to remove all non-loading partition walls and return to shell office space in this existing commercial building. Scope of work: demo parition walls, doors/frames, ceiling tiles/grid, finishes to open shell condition. Electrical, mechanical/plumbing, & Sprinklelrs to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $450,000
no contractor listed Issued -
2026-06-22
#2020 - 20th floor (demise into 2) Interior alterations on the 20th floor to demise the existing office #2020 into two units to be #2020 and #2050 and to provide tenant improvements only to suite #2020 in this existing commercial building on this site. Scope of work: Construct a demising wall to create 2 suites (#2020 & #2050). Selective demo to alter existing layout. Construct new walls, doors for private offices, finishes, millwork. electrical, mechanical, plumbing and sprinkler work to suit. TENANT: Path Group Properties Corp · $900,000
M Moser Associates Inc Issued -
2026-05-27
#200 - 2nd floor Interior alterations to provide improvements for a new office tenant on the 2nd floor (#200) of this existing commercial building on this site. * District Buildling Inspector to determine if a Special Sprinkler Inspection is required. · $1,800,000
Govan Brown Ltd Issued -
2026-05-19
#660 - 6th floor Interior alterations to provide improvements to this existing office space on the 6th floor (#660) of this existing commercial building on this site. Scope of work: Select demo and add new partition walls, glazing, doors, millwork, ceiling work to alter layout for an additional office and increase size of staff lounge. Electrical to suit. REVISION #1 - remove a portion of a partition wall and door to staff lounge. Oct 23/26 mk * All work in compliance with VBBL 2025. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $452,500
no contractor listed Issued -
2026-05-19
#210 - 2nd floor Interior alterations to provide improvements for a new office tenant on the 2nd floor (#210) of this existing commercial building on this site. Scope of work: Complete tenant fit out to shell space. Electrical, plumbing/mechanical, & sprinklers to suit. * In accordance with VBBL 2026 See BP-2022-03497 for interior demo. See BP-2026-00264 for demising permit · $471,600
M Moser Associates Inc Issued -
2026-04-24
Unit #104 (Food Court) Interior alterations to this Retail - Limited Food Service (Group E) unit in the Food Court of Bentall One to provide tenant improvements for a new tenant it this commercial building at this site. Notes: - Class 1 Cooking Operation (Grease-Laden Vapours). - Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - See BP-2024-02177 for new grease ducting for food court. *** Reviewed under the VBBL 2025 *** · $40,000
N 5 Builds Ltd Issued -
2026-03-17
Unit #108 Interior alterations to provide tenant improvements to this existing Retail Limited Food Service unit on the ground mall level of this existing commercial building on this site. Notes: - No seating proposed within tenant space. - Class 1 Cooking Operation (Grease-Laden Vapours): - Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). *** Reviewed under the VBBL 2025 *** · $75,000
no contractor listed Issued -
2026-02-10
#200 & #210 (demised from #200) Interior alterations to this full floor office (shell ) space on the 2nd floor (#200) to demise this space into 2 units (to be #200 and #210) in this existing commercial building on this site. Scope of work: remove corridor/doors on the east side 2 new demising walls, new entrance doors. REVISION #1 - Electrical and mechanical changes. See BP-2022-03497 for demo work. Separate permit(s) required to these units for tenant improvements. · $400,000
M Moser Associates Inc Issued -
2026-02-02
Unit #105 Interior alterations to provide tenant improvements for a new tenant in this existing Retail Limited Food unit (no seating) at the mall level of this commercial building on this site. Revision #1 April 10, 2026 1. Remove 1 hot water tank; reroute cold and hot water to accommodate changes 2.Remove hand sink 17(HS&FX) and SS13(HS) drains from grease sanitary lines and reroute to connect downstream of GU 3.Resize Grease Interceptor to 50 GPM 4. Relocate TP-1 and associated plumbing 5. Reroute 3" SAN from backflow devices above slab in wall and drain into FFD-2 to avoid coring. Notes: 1. See BP-2024-02177 for new ducting 2. Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). Schedules submitted by: · $100,000
JUAN CONSTRUCTION LTD. Issued -
2026-01-30
#2150 - 21st floor Interior alterations to provide improvements to this office (shell) space on the 21st floor (#2150) of this existing commercial building on this site. Scope of work: complete tenant fit out to shell space. Electrical, mechanical/plumbing, & sprinklers to suit. In accordance with VBBL 2025 See BP-2022-03459 for demo. · $950,000
no contractor listed Issued -
2025-12-02
#2100 - 21st Floor Interior alterations to provide improvement to this new office tenant on the 21st floor (#2100) in this existing commercial building on site. Scope of work: Construct new interior walls, electrical, mechanical/plumbing work to suit. TENANT: Robert Half · $911,000
no contractor listed Issued -
2025-11-18
Unit 106 Interior alterations to an existing commercial kitchen retail food service (no seating) in the Bental One - Mall location Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). 1) See BP-2024-02177 for new ducting · $70,000
JUAN CONSTRUCTION LTD. Issued -
2025-11-06
Unit #107 Interior alterations to an existing commercial kitchen retail food service (no seating) in this commercial building (Bental One - Food court). Class 1 cooking operation Building Review Branch note: 1. See BP-2024-02177 for new ducting · $70,000
JUAN CONSTRUCTION LTD. Issued -
2025-10-30
# 340 - 3rd floor Interior alterations to provide improvements to this existing office space on the 3rd floor (#340) of this existing commercial building on this site. Scope of work: partition walls, doors/frames, millwork, finishes. Electrical, Plumbing, sprinklers to suit. REVISION #1 - layout changes. March 5/26 mk See related BP-2025-04069 for demising walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $840,000
no contractor listed Issued -
2025-10-30
#350 - 3rd floor Interior alterations to provide improvements for a new office tenant on the 3rd floor (#350) of this existing commercial building on this site. Scope of work: new partitions, doors/frames, millwork, finishes. Electrical and sprinklers to suit. REVISION #1 - Layout changes. Mar5/26 mk * See related BP-2025-04069 for demising walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing · $411,593
no contractor listed Issued -
2025-10-23
#340, #350, & #360 (demised and changed from #300 & #350) Interior alteration to this existing vacant office space on the entire 3rd floor to demolish a demising a wall between unit #300 and #350 and re-demise this floor into three units to be #340, #350, and #360 and and provide improvements to #360 only in this existing commercial building on this site. Scope of work - remove demising walls, partition walls, and all entrance doors except for two interior offices in newly created #360. New corridor walls and entrance doors to all 3 units and new partition walls, doors, finishes for new layout in #360 only. * Reviewed under VBBL 2019. Separate permits required for Tenant Improvements to #340 and #350. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $292,202
no contractor listed Issued -
2025-10-23
#2100 and #2150 - 21st floor (demised from #2100) Interior alterations to demise this existing full floor office (shell) space on the the 21st floor (#2100) into two units (to be #2100 & #2150) of this existing commercial building on this site. Scope of work: demo and alter select areas of corridor walls and new demising walls. See BP-2022-03459 for interior demo. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $100,000
no contractor listed Issued -
2025-03-11
Unit 111 Interior alterations to provide tenant improvements and change of use of this existing retail to small scale pharmacy (Group E). Ok for field review as per City staff · $150,000
no contractor listed Issued -
2025-02-24
Bentall 1 - Lobby Exterior and interior alterations to interior main level lobby and concourse level of this existing commercial building. Work to include: alterations to main level entry vestibule, alteration and refinishing of the escalator for main level lobby to concourse level. Note: 1). The 15m max travel distance within the exit lobby is an existing deficiency. See Code Consultant Letter. 2). The proposed breakaway doors need to be identified as per City staff.3.1.12. 3). Fire separation with 0 fire resistance rating (smoke barrier) is required between the exit lobby and the adjacent tenant spaces. · $1,950,000
no contractor listed Issued -
2025-02-11
#1650 - 16th floor (#1650 and #1640 combining) Interior alterations to the 16th floor to combine the existing vacant office units #1650 and #1640 (retain #1650) and provide improvements in this existing commercial building on this site. Scope of work: demo demising wall and all partitions walls, glazing, doors, & ceiling to shell. Construct new partitions, doors/frames, millwork, ceiling, finishes, new kitchen. Electrical, mechanical/plumbing, & sprinklers to suit. · $600,000
Fusion Project Management Ltd Issued -
2025-02-06
Level 12 & 14 - common washroom Interior alterations to provide improvements to the existing common washrooms on the 12th and 14th floor in this existing commercial building. Scope of work: New full height partition, re-piping of potable water riser, electrical and plumbing work to suit. NOTE: 12th and 14th floors are interconnected and considered a single space (BU457453). #1400 main reception · $250,000
no contractor listed Issued -
2025-01-10
Interior demolition to this existing two retail stores #111 and #204 on the mall level of this existing commercial building (505 Burrard Street - Bentall I) on this site. The scope includes to relocate the demising wall. · $100,000
no contractor listed Issued -
2024-11-18
#1560 - 15th floor Interior alterations to provide improvement for an existing office tenant on the 15th floor (#1560) of this existing commercial building on this site. Scope of work: new partition wall installation to divide one office into two, with sliding glass doors. * District Building inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $30,000
no contractor listed Issued -
2024-10-03
#430 - 4th floor Interior alterations to provide improvements for a new office tenant on the 4th floor (#430) of this existing commercial building on this site. Scope of work: select demo and new partitions to alter layout. Electrical, plumbing, and sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $328,605
no contractor listed Issued -
2024-09-17
#104, 105, 106,107,108 Interior alterations to repair food court retail units 104, 105, 106, 107 108 and the seating area due to water leak at the mall level of this commercial building on this site. Scope of work includes repairs from water damage, new interior partition walls, plumbing, electrical, lighting, and finishes. OK for Field Review per City staff · $950,000
no contractor listed Issued -
2024-06-28
#1640 & #1650 - 6th Floor (demised from #1650) Interior alterations to demise the existing office on the 6th Floor (#1650) to 2 units (#1650 and #1640) of this existing commercial building on site. Scope of work: Construct new demising wall only, to divide one unit into two. TENANT: Saliance Global Holdings Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $2,500
no contractor listed Issued -
2024-06-25
#1100 - 11th Floor (Full Floor) Interior alterations to provide improvements to this existing office tenant on the 11th floor (#1100) in this existing commercial building on site. Scope of work: Splitting an existing office into 2 smaller offices, electrical and sprinkler work to suit TENANT: McKorman Management Ltd Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $15,000
Matra Construction Inc Issued -
2024-02-27
#1570 - 15th floor Interior alterations to provide improvements to this vacant office tenant space on the 15th floor to prepare for leasing by adding 1 kitchenette/sink in this existing commercial building on this site. REVISION #1 - - Installing taller glass side lites. - creating a new boardroom. - Realign kitchen to suit plumbing changes. District Building Inspector to determine if a Special Sprinkler Inspection required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
Epic Spaces Inc Issued -
2024-02-01
#1900 - 19th floor Interior alterations to provide improvements for this existing full floor office tenant on the 19th floor (#1900) of this existing commercial building on this site. Scope of work: Modify 10 workstations to allow for 6 new offices and 2 workstations. 1 meeting room changed to an office. Lighting, mechanical, and sprinklers adjusted to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $125,000
Reotech Construction Ltd Issued -
2023-11-06
#620 - 6th floor Interior alterations to provide tenant improvements for a new office tenant on the 6th floor (#620) in this existing commercial building on this site. Scope of work: remove all partition walls, doors, construct new demountable glazed partition walls and doors, ceiling work, finishes, electrical, plumbing, mechanical and sprinkler work. · $1,000,000
Govan Brown Ltd Issued -
2023-07-13
#300 - 3rd floor Interior alterations to provide removal off all non-load bearing partition walls on the 3rd floor (#300) and return to shell space in this existing commercial building. Separate permit will be required for any tenant improvements to this unit. · $240,000
no contractor listed Issued -
2023-05-26
#1630 - 16th Floor Interior alterations to provide tenant improvements to this existing general office on the 16th floor (#1630) of this existing commercial building on site. Scope of work: New interior layout to make suite ready for future lease. New reception area, new offices, boardroom, server room and kitchenette. Create an open office concept. Electrical, plumbing and sprinkler work to suit. · $550,000
Fusion Project Management Ltd Issued -
2023-05-25
#620 - 6th Floor Interior alterations to provide tenant improvement to this existing general office on the 6th floor (#620) in this existing commercial building. Scope of work: Demolish existing partitions, millwork, doors and flooring. Construct new partitions, lighting, millwork, electrical, plumbing and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. · $617,000
no contractor listed Issued -
2022-09-28
#1900 - 19th floor (full floor tenant) Interior alterations to provide improvements for the existing full floor General Office tenant on the 19th floor (#1900) in this existing commercial building. Scope of work: remove two partition walls/doors and construct new partition wall and glazing partition, finishes, lighting and electrical work. TENANT: HUB International Canada West ULC OK for Field Review for Office TI Building Sprinklered - Building Inspector to determine on site if a separate sprinkler permit is required. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $20,000
Reotech Construction Ltd Issued -
2022-08-11
#200 - 2nd floor (#200 and #260 combining see Rev #1) Interior alterations to remove partition walls and finishes to create a shell office space on the 2nd floor (#200) in this existing commercial building. Scope of work: remove all partition walls and doors, construct new suite entry, card reader, lighting, electrical, plumbing and sprinkler work. REVISION #1: remove existing demising walls and partition walls, ceilings, millwork and finishes, expand #200 into #260 (retaining #200) and to provide a new lighting layout in this expanded area. Increase in project value from $282,000.00 to $322,000.00. REVISION #2: Change in scope to remove demising corridor wall and add door closer. Increase in project value from $322,000.00 to $330,000.00. (EV) July 5, 2024 Separate permits required for tenant improvements E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd. · $330,000
no contractor listed Issued -
2022-07-19
#2100 - 21st Floor Interior alterations to demolish partition walls and finishes to create a shell office space on the 21st floor (#2100) in this existing commercial building on this site. Scope of work: Interior demolition of all existing finishes and removal of all walls ceiling, lighting, millwork, t-bar ceiling, fixtures. New card reader, new paint, electrical, plumbing and sprinkler work. Separate permit required for a future tenant improvements Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $329,000
no contractor listed Issued -
2022-07-13
#1550 & #1560 - 15th Floor Interior alterations to provide tenant improvements to an existing office tenant on the 15th floor (#1560) to expand into an adjacent unit (#1550) retaining #1560 in this existing Bentall One commercial building on this site. Scope of work: Remove a portion of the demising wall and combine #1550 & #1560, remove doors, millwork, construct new glazed partition walls to create new offices, new door, new cabinets, new paint, electrical and sprinkler work. TENANT: Poulus Ensom LLP Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Required · $52,000
Epic Spaces Inc Issued -
2022-05-13
#1100 - 11th floor (combining #1100 & #1150) Interior alterations to provide improvements for a new office tenant on the 11th floor to combine unit #1100 and #1150 (retaining #1100) to become a full floor office tenant in this existing commercial building on this site. Scope of work: remove demising walls, select removal/construction of partition walls, doors, finishes, lighting, power & data, electrical, plumbing, mechanical and sprinkler work. TENANT: Mackorman Management Ltd · $758,000
no contractor listed Issued -
2022-05-12
#1400 - 12th and 14th floor Interior alterations to remove all interior partition walls, doors, millwork to return to shell and to provide tenant improvements to the new office tenant on the 12th and 14th floor (#1400) in this existing commercial building on site. Scope of work: remove/construct partition walls for new offices, accessible washroom, new millwork, electrical, plumbing and sprinkler work to suit. REVISION #1: - transformer room added on the 12th floor. - ceiling revision - relocated electrical transformer to new room. July, 21, 2022 mk NOTE: 12th and 14th floors are interconnected and considered a single space (BU457453). #1400 main reception TENANT: Tipalti Canada Inc Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. · $5,000,000
no contractor listed Issued -
2022-03-21
#209 & #210 (Lower Mall Level) Interior alterations to the lower mall level to provide improvements to these retail units, #209 & #210, in this existing commercial tower underground mall building on this site. Scope of work includes demolition of the storefront and ceiling to an exposed open ceiling. Area to tie into general mall section. New finishes and RE&RE sprinklers. Tenant #209 : Perks Capuccino Bar Tenant #210 : Enzo's (stationery/ gift store) OK For Field Review per City staff: - DBI to determine sprinkler permit requirements for proposed sprinkler work. · $30,600
Matra Construction Inc Issued -
2021-11-04
#860 - 8th Floor Interior alterations to provide improvements for a new office tenant on the 8th floor (#860) of this existing commercial building. Scope of work: demo / construct walls, doors, ceiling, finishes for new layout. Electrical, plumbing, mechanical and sprinklers to suit. TENANT: PPI Management Inc · $500,000
Aura Office Environments Inc Issued -
2021-11-03
#450 interior alterations to provide improvements for this new office tenant on the 4th floor (#450) in this existing commercial building on this site. Work to include: remove/reconstruct interior partition walls, interior doors, new carpet tiles, electrical work to match new layout. Tenant: Orezone Gold Corp. OK for field review per City staffpermit required per City staff · $85,000
Epic Spaces Inc Issued -
2021-08-13
#1030 - 10th Floor Interior alterations to provide improvements for this new office tenant on the 10th floor (#1030) in this existing commercial building on this site. Scope of work: remove/construct interior partition walls, doors, finishes, power & data, millwork, electrical, plumbing and sprinkler work. Ok for Field Review as per City staffate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $125,000
no contractor listed Issued -
2021-07-20
#1150 - 11th floor Interior alterations to this existing vacant office unit on the 11th floor (#1150) in this existing commercial building on this site. Scope of work: partial demo of offices, kitchenette, & reception. Construct new offices and kitchenette, millwork to be installed a new finishes throughout. New t-bar ceiling. HVAC & lighting to be updated to suite new layout. · $67,000
no contractor listed Issued -
2021-07-05
#350 Interior alterations to provide improvements for a new office tenant at #350 on the 3rd floor of this existing commercial building on this site. Scope of work: -Remove existing carpet -Build new IT room -New waiting area -Change entrance to existing boardroom -Re & Re 9 light fixtures -Remove 8 light fixtures replace with potlights -New Carpet, new paint OK for Field Review per City staff · $70,000
Sun Capital Corporate Construction Inc Issued -
2021-06-16
#480 - 4th floor Interior alterations to provide tenant improvements for a new office tenant on the 4th floor (Unit #480) of this existing mixed use building on this site. Scope of work: construct interior partition walls to create one boardroom and one office, finishes, electrical and sprinkler work. TENANT: Panoro Minerals Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Note: Energy trigger not required BOMA BEST building. · $22,000
no contractor listed Issued -
2021-04-30
#112 & #204 mall level (combining to be #204) Interior alterations to remove all non loadbearing partitions and a demising wall between #112 and #204 to create one open retail shell space (retaining unit#204) in this existing commercial building on this site. Energy upgrade exempt: Interior demolition. Separate permit(s) and ASHRAE checklist will be required for future tenant improvements. OK for Field Review per City staffrinkler permit required for proposed sprinkler work. · $40,000
Matra Construction Inc Issued -
2020-11-30
#1070 - 10th floor Interior alterations to demise #1070 into two units to be #1030 and #1070 and for tenant improvements to the existing office tenant (#1070) on the 10th floor of this commercial building on this site. Scope of work: construct new demising walls, remove/construct partition walls, doors, finishes, power & data, millwork, electrical, plumbing and sprinkler work. TENANT: PBI Actuarial Consultants Ltd. Note: Energy trigger not required; BOMA BESt building Ok for Field Review as per City staffprinkler permit required for proposed sprinkler work. · $200,000
Reotech Construction Ltd Issued -
2020-10-20
#480 - 4th floor Interior alterations to provide tenant improvements to this existing vacant office space on the 4th floor (Unit #480) of this existing mixed Use building on this site. Scope to Include: Removing some interior partition walls, Updates to the Staff kitchenette and reception area. New lighting and HVAC system. OK For Field Review per City staff.2020 Energy Exemption: N/A (BOMA BESt (Path 1)) · $56,000
no contractor listed Issued -
2020-09-18
#1840 - 18th Floor Interior alterations to provide tenant improvements to #1840 on the 18th floor to this existing mixed use building. Scope of work: remove doors & partitions, new partition walls, remove/replace millwork, new finishes, electrical, mechanical, sprinkler, lighting and electrical work. · $650,000
Etro Construction Limited Issued -
2020-09-14
#1830 Interior alterations to combine three units #1830, 1860 & 1870 into one unit and provide improvements for General Office tenant at 1830 (to be determined) - 505 Burrard St in this existing commercial building. OK for field review as per City staff: HUB International (Layne Bruin) Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016) · $240,000
Reotech Construction Ltd Issued -
2020-08-17
Bentall 1 - Floors 2, 4, 5, 6, 7, 8, 10, 11, 15, 16, 17, 18 common washrooms/lobbies/corridors (*SEE REVISION #1 and #2) Interior alterations to provide landlord improvements on 2, 4, 5, 6, 7, 8, 10, 11, 15, 16, 17, & 18th floors common washrooms &/or lobbies &/or corridors of this existing commercial building. . *REVISION #1 - NOV.12/21 mk - to remove the 11th floor from scope of work which includes washrooms, lobbies, & corridor upgrades. *REVISION #2 Sept.19/23 mk - remove 10th floor from scope and ADD 3rd and 21st floor common washrooms, lobby and corridors. · $4,200,000
EllisDon Corporation Issued -
2020-05-14
#300 & #350 Interior alterations to demise this existing full floor office tenant space (unit #300) into two units (#300 & #350), and to provide improvements to both office units on the 3rd floor of this commercial building on this site. *Same tenant occupying both units. Scope of Work per VBBL 2019: demolish demising/partition walls, relocate doors, construct new demising wall, new drywall partition, partition alterations, electrical and plumbing work TENANT: CounterPath Corporation · $60,000
Allspaces Design & Management Ltd Issued -
2020-03-31
#880 - 8th Floor Interior alterations to provide tenant improvement on the 8th floor (#880) of this existing commercial building. Scope of work: remove ceiling tiles in open area only. Change lights to new LED linear. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) OK for Field Review per City staff · $35,000
Epic Spaces Inc Issued -
2020-01-23
#1840 - Interior alterations to demise unit #1830 into two units. Unit #1840 is newly created to provide improvements for new office tenant in this existing commercial building on this site. Scope of work: Remove and install partition walls, millwork, finishes, plumbing and electrical work. Field Review approved per City staff · $200,000
Reotech Construction Ltd Issued -
2019-12-20
TI for a new Fitness Center (Barry's Bootcamp). A previous DB (DB-2018-06592) has already been initiated for the building shell and change of major occupancy. This BP is strictly for the inside of the building. The fitness centre also has a juice bar. Revision (issued March 9 2020). Batt insulation on top of studio cap has been replaced with Roxul insulation. VBBL 2014 · $375,000
no contractor listed Issued -
2019-11-27
#1650-16th Floor Interior alterations to provide tenant improvements on the 16th floor to combine two units (#1640 & #1650) into one unit (retain #1650) in this existing mixed use building. Scope of work: remove a portion of a demising wall to combine #1640 & #1650 into one unit, remove doors, new partition walls, remove/replace millwork, new finishes, electrical work. TENANT: Saliance Global Holdings Co. Ltd. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK for Field Review - Oct 23/19 Selected Energy Upgrade: N/A (BOMA BESt (Path 1)) Processed Thru FIT · $10,000
no contractor listed Issued -
2019-11-26
#1790 - 17th Floor (Bentall 1) Interior demolition of non load-bearing partition walls on the 17th floor (#1790) to create a "shell" office space. *see revised Scope of work: remove all interior partition walls, doors, finishes, millwork, plumbing fixtures. * REVISION #1 -Change of applicant/consultant from Turner Construction to B.H. Center Head Corp. ada; Hudson Pacific Properties per email dated Sept. 22, 2020 from Lisa Jones/Turner Construction. -New drawings to change scope of work from interior demo only to demo and tenant improvement work including partition walls, millwork, modify lights, HVAC to suite new layout. · $80,000
Canadian Turner Construction Company Ltd Issued -
2019-11-26
#1550 - 15th Floor (Bentall 1) Interior demolition of non load-bearing partition walls doors on the 15th floor (#1550) to create a "shell" office space. Scope of work: remove all interior partition walls, doors, glazing, finishes, millwork and plumbing fixtures. Energy upgrade exempt: Interior demolition Separate permits(s) and ASHRAE checklist will be required for any tenant improvements to this space. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK for Field Review - Nov 4, 2019 Processed Thru FIT · $15,000
Canadian Turner Construction Company Ltd Issued -
2019-11-01
#1720-17th floor Interior alterations to provide improvements to office unit #1720 for a new tenant on the 17th floor of this commercial building on this site. Scope of work: demolish glass wall and partition walls, relocate door, new glazing, partition walls, door, finishes, electrical and sprinkler work. TENANT: Top Speed Energy Canada Holding Ltd. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for field review per City staff: No energy trigger required; BOMA BESt building · $50,000
VPAC Construction Group Ltd Issued -
2019-08-20
#1900 - 19th floor (full floor tenant) see Revision #1 Interior alterations to provide improvements for new General Office tenant (full floor tenant) in unit #1900 in this existing commercial building. REVISION #1: to replace base building plumbing fixtures and surface finishes, layout changes, and electrical and mechanical revisions with updated ASHRAE forms. Revision also includes correcting unit number from #1920 to #1900 as per City staff: installation of new card readers with electrical strike only. No mag lock proposed. OK for field review as per City staff: BOMA BESt · $800,000
no contractor listed Issued -
2019-06-06
#500-5th floor (Bentall One) Interior alterations to provide tenant improvements for a new general office in an existing office space. Scope of work: new interior glass door and storage room door, new partition wall to fur out door, patch/repair walls and ceiling, electrical work. TENANT: Fujitsu Intelligence Technology Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK for Field Review - May 27/19 No energy upgrade required. BOMA BESt building. Processed Thru FIT · $21,000
TotalPlan Inc Issued -
2019-05-03
Change of major occupancy: Change of use of 5100 ft2 from office to fitness center including demolition of interior partitions to a shell space by the landlord. Work also includes new entry door facing W Pender. Note: Application is reviewed under VBBL 2014. Additional Building permit will be required for future tenant improvement. New exterior door and change of use acceptable for DB per City staff: Proposed location of intake and vents approved by Brenda Clark, October 8, 2019. · $80,000
no contractor listed Issued -
2019-04-24
#750-7th floor Interior alterations to provide tenant improvements to unit (#750) on the 7th floor of this existing General Office in this existing commercial building on this site. Scope of work: demolish/construct partition walls and doors, new finishes, power/data, card reader, electrical and plumbing work. REVISION #1: adjustments to the interior partition walls due to new furniture layout. No change to ASHRAE. mlh/ June 5, 2019. TENANT: Genworth Financial Mortgage Insurance Company Canada OK for field review as per City staff: BOMA BESt building NOTE: Building Sprinklered – Building inspector to determine on site is a separate sprinkler permit is required. · $116,900
TotalPlan Inc Issued -
2019-01-03
#1570-15th floor Interior alterations to provide tenant improvements in this existing office "shell" unit on the 15th floor of this existing highrise commercial building. Scope of work: new partitions, glazing, millwork, ceiling work, lighting, finishes, electrical, plumbing and sprinkler work. TENANT: Silver Glory Holdings Ltd. OK for FLD RVW per City staff. No energy upgrade. BOMA BESt building. · $230,000
Aura Office Environments Inc Issued -
2018-10-02
#950-9th floor Interior alterations to provide improvements for a new office tenant at this existing office unit #950 on the 9th floor of this existing commercial building on this site. This permit includes the previous work without permit done to remove the demising wall between #940 and #950 (retaining #950). Scope of work: demolish demising wall to expand #950 into #940 (retaining #950), demolish partition walls and doors, ceiling work, new partition walls, glazing, millwork, lighting, electrical, HVAC and sprinkler work. REVISION #1: lighting and layout changes. Delete door/wall for lunch and learn space, delete storage room, relocate meeting room, server room door swing change, delete door/partition wall for phone booth area in kitchen/lounge. Changes to ASHRAE. Dec 19, 2018 mlh Address Note: #940 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #950 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: AES OK for field review per City staff. Note: No energy trigger required; BOMA BESt building · $85,000
Allspaces Design & Management Ltd Issued -
2018-09-07
#1710 - 17th floor Interior alterations to provide improvements for a new General Office tenant on the 17th floor (suite #1710) of this existing commercial building. Scope of work: Demolish drop ceiling & extend T-bar ceiling, demo paritions & create 3 new offices. Remove and replace flooring, finishes, & relocate and new pot and recessed lighting. Ok for field review as per City staff · $75,000
Fusion Project Management Ltd Issued -
2018-05-25
#410 - 4th floor Interior alterations to provide improvement to this existing office unit #410 on the 4th floor for a new office tenant (Courts Pulver Crawford LLP) in this existing commercial building on this site. Scope of work: Select removal of partition walls and finishes. Construct new partitions, doors, frames, glazing. Supply and install millwork, flooring, HVAC, & lighting to suit new layout. OK for field review as per City staff · $190,000
TotalPlan Inc Issued -
2018-03-13
#1100 - 11th floor Interior alterations to the existing office tenant space on the 11th floor (#1100) to expand into the adjacent unit and provide improvements in this existing commercial building. Scope: to expand #1100 into adjacent office space created under BP-2016-01735 (no suite number assigned). Demolish portion of demising wall, partition walls, and install new partition walls, doors for new layout, Infill previous entrance door, and alter electrical and sprinklers. Address Note: #1100 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: Kornfeld LLP This is BOMA BESt building. · $80,000
Matra Construction Inc Issued -
2018-02-06
#770 - Interior alterations to provide renovation to suite #770 on the 7th floor for the general office area. Scope of work includes a new demising wall and interior office space layout. OK field review as per City staff. Note: 1. reviewed by Addressing 2. energy upgrade: BOMA BESt (Path 1)- No additional upgrades req'd · $30,000
Epic Spaces Inc Issued -
2018-02-05
18th floor-Common Washrooms Related to Building Permit for BP-2018-00036 Interior alterations to this existing office building to provide new finishes and fittings for the common washrooms in the core area of the eighteenth floor. Scope of work: new interior walls, new finishes and fixtures, ceiling, plumbing and electrical work. See related Special Sprinkler Inspection No. IA-2018-00055.
no contractor listed Issued -
2018-02-05
9th floor-Common Washrooms Related to Building Permit for BP-2018-00036 Interior alterations to this existing office building to provide new finishes and fittings for the common washrooms in the core area of the ninth floor. Scope of work: new interior walls, new finishes and fixtures, ceiling, plumbing and electrical work. See related Special Sprinkler Inspection No. IA-2018-00054.
no contractor listed Issued -
2018-02-05
7th floor-Common Washrooms Related to Building Permit for BP-2018-00036 Interior alterations to this existing office building to provide new finishes and fittings for the common washrooms in the core area of the Seventh floor. Scope of work: new interior walls, new finishes and fixtures, ceiling, plumbing and electrical work. See related Special Sprinkler Inspection No. IA-2018-00048.
no contractor listed Issued -
2018-02-05
6th floor-Common Washrooms Related to Building Permit for BP-2018-00036 Interior alterations to this existing office building to provide new finishes and fittings for the common washrooms in the core area of the sixth floor. Scope of work: new interior walls, new finishes and fixtures, ceiling, plumbing and electrical work. See related Special Sprinkler Inspection No. IA-2018-00056.
no contractor listed Issued -
2018-02-05
2nd floor-Common Washrooms Interior alterations to this existing office building to provide new finishes and fittings for the common washrooms in the core area of the second floor. Scope of work: new interior walls, new finishes and fixtures, ceiling, plumbing and electrical work. See related Special Sprinkler Inspection No. IA-2018-00057. · $450,000
no contractor listed Issued -
2018-01-04
#570 - 5th floor Interior alterations to provide tenant improvements for a new Office tenant on the 5th floor (#570) in this existing commercial building. Scope of work: demolish all existing walls/doors, construct new partition walls, doors, finishes, ceiling work, mechanical, electrical, plumbing and sprinkler work. TENANT: Pearson Canada Inc. · $600,000
Govan Brown Ltd Issued -
2017-10-17
9th and 15th floors (Revised locations) - Elevator Lobbies and Public Corridors Interior alterations to provide cosmetic upgrade to the 9th, 15th and 16th floor Elevator Lobbies and Public corridors in this existing building. Revision # 1 - Change scope of work location from 9th, 15th & 16th floor to 4th & 15th floors. Dec 18/17 C.R Revision #2 - Change work location from 4th &15th floors to 9th & 15th floors. May 31/18. mk Ok for field review per City staff: Exempt - BOMA BEST · $330,000
no contractor listed Issued -
2017-07-14
(#1580-15th floor) Interior alterations to demise #1580 into 3 office units and to provide tenant improvements for a new office tenant at #1580. Note: #1590 - BP-2017-03072 #1570 - Separate permit required for future tenant improvements OK for field review as per City staff: BOMA Best Building · $80,000
All Spaces Project Management Ltd Issued -
2017-07-14
(#1590-15th Floor) - Interior alterations to demise #1580 into 3 office tenant spaces and to provide tenant improvements to newly created #1590 for a new office tenant. Note: #1580 - BP-2017-03073 #1570 - Separate permit required for future tenant improvements OK for field review as per City staff: BOMA Best Building · $80,000
All Spaces Project Management Ltd Issued -
2017-06-20
#1640-16th floor Interior alterations to provide tenant improvements to this existing office unit #1640 on the 16th floor of this existing commercial building on this site. Scope of work: remove portion of partition wall to accommodate removed door and new portion of partition wall where door was, remove/replace signage on glazing. REVISION # 1 - 1) Update on drawings no ID 2.0, 2.1 and 2.2. Reduce scope of work (demolition), meeting room door to remain at current location (portion of partition wall to accommodate door not needed to be removed). ASHRAE checked/confirmed by Marisa Lee. March 5, 2018 jm TENANT: Gravitas Securities Inc. See related Special Sprinkler Inspection Permit No. IA-2017-00726. OK for field review per City staff. Note: Energy trigger not required BOMO BESt building. · $10,000
Pagliaro Projects Ltd Issued -
2017-04-18
Unit #880 - 8th floor Interior alterations to provide tenant improvement for a new office tenant on the 8th floor (unit #880) of this existing commercial building. Scope of work: demo/construct partition wall and relocate door to reconfigure entrance area, millwork for new staff kitchen, ceiling, electrical,plumbing & sprinkler work. OK for field review as per City staff Energy Upgrade Exempt: BOMA BESt Building. · $75,000
no contractor listed Issued -
2017-02-06
(#110) Interior alterations to remove non-loading partition walls, add 3 new entrances and non-loading partition walls to this existing print shop in this existing building. Scope includes new glazing and millwork. · $45,000
Gibraltar Holdings Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05