Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
4985 Quebec St, Vancouver
An address in Riley Park, Vancouver, zoned CD-1 (675) (Comprehensive Development). 9 building permits are on file, most recently “To construct a 6-storey multi-family (co-housing) residential building with a single leve…” (issued 25 September 2018). The City's 2026 assessed value for the 26 accounts at this address is $22,869,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150538, 677 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2018-09-25
To construct a 6-storey multi-family (co-housing) residential building with a single level underground storage garage having vehicular access from a lane. · $8,621,000
no contractor listed Issued -
2018-08-30
To demolish by deconstruction this existing one-family dwelling building to grade. ($20,000.00) Related to DP-2017-00667, BP-2017-06127, BP-2018-03251 Note: 1) 75% of the demolition material must be recycled as per City staff)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Hans Demolition and Excavating Ltd. Issued -
2018-08-30
To demolish by deconstruction this existing one-family dwelling building to grade. ($20,000.00) Related to DP-2017-00667, BP-2017-06127, BP-2018-03250 Note: 1) 75% of the demolition material must be recycled as per City staff)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Hans Demolition and Excavating Ltd. Issued -
2018-08-30
To demolish by deconstruction this existing one-family dwelling building to grade. ($20,000.00) Related to DP-2017-00667, BP-2017-06127, BP-2018-03249 Note: 1) 75% of the demolition material must be recycled as per City staff)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $20,000
Hans Demolition and Excavating Ltd. Issued -
2018-07-25
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Related to Demo Permit BP-2018-03243
Hans Demolition and Excavating Ltd. Issued -
2018-07-17
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Related to Demo Permit BP-2018-03246
Hans Demolition and Excavating Ltd. Issued -
2018-07-17
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. Related to Demo Permit BP-2018-03241
Hans Demolition and Excavating Ltd. Issued -
2017-07-18
To deconstruct the existing 1FD and detached carport on this site, with a minimum 75% recycling requirement (as per condition of rezoning). Related to: BP-2017-01795 for the salvage and abatement Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver Note: 75% recycling of construction waste required. The deconstruction shall be in accordance with the submitted recycling and Reuse plan and to be confirmed through an acceptable Deconstruction Compliance Report form, with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. · $31,250
D & S Bulldozing Ltd Issued -
2017-05-29
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one-family dwelling building and detached carport on this site. Related to BP-2017-01790 (To deconstruct the existing 1FD and detached carport on this site, with a minimum 75% recycling requirement.)
D & S Bulldozing Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Riley Park
Exterior and interior alterations to provide tenant improvements for this existing Restaurant - Class 1 (Group A2) for a new tenant in this existing one-storey with basement commercial building on this site. Scope includes adding partition walls, replacing exhaust hoods and cooking equipment, re-configuring male washroom and removing two windows facing south. Notes: - CF-2026-003230 - Class 1 Cooking Operation (Grease-Laden Vapours): Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - Proposed occupant load: 100 persons. · 1010541 BC Ltd2026-10-26
Interior alterations to change the use from Beauty Salon to Retail Store in this existing commercial building on this site. · no contractor listed2026-10-19
4171 Fraser St Interior alterations and change of use and major occupancy from Retail (Group E) to Health Care Office (Group D) for a new physiotherapy tenant on the round floor of this existing mixed use commercial building on this site. OK For Field Review per City staff. · no contractor listed2026-10-19