Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
4908 Cambie St, Vancouver
An address in Riley Park, Vancouver, zoned CD-1 (635) (Comprehensive Development). 13 building permits are on file, most recently “Interior alterations to the existing shell retail space to provide tenant improvements wh…” (issued 16 November 2021). The City's 2026 assessed value for the 80 accounts at this address is $99,178,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153250, 493 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2021-11-16
Interior alterations to the existing shell retail space to provide tenant improvements which include a new accessible washroom for this proposed new retail limited food tenant in this existing mixed use commercial building on this site. Scope of work: New layout to include accessible washroom, bar area, mud room, and sitting area. New floor, ceiling, wall finishes, lighting and millwork. Tenant name: Simple Love Coffee Home Ltd. · $200,000
Transvan Development Ltd Issued -
2019-01-10
Building Permit for BP-2017-00982 - To develop townhouse homes along lane (Building C) containing 5 dwelling units over two levels of underground parking having vehicular access from the lane and provide vehicular access to the building at 4986 Cambie St. Building A (apartment building facing Cambie St) - BP-2018-01379 Building B (apartment building facing W 33rd Av) - BP-2018-01380 Building C (townhouse at rear) - BP-2018-01381 See site permit BP-2017-00982 for details Stage #1 - excavation and structure up to grade - issued 2018 Jan. 08 Stage #2 - Structural work up to roof - issued 2018 Nov.06 Stage #3 - Full construction - issued 2019 Jan.10
no contractor listed Issued -
2019-01-10
Sub-Building Permit for BP-2017-00982 - To develop a six storey mixed-use building (Building A) with one level of Retail (first floor) and six levels of Residential (1st to 6th floors) containing 46 dwelling units over two levels of underground parking having vehicular access from the lane and provide vehicular access to the building at 4986 Cambie St. Building A (apartment building facing Cambie St) - BP-2018-01379 Building B (apartment building facing W 33rd Av) - BP-2018-01380 Building C (townhouse at rear) - BP-2018-01381 See site permit BP-2017-00982 for details Stage #1 - excavation and structure up to grade - issued 2018 Jan. 08 Stage #2 - Structural work up to roof - issued 2018 Nov.06 Stage #3 - Full construction - issued 2019 Jan.10
no contractor listed Issued -
2018-11-06
Sub - Building Permit for BP-2017-00982 - To develop a six storey multiple dwelling building (Building B) containing 27 dwelling units over two levels of underground parking having vehicular access from the lane and provide vehicular access to the building at 4986 Cambie St. Building A (apartment building facing Cambie St) - BP-2018-01379 Building B (apartment building facing W 33rd Av) - BP-2018-01380 Building C (townhouse at rear) - BP-2018-01381 See site permit BP-2017-00982 for details Stage #1 - excavation and structure up to grade - issued 2018 Jan. 08 Stage #2 - Structural work up to roof - issued 2018 Nov.06 Stage #3 - Full construction - issued 2019 Jan.10
no contractor listed Issued -
2018-11-06
Site work to develop a six storey mixed-use building (Building A) with one level of Retail (first floor) and six levels of Residential (1st to 6th floors) containing 46 dwelling units and a six storey multiple dwelling building (Building B) containing 27 dwelling units and townhouse homes along lane (Building C) containing 5 dwelling units for a total of 78 dwelling units, all over two levels of underground parking having vehicular access from the lane and provide vehicular access to the building at 4986 Cambie St. Building A (apartment building facing Cambie St) - BP-2018-01379 Building B (apartment building facing W 33rd Av) - BP-2018-01380 Building C (townhouse at rear) - BP-2018-01381 Stage #1 - excavation and structure up to grade - issued 2018 Jan. 08 Stage #2 - Structural work up to roof - issued 2018 Nov.06 Stage #3 - full construction - issued 2019 Jan.10 · $25,000,000
no contractor listed Issued -
2017-11-23
To demolish the existing residential rental one family dwelling built in 1989.No excavation greater than 4' or shoring permitted. OK for SIPS per City staff: BP-2017-02901 for the salvage and abatement Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $10,000
Graham Construction and Engineering LP Issued -
2017-11-23
To demolish this existing residential rental post 1940 one family dwelling. No excavation greater than 4' or shoring permitted. OK for SIPS per City staff: BP-2017-02905 for the salvage and abatement Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $10,000
Graham Construction and Engineering LP Issued -
2017-11-23
To demolish this residential rental one family dwelling built in 1987. No excavation greater than 4' or shoring permitted. OK for SIPS per City staff: BP-2017-02906 for the salvage and abatement Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $10,000
Graham Construction and Engineering LP Issued -
2017-09-11
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one family dwelling built on this site. Related to: DB-2017-02889 to demolish
Kare Environmental Ltd Issued -
2017-09-11
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one family dwelling built on this site. Related to: DB-2017-02890 to demolish
Kare Environmental Ltd Issued -
2017-09-11
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one family dwelling built on this site. Related to: DB-2017-02891 to demolish
Kare Environmental Ltd Issued -
2017-05-03
To demolish this existing one-family dwelling on this site. Note: 1) demo to grade only 2) 75% recycling as a condition of rezoning (no green by-law deposit). 3) The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit · $35,000
Kare Environmental Ltd Issued -
2017-04-10
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building.
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Riley Park
5628 CAMBIE ST. Interior alterations to provide improvement to this existing Office (D) at 5628 Cambie St. on the first floor of this existing mixed-use building on the site. Okay for DTI per City staff · no contractor listed2026-11-05
#12 - 10 W 17TH AV - Building 3 Interior alterations to provide improvements to this TH #12 - 10 of this existing multiple dwelling building on this site Project scope: relocation of kitchen from level 3 to level 1, bedroom and bathroom reno Okay for DTI as per City staff · AMC Project Management Ltd2026-11-04
Interior alterations to renovate one of the dwelling units of this existing duplex. OK to process as DTI as per City staff · Diseno Development Corporation2026-11-03