Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
475 Main St, Vancouver
An address in Downtown, Vancouver, zoned HA-1 (Historical Area). 9 building permits are on file, most recently “#205 Interior alterations only and a change of use from the existing General Office use a…” (issued 6 June 2024). The City's 2026 assessed value is $14,422,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153585, 1,256 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2024-06-06
#205 Interior alterations only and a change of use from the existing General Office use as a Group D Occupancy to a new ‘Similar To’ Beauty Salon use for a Tattoo Parlour as a Group D Occupancy at unit #205 at this existing Commercial Building. Scope of work includes the validating of the past installation of the interior partitions for the indicated Storage/Office Room. Note: A separate Plumbing Permit (PP) is required to show compliance to the current Plumbing Code for the indicated two compartment hand sink. Tenant: Heather Park Art and Stuff. OK for Direct to Inspections processing as per City staff. · $3,500
no contractor listed Issued -
2022-04-12
445 Main St & 455 Main St To alter the interior of this existing 2-storey commercial building to reinstate the demising wall between 445 Main St (retail shell space) and 455 Main St (retail shell space) on the ground floor. Scope of work includes: demolition of partition walls and construct new demising wall. OK for Field Review per City staff: These units are approved as a retail store SHELL SPACE ONLY. Separate permit(s) are required prior to any future tenant improvements and/or occupancies. Energy Upgrade: E2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $15,000
JDP Services Inc Issued -
2021-12-13
#227 Change of major occupancy from General Office (D) to Artist Studio Class A (F2) with ancillary retail (E) in this existing commercial building on this site. OK for field review as per City stafflteration proposed · $1
no contractor listed Issued -
2020-06-19
#215 - 475 Main St (2nd floor) Interior alterations for interior demolition to shell of this existing 'Miscellaneous Products Manufacturing Class B' Suite #215 on the 2nd floor in this existing two-storey commercial building on this site. OK for Field Review per City staff: 1. Energy Upgrade Exemption; Interior Demolition 2. Building inspector to determine on site if a separate sprinkler permit is required. Revision #1 - Change in scope for existing door, millwork sink and lighting and HVAC to remain · $6,000
no contractor listed Issued -
2019-06-11
unit #209 & #211 - 2nd floor Interior alterations to demise the existing office unit #212 into two units to be #211 (shell) and #209 and to provide tenant improvements for a new office tenant in #209 on the 2nd level of this existing commercial building on this site. Scope of work: construct new demising wall and one glass partition wall/door, new dishwasher/fridge, electrical and plumbing work. OK for field review per City staff: L4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1 of ASHRAE 90.1 - 2010) · $72,000
M-Core Construction Ltd Issued -
2018-11-09
#209 To change of use on the 2nd floor (suite #209) from General Office to Tattoo Parlour (similar to beauty & wellness centre) and to alter the interior to provide tenant improvements. Scope of work: installation of 3 new sinks (1 single handsink, 1 double sink, & 1 mop sink) and a new hot water tank. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) NOTE: Related to BP-2018-04136 (to demise #212 to create #209 & #211). · $20,000
applicant withheld (individual) Issued -
2018-09-10
unit #211 - 2nd floor Interior alterations to demise the existing office unit #212 into two units to be #209 (shell) and #211 and to provide tenant improvements for a new office tenant in #211 in this existing commercial building on this site. Scope of work: construct new demising wall and one glass partition wall/door, new dishwasher/fridge, electrical and plumbing work. TENANT: Defacto Entertainment Inc. OK for field review per City staff: L4 - SWH - Upgrade all SWH Equipment Efficiency (per City staff.4.2 of ASHRAE 90.1 - 2010) · $40,000
no contractor listed Issued -
2017-11-06
Unit #217 Interior alterations to provide improvements to this unit in this existing commercial building on this site. Scope of work includes adding a pony wall and lighting for a new office tenant. Existing use was health-care office. OK for field review as per City staff: Upgrade all hard wired lighting within an occupied space to high efficiency light systems · $7,000
no contractor listed Issued -
2017-04-26
Interior alterations only and change of use from a Photography Studio use to provide tenant improvements for a new Beauty and Wellness Centre use (tattoo parlour) at 485 Main Street at this existing commercial building. OK for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade all hard wired Lighting within an occupied space to High Efficiency light systems · $8,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc2026-10-30
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd2026-10-30
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.2026-10-30