An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 17 building permits are on file, most recently “#700-470 Granville Street Interior alterations to provide tenant improvements to an exist…” (issued 23 April 2026). The City's 2026 assessed value is $38,497,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
17
Assessed value (2026)
$38,497,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 470 Granville St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153466, 693 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
693
Households
375
Median age
32.8
Median household income (2020)
$74,000
Own their home
39%
Vancouver: 45%
Average household size
1.7
Under 15
4%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-04-23 #700-470 Granville Street Interior alterations to provide tenant improvements to an existing Office - Group D in unit #700 on the 7th floor of this existing commercial building. Scope of work includes: partitions, doors, lighting, ceiling, finishes and fixtures Okay for Field Review as per City staffe washrooms layout Increase work cost of $200 · $650,200
    no contractor listed
    Issued
  2. 2026-04-02 #606 – 6th Floor Interior alterations to demise unit #606 into 3 separate general office units on the 6th floor of this existing commercial building on this site. Scope of work: New partition walls to demise 1 unit into 3 separate units. · $90,000
    no contractor listed
    Issued
  3. 2025-09-09 Interior alterations to demise units 617 to create 4 new units (addressed as 606, 609, 611 and 617) and to combine 4 units (626, 627, 628 and 629) to create one new office unit (unit 628) Unit 609 to be Beauty Service as per City staff: Remove and add interior walls to create new units OK for field review as per City staff · $90,000
    SEAFORTH CONSTRUCTION LTD
    Issued
  4. 2024-06-26 Interior alterations to combine unit #801 #802 and #803 into one unit and change the use from General Office to Beauty and Wellness Center on the 8th floor of this existing commercial building on this site. No construction work to be done- change of use only. · $5,000
    no contractor listed
    Issued
  5. 2024-06-24 #230 - 470 Granville St Interior alterations to provide improvements for a new Similar to Beauty and Wellness Centre tenant in unit #230 in this existing Vancouver Heritage Register "A" commercial building on this site. OK for field review as per City staff. · $40,000
    no contractor listed
    Issued
  6. 2023-03-10 Interior alterations to expand unit #405 to #401 and provide improvements to a new beauty and wellness tenant in unit #401 on the 4th floor of this commercial building. Energy upgrade: E2 - Lightning - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) Addressing Note: #405 #401 #405 has expanded into a portion of #401. Both suite numbers retained. #401 and #405 are to be posted at suite entries in accordance with the Building By-law prior to final inspection. · $7,500
    SEAFORTH CONSTRUCTION LTD
    Issued
  7. 2022-05-16 480 Granville Street Interior alterations to provide tenant improvements in this existing commercial building. Scope of Work: Removal of interior partition walls, doors, new handrails, and new cabinets with shelves. Revision #1: - Add tactile strips to ramp and stair landings - Retain an interior wall previously proposed to be removed - New wall finishes B.Wong - Aug 9/22 OK For Field Review as per City staff · $50,000
    no contractor listed
    Issued
  8. 2021-09-24 Exterior and interior alterations to convert ancillary office spaces of the building into ancillary storage, recycle, office and common corridor of this existing commercial building on this site. Exterior work to add a new door at lane elevation. OK for DB per City staff-19 pandemic VBBL 2019 Revision No.1 Aug. 21, 2023 W.Ng 1) addition of janitorial closet and 2) reconfiguration of interior partition due to changes to janitorial closet. · $44,500
    no contractor listed
    Issued
  9. 2021-07-12 #416, #418, #420 Interior alterations to provide improvements and to demise office unit #416 into #416, #418 & #420 on the 4th floor of this commercial building on this site. OK for Field Review per City staffote to PC; drawings are missing the major reno upgrade triggers · $5,500
    SEAFORTH CONSTRUCTION LTD
    Issued
  10. 2020-11-24 #518 (to be divided into #516 & #518) - 5th floor Interior alterations to demise unit #518 into two general office units (to be #516 and #518) and to provide improvements for a new office tenant in unit #516 on the 5th floor of this commercial building on this site. OK for Field Review per City staff · $750
    SEAFORTH CONSTRUCTION LTD
    Issued
  11. 2020-06-23 Interior alterations only to provide improvements for a new Retail Store tenant at 466 Granville Street at this existing Vancouver Heritage Register 'A' commercial Rogers Building. Scope of work to include installing drywall on existing wall and ceiling, paint ceiling, install counters, add display shelves and work related to electrical. OK for field review as per City staff. Notes: 1. Energy upgrade trigger: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems 2. Building inspector to determine on site if a separate sprinkler permit is required. · $30,000
    no contractor listed
    Issued
  12. 2020-04-08 Interior alterations only to provide tenant fitout for a new Cannabis Store use at 460 Granville Street at this existing commercial Rogers Building. Tenant: Muse Cannabis Stores. Scope of work includes millwork, new kitchenette, electrical and plumbing work. Related to DP-2019-00718 OK for field review as per City staff. Note: 1. Energy upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1(a) of ASHRAE 90.1-2016) · $150,000
    Stephen Thomas Construction Ltd
    Issued
  13. 2020-03-31 #1001 - 10th floor Interior alterations to provide tenant improvements for a new office tenant on the 10th floor (#1001) in this existing commercial building on this site. Scope of work: per the 2019 VBBL to remove partition walls, doors, sinks and cabinets and to construct new glass partition walls, door, finishes and electrical work. OK for Field Review per City staff: 1. Building inspector determined sprinkler permit is required. 2. Energy trigger chosen; E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) · $7,100
    SEAFORTH CONSTRUCTION LTD
    Issued
  14. 2019-06-11 #930 - 9th floor Interior alterations to provide improvements on the 9th floor to combine office units #928, #935 and #936 into one unit (to be #930) and provide improvements for a new office tenant in this existing commercial building on this site. Scope of work: remove demising and partition walls, and install two new tempered glass partitions and doors. TENANT: AIBA International Education Consulting Inc. OK for field review per City staff: 1. Building inspector to determine on site if a separate sprinkler permit is required. 2. Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016. · $10,000
    Ben & Derek Contracting Management Ltd
    Issued
  15. 2018-06-12 #530 & #532-5th floor Interior alterations to demise office unit #529 and change to #530 and #532 on the 5th floor of this commercial building on this site. Tenant improvement work for new office tenant at #532. Scope of work: construct new demising wall, new partition walls, doors, millwork, finishes, new tenant layout includes kitchenette, two offices, a boardroom, coat closet, electrical, plumbing and sprinkler work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to unit 530. OK for field review per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $17,800
    SEAFORTH CONSTRUCTION LTD
    Issued
  16. 2018-03-26 #524 & #529-5th floor Interior alterations to the 5th floor to demise the existing vacant office space unit #529 into two units (to be #524 & #529) and to provide improvements to unit #524 only, in this existing Vancouver Heritage Register 'A' commercial Rogers Building. Scope of work: construction of new demising and partition walls, interior doors, relocated suite entry door, millwork, finishes, electrical and sprinkler work. Tenant improvement work to #524 only. Address Note: Suite numbers are to be posted by suite entry prior to final building inspection. TENANT: vacant OK for field review as per City staff. No alteration proposed to lighting. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $19,000
    no contractor listed
    Issued
  17. 2018-03-26 #416, #422, #424-4th floor Interior alterations to the 4th floor to demise the existing vacant office space unit #414 into three smaller office spaces (to be #416, #422, #424) in this existing Vancouver Heritage Register 'A' commercial Building. Scope of work: construct two new demising walls in Unit #416 thereby creating two new additional units (#422, #424), electrical and sprinkler work OK for field review as per City staff. No alteration proposed to lighting. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $15,800
    SEAFORTH CONSTRUCTION LTD
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited