This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
4088 Columbia St, Vancouver
An address in Riley Park, Vancouver, zoned RM-8A (Residential). 8 building permits are on file, most recently “Building 3 - To construct a 3-storey multiple townhouse building consisting of 6 dwelling…” (issued 20 April 2023). The City's 2026 assessed value for the 17 accounts at this address is $28,632,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153252, 688 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2023-04-20
Building 3 - To construct a 3-storey multiple townhouse building consisting of 6 dwelling units. Refer to BP-2021-05329 for site work, below grade facilities and common underground parking. VBBL2019 - Sprinklered.
no contractor listed Issued -
2023-04-20
Building 2 - To construct a 3-storey multiple townhouse building consisting of 2 dwelling units. Refer to BP-2021-05329 for site work, below grade facilities and common underground parking. VBBL2019 - Sprinklered.
no contractor listed Issued -
2023-04-20
Building 1 - To construct a 3-storey multiple townhouse building consisting of 8 dwelling units. Refer to BP-2021-05329 for site work, below grade facilities and common underground parking. VBBL2019 - Sprinklered.
no contractor listed Issued -
2023-04-20
To construct three (3) multiple dwellings townhouse buildings consisting of 3 storeys in height with an enclosed mezzanine for Building 3 on this site to a total of sixteen (16) market dwelling units, over 1 level of underground parking having vehicular access from the North side of the lane. VBBL2019 - NFPA 13R. Building 1 is under BP-2022-01677. Building 2 is under BP-2022-01685. Building 3 is under BP-2022-01686. Stage I - Excavation, Shoring and Foundation to Grade ISSUED: Sept. 15, 2022. Stage II - Full Construction ISSUED: April 20, 2023. · $10,200,000
Performance Builders Ltd Issued -
2022-09-26
To demolish this existing One Family Dwelling to grade. Related to Salvage and Abatement permit BP-2022-00362. 1. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $30,000
MG Demolition Ltd Issued -
2022-08-22
To demolish by deconstruction this existing one family dwelling building to grade. This building is pre 1950 and as such 75% of the demolition material must be recycled. Related to Salvage and Abatement permit BP-2022-00378. 1. Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $30,000
MG Demolition Ltd Issued -
2022-08-08
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing multiple conversion dewlling. Related to demolition permit DB-2022-00361. Issued separately.
MG Demolition Ltd Issued -
2022-07-21
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one family dwelling. Related to demolition permit DB-2022-00377. Issued separately.
MG Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Riley Park
5628 CAMBIE ST. Interior alterations to provide improvement to this existing Office (D) at 5628 Cambie St. on the first floor of this existing mixed-use building on the site. Okay for DTI per City staff · no contractor listed2026-11-05
#12 - 10 W 17TH AV - Building 3 Interior alterations to provide improvements to this TH #12 - 10 of this existing multiple dwelling building on this site Project scope: relocation of kitchen from level 3 to level 1, bedroom and bathroom reno Okay for DTI as per City staff · AMC Project Management Ltd2026-11-04
Interior alterations to renovate one of the dwelling units of this existing duplex. OK to process as DTI as per City staff · Diseno Development Corporation2026-11-03