Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
400 Burrard St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 46 building permits are on file, most recently “#1900- 19th floor (consolidated and changed from #1950 and #1910) Interior alterations to…” (issued 13 October 2026). The City's 2026 assessed value is $135,226,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153466, 693 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-10-13
#1900- 19th floor (consolidated and changed from #1950 and #1910) Interior alterations to the 19th floor to consolidate #1910 and #1950 ( & change to #1900) to become a full floor tenant in this existing commercial building on this site. Scope of work: demo of demising walls, corridor walls, partition walls, Remove staff lunchroom and construct new partitions to alter layout. Electrical, & Sprinklers to suit. · $650,000
Aura Office Environments Inc Issued -
2026-08-17
#1030 - 10th floor Interior alterations to provide improvements provide improvements for an existing office tenant on the 10th floor (#1030) of this existing commercial building on this site. Scope of work: partition walls and doors to create two offices. Electrical work to suit. No demo work proposed. District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $8,500
Central West Project Management Inc. Issued -
2026-02-17
#1750 & #1770 - 17th Floor Interior alterations in this existing office space on the 17th floor to combine suite #1750 and #1770 (retaining #1750) and to provide improvements for an existing office tenant in this existing commercial building on site. Scope of work: Create an opening between suite #1750 & #1770 to combine the 2 suites. Construct new partitions to create new offices and a boardroom. TENANT: Nlaka' Pamux Nation Tribal Council Renovation NOTE: THIS PERMIT VALIDATES THE LOCATION OF THE DEMISING WALL BETWEEN #1750 & #1770 THAT WAS PREVIOUSLY DONE BY THE PREVIOUS OWNER. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
Riverport Homes (2024) Ltd Issued -
2025-10-10
#1880 - 18th Floor (#1880 expanding to #1800) Interior alterations for an existing office tenant on the 18th floor to expand unit #1880 to suite #1800 (retaining #1880) in this existing commercial building on this site. Scope of work: Remove the demising wall between the 2 units, new partition walls, flooring, paint, t-bar ceiling, HVAC, electrical, mechanical/plumbing and sprinkler work. Revision #1: New partition to Rm1807 to create 2 meeting rooms, change ceiling design, change in closet door height. - Nov 27/25 - LLL Revision #2: Addressing to correct the retaining suite # to #1800. No charge to the applicant - June 11/26 - LLL. TENANT: Fidelity Investments · $250,000
Taurus Renovations Ltd Issued -
2025-03-14
#430 - 4th floor Interior alterations to provide improvements to this existing shell office space on the 4th floor (#430) of this existing commercial building on this site. Scope of work: complete tenant fit out to shell space. Electrical, Mechanical/Plumbing, Sprinklers to suit . * see BP-2023-01149 for demo. OK for Field Review per City staffith your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $600,000
no contractor listed Issued -
2024-02-27
400 Burrard St Project Description: Tenant improvement includes Interior alterations and cosmetic upgrade on the main lobby in this existing commercial building. Scope of work Includes: demolishing of one existing door and close off the door opening, close off two small section of un-used space, and replacing building directory with a new one. The cosmetic upgrade includes elevator cabs interior finishes, lobby new drop ceiling, new flooring, painting, installing new lighting fixtures, and new electrical receptacles. · $650,000
no contractor listed Issued -
2024-02-21
#1020 - 10th Floor (expanding into a portion of #1050) Interior alterations on the 10th floor for an existing office tenant to expand unit into a portion of #1050 and provide tenant improvements in this existing commercial building. Scope of work: Remove the demising wall between units #1020 and #1050 increasing the size of #1020. Demolish partitions in private offices, construct new demising partition, new paint to doors, frames and sprinkler work. REVISION #1 - partition layout change in IT room . Mar.27/24 mk TENANT: OceanaGold Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $60,000
no contractor listed Issued -
2023-05-10
#1910 and #1950 - 19th floor Interior alterations to expand the existing office in #1950 into a portion of #1910 on the 19th floor in this existing commercial building on this site. Scope of work: remove/construct new demising wall, remove select partition walls/door and sprinkler work. OK for Office TI Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $10,000
Gibraltar Holdings Ltd Issued -
2023-04-24
#430 - 400 Burrard Street Interior alterations to demolish the interior of this existing unit #430 and create a open building shell and remove the existing interconnecting stairway to the 3rd floor. Rev#1: Ceiling & ceiling light fixtures to be replaced. Existing partitions to be removed for a new opening to elevator lobby. New glass door to suite #430. Work value added: 165,400 (210,000 + 165,400 = 375,400) · $375,400
no contractor listed Issued -
2023-03-21
#1420 and #1450 - 14th floor Interior alterations to demise #1400 into two office units to be #1420 and #1450 and to provide interior alterations to both units in this existing commercial building on this site. Scope of work: remove select partition walls/doors and construct new demising walls, glass entry doors, men's washroom, finishes, electrical, plumbing and sprinkler work. REVISION #1 - to reduce proposed scope of work to remove entry doors to #1420. Wood doors to remain as is. Dec.15/23mk TENANT: #1420 - Bernard LLP #1450 - Navis Marine Insurance Brokers OK for Office TI per City staff required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $103,145
TotalPlan Inc Issued -
2022-12-21
#800 - 8th Floor Interior alterations to provide tenant improvements for a new office tenant on the 8th floor, combining #800, #805 & #810 to become a full floor tenant of this existing commercial building. Scope of work: Demolish demising walls between suites, doors, millwork, flooring. Construct partition walls, new sliding/swing door, glazing, electrical, plumbing and sprinkler work. TENANT: Elbar Enterprise Ltd NOTE: #800 is interconnected to #900 per City staff. Reception is at on the 9th floor · $950,000
no contractor listed Issued -
2022-10-12
1st Floor (Ground floor) Interior alterations to provide tenant improvements to this existing financial institution (CIBC) on the ground floor of this existing commercial building on site Scope of work: Remove/construct partition walls, demolish doors & frames, remove flooring, millwork, csr wickets and electrical work. TENANT: CIBC · $1,500,000
no contractor listed Issued -
2022-08-11
#470 - 4th floor Interior alterations to provide tenant improvements for a new office tenant on the 4th floor (#470) in this commercial building on this site. Scope of work: remove/construct partition walls, doors, new kitchen, finishes, millwork, electrical, plumbing and sprinkler work. REVISION #1 - Nov. 4/22 mk - Layout change by switching kitchen and office location. TENANT: 3 Bridges Development Corp. OK for Field Review for Office TI E2 - Retrofit Path: BOMA BEST (Path 1) - No Additional Upgrades Req'd · $90,580
Gibraltar Holdings Ltd Issued -
2022-05-25
#810 - 8th Floor Interior alterations to remove all interior walls from this existing vacant office space on the 8th floor (#810) to create a shell space for future tenant in this existing commercial building on this site. Scope: Demolish entire suite, remove all walls, flooring, doors, frames, glazing and millwork. Electrical, plumbing & sprinkler work to suit. Separate permit required for future tenant improvements. TENANT: Intact Insurance Company OK For Field Review per City staffinkler permit required for proposed sprinkler work. Note: Energy trigger not required BOMA BEST building Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $26,100
no contractor listed Issued -
2022-05-11
2nd, 9th and 16th Floors - Common Washrooms Interior alterations to provide improvements to the common washrooms located on the 2nd, 9th and 16th floors only in this existing commercial building on this site. Scope of Work: mens and ladies washroom upgrades consisting of flooring, walls, millwork, ceiling, lighting, plumbing fixtures, finishes, electrical, plumbing and sprinkler work. REVISION #1: to add the 5th, 6th, 12th, and 17th floor, which have a total of eight (8) washrooms, to the scope of work. Finishes to be the same throughout the floors. Increase in project value from $397,000.00 to $932,000,00. Aug 15, 2022 mlh OK for Field Review by S. Yue; April 4, 2022 E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1 (g) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $932,000
no contractor listed Issued -
2022-04-22
4th floor - Amenity Space (Workout Room) Interior alterations to the amenity space of the 4th floor and to change the use from lunch room to workout room in this existing commercial building on this site. Scope of work: remove existing lunchroom fixtures and finishes, millwork, floor, ceiling work, apply new finishes, flooring, electrical and sprinkler work. OK for Field Review per City staff; April 1, 2022 E2 - Lighting - replacing fluorescent lighting with LED and automatic controls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $125,400
no contractor listed Issued -
2021-12-20
#1680 - 16th floor Interior alterations to provide tenant improvements for a new office tenant on the 16th floor (#1680) in this existing commercial building on this site. Scope of work: remove one partition wall and door and new finishes. TENANT: Sequeira Partners Building Sprinklered - Building Inspector to determine if a separate sprinkler is required/No sprinkler permit required per City staff; Dec. 1, 2021 E1 - Lighting - Upgrade internal Exit Signs to not exceed 5W per City staffno longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $35,000
VPAC Construction Group Ltd Issued -
2021-11-10
#1110 - 11th Floor Interior alterations to provide improvements for an existing office tenant on the 11th floor (#1110) of this commercial building on this site. Scope of work: Construct three rooms using demountable walls system and one wall out of steel stud and drywall to accommodate changes in ceiling height. Electrical and Sprinklers to suit. TENANT: BCI OK for Field Review per City staffte Sprinkler Permit required for proposed sprinkler work. E2 Upgrade - Lighting - Upgrade to Local Control (per City staff.4.1.1 (a) of ASHRAE 90.1-2016. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $15,500
no contractor listed Issued -
2021-06-18
#1950 - 19th floor Interior alterations to provide tenant improvements for the existing General office tenant on the 19th floor (#1950) of this existing commercial building. Scope of work: Construct partition walls to create new offices, finishes, lighting, electrical and sprinkler work TENANT: Mathews, Dinsdale & Clarke LLP Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Note: Energy trigger not required BOMA BEST building. · $50,000
Mainland Office Environments Ltd Issued -
2020-01-06
#1860 - 18th floor Interior alterations to provide tenant improvements for a new office tenant on the 18th floor (#1860) in this existing commercial building on this site. Scope of work: construct one partition wall and door for a new office space including electrical work. TENANT: Novagold Resources Inc. OK for field review M. Lee, Nov 6, 2019 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016) · $7,000
Gibraltar Holdings Ltd Issued -
2019-05-14
#1110-11th floor Interior alterations to provide improvements for a new office tenant and to combine office units #1110 and #1120 (retaining #1110) on the 11th floor in this commercial building on this site. Scope of work: demolish demising wall, partition walls, millwork, doors, finishes, glazing, ceiling, card reader, power/communication construct new partition walls, doors, millwork, ceiling, lighting, finishes, card reader/electric strike, power/communication, convenience washroom, electrical, plumbing, mechanical and sprinkler work. OK for field review per City staff. · $800,000
no contractor listed Issued -
2019-04-11
#1500 - 15th and 16th floors Interior alterations to provide improvements for an existing full floor office tenant on the 15th and portion of 16th floors in this existing commercial building. Scope of work: new office and a new meeting room on level 15 and two (2) new office rooms on level 16. * Tenant occupies entire the 15th floors and a portion of the 16th floor and are connected by existing interconnecting stairs (BU456485). OK for field review as per City staff. No energy upgrade required. BOMA BESt building. · $67,000
Curve Construction Inc Issued -
2019-03-06
10th floor elevator lobby and corridors Interior alterations to provide improvements to the elevator lobby and common corridor on the 10th floor of this existing commercial Commerce place building. Scope of work: demolish/remove wall paneling/furring, flooring, lighting, tenant doors/frame and replace with new. Electrical and sprinkler work. Note: There are 2 units on this floor. Units are not reflected on plans as work is limited to the elevator lobby and corridor only. OK for field review as per City staff. No energy upgrade required. BOMA BESt building. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. · $110,000
Reotech Construction Ltd Issued -
2019-02-11
#1800 - 18th floor Interior alterations only to provide a full tenant fitout for a new General Office tenant on the 18th floor (#1800) in this existing commercial building on this site. Scope of work: construct interior partition walls, doors, glazing, millwork, finishes, ceiling work, electrical, plumbing, mechanical and sprinkler work. TENANT: Fidelity Investments Canada ULC. No energy upgrade required. BOMA BESt building. · $650,000
Taurus Renovations Ltd Issued -
2019-01-30
19th floor elevator lobby and corridors Interior alterations to provide improvements to the elevator lobby and common corridor on the 19th floor of this existing commercial building. Scope of work: demo/remove wall paneling/furring, flooring, lighting, tenant doors/frame and replace with new. Note: There are 2 units on this floor. Units are not reflected on plans as work is limited to the elevator lobby and corridor only. · $110,000
Reotech Construction Ltd Issued -
2019-01-30
16th floor elevator lobby and corridors Interior alterations to provide improvements to the elevator lobby and common corridor on the 16th floor of this existing commercial building. Scope of work: demo/remove wall paneling/furring, flooring, lighting, tenant doors/frame and replace with new. Note: There are 3 units on this floor. Units are not reflected on plans as work is limited to the elevator lobby and corridor only. · $110,000
Reotech Construction Ltd Issued -
2019-01-30
8th floor elevator lobby and corridors Interior alterations to provide improvements to the elevator lobby and common corridor on the 8th floor of this existing commercial building. Scope of work: demo/remove wall paneling/furring, flooring, lighting, tenant doors/frame and replace with new. Note: There are 3 units on this floor. Units are not reflected on plans as work is limited to the elevator lobby and corridor only. · $110,000
Reotech Construction Ltd Issued -
2018-11-28
#805-8th floor To permit interior alterations to provide tenant improvements to this existing office space on the 8th floor (#805) in this commercial building. Scope of work to include: removal of existing glass wall complete with door. Cut and form new door opening, install relocated door complete with latching hardware, new partition wall, add new desks, electrical work. TENANT: Elbar Enterprises Ltd. See related Special Sprinkler Inspection No. IA-2018-01707. OK for Field Review as per City staff.2018 No energy upgrade required. BOMA BESt building. · $15,000
Fusion Project Management Ltd Issued -
2018-07-16
18th Floor Lobby and Corridor Interior alterations to the lobby & corridor of the 18th floor of existing commercial building on this site. Okay for Field Review per City staff: BOMA BEST Building · $110,000
Reotech Construction Ltd Issued -
2018-06-18
17th floor Elevator Lobby and Public Corridor Interior alterations to provide upgrades to the elevator lobby and public corridors ONLY on the 17th floor of this commercial building. Scope of work; replacement of doors, flooring, wall finish, lighting, bulk head, RCP, electrical, & sprinkler alterations. · $110,000
Reotech Construction Ltd Issued -
2018-06-18
4th floor Elevator Lobby and Public Corridor Interior alterations to provide upgrades to the elevator lobby and public corridors ONLY on the 4th floor of this commercial building. Scope of work; replacement of doors, flooring, wall finish, lighting, bulk head, RCP, electrical, & sprinkler alterations. OK for field review as per City staff. · $110,000
Reotech Construction Ltd Issued -
2018-06-13
4th, 11th, 18th, 20th Floors, Common Washroom Interior alterations to provide improvements to the existing common washrooms on the 4th, 11th, 18th, and 20th floors of this existing commercial building. Scope of work: men's and ladies washroom upgrades consisting of flooring, walls, ceiling, lighting, plumbing and finishes. Revision #1: - Change the scope of work location to 4th, 11th, 18th and 20th floor - Original plans superseded by this revision /MT, September 26, 2018 Revision #2: · $300,000
no contractor listed Issued -
2018-05-09
11th floor - Lobby/Corridor Interior alterations to the lobby/corridor on the 11th floor of this existing office building Scope of work: demolish pot lights, doors, gypsum board ceiling, corridor flooring, glazing, provide new doors, ceiling, glazing, finishes, lighting, new HVAC and fire suppression, electrical, mechanical and sprinkler work. · $110,000
Reotech Construction Ltd Issued -
2018-02-14
#1050 - 10th floor Interior alterations in this existing office unit on the 10th floor (#1050) for a new office tenant in this existing commercial building. Scope of work: new glass partitions and doors to create two offices, ceiling work, electrical and sprinkler work. TENANT: Integra Resource Corp. OK for field review per City staff. Note: new demising wall constructed under BP-2017-04115 Energy Upgrade Exempt: BOMA BESt Building. · $35,000
Syncor Solutions Limited Issued -
2018-01-09
Repipe Interior alterations to provide domestic water repipe at this existing office building (400 Burrard Street) in conjunction with replacing the domestic waterpiping, including firestopping, and repairing walls and ceilings. · $350,000
no contractor listed Issued -
2017-12-18
#1800-18th floor Interior alterations to remove all non-load bearing partition walls to create a "shell" office space for unit #1800 on the 18th floor of this existing commercial building. Scope of work includes removal of doors, glazing, millwork, racking, flooring, power, voice and data lines, ceiling work, electrical and sprinkler work. · $12,000
applicant withheld (individual) Issued -
2017-11-23
#1910 - 19th floor Interior alterations only to provide improvements for a new general office tenant on the 19th floor (#1910) of this existing commercial building on this site. Scope of work: construct new partitions, millwork, finishes, ceiling work, install card reader, electrical, plumbing and mechanical. TENANT: Qualex-Landmark Inc. · $500,000
Reotech Construction Ltd Issued -
2017-10-30
#1030 - Interior alterations to this general office space in this existing commercial building. OK for Field Review per City staff. Note: new demising wall constructed under BP-2017-04115. Energy Upgrade Exempt: BOMA BESt Building. · $14,000
Epic Spaces Inc Issued -
2017-10-30
Unit #1030 & #1050 Interior alterations to a vacant office space at unit #1050 on the 10th floor of this existing commercial building. Scope of work includes a portion of unit #1030 expanding into unit #1050. No other work proposed for unit #1030. Separate Permits and ASHRAE will be required for #1030. OK for field review as per City staff: BOMA BESt Building. · $11,000
applicant withheld (individual) Issued -
2017-09-27
7th floor Interior alterations to an existing office space (approx. 1163 m2) on the 7th floor of this existing mixed-use commercial high-rise building. Notes: 1. All work is for interior only. 2. Any other work shall be on a separate permit. 3. Any changes leading to an increase in occupant load shall require further review of the VBBL. · $400,000
no contractor listed Issued -
2017-09-14
Interior alterations to replace existing domestic water fed AC unit with condensing water-fed AC units on the ground floor, 2nd, 3rd, 5th, 6th, 7th, and 12th floors of existing commercial building. OK for Field Review per City staff. Schedules submitted: · $260,000
no contractor listed Issued -
2017-07-27
#800 & #805 - 8th floor Interior alterations to provide improvements for this existing general office tenant space on the 8th floor by demising unit #800 into two units (to be #800 and #805) in this existing commercial building. Scope of work: construct a new demising partition to reduce the size of unit #800, and add a entry door to the new General Office space to be addressed as unit #805, Revision #1 - changes to the proposed demising wall. Nov 9/17 mk Separate permit(s) will be required for future tenant improvements. Note: Unit #800 has existing interconnecting stairs to the 9th floor (#900). Tenant: Elbar Entprises ltd. dba; Wolrige Mahon LLP OK for field review as per City staff. Selected energy upgrade: (BOMA Best Building) L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $20,000
Fusion Project Management Ltd Issued -
2017-07-11
#1800 and #1880-18th floor To demise existing General Office space (#1800) into two units: General Office in #1880 & General Office (vacant space) in #1800 ) only on the 18th floor of this existing commercial building. No interior alterations proposed. No lighting fixture changes proposed. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements in unit #1800 (vacant space). Address Note: Suite numbers to be posted by suite entry prior to final building inspection. OK for field review as per City staff: 1. Travel distance & interior layout are not changing from last approved Building Permit No. BU463294. 2. Energy checklist is not required as no alterations proposed as per City staff. 3. Special Sprinkler Inspection Permit not required as no alterations proposed as per City staff. · $5,000
applicant withheld (individual) Issued -
2017-06-07
To provide elevator upgrades to all elevators in this existing General Office (Group D) building on this site. This permit has been converted from PRISM. Related to BU456975
no contractor listed Issued -
2017-03-01
#1910 & #1920-19th floor Interior alterations only to provide base building demolition of all partitions, flooring, millwork, and the common demising partition between unit #1910 and #1920, and to remove an exit door and to infill the opening at unit #1920, and to retain unit #1910 for addressing at this existing commercial building. Scope of work to include electrical, plumbing and sprinkler work. Separate permit(s) and ASHRAE checklist required for any future tenant improvements to this space. Addressing Note: #1920 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #1910 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. Energy upgrade exempt: Interior demolition and demising wall. OK for SIPS processing as per City staff. · $17,000
applicant withheld (individual) Issued -
2017-02-21
#1950 - 19th floor Interior alterations to provide tenant improvements for a new General office tenant on the 19th floor (#1950) of this existing commercial building. Scope of work: Includes demolition of demising wall to expand #1950 into #1980 and construct/relocate new demising wall to expand into a portion of #1910. Demo partition walls/doors to create kitchen/server/copy room, electrical, plumbing, sprinkler work. * Unit#1980 to be removed from the building prior to final inspection. OK for field review as per City staff: BOMA BESt Building. · $40,000
All Spaces Project Management Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05