Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
3530 Cambie St, Vancouver
An address in Riley Park, Vancouver, zoned RM-3A (Residential). 3 building permits are on file, most recently “#2B - 3540 CAMBIE ST Interior alterations to provide residential improvement to an existi…” (issued 24 April 2026). The City's 2026 assessed value is $13,089,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150678, 591 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-04-24
#2B - 3540 CAMBIE ST Interior alterations to provide residential improvement to an existing dwelling unit at #2B - 3540 CAMBIE ST. on the second floor of this existing multiple dwelling building on the site. Okay for DTI per City staff · $60,000
applicant withheld (individual) Issued -
2026-03-13
3530 Cambie St Exterior alterations to reconfigure the roof deck on the penthouse level of this existing multiple dwelling building on this site. the scope is to remove the cover and reduce the deck size. Ok for Field Review by Jamie Z. on Feb 4, 2026 Note: (1) Contractor to have a valid Vancouver Business License or Inter-municipal Business License · $10,000
no contractor listed Issued -
2020-04-01
#205 Interior alterations to provide improvements to this residential unit in this existing multiple dwelling building on this site. Scope of work to include: Removing top 2'0" of drywall on the perimeter walls only in the bedroom and living room. Installing proper blocking/insulation/fire caulking on the top of the party wall between neighboring suites. Detail Submitted for Fire Stopping and Insulation based on review with Bram Cowan March.3.2020 Separation to meet 1 Hour Fire Separation based on the 2019 VBBL Also removing drywall around existing pipes in bedroom, add wrapping to pipes with proper insulation and re-install drywall OK For Field Review Per. B.Cowan & A.Campbell - March.3.2020 DBI to determine on site if additional detailing required before permit complete This building is not sprinklered. Energy Upgrade Exempted per City staff · $5,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Riley Park
5628 CAMBIE ST. Interior alterations to provide improvement to this existing Office (D) at 5628 Cambie St. on the first floor of this existing mixed-use building on the site. Okay for DTI per City staff · no contractor listed2026-11-05
#12 - 10 W 17TH AV - Building 3 Interior alterations to provide improvements to this TH #12 - 10 of this existing multiple dwelling building on this site Project scope: relocation of kitchen from level 3 to level 1, bedroom and bathroom reno Okay for DTI as per City staff · AMC Project Management Ltd2026-11-04
Interior alterations to renovate one of the dwelling units of this existing duplex. OK to process as DTI as per City staff · Diseno Development Corporation2026-11-03