Permit GopherAlberta and B.C. property, permit and zoning records

333 Seymour St, Vancouver

An address in Downtown, Vancouver, zoned CD-1 (164) (Comprehensive Development). 41 building permits are on file, most recently “#200 - Level 3 Interior alterations to provide improvement for a new tenant on this exist…” (issued 9 July 2026). The City's 2026 assessed value for the 2 accounts at this address is $86,352,000.

Zoning
CD-1 (164) · Comprehensive Development
Neighbourhood
Downtown
Permits on file
41
Assessed value (2026)
$86,352,000
2 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 333 Seymour St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153466, 693 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
693
Households
375
Median age
32.8
Median household income (2020)
$74,000
Own their home
39%
Vancouver: 45%
Average household size
1.7
Under 15
4%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-07-09 #200 - Level 3 Interior alterations to provide improvement for a new tenant on this existing office shell on the 3rd Level (#200) of this existing mixed-use building on site. Scope of work: Construct new office rooms, meeting room, reception, staff area, electrical, mechanical, plumbing and sprinkler work to suit. TENANT: Thinking Box Media · $2,200,000
    VANCOUVER CONSTRUCTION LTD
    Issued
  2. 2026-03-25 #1100 - 11th floor Interior alterations to demise unit #1100 into three (3) general office units and to provide tenant improvements for two (2) new office tenants on the 11th floor of this existing commercial building on this site. Scope of work: Demolition and construction of partition walls, doors and millwork, plumbing, electrical, mechanical and sprinkler work to suit. Separate TI required for office shell unit Ok for Field Review as per City staff · $940,000
    Atlas Construction Ltd
    Issued
  3. 2026-01-20 #1700 - 17th floor Interior alterations to remove all non load bearing partition walls in this existing full floor office space on the 17th floor (#1700) of this existing commercial building on this site. Scope of work; interior demolition to remove entire build out to create warm shell for future tenant. In accordance with VBBL 2025 · $200,000
    no contractor listed
    Issued
  4. 2026-01-20 #1600 - 16th floor Interior alterations to remove all non load bearing partition walls in this existing full floor office space on the 16th floor (#1600) of this existing commercial building on this site. Scope of work; interior demolition to remove entire build out to create warm shell for future tenant. In accordance with VBBL 2025 · $200,000
    no contractor listed
    Issued
  5. 2026-01-20 #1580 - 15th floor Interior alterations to remove all non load bearing partition walls in this existing full floor office space on the 15th floor (#1580) of this existing commercial building on this site. Scope of work; interior demolition to remove entire build out to create warm shell for future tenant. In accordance with VBBL 2025 Separate permit(s) required for future improvements to this space. · $200,000
    no contractor listed
    Issued
  6. 2025-10-08 Interior alterations to provide for the installation of four (4) new phone booths for this existing full floor General Office tenant on the 9th floor (#900) in this existing commercial building on this site. Ok for Field Review as per City staff A separate sprinkler permit is required for all related work · $50,000
    no contractor listed
    Issued
  7. 2023-10-27 #1280 - 12th Floor Interior alterations to provide tenant improvement to this new office tenant on the 12th floor (#1280) of this existing commercial building on site. Scope of work: Demolish select office partitions, plumbing fixtures, millwork, existing doors and carpet. New millwork, new partitions to suit new layout, electrical, plumbing and sprinkler work. TENANT: Lysander Capital Real Estate Ltd · $800,000
    no contractor listed
    Issued
  8. 2023-08-18 #1201 - 12th floor Interior alterations to provide improvements for a new office tenant on the 12th floor (#1201) of this existing commercial building. Scope of work: remove millwork, finishes, lighting. Install partition walls, doors, millwork, finishes. Electrical, Plumbing & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $80,000
    Atlas Construction Ltd
    Issued
  9. 2022-08-22 Voluntary upgrade Installation of maglocks on the entrance doors to the office areas of the 8th and 10th floors elevator lobbies in this existing high rise commercial building. Notes: 1. A single tenant occupies both of 8th and 10th floors 2. Permit is reviewed for conformance to VBBL 2019 · $25,000
    no contractor listed
    Issued
  10. 2022-07-05 #125 - 333 Seymour St Interior alterations to provide improvements for a new office (amenity space for building tenants) at this existing office (shell) unit on the ground floor of this commercial building on this site. Scope of work to include: new interior partition walls, ceiling, millwork/finishes, electrical/lighting, HVAC REVISION#1 - Sept 23/22 mk - revise existing demising wall location by removing and replacing part of the demising wall. - revise new entry door D1 to double glazed swing door with card access. - revised electrical lighting, emergency light layout, & power locations to suit new demising wall changes. - relocate convenient door R1 for adjacent tenant at 325 Seymour to existing existing stairwell 2. - Increase Project Value from $40,000.00 to $80,000.00. OK for Field Review per City staff · $80,000
    no contractor listed
    Issued
  11. 2022-05-20 Interior alterations to demise the existing restaurant shell space into two units 325 Seymour (restaurant) and #125 - 333 Seymour (office). Work to include first tenant improvements to 325 Seymour St while changing the use from Restaurant Shell to Restaurant (Group D, low occupancy A2 occupant load max. 30 persons as per Division B, 3.1.2.6) on the first floor of this existing commercial building on this site. Tenant: Deville Coffee · $250,000
    Blue Rock Construction Management Ltd
    Issued
  12. 2022-03-15 #900 - 9th floor (full floor tenant) Interior alterations to provide for the installation of four (4) new phone booths for this existing full floor General Office tenant on the 9th floor (#900) in this existing commercial building on this site. Tenant: WeWork · $15,000
    no contractor listed
    Issued
  13. 2022-03-15 #800 - 8th floor (full floor tenant) Interior alterations to provide for the installation of four (4) new phone booths for this existing full floor General Office tenant on the 8th floor (#800) in this existing commercial building on this site. Tenant: WeWork · $15,000
    no contractor listed
    Issued
  14. 2021-11-10 9th Floor (Unit #960 and #930) Interior alterations to provide tenant improvements for an existing full floor office tenant on the 9th floor in this existing commercial building on this site. · $128,874
    no contractor listed
    Issued
  15. 2021-10-05 An upgrade to the exterior cladding of the office tower (levels 03 – 17) through a replacement of the existing glazing system, and the application of a high-performance paint coating over the existing roof dome for this existing 19-storey highrise office building ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2019******** Notes: Reviewed during the 2019 Pandemic Crisis · $11,000,000
    Ledcor Construction Limited
    Issued
  16. 2020-07-24 Major vertical addition. Interior and exterior alterations and to provide additional floor area on the ground through third floor levels to this existing 19-storey highrise office building. - Level 1: increased floor area - Level 2: increased floor area (gym) - Level 3: increased floor area; change of occupancy (amenity space to office) all over 4 levels of existing underground parking accessed from West Cordova Street. The existing parking is connected to the underground parking at 601 West Hasting St. at Level P1. Access to to the 601 West Hastings parkade will be via 333 Seymour parking entrance. Refer to AL-2019-00071 and BP-2018-04746 for more details. Scope of work includes upgrade of the entire building over 5-year period (average 3 floors per year) in accordance with requirements of Part 11 of the VBBL 2014: - E5 - Lighting system to be upgraded to 9.4 of ASHRAE 90.1-2010 - N4 - Non- structural safety - A4 - Accessibility - deferred to Stage 3 Upgrades to meet requirements of F4 and S4 are covered under this permit. See Code Report by LMDG and report by RJC. 12-Nov-2019 - Stage 1 (structural, rough-in mechanical/plumbing and electrical only) issued. 24-July-2020 - Stage 2 (full construction except accessibility upgrade( A4) - ADO at Washrooms within the entire building). 12-Feb-2021 - Stage 3 ( A4 upgrading deferred to future tenant improvements as accepted by the CBO. Refer to LMDG Code Report Revised Dec. 15, 2020). Revision#1 - 17-July-2020 tn · $8,469,295
    no contractor listed
    Issued
  17. 2019-09-04 Exterior and interior alterations to demolish the exterior walls for levels 1 & 2 in this commercial building on this site. OK for field review per City staff Emma Gibson with Enviro-Vac (division of Paragon Remediation Group Ltd.) Energy upgrade exempt: partial demolition only. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to these spaces. · $384,369
    Elias Tkachuk Contracting Ltd
    Issued
  18. 2019-05-30 Levels 0, 1 & 2 Interior alterations to demolish partition walls at levels 0, 1 & 2 in this commercial building on this site. Scope of work: remove flooring, concrete stair/ramp, doors/frames, interior glazing/screens, walls, partitions, finishes, millwork, lockers, ceiling. · $115,500
    Elias Tkachuk Contracting Ltd
    Issued
  19. 2018-10-17 Removal of a portion of foundation wall and revisions to floor slabs at 3 parking levels for access into 601 West Hastings Street parking levels. 601 West Hastings BP number for reference is BP-2017-005853. Related Alternative Solution for the protection of openings providing connection to the new project at 601 W Hastings is under AL-2018-00140. No DP required as per City staff · $250,000
    no contractor listed
    Issued
  20. 2018-09-11 #1700-17th floor (full floor tenant) Interior alterations only to provide a new partition at the existing file room, thereby creating two (2) new office rooms at this existing General Office tenant at unit #1700 at this existing commercial Grant Thornton Place building. Scope of work: demolish partition wall, door and glazing, construct two partition walls to create two new offices, new doors, glazing, power/data, finishes, electrical work. TENANT: CapServCo Limited Partnership (Grant Thornton LLP) *Reception on 16th floor (#1600) OK for field review as per City staff. No energy upgrade required. BOMA BESt building. Related to Special Sprinkler Inspection No. IA-2018-01202. · $25,000
    Fusion Project Management Ltd
    Issued
  21. 2018-09-10 #700 - 7th floor (full floor tenant) Interior alterations to provide tenant improvements to the entire 7th (#700) floor shell space for a new general office tenant in this existing commercial building. Maximum occupant load is 200 as per letter dated August 27, 2018. *UPDATE: REVISION #1: See letter from MKThink dated December 10, 2018. Scope of work: Complete tenant fit-out. See related BP-2018-03604 for interior demolition of this floor. REVISION #1 - See new complete set of revised plans (now 31 pages) to show reduction in value of work from $1,000,000 to $750,000, new RCP (ASHRAE), all to reflect layout change/redesign. Refer to Operational Letter dated December 10, 2018 from MKThink (regarding occupancy calculations) and authorization letter dated December 7, 2018 from original applicant L. Schmidt. January 9, 2019 jm TENANT: WeWork (tenant occupies floors 4-10) · $1,000,000
    Unison Construction Management Ltd
    Issued
  22. 2018-09-10 #600 - 6th floor (full floor tenant) Interior alterations to provide tenant improvements to the entire 6th (#600) floor shell space for a new general office tenant in this existing commercial building. Maximum occupant load is 200 as per letter dated August 27, 2018. *UPDATE: REVISION #1: See letter from MKThink dated December 10, 2018. Scope of work: Complete tenant fit-out. See related BP-2018-03603 for interior demolition of this floor. REVISION #1 - See new complete set of revised plans (now 31 pages) to show reduction in value of work from $1,000,000 to $750,000, new RCP (ASHRAE), all to reflect layout change/redesign. Refer to Operational Letter dated December 10, 2018 from MKThink (regarding occupancy calculations) and authorization letter dated December 7, 2018 from original applicant L. Schmidt. January 9, 2019 jm TENANT: WeWork (tenant occupies floors 4-10) · $1,000,000
    Unison Construction Management Ltd
    Issued
  23. 2018-08-30 #400 - 4th floor (full floor tenant) Interior alterations to provide improvements for a new full floor office tenant on the 4th floor (#400) of this existing commercial building. Scope f work: complete tenant fit-out for new multi-floor tenant to shell space. TENANT: WeWork (multi-floor tenant) · $1,000,000
    Unison Construction Management Ltd
    Issued
  24. 2018-08-23 #1480 - 14th floor Interior alterations on the 14th floor to expand the existing office tenant in unit #1480 into the adjacent unit #1460 (retaining #1480) of this existing commercial building on this site. Scope of work: remove a demising wall, new partition, glazing, doors, millwork, RCP, finishes, plumbing, electrical, sprinkler work. Address Note: #1460 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #1480 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: Wider Funnel Marketing Inc. OK for field review per City staffbuilding. · $75,000
    Epic Spaces Inc
    Issued
  25. 2018-08-22 #1000 - 10th floor (full floor) Interior alterations to provide tenant improvements for a new full floor office tenant on the 10th floor (#1000) of this existing commercial building. Maximum occupant load is 200 as per letter dated August 27, 2018. Scope of work: demolish/construct partitions, doors, upgrade common washrooms new staff pantry, doors, finishes, millwork, card reader, electrical, mechanical, plumbing and sprinkler work. REVISION #1: - revise occupant load: Maximum occupant load is 200 as per letter dated August 27, 2018. - add to TENANT: WeWork "tenant occupies floors 4-10" Sept.6/18 jm TENANT: WeWork (tenant occupies floors 4-10) · $700,000
    Canadian Turner Construction Company Ltd
    Issued
  26. 2018-08-15 #700 - 7th floor (full floor) Interior alterations to demolish non load bearing partition walls to return to shell space on the 7th floor (#700) of this existing office building. Scope of work: demolish demising wall, partition walls, doors, finishes, lighting, re-work mechanical and electrical, plumbing, mechanical and sprinkler work. OK for Field Review per City staff · $166,666
    no contractor listed
    Issued
  27. 2018-08-15 #600 - 6th floor (full floor) Interior alterations to demolish non load bearing partition walls on the to return to shell space on 6th floor (#600) of this existing office building. Scope of work: demolish all partition walls, doors, finishes, lighting, re-work mechanical and electrical, plumbing, mechanical and sprinkler work. · $166,667
    no contractor listed
    Issued
  28. 2018-08-15 #400 - 4th floor (full floor) Interior alterations to demolish non load bearing partition walls to return to shell space on the 4th floor (#400) of this existing office building. Scope of work: demolish partition walls, doors, finishes, lighting, re-work mechanical and electrical, plumbing, mechanical and sprinkler work. Install new corridor wall on the 4th floor elevator lobby. OK for Field Review per City staff · $166,667
    no contractor listed
    Issued
  29. 2018-08-15 #1210-12th floor Interior alterations to provide improvements for a new office tenant at office unit #1210 on the 12th floor of this existing commercial building on this site. Scope of work: demolish all interior walls, remove/relocate doors and glazing, construct new partition walls, new millwork, ceiling, lighting, finishes, electrical, mechanical, plumbing and sprinkler work for new tenant layout including a room for a show suite. OK for field review per City staff. · $405,000
    no contractor listed
    Issued
  30. 2018-08-10 #500-5th floor (full floor tenant) Interior alterations for interior demolition and tenant improvements for a new full floor office tenant which will occupy all 4 suites on the 5th floor of this existing commercial building. Maximum occupant load is 200 as per letter dated August 27, 2018. *UPDATE: REVISION #1: See letter from MKThink dated December 10, 2018. Scope of work: interior demolition of all partitions and demising walls and construct new demising walls and new partitions for new layout of the 5th floor. Work includes new convenience washroom, updates to common washrooms, new millwork and finishes, card reader, electrical, plumbing, mechanical and sprinkler work. REVISION #1: - revise occupant load: Maximum occupant load is 200 as per letter dated August 27, 2018. - add to TENANT: WeWork "tenant occupies floors 4-10" Sept.6/18 jm Address Note: Suite numbers to be posted by suite entry prior to final building inspection. REVISION #2 - See new complete set of revised plans (now 33 pages) to show reduction in value of work from $1,000,000 to $750,000, new RCP (ASHRAE), all to reflect layout change/redesign. Demising walls removed and #500 is assigned to this full floor suite now. Refer to Operational Letter dated December 10, 2018 from MKThink (regarding occupancy calculations) and authorization letter dated December 7, 2018 from original applicant L. Schmidt. January 15, 2019 jm TENANT: WeWork (tenant occupies floors 4-10) · $700,000
    Canadian Turner Construction Company Ltd
    Issued
  31. 2018-07-05 #1580 - 15th floor Interior alterations for this existing office tenant in unit #1580 on the 15th floor to expand into #1550 (retaining #1580) and to provide improvements to become a full floor office tenant in this existing commercial building on this site. OK for field review per City staff. Note: No energy trigger required; BOMA BESt building · $30,000
    Fusion Project Management Ltd
    Issued
  32. 2018-06-04 #930 & #960-9th floor Interior alterations to provide tenant improvements for a new full floor office tenant on the 9th floor (#930 & #960) in this existing commercial building on this site. Maximum occupant load is 200 as per letter dated August 27, 2018. Scope of work: demolish/construct partitions, new demising walls, doors, sinks/toilets, upgrade finishes in common washrooms and construct partition walls to create new offices, doors, finishes, millwork, card reader, electrical, mechanical, plumbing and sprinkler work. Revision #1-Mark ups to show change in occupant load, revised pages to identify cross-over floors, interior changes including card readers, ceiling work, washroom reconfiguration, light fixtures, doors, wall assembly. No changes to ASHRAE. Refer to CRP Narrative dated August 13, 2018 for details. September 11, 2018 jm Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to these units. TENANT: WeWork (tenant occupies floors 4-10) · $1,002,000
    Unison Construction Management Ltd
    Issued
  33. 2018-05-28 #800 - 8th floor (full floor tenant) Interior alterations to provide tenant improvements for a new office tenant on the 8th floor (#800) in this existing commercial building on this site. Scope of work: demolish/construct partitions, doors, upgrade finishes in common washrooms and construct partition walls to create new offices/staff pantry, doors, finishes, millwork, card reader, electrical, mechanical, plumbing and sprinkler work. See BU467701 for interior demolition of this floor. TENANT: WeWork (occupies floors 4-10) REVISION #1: Revise occupant load: Maximum occupant load is 200 as per letter dated August 27, 2018. Identify crossover floors and interior changes including card readers, elevator lobby doors, ceiling work, appliance and lighting fixtures, door hardware. No change to ASHRAE. Refer to CRP Narrative dated Aug 13, 2018 for details. Sept 11, 2018 mh · $1,002,000
    Unison Construction Management Ltd
    Issued
  34. 2018-05-28 608 W Cordova Interior alterations to provide improvements for a new office tenant in this office (shell) at 608 W Cordova on the ground floor of this existing commercial building on this site. Scope of work is to include partial demolition of existing partitions and to build new partitions. Change of use approved under DP-2017-00793, 2 Oct 2017 OK for field review per City staff. Note: No Energy trigger required BOMA BEST building Revision #1- Storage room *Revise suite layout *Revise storage room and area *Reconfigure non-loadbearing partitions *Revise lighting layout *Submit ASHARE (L2 - Lighting upgrade to incorporate automatic lighting shutoff per (9.4.1.1 of ASHARE 90.1 - 2010) and Lighting Compliance · $70,000
    Mercury Contracting Ltd
    Issued
  35. 2018-02-14 Exterior alterations to replace the walkway opening with a glazed wall on the south elevation of this commercial building on this site. OK for DB per City staffanuary 5, 2018. · $30,000
    Ledcor Construction Limited
    Issued
  36. 2017-11-10 Exterior alteration: Exterior alterations to add approx. 421 sf for a mechanical platform to the rear. Note: Related to DP-2017-00793 1) Separate permit is required for the Tenant improvements and the Change of major occupancy of 608 W Cordova St. from Retail Store to General Office. CRP: PJ Mallen, [contact removed]. Note: "This permit has been reviewed under the 2014 Vancouver Building By-law (#10908)." · $50,000
    no contractor listed
    Issued
  37. 2017-11-06 #1450 Interior alterations to provide improvements to this unit in this existing commercial building on this site. Scope of work includes adding a partition wall to separate the existing storage room into one storage room and one meeting room. OK for field review as per City staff: Exempt - BOMA Best · $15,000
    Altek Construction Ltd
    Issued
  38. 2017-06-19 #1480 - 14th floor Interior alterations to provide improvements for a new office tenant on the 14th floor (#1480) of this commercial building on this site. Scope of work: demo and construction of partition walls to create new meeting room and create open kitchen/lounge. Reuse existing lighting, no relocation of plumbing, no changes to ceiling. OK for field review per City staff. Energy trigger chosen; Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $155,000
    Epic Spaces Inc
    Issued
  39. 2017-03-30 #1100 Interior alterations to provide improvements for a new office tenant (#1100) on the 11th floor of this existing commercial building. Energy Upgrade Exempt: BOMA BESt Building. · $40,000
    Pacific One Contracting
    Issued
  40. 2017-03-23 Elevator Upgrade. Interior alterations to provide elevator recall upgrade for elevators 2-5 in this existing mixed use commercial building on this site. Scope of work does not include upgrades to service elevator 1. Related to EP-2017-00158 . · $1,060,000
    no contractor listed
    Issued
  41. 2017-01-11 Interior Alteration - to install a security gate and infill panels to exit stairwell at third floor, to prevent unauthorized access to floors above third floor in this existing office building on the site. The gate and infill panels will be constructed with perforated sheet metal and steel frame. Panic hardware will be provided. · $18,000
    Altek Construction Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.