Permit GopherAlberta and B.C. property, permit and zoning records

332 Water St, Vancouver

An address in Downtown, Vancouver, zoned HA-2 (Historical Area). 5 building permits are on file, most recently “#230- 332 Water Street Interior alterations to provide tenant improvements and a change o…” (issued 26 August 2026). The City's 2026 assessed value is $13,864,000.

Zoning
HA-2 · Historical Area
Neighbourhood
Downtown
Permits on file
5
Assessed value (2026)
$13,864,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 332 Water St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154182, 1,139 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,139
Households
700
Median age
34
Median household income (2020)
$93,000
Own their home
26%
Vancouver: 45%
Average household size
1.8
Under 15
9%
65 and over
4%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-08-26 #230- 332 Water Street Interior alterations to provide tenant improvements and a change of use from Retail Store in conjunction with a 'similar to' Beauty Salon to a Retail Store- group E for a new tenant on the 1st storey at this existing Municipally Designated Heritage 'M' commercial building. Okay for Field Review as per City staff · $15,000
    no contractor listed
    Issued
  2. 2023-10-20 Unit #140 - 332 water St Alteration to existing unit in commercial building to change use to fitness centre class 1. No renovations proposed, change of major occupancy from F2 to D (per VBBL 3.1.2.6). DBI to determine if any upgrades are required. Ok for field review per City staff · $10,000
    no contractor listed
    Issued
  3. 2022-08-25 #130 & #135 Interior alterations to provide improvements and to divide the office unit #130 into two units and to change the use of unit #135 from office to retail in this existing commercial building. Ok for field review as per City staff. Addressing Note: Basement - #130 & #135 #130 has divided into 2 units, #135 has been assigned to the newly created space and #130 retained for the remainder space. #130 & #135 are to be posted as shown on the approved plans & clearly visible from the suite entry prior to final inspection. · $5,000
    no contractor listed
    Issued
  4. 2021-06-04 Interior alterations only and a change of use from the existing Retail Store to a new Retail Store use inconjunction with a 351 sq.ft. 'similar to' Beauty Salon use providing piercing and cosmetic tattoo services at unit #230 (1st storey) at this existing Municipally Designated Heritage 'M' commercial building. Tenant: Michelle Livingston - 1111552 BC LTD. - DBA. Arcane Body Arts Interior. OK for field review processing as per City staff. SP required per City staff(per City staff.7.2.3.2 of ASHRAE 90.1-2016) · $100,000
    Lower Coast Building Group Inc
    Issued
  5. 2019-07-16 Unit #230 Interior alterations to provide partition walls and shelving units for new retail tenant in this existing commercial building. Ok for field review per City staff: L2 - HVAC - clean and balance all air systems (per City staff.7.2.3.2 of ASHRAE 90.1-2010) · $55,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

347 W Pender St
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc
2026-10-30
180 Keefer St
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd
2026-10-30
885 W Georgia St
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.