325 Howe St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 8 building permits are on file, most recently “#604 - 6th Floor (#608, #609, #605) Interior alterations to combine 4 suites (#604, #605,…” (issued 17 April 2025). The City's 2026 assessed value is $12,524,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
8
Assessed value (2026)
$12,524,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 325 Howe St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153466, 693 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
693
Households
375
Median age
32.8
Median household income (2020)
$74,000
Own their home
39%
Vancouver: 45%
Average household size
1.7
Under 15
4%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-04-17 #604 - 6th Floor (#608, #609, #605) Interior alterations to combine 4 suites (#604, #605, #608, #609) and to re-demise the unit into 2 suites in this existing commercial building on site. Scope of work: Demolish the demising wall within units AND re-construct a new demising wall to create 2 new suites (#604 and #608). REVISION #1: Interior layout changes to include combining unit 608 and unit 610 (retaining #608). Increase in project cost of $5,000. - June 10/25 - LLL · $137,000
    SEAFORTH CONSTRUCTION LTD
    Issued
  2. 2024-11-20 Interior alterations and to change the major occupancy from Retail to Restaurant Class 1 (Group D under Article 3.1.2.6) for a bagel shop in this unit on the ground floor of this existing commercial building on this site. Total occupants will be 20 with patrons of 17 and staff of 3. One class 5 cooking. Note: 1.0.\tApplication is reviewed under VBBL 2019 2.0.\tChange of major occupancy of small suite and minor renovation are category of works and upgrading triggers are F1, S2, N1 and A2. 3.0. Occupant load is restricted by available public washrooms on ground level which is shared by other tenants on the floor. · $80,000
    Century Cabinet & Counter Tops Ltd
    Issued
  3. 2023-06-07 Interior alterations to provide tenant improvements to this existing retail space for a new tenant on the ground floor. · $29,000
    no contractor listed
    Issued
  4. 2022-03-16 #601 - 6th Floor (combining #601 & #603) Interior alterations to provide tenant improvement to an existing office tenant on the 6th floor (#601) to expand into an adjacent unit (#603) retaining #601 in this existing commercial building on the site. This permit is to legalized the work that was done by the previous owner. Scope of work: removing demising walls to combine units #601 & #603. Remove and construct partition walls for new layout, new doors and electrical work. CF-2021-016651 OK for Field Review per City stafflding inspector to determine on site if a separate sprinkler permit is required. E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $37,000
    SEAFORTH CONSTRUCTION LTD
    Issued
  5. 2022-03-16 #101 &102 - 1st floor Interior alterations to expand unit #101 to the existing office unit #102 and provide tenant improvements to unit #101 for a health care office tenant on the 1st floor of this existing commercial building. E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016) OK for field review as per City staff · $25,000
    SEAFORTH CONSTRUCTION LTD
    Issued
  6. 2020-03-11 Ground Floor - Common Washrooms Interior alterations to validate the common washrooms on the ground floor in this existing commercial building on this site. Scope of work includes : per the 2019 VBBL to remove doors, construct new partition walls and doors, new washrooms, finishes and electrical and plumbing work. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff NOTE: Fire-rated wall assembly upgrade at recycle room may be required by District Building Inspector - to be determined on site. · $9,000
    no contractor listed
    Issued
  7. 2018-03-06 Interior alterations to change of use from Dry Cleaning to Art Gallery Store ( Retail store) on the ground floor. Scope of work includes the installations of a 8'-0" height partition wall and new lighting fixtures. OK for field review as per City staff Jan. 11/18 Relate to Permit IA-2018-00096 Note: energy Upgrade - L2-Lighting-upgrade to incorporate automatic lighting shutoff (per City staff.4.1.1 of ASHARE 90.1-2010) · $15,000
    Western Wood Development Ltd
    Issued
  8. 2017-02-01 Interior alteration to change of use from general office to fitness centre in Level B1 - Unit 102 and Level B2 - unit 201 in this existing commercial building · $1,500
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

347 W Pender St
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc
2026-10-30
180 Keefer St
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd
2026-10-30
885 W Georgia St
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.