Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
268 W King Edward Av, Vancouver
An address in Riley Park, Vancouver, zoned CD-1 (691) (Comprehensive Development). 6 building permits are on file, most recently “To construct a 4 storey multiple dwelling building ( Building 1 -North Building) consisti…” (issued 6 July 2018). The City's 2026 assessed value is $35,464,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153251, 877 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2018-07-06
To construct a 4 storey multiple dwelling building ( Building 1 -North Building) consisting of 45 secured market rental dwelling units all over 1 level of underground parking, having vehicular access from the lane on this site. Related to BP-2017-05508 (Site permit). Full Construction issued on July 6, 2018 .
Etro Construction Limited Issued -
2018-07-05
To construct a 2 storey building along the lane (Building 3 - southeast corner of this site), consisting of 4 secured market rental dwelling units all over 1 level of underground parking, having vehicular access from the lane on this site. Related to BP-2017-05508 (Site Permit). 05-July-2018 - Full Construction issued.
Etro Construction Limited Issued -
2018-07-05
To construct a 2 storey building along the lane ( Building 2 - Southwest Building), consisting of 2 market rental dwelling units all over 1 level of underground parking, having vehicular access from the lane on this site. Related to BP-2017-05508 (Site Permit). 05-July-2018 - Full Construction issued.
Etro Construction Limited Issued -
2018-05-08
This permit has been issued for the site work, retaining walls, and below grade facilities for the proposed development: To construct a 4 storey rental apartment building (Building 1) in addition to two 2-storey rental townhouse buildings ( Building 2 & Building 3) facing the lane all over 1 level of underground parking. The entire development is consisting of 51 secured market rental dwelling units. NOTE: All fees for the entire development on this site applied against this permit. Related to: BP-2018-01315 - Building 1 - 45 dwelling units BP-2018-01092 - Building 2 - 2 dwelling units BP-2018-01093 - Building 3 - 4 dwelling units 08-May-2018 - Stage 1 - (excavation and shoring) issued. 05-July -2018 -Stage 2 - (full construction) issued. · $8,600,000
Etro Construction Limited Issued -
2018-05-07
To demolish this existing one-family dwelling ($20,000). Note: 1) 75% of the demolition material must be recycled. 2) The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit · $20,000
MWL Demolition Ltd Issued -
2018-03-23
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing single family dwelling building. QP is Ramin Hamidnejad of Kinetic OHS Services Ltd., [contact removed]
MWL Demolition Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Riley Park
5628 CAMBIE ST. Interior alterations to provide improvement to this existing Office (D) at 5628 Cambie St. on the first floor of this existing mixed-use building on the site. Okay for DTI per City staff · no contractor listed2026-11-05
#12 - 10 W 17TH AV - Building 3 Interior alterations to provide improvements to this TH #12 - 10 of this existing multiple dwelling building on this site Project scope: relocation of kitchen from level 3 to level 1, bedroom and bathroom reno Okay for DTI as per City staff · AMC Project Management Ltd2026-11-04
Interior alterations to renovate one of the dwelling units of this existing duplex. OK to process as DTI as per City staff · Diseno Development Corporation2026-11-03