Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
227 W 18th Av, Vancouver
An address in Riley Park, Vancouver, zoned R1-1 (Residential Inclusive). 4 building permits are on file, most recently “To construct a 2 storey laneway house building ($414,000.00) with an attached garage, and…” (issued 5 December 2024). The City's 2026 assessed value is $4,464,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150679, 419 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2024-12-05
To construct a 2 storey laneway house building ($414,000.00) with an attached garage, and 1 open parking pad providing a total of 3 parking spaces, having vehicular access from the lane. Note: The entire building, INCLUDING THE ATTACHED GARAGE, to be sprinklered to NFPA 13D (Rev.#1 - KT) 1.\tCovenant registered at the Land Title Office under CB1671863 2.\tNo Strata Titling permitted · $414,000
Maplewest Homes Ltd Issued -
2024-12-05
To construct a 2 storey single detached house ($1,021,000.00) with an open parking pad, at the rear providing 1 parking space, having vehicular access from the lane. Note: This is a 2 storey building pursuant to the Zoning and Development By-Law 1- Bar/Sink proposed in Ext. Kitchen 2- External Mechanical unit proposed · $1,021,000
Maplewest Homes Ltd Issued -
2024-12-03
To demolish the existing duplex building ($40,000) on this site by means of deconstruction. Demo Declaration – Bhullar Excavating and Demolition This permit is subject to the Green Demolition Bylaw (11023) Pre-1950: Green Demolition Conditions Apply 75% Recycling Rate of Building Materials Required ***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.*** · $40,000
Bhullar Excavating and Demolition Issued -
2024-09-25
Salvage and abatement permit only for DB-2024-03222 and to be completed under the supervision of a registered professional. This permit does not authorize demolition, deconstruction or construction work. QP: Ramin Hamidnejad of Kinetic OHS Services Ltd. ***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Bhullar Excavating and Demolition Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Riley Park
5628 CAMBIE ST. Interior alterations to provide improvement to this existing Office (D) at 5628 Cambie St. on the first floor of this existing mixed-use building on the site. Okay for DTI per City staff · no contractor listed2026-11-05
#12 - 10 W 17TH AV - Building 3 Interior alterations to provide improvements to this TH #12 - 10 of this existing multiple dwelling building on this site Project scope: relocation of kitchen from level 3 to level 1, bedroom and bathroom reno Okay for DTI as per City staff · AMC Project Management Ltd2026-11-04
Interior alterations to renovate one of the dwelling units of this existing duplex. OK to process as DTI as per City staff · Diseno Development Corporation2026-11-03