Permit GopherAlberta and B.C. property, permit and zoning records

200 Nelson St, Vancouver

An address in Downtown, Vancouver, zoned HA-3 (Historical Area). 10 building permits are on file, most recently “Interior alterations only and a change of use from the existing School - Business to a ne…” (issued 31 January 2024). The City's 2026 assessed value is $27,307,700.

Zoning
HA-3 · Historical Area
Neighbourhood
Downtown
Permits on file
10
Assessed value (2026)
$27,307,700
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 200 Nelson St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153470, 853 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
853
Households
315
Median age
46.8
Median household income (2020)
$113,000
Own their home
64%
Vancouver: 45%
Average household size
2.2
Under 15
12%
65 and over
25%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2024-01-31 Interior alterations only and a change of use from the existing School - Business to a new School - Vocational DBA: New Image College in Unit 100 - Nelson Street at this existing Commercial Building. OK for Direct To Inspections processing as per City staff4. · $25,000
    no contractor listed
    Issued
  2. 2023-08-18 1003 Cambie - 2nd floor Interior alterations to provide improvements and change of use from General Office to Beauty and Wellness on the 2nd floor of 1003 Cambie street of this existing mixed-use building on this site. Scope of work: new plumbing, and validate walls and doors removal. New Tenant: AX Art Atelier OK for field review - C Yue June 13/23 Notes: - This building is sprinklered. DBI to determine on site if a sprinkler permit is required. · $9,500
    applicant withheld (individual)
    Issued
  3. 2021-11-30 1003 Cambie - 2nd floor Interior alterations to provide improvements for this existing office tenant on the 2nd floor of 1003 Cambie street portion of this existing mixed-use commercial & residential building on this site. Scope of work: Modification to lighting, update layout including removing and building partitions, sprinkler modification to suit new layout. OK for field review per City staff: DBI to determine onsite if Sprinkler Permit is required. Required per City staff · $24,387
    Gibraltar Holdings Ltd
    Issued
  4. 2021-02-17 Interior alterations to change of use from office to Health Care Office in this unit on the 2nd floor of in this existing commercial building on this site. OK for field review as per City staff: 1. Energy upgrade trigger: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) 2. Sprinkler permit required · $15,000
    applicant withheld (individual)
    Issued
  5. 2019-05-01 1011 Cambie Street To change use from School of Self Improvements to Beauty and Wellness (D) (Microblading) and to provide tenant improvements in this existing mixed use building. Scope of work to include: New hand sink added, new flooring and paint throughout. Updating lighting with High efficiency lighting. OK For Field Review as per. A.Campbell - April.2.2019 Selected Energy Upgrade: L2 - Lighting - L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $2,500
    Ankon Plumbing & Heating Ltd
    Issued
  6. 2019-03-19 Building Permit for DP-2018-01058 To expand the existing Elementary School (Group A2) into the existing subleased general office area at 1035 Cambie Street in this existing mixed use building. Maximum Occupant Load is 60 persons (55 students + 5 staff) as approved under DP-2018-01058. Refer to BP-2016-04665 for original change of major occupancy and upgrading work. · $10,000
    no contractor listed
    Issued
  7. 2017-09-05 1011 Cambie St Interior alterations to demolish interior partitions in this existing self-improvement school on the second floor to provide for new tenant in this existing commercial building. OK for field review per City staffre tenant improvement works. · $15,000
    Gibraltar Holdings Ltd
    Issued
  8. 2017-04-13 Exterior alterations only for building envelope repair to the existing mixed-use building on this site and legalize WWOP work. Repairs proposed on east side of two commercial units on the first and second floor (1017-1019 & 1041-1043 Cambie St) and two residential units (Unit #2 & #5) on the third floor for wall rehabilitation including new rainscreen stucco wall system at infill exterior walls, replacing a window with a French door at Unit #2 balcony, and new balcony guardrails at the residential units. All new windows and doors to be no larger than the eixsting unprotected opening dimensions at site. No electrical work proposed. OK for BP only as per City staff. · $125,000
    Allstar Waterproofing And Restoration Systems Ltd
    Issued
  9. 2017-03-07 Interior alterations to this existing office space and to change the use from general office (D) to assembly (elementary school A2) with a subleased area being used as general office (computer programming). Occupant load of school not to exceed 30 students as per DP-2016-00384. Revision #1 - accepted Mar.7/17 - is related to M/A DP-2017-00417 · $150,000
    Counterpoint Interiors Inc
    Issued
  10. 2017-02-22 Interior alterations for a new beauty and wellness centre (esthecian) in this existing tanning salon space. OK for Field Review per City staff. Selected Energy Upgrade: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems. · $25,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

347 W Pender St
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc
2026-10-30
180 Keefer St
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd
2026-10-30
885 W Georgia St
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.