Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
123 Keefer St, Vancouver
An address in Downtown, Vancouver, zoned HA-1A (Historical Area). 1 building permit is on file, most recently “To construct a 10-storey (9 levels Z&D) hotel consisting 1st storey - 1 CRU (shell only),…” (issued 14 November 2023). The City's 2026 assessed value for the 66 accounts at this address is $19,464,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153585, 1,256 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2023-11-14
To construct a 10-storey (9 levels Z&D) hotel consisting 1st storey - 1 CRU (shell only), neighbourhood public house, hotel lobby, garbage room and loading bay, 2nd storey - indoor amenity space and hotel dwelling units, 3rd to 10th storeys - Hotel dwelling units, and outdoor amenity at roof level, all over one basement level of service rooms, storage rooms, and hotel back of house. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511) with amendments effective on July 14, 2021. Notes: 1. Building to be sprinklered to NFPA 13 requirements. 2. The building is within the designated floodplain area. 3. Radio Antenna System to be installed in this building. 4. Pre-shaft: Only one 2-hr-rated vertical shaft with a duct is provided in the building for the neighbourhood public house on the ground floor. STAGED CONSTRUCTION Stage 1 - Excavation and Shoring - issued Nov. 14, 2022 Stage 2 - Foundation up to Grade - issued Dec. 20, 2023 Revision 1 - Change of CP, from Mark Roozbahani to Michael Ferber, effective December 22, 2023 - issued Jan. 12, 2024 Stage 3 - Full Construction, excluding commercial kitchen exhaust duct and shaft - issued May 10, 2024 · $14,710,421
applicant withheld (individual) Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc2026-10-30
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd2026-10-30
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.2026-10-30