Permit GopherAlberta and B.C. property, permit and zoning records

1188 W Georgia St, Vancouver

An address in West End, Vancouver, zoned DD (Comprehensive Development). 57 building permits are on file, most recently “Exterior alterations for envelope repair to this existing high-rise commercial building o…” (issued 19 May 2026). The City's 2026 assessed value is $76,923,000.

Zoning
DD · Comprehensive Development
Neighbourhood
West End
Permits on file
57
Assessed value (2026)
$76,923,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1188 W Georgia St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153483, 869 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
869
Households
375
Median age
41.2
Median household income (2020)
$73,000
Own their home
47%
Vancouver: 45%
Average household size
1.7
Under 15
6%
65 and over
14%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-05-19 Exterior alterations for envelope repair to this existing high-rise commercial building on this site. Scope of work includes: 1. Replace waterproofing membrane on the suspended slab over the parkade 2. Removal and replace existing finishes Notes: 1. OK for exterior alteration per City staff. OK for DB per City staff. Exterior work only. No interior or electrical work proposed. · $500,000
    no contractor listed
    Issued
  2. 2026-04-15 #1920 - 19th Floor Interior alterations to provide tenant improvements to this new office tenant on the 19th floor (#1920) of this existing highrise commercial building on site. Scope of work: Construct new partitions to create 2 enclosed offices in an existing open space area, increase the size of the server room, relocate millwork in new location, electrical, mechanical and sprinkler work to suit. TENANT: Latin Metals Inc Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $49,000
    Central West Project Management Inc.
    Issued
  3. 2026-03-02 #1910 - 19th Floor Interior alterations to provide tenant improvements to this existing office space on the 19th floor (#1910) of this existing highrise commercial building on site. Scope of work: Selective demo, construct new partitions, glazing, new millwork location, new exit sign electrical, mechanical, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $172,000
    Syncor Solutions Limited
    Issued
  4. 2025-07-22 Interior alterations to provide improvements to 15th floor corridor in this existing commercial building. Scope of work includes flooring, ceiling and wall finishes. OK for field review as per City staff · $140,000
    Corview Construction Ltd
    Issued
  5. 2025-05-23 #1920 - 19th Floor Interior alterations to provide tenant improvements to this existing office space on the 19th floor (#1920) of this existing highrise commercial building on site. Scope of work: Selective demo of partition walls. Construct new offices, boardroom, glazing and staff room. Electrical, mechanical/plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $225,000
    no contractor listed
    Issued
  6. 2025-01-09 #660 & #650 - 6th Floor (to expand) Interior alterations to this existing office space on the 6th floor, to expand #650 to suite #660 (retaining #650) and provide landlord improvement to suite #660 only in this existing commercial building. Scope of work: Remove the demising wall between 2 suites (#650 and #660), select demo of interior walls, new sliding/glass doors and walls to create new offices. Electrical and sprinkler work to suit. TENANT: Scion Law Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $150,000
    BC Coastal Projects Ltd.
    Issued
  7. 2024-10-21 #1440 - 14th Floor Interior alterations to provide tenant improvement to this existing general office on the 14th floor (#1440) of this existing commercial building on site. Scope of work: Demolish all existing partitions for new layout, electrical, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
    Corview Construction Ltd
    Issued
  8. 2024-08-01 1188 West Georgia Street, Vancouver Interior alterations to provide tenant improvement for an existing office tenant on the 11th floor (#1180) in this existing commercial building on the site. Scope of work: construct new partition walls, glazing, finishes, millwork, lighting, electrical, plumbing and sprinkler work. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work OK for Field Review for Office TI as per City staff · $25,000
    Syncor Solutions Limited
    Issued
  9. 2024-06-05 16th floor - Elevator lobby and corridor Interior alterations to provide improvements to the elevator lobby and corridors on the 16th floor of this existing commercial building on this site. Scope of work: update existing finishes including new lighting, wall finishes, flooring and ceiling. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
    Corview Construction Ltd
    Issued
  10. 2024-05-03 #1805 and #1810 - 18th floor (demised from #1805) Interior alterations to provide improvements to this existing office space on the 18th floor (#1805 ) to be demised into two units to be #1805 & #1810 in this existing commercial building on this site. Scope of work; select demo of partition walls, doors/frames and to construct a demising wall to divide #1805 into two units, new entrance doors, and partition walls to reconfigure layout to both units. Revision #1 - Selected walls, doors, light switches to remain as it. May23/24 mk · $80,000
    VPAC Construction Group Ltd
    Issued
  11. 2024-03-18 #1410 - 14th floor Interior alteration to provide improvements for a new office tenant on the 14th floor (#1410) of this existing commercial building on this site. Scope of work: demo all interior to shell and construct new walls, doors/frames, millwork, new kitchen & finishes throughout for new layout. Electrical, mechanical/plumbing, sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $146,000
    no contractor listed
    Issued
  12. 2024-03-12 #1830 & #1805- 18th floor (#1830 expanding into a portion of #1805 Interior alterations to the 18th floor to expand the existing office tenant space for #1830 into a portion of #1805 of this existing commercial building. Scope of work: remove and construct a demising wall. Create a new opening into the corridor and add a door. Turn one existing partition wall on the adjacent side of #1805 into a demising wall. District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $66,000
    VPAC Construction Group Ltd
    Issued
  13. 2023-12-06 #1060- 10th floor Interior alterations to provide improvements to an existing vacant office space to prepare for leasing, on the 10th floor (#1060) of this existing commercial building. Scope of work: Select demo of partition walls & doors to alter layout and install new kitchen. Electrical, Plumbing, & sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $120,000
    Corview Construction Ltd
    Issued
  14. 2023-11-23 #1260 - 12th floor Interior alterations to provide tenant improvements to this existing general office on the 12th floor (#1260) of this existing commercial building on site. Scope of work: Demo/construct partition walls, doors, glazing, flooring. Add new suite entrance, electrical, plumbing and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $90,000
    Syncor Solutions Limited
    Issued
  15. 2023-10-27 #108 - Main Floor Interior alterations to remove all non-load bearing partition walls to create a one shell space for this existing financial institution on the main floor (108) of this existing commercial building. Scope of work: Complete demolition of existing partitions, millwork, finishes, kitchen, washroom, bank vault, power and data, electrical, plumbing and sprinkler work. Separate permit is required for any future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $100,000
    Syncor Solutions Limited
    Issued
  16. 2023-07-17 #1010 - 10th floor Interior alterations to provide tenant improvements for this office space on the 10th floor (#1010) in this existing commercial building. Scope of work: remove/construct partition walls, doors, millwork, finishes, lighting, electrical, plumbing and sprinkler work. OK For DTI per City staff · $43,000
    no contractor listed
    Issued
  17. 2023-07-14 9th floor - common lobby and washrooms Interior alterations to provide improvements to the 9th floor lobby and common washrooms in this existing commercial building Scope of work: remove/replace finishes, millwork, partitions in common washrooms, lighting, electrical work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
    VPAC Construction Group Ltd
    Issued
  18. 2023-07-07 #1220 and #1260 - 12th floor Interior alterations to demise office unit #1220 into two office units to be #1200 and #1260 and to provide alterations to the newly created #1220 in this existing commercial building on this site. Scope of work: constuct demising wall, remove/construct select partition walls, finishes, electrical work. · $80,000
    no contractor listed
    Issued
  19. 2023-05-30 #1800 - 18th floor (demising and change to #1830 and #1805) Interior alterations to the existing full floor office tenant on the 18th floor (#1800) of this existing commercial building on this site. Scope of work: remove/construct select partition walls/doors, lighting and electrical work * REVISE description to include: new demising walls to divide and change unit #1800 into #1805 & 1830. Nov.2/23 mk #1830 (north unit) TENANT: Coromandel Properties Ltd. #1805 (south unit) - Vacant Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. SP required as per City staffh your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
    CMP Development Group Ltd
    Issued
  20. 2023-04-06 #950 - 9th floor Interior alterations to provide tenant improvement for an existing office tenant on the 9th floor (#950) in this existing commercial building on the site. Scope of work: new partition wall/doors to divide an existing meeting room into two offices and electrical work. TENANT: Lions Gate Law Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
    VPAC Construction Group Ltd
    Issued
  21. 2023-03-31 #650 - 6th floor Interior alterations to provide tenant improvement for an existing office tenant on the 6th floor (#650) in this existing commercial building on the site. Scope of work: new walls and doors for office rooms. OK for DTI - C. Yue March 28, 2023 · $45,000
    Syncor Solutions Limited
    Issued
  22. 2022-12-08 19th Floor - Common Corridor and Washrooms Interior alterations to provide improvements to the 19th floor common corridors and washrooms only in this existing commercial building. Scope of work: remove existing ceiling, lights flooring, & finishes. New drywall bulkheads, lighting, flooring, finishes, and sprinkler work. E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.\t\t\t\t\t\t\t\t\t · $120,000
    BC Coastal Projects Ltd.
    Issued
  23. 2022-12-01 11th Floor - Lobby/Corridor Interior alterations to provide improvements to the common corridors on the 11th floor of this existing commercial building. Scope of work: Demo existing ceilings, lighting, flooring and finishes. Remove elevator millwork, new drywall bulkheads, lighting, flooring, finishes, and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $80,000
    no contractor listed
    Issued
  24. 2022-11-02 #1180 - 11th floor Interior alterations to provide tenant improvement for an existing office tenant on the 11th floor (#1180) in this existing commercial building on the site. Scope of work: construct new partition walls, glazing, finishes, millwork, lighting, power & data, electrical, plumbing and sprinkler work. OK for Field Review for Office TI Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $35,000
    no contractor listed
    Issued
  25. 2022-09-09 #1640 - 16th Floor Interior alterations to provide tenant improvement to an existing office tenant on the 16th floor (#1640) in this existing commercial building on the site. Scope: Construct new partition walls for new offices, meeting rooms and reception area. New doors, floors, millwork and electrical work. TENANT: Silverbirch Hotels and Resorts LP Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. E2 - HVAC - Clean and balance all air systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $70,000
    Syncor Solutions Limited
    Issued
  26. 2022-09-07 #950 - 9th Floor Interior alterations to provide tenant improvement to an existing office tenant on the 9th floor (#950) in this commercial building on this site. Scope of work: Construct new partition walls to suit new office layout for boardroom, offices, pantry with kitchenette and electrical work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. E2 - Lighting - Upgrade to Restricted to Manual ON (per City staff.4.1.1.(b) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $114,000
    VPAC Construction Group Ltd
    Issued
  27. 2022-06-09 Common Lobbies - 6th and 12th floors Interior alterations to provide improvements to common lobbies on the 6th and 12th floors of this commercial building on this site. Okay for DTI processing by Wayland Wong May 27, 2022. Sprinkler permit required as per City staff · $225,000
    no contractor listed
    Issued
  28. 2022-04-20 #920 - 9th floor Interior alterations to expand this existing office tenant on the 9th floor (#920) into a portion of #950 and provide a tenant improvement in this commercial building on this site. Scope of work: remove a demising wall, new partition walls to expanded area for new layout. Electrical and sprinklers to suit. DBI to determine if a Sprinkler permit is required. TENANT: VPAC Construction Group Ltd. E2 - Lighting - Upgrade to Restricted to Manual ON Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $10,000
    VPAC Construction Group Ltd
    Issued
  29. 2021-11-16 #1000 - 10th floor Interior alterations to provide tenant improvements for a new office tenant on the 10th floor (#1000) in this existing commercial building. Scope of work: remove/construct partition walls, doors, millwork, finishes, new kitchenette, lighting, electrical, plumbing and sprinkler work. TENANT: Horizon Recruitment Inc Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK For Field Review per City staff: BOMA BESt (Path 1) - No Additional Upgrades Req'd Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $70,000
    Epic Spaces Inc
    Issued
  30. 2021-09-01 #560 To alter the interior of the 5th floor of this existing commercial building to combine suites #550and #560, retaining #560, to provide improvements for the existing General Office tenant (Trimble Forest Corporation). E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) · $37,000
    Pagliaro Projects Ltd
    Issued
  31. 2020-10-13 Exterior and interior alterations to install two fluid coolers on the roof of this existing commercial building on this site. OK for field review per City staff Exempted · $588,038
    Somatic HVAC Solutions Ltd
    Issued
  32. 2020-10-06 #1790 - 1188 W Georgia St (#1790 expanding into #1760, retaining #1790) To alter the interior of this existing commercial building to expand the General Office in unit #1790 into unit #1760, retaining #1790 and to provide tenant improvements. Scope of work: demo & install interior walls, new door & finishes, electrical work, new flooring & painting throughout. Tenant: Infor (Canada) Ltd. · $110,000
    BC Coastal Projects Ltd.
    Issued
  33. 2020-05-14 #2070 Interior alterations to provide improvements to this office unit #2070 on the 20th floor in this existing commercial building on this site. No changes to lighting. OK for field review as per City staffquired as per City staff; BOMA BESt building. · $35,000
    no contractor listed
    Issued
  34. 2020-02-10 #600 - 6th floor Interior alteration to provide tenant improvements for office suite #600 for a new office tenant (iATS Payments) on this 6th floor of this existing commercial building on this site. REVISION #1: to reduce scope of work. June 25/20 mk - Construction scope reduced to building only 1 meeting room and one smoke barrier wall. - remove the existing TV and patch existing recessed wall - wall types shown for new construction. - no work to ceiling. - no addition lights -electrical; to remove TV power in 2 locations, reloate 1 and upgrade outlet. - elevation show for new meeting room wall. - seating area in waiting room layout changed. - furniture plan added (ID4.0) Okay for field review as per City staff; BOMA BESt. · $160,000
    Counterpoint Interiors Inc
    Issued
  35. 2020-02-10 #650 - 6th floor Interior alteration to relocate the demising wall between two office units and expand #650 into a portion of #600 resulting both suites unoccupiable. REVISION #1: Interior layout changes, Door Schedule provided and increase in project value from $48,000.00 to $118,000.00 Aug. 4, 2021 mlh Note: Future permit required prior to any tenants to occupy suite #600 and #650. · $118,000
    Counterpoint Interiors Inc
    Issued
  36. 2019-12-09 #1640 Interior alterations to provide improvements for existing office tenant. Scope of work: new partitions. District Building Inspector to determine on site if sprinkler permit is required. Energy upgrade trigger: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) · $20,000
    Syncor Solutions Limited
    Issued
  37. 2019-11-21 #1160 & #1180-11th floor *t.i. work to #1160 Interior alterations to demise existing full floor tenant at #1160 on the 11th floor of this existing commercial building on this site into two units (#1160 & #1180). Scope of work includes tenant improvements to #1160 and creation of new common corridor on the 11th floor, interior demolition of partition walls, doors, glazing, flooring, construct demising walls to create two units and partition walls for new corridor, glazing, millwork, doors,ceiling work, power/data, finishes, card reader/electric strike, electrical, mechanical, plumbing and sprinkler work. *REVISION #1: Interior layout changes due to additional wall removal. See pages ID0.00, ID1.01, ID1.02, ID1.03, ID1.04, ID1.05, ID1.07, and Electrical; EL1.0, and EL1.1. No increase to project value. Aug.7/20mk TENANT: Corix Infrastructure Inc. · $800,000
    Fusion Project Management Ltd
    Issued
  38. 2019-10-07 #900-9th floor Interior alterations for tenant improvements for an existing office tenant in this existing commercial building. Scope of work: demolish partition walls, remove doors, construct new partition walls, glazing, doors, new kitchenette, lighting, electrical and plumbing work. TENANT: Innovate BC Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. No energy upgrade required as building is BOMA Best. OK for Field Review per City staff · $40,000
    VPAC Construction Group Ltd
    Issued
  39. 2019-08-07 17th Floor - Common Lobby & Corridor Interior alterations to provide improvements to the lobby and corridor on the 17th floor of this existing commercial building on this site. Scope of work: remove and provide new finishes, signage, fire evacuation plans, switches and electrical outlet faceplates, ceiling work, electrical and sprinkler work. OK For Field Review as per City staffequired, BOMA Best Building No proposed work in suites; this permit for Lobby/Corridor work only. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work · $80,000
    BC Coastal Projects Ltd.
    Issued
  40. 2019-08-07 20th Floor - Common Lobby & Corridor Interior alterations to provide improvements to the common lobby and corridor on the 20th floor of this existing commercial use building on this site. Scope of work: remove and provide new finishes, signage, fire evacuation plans, switches and electrical outlet faceplates, ceiling work, electrical and sprinkler work. OK For Field Review as per City staffequired, BOMA Best Building No proposed work in suites; this permit for lobby/corridor work only. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work · $80,000
    BC Coastal Projects Ltd.
    Issued
  41. 2019-07-11 #1800 - To permit interior alterations and to provide tenant improvements to this unit as well as to demise the interior walls between unit #1800 and #1850 to create one unit to occupy the entire floor. Scope of work to include: Demolition the existing interior partition walls in unit #1850. Build new office space, meeting rooms, kitchenette and storage rooms. New lighting REVISION #1: Validate one interior wall, remove fire resistance rating requirements between office and corridor for full floor tenant. No change to ASHRAE. Sept 11, 2019 mlh REVISION #2: To add a door at south corridor, an exit sign at new door at south corridor and to increase the project value from $470,000.00 to $470,500.00. Nov 26, 2019 mlh OK For Field Review as per City staff.2019 Selected Energy Upgrade: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) · $470,500
    no contractor listed
    Issued
  42. 2019-06-28 #1080 Interior alteration to provide tenant improvement for this existing office tenant #1080 on the 10th floor in this existing commercial building on this site. Scope of work includes installing new kitchenette and non-loadbearing partition walls to create new meeting room. Okay for field review as per City staff: BOMA BESt · $21,000
    Epic Spaces Inc
    Issued
  43. 2019-03-28 #2000 & #2070 - 20th floor Interior alterations and to demise #2000 into two units to be #2000 and #2070 and to provide tenant improvements for a new office tenant in unit #2000 on the 20th floor in this existing commercial building on this site. Scope of work: remove interior partition walls/doors, construct new demising wall and interior partition walls, doors, glazing, new staff kitchen, ceiling work, infill existing entry and door and remove a portion of wall to create new glass entry door with electric strike, electrical and sprinkler work. *tenant improvement work to #2000 only Revision #1: demolition of existing interior partitions in the printer and storage areas of unit #2070,new reflected ceiling plan submitted and increasing project value from $65000 to $67000 Nov. 7, 2019 mlh TENANT: McMillen Jacobs Associates Separate permit(s) and ASHRAE checklist required for any tenant improvements to newly created #2070. · $67,000
    Allspaces Design & Management Ltd
    Issued
  44. 2018-12-20 #1920 Interior alterations to provide tenant improvements to this existing office space on the 19th floor of this existing highrise commercial building. Scope of work: Install new full height partition wall, interior glazed partition, new flooring and painting. OK for Field Review per City staff. Tenant: Sung Strategy/Unity Global Ent Ltd. Energy upgrade exempt: Boma Best Building · $29,000
    Epic Spaces Inc
    Issued
  45. 2018-12-14 #580-5th floor Interior alterations only to provide improvements to this existing General Office tenant at unit #580 at this existing commercial building. Scope of work: demolish/construct partition walls, new millwork, relocate light fixtures, ceiling, data, electrical and sprinkler work. TENANT: PhotoSat Information Limited OK for field review as per City staff. No energy upgrade required. BOMA BESt building. · $110,000
    Syncor Solutions Limited
    Issued
  46. 2018-12-14 #1470 - 14th floor Interior alterations to provide improvements for a new office tenant on the 14th floor ( #1470) of this existing commercial building. Scope of work: demo and construct new partition walls, glazing, doors, RCP, millwork, finishes, plumbing, electrical, & sprinkler work. No energy upgrade required. BOMA BESt building. · $40,000
    VPAC Construction Group Ltd
    Issued
  47. 2018-11-15 #2150 - 21st floor interior alterations to provide improvements for this existing office tenant on the 21st floor 9#21500 in this existing commercial building on this site. Scope of work: construct new drywall bulkhead/ceilings in portions of the space, new millwork, glazing and electrical work TENANT: Syncor Solutions Ltd. OK for field review per City staffIA-2018-01672 Energy upgrade: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems · $15,000
    Syncor Solutions Limited
    Issued
  48. 2018-10-16 #101 Interior demolitions to remove the cafe areas (approx. 450 sq.ft) in this existing financial institution (HSBC) on the ground floor in this existing commercial building on this site. Scope of work includes to remove non-bearing partition walls, millwork, plumbing fixtures, flooring, kitchen equipment etc. OK for field review as per City staff · $60,000
    Pacific One Contracting
    Issued
  49. 2018-08-30 #1800 Interior alterations to provide tenant improvements to this existing office shell unit on the 18th floor of the existing 21 storey commercial building at 1188 W Georgia St. Scope of Work: - construct interior partition walls to create new offices, lunchrooms, and reception area - install new finishes, millwork, furniture - demolish existing lighting, floor finishes, T-bar ceiling and lighting fixtures and install new. - install new electrical work, sprinkler, fire alarm & mechanical system - remove an existing door from hallway to suite #1800 (next to existing mechanical and electrical room) OK for FLD RVW per City staff · $720,000
    Bold Construction Ltd
    Issued
  50. 2018-07-30 #1460 - 14th floor To provide interior alterations and to expand existing office unit #1460 into a portion of existing office unit #1470, retaining both unit numbers, on the 14th floor of this existing commercial building. Tenant improvement work to #1460 only. Scope of work: demolish/construct demising wall, partition walls, ceiling work, millwork, electrical, plumbing and sprinkler work. TENANT: Cristina Oberti Interior Design Inc. OK for Field Review per City staffuilding · $40,000
    VPAC Construction Group Ltd
    Issued
  51. 2018-06-18 #1760 Interior alterations to combine #1760 & #1790 into one unit on the 17th floor in this existing commercial building on this site. OK for field review as per City staff: Energy trigger not required BOMA BEST building · $4,100
    BC Coastal Projects Ltd.
    Issued
  52. 2018-05-11 #920 - 9th floor Interior alterations to provide improvements for a new office tenant on the 9th floor (#920) of this existing commercial building on this site. Scope of work: construct new partition walls/glazing, doors, ceiling work, new staff kitchenette, electrical, plumbing and sprinkler work. TENANT: VPAC Construction Group Ltd. OK for field review per City staff. Note: No energy trigger required; BOMA BEST building · $60,000
    VPAC Construction Group Ltd
    Issued
  53. 2017-11-28 #1640-16th floor Interior alterations to provide tenant improvements for a new office tenant at unit #1640 on the 16th floor of this existing commercial building on this site. Scope of work: demolish/construct partition walls, doors, millwork, new glazing, lighting, ceiling, card reader (electric strike), electrical, plumbing and sprinkler work. TENANT: Silverbirch Hotels & Resorts OK for field review per City staff. Energy trigger not required BOMA BESt building · $210,000
    Syncor Solutions Limited
    Issued
  54. 2017-10-12 #1488 Interior alteration to provide tenant improvement in this existing office tenant #1488 on the 14th floor in this existing commercial building on this site. Scope of work includes relocate sink and non-load bearing partitions. Okay for field review as per City staff · $15,000
    VPAC Construction Group Ltd
    Issued
  55. 2017-08-09 #1640 - 16th floor Interior alterations to demolish all non load bearing partition walls in this vacant office space on the 16th floor (unit #1640) of this existing commercial building on this site. Scope of work: demolish and remove all partition walls, doors, millwork, glass partitions to return to shell space. OK for field review per City staff. Note: No energy trigger required, interior demolition only Note: Separate permit required for future tenant improvements. · $30,000
    VPAC Construction Group Ltd
    Issued
  56. 2017-07-04 #1800 - 18th floor Interior alteration to demolish all interior walls in this existing office and turn this into office shell in unit #1800 on the 18th floor of this existing commercial building on this site. Note: Separate permit required for any future tenant improvements. Okay for field review per City staff · $60,000
    no contractor listed
    Issued
  57. 2017-03-23 #1400 Interior alteration to construct non-load bearing partition walls for existing office tenant in this suite. Scope of work includes removal of 3 fluorescent lights. Okay for field review as per City staff · $25,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1128 W Georgia St
1128 W Georgia Street Interior alterations to provide tenant improvements to the existing Hotel on the P1 mezzanine level of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
1166 Alberni St
#810 - 8th floor Interior alterations and tenant improvements to an existing general office (D) for a new partition wall and minor layout changes on the 8th floor in this existing commercial building on this site. Tenant: Cambridge Mortgage Investment Corporation Ok for field review per City staff · no contractor listed
2026-11-05
1080 Broughton St
#309 - 1350 COMOX ST Interior alterations to provide residential improvement to an existing dwelling unit at #309 - 1350 COMOX ST. on the third floor of this existing multiple dwelling building on the site. Okay for DTI per City staff · applicant withheld (individual)
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.