Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1166 Alberni St, Vancouver
An address in West End, Vancouver, zoned DD (Comprehensive Development). 57 building permits are on file, most recently “#810 - 8th floor Interior alterations and tenant improvements to an existing general offi…” (issued 5 November 2026). The City's 2026 assessed value is $89,442,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153483, 869 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-11-05
#810 - 8th floor Interior alterations and tenant improvements to an existing general office (D) for a new partition wall and minor layout changes on the 8th floor in this existing commercial building on this site. Tenant: Cambridge Mortgage Investment Corporation Ok for field review per City staff · $80,000
no contractor listed Issued -
2026-03-10
#401 & #430 - 1166 Alberni Interior alterations to combine a portion of unit #420 and 430 - to be retained as two office units (#410 and 420), and to combine a portion of unit #430 and #401 into one unit, which will then be demised into four additional office units addressed as #430, 440, 450 and 460 for a total of six new office units on the fourth floor of this existing commercial building on this site. Scope of work; demolition and construction of non-structural partitions, change of lighting layout, finishes and furniture/equipment and associated MEP improvements. Addressing to determine unit numbers. · $800,000
no contractor listed Issued -
2025-12-08
#908 - 9th Floor (demise into 3) Interior alterations to demise the unit #908 on the 9th floor into 3 separate units to be (#908, #930 and #940) in this existing commercial building on site. Scope of work: Demo existing non-load bearing interior walls. Construct demising walls, partition walls, repair flooring and wall finishes, new millwork and electrical work to suit. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $275,000
Altek Construction Ltd Issued -
2025-09-04
1152 Alberni Interior alterations to provide improvement to this existing Class 1 Restaurant on the 1st floor of this commercial building on this site. Scope of work: New of interior finishes, New seating layout, Washroom upgrade. · $300,000
no contractor listed Issued -
2025-07-14
#602 - 6th Floor Interior alterations to provide improvements to this new tenant on the 6th floor (#602) in this existing commercial building on site. Scope of work: Move demising wall to increase the size of suite 602 and decrease #608. Construct 3 private offices, electrical and sprinkler work to suite. TENANT: Yoko Management Ltd Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $65,000
Reliance World Wall & Ceiling Ltd Issued -
2025-03-28
#1001 - 10th Floor Interior alterations to provide improvement to this existing general office on the 10th floor (#1001) in this existing commercial building on site. Scope of work: Selective demo of partition walls, construct non-structural walls to create one private office, new paint and electrical work to suit. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
Reliance World Wall & Ceiling Ltd Issued -
2025-03-18
#807 - 8th Floor Interior alterations to provide improvements to a new tenant and a Change of Use from General Office to Health Care Office on the 8th floor (#807) of this existing commercial building on this site. Scope of work: Construction of partition walls for private offices, new sinks, millwork, electrical and mechanical/plumbing upgrades. TENANT: Blue Door Wellness Ltd. OK for TIPS as per City staff · $35,000
Giomar Contracting Ltd Issued -
2024-11-05
#1450 (changed from #1401) Interior alterations to provide landlord improvements to this vacant office space to prepare for leasing on the 14th floor (#1450) of this existing commercial building on this site. Scope of work: select demo and construction of partition walls to alter layout. New doors/frames to kitchen, data & meeting room, millwork, finishes to match. Electrical, Plumbing, & Sprinklers to suit. REVISION #1 - reconfigure the kitchenette and office room doors, and add glazing to the front office walls, and remove the data closet. Jan14/24 mk Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $91,000
Altek Construction Ltd Issued -
2024-09-26
#605 - 6th Floor (#605 expanding to #608) Interior alterations on the 6th floor (#605) for an existing office tenant to expand the unit into a portion of #608 in this existing commercial building. Scope of work: Remove the demising wall to increase the size of suite #605 and decrease #608. Remove and replace existing walls, doors, ceilings and finishes. Some electrical, plumbing and sprinkler work to suit TENANT: Korecki Real Estate Services Inc. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $160,000
no contractor listed Issued -
2024-09-11
#1200- 12th floor (demise from #1201) * see addressing note. Interior alterations to an existing office space on the 12th floor (#1201) to demise into two units (#1201 & #1200) and to provide improvements to unit #1200 only, in this existing commercial building Scope of work; new demising wall. Tenant improvements to newly created #1200 only. REVISION #1 - add to depth off offices and kitchen. * Addressing note: #1201 demised into #1200 & #1201 and change the existing unit #1200 to #1206. (see plan page ID4) District Building inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $61,800
Altek Construction Ltd Issued -
2024-07-31
#808 - 1166 Alberni Interior alterations to demise existing office suite #808 into two new offices #807 and #808 and provide tenant improvements in each unit in this existing commercial building on this site. Scope of work to include demising unit #808 in two, adding three internal offices and a kitchenette in each unit, and electrical upgrades. Ok for field review per City staff. REVISION #1 Minor partition layout changes to create two new boardrooms in Unit #808. Revised electrical and lighting to suite · $117,500
Reliance World Wall & Ceiling Ltd Issued -
2024-04-30
#1010 - 10th floor (Changed from #1005) Interior alterations to provide improvements for an existing office space on the 10th floor (#1010) of this existing commercial building. Scope of work: Demo of a wall to open entrance area. Replace glass partition to some offices. New mill work for kitchen. Electrical, Plumbing, and Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $55,000
Altek Construction Ltd Issued -
2024-04-03
#1101 - 11th floor Interior alterations to provide improvements to an existing office space on the 11th floor (#1101) of this existing commercial building on this site. Scope of work: demo/ construct partition walls, doors/frames to alter layout, millwork, finishes. Electrical, Plumbing, Sprinklers and RCP to suit. REVISION #1 jUNE 20/24 mk - reduce scope of work to remove 1 wall only. (Everything else to remain as is) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $49,000
Altek Construction Ltd Issued -
2024-03-27
#1202 - 12th floor Interior alterations to provide improvements to this vacant office space on the 12th floor (#1202) of this existing commercial building on this site. Scope of work; relocate kitchen sink, new millwork, new flooring. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $30,000
no contractor listed Issued -
2024-03-25
#1008 - 10th floor Interior alterations to provide tenant improvements to this existing office unit #1008 on the 10th floor of this existing commercial building on this site. OK to process as DTI as per City staff · $51,000
Altek Construction Ltd Issued -
2024-03-11
Interior alterations to install an electrical room with a new transformer in the loading area of this existing mixed use building. OK for field review per City staff · $18,200
VPAC Construction Group Ltd Issued -
2024-02-09
#1006 - 10th Floor Interior alterations to provide tenant improvements to this existing general office on the 10th floor (#1006) in this existing commercial building. Scope of work: Remove one office and a closet. Replace existing millwork, new fixtures, electrical and plumbing work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $37,000
Reliance World Wall & Ceiling Ltd Issued -
2024-02-07
#1402 - 14th floor Interior alterations to provide improvements for a new office tenant on the 14th floor (#1402 ) of this existing commercial building on this site. Scope of work: remove all partitions, doors, millwork, finishes for new layout including a kitchenette. Electrical, plumbing, Sprinklers to suit * permit to validate work done by others to divide this floor from 3 units to 6 units. #1401, #1402, & #1406 added. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $75,000
no contractor listed Issued -
2024-01-31
#602 - 6th Floor (expanding to #608) Interior alterations on the 6th floor (#602) to this new office tenant, to expand unit into a portion of #608 and provide tenant improvements in this existing commercial building. Scope of work: Remove the demising wall between #602 & #680 and construct a new demising wall to increase the size of #602 and decrease #608. Construct new partitions for new offices, new flooring, new exit/entry door to corridor, electrical, plumbing and sprinkler work. REVISION #1: Interior layout change to provide jog in demising wall. - May 7, 2024 - LLL TENANT: Yoko Management Ltd Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $80,000
Reliance World Wall & Ceiling Ltd Issued -
2023-12-14
6th floor elevator lobby and corridors Interior alterations to provide improvements to the 6th floor elevator lobby and corridors in this existing commercial building on this site. Scope of work: Demo and replace with new all existing flooring & ceiling. Demo a portion of corridor wall to #602 and #608 to extend corridor at southwest end. * District Building Inspector to determine if a Special Sprinkler inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing) · $145,000
Altek Construction Ltd Issued -
2023-03-23
1100 & 1103 - 11th Floor Interior alterations to provide tenant improvements on the 11th floor for an existing office tenant to expand unit to suite #1103 (retaining #1100) in this existing commercial Building. Scope of work: Remove a portion of the demising wall to create an opening between #1100 & #1103. Remove/construct new partition, new paint, electrical and sprinkler work. TENANT: Gillespie-Munro Inc Addressing Note: Future unit #1100 to be re-addressed as either #1105/1106 (only for new tenant) Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $35,000
Reliance World Wall & Ceiling Ltd Issued -
2022-11-09
#502 - 5th Floor Interior alterations to provide tenant improvements to an existing general office on the 5th floor (#502) of this existing commercial building. Scope of work: Demolish existing partition, construct new partition walls to create offices, new door, new reception and electrical work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $38,000
no contractor listed Issued -
2022-09-22
#920 - 9th floor Interior alterations to provide improvements for an existing office tenant on the 9th floor (#920) of this commercial building on this site. Scope of Work: Construct new partition for new offices, new doors frame and baseboard. New paint, relocate existing lights and electrical work. TENANT: PARC Communities Management Ltd. OK for Field Review per City staff inspector to determine on site if a separate sprinkler permit is required. Sprinkler permit required per City staff(per City staff.4.1.1.(a) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $18,000
Altek Construction Ltd Issued -
2022-09-21
#1500 - 15th floor Interior alteration to the 15th floor to expand #1500 into a portion of #1505 and provide tenant improvements for a new office tenant in this commercial building on this site. Scope of work: remove/construct demising wall/partition walls, doors, millwork, flooring, finishes for new layout including relocating kitchen/lunchroom to expanded area, electrical, plumbing and sprinkler work. REVISION #1: change the applicant from Diana Kwak DBA: Fusion Projects to Property Owner's Representative Graham Rohland of Alberni Investment (1988) Inc., to change the contractor from Fusion Project Management Ltd to VPAC Construction Group Ltd., and to update the Project Value from $1,200,000.00 to $415,000.00. Nov 8, 2022 mlh TENANT: Peterson E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $415,000
VPAC Construction Group Ltd Issued -
2022-09-07
Interior alterations for a new retail limited food tenant in the commercial building on this site. tenant: DB8888 Limited Partnership (Dragon Bowl) Work to include layout changes, new kitchen equipment, mechanical, plumbing, lighting to suite new layout, new t-bar and drywall ceiling. OK for field review per City staff · $300,000
no contractor listed Issued -
2022-08-23
CF-2022-004724 Interior alterations to provide improvements to this existing restaurant on the 1st floor of this commercial building on this site. Scope of work includes new ceiling panels, wall finishes, millwork for bar area, trenching for new plumbing lines to bar area and new washroom fixtures. New tenant: Archer Dining OK for field review as per City staff. Notes: · $200,000
Elevation Ventures Inc Issued -
2022-06-22
8th Floor - Common Lobby/Corridor and Washrooms Interior alterations to provide improvements to this existing common lobby/corridor and washrooms on the 8th floor of this commercial building on this site. Selected Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required OK to process as DTI as per City staff · $120,000
Altek Construction Ltd Issued -
2022-05-19
#1400 - 14th floor Interior alterations to this existing office tenant on the 4th floor (#1400) in this existing commercial building on this site. Scope of work: remove a portion of a partition wall above 42" to create a counter, construct a new partition wall/door to divide boardroom and create an additional office space. No sprinkler permit required E4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1.1 of ASHRAE 90.1.1 of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $38,000
Altek Construction Ltd Issued -
2022-04-04
#801 and #802 - 8th floor Interior alterations to expand the existing office in #801 into a portion of #802 in this existing commercial building on this site. Scope of work: remove/construct demising wall, select partition walls/doors, finishes. Alterations to both units. REVISION #1: - to show demo work done by others without a permit. July 7/22 mk OK for Field Review per City staffer Permit is required for proposed work. E4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1.1 of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $40,000
Altek Construction Ltd Issued -
2022-03-01
#810 & #808 - 8th floor (T.I. work in #810 only) Interior alterations to the 8th floor to demise unit #810 into two units to be #810 and #808 and provide improvements for new office tenant in unit #810 only in this existing commercial building on this site. Scope of work: construct demising wall, partition walls, doors, millwork, finishes, kitchen and electrical work. * Separate permit(s) required for any future improvements to unit #808. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. OK for Field Review per City staff: E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $85,000
Altek Construction Ltd Issued -
2022-01-26
#1606 - 16th Floor Interior alterations to provide improvements for a new office tenant in existing office space on the 16th floor (#1606) in this existing commercial building. E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) TENANT: vacant OK For Field Review per City staff · $125,000
Altek Construction Ltd Issued -
2021-10-07
#1110 - 11th floor Interior alterations to provide tenant improvements for a new office tenant on the 11th floor (#1110) in this existing commercial building on this site. Scope of work: remove select interior partition walls, door, new interior sliding doors, finishes, electrical and sprinkler work. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. DBI will deal with the SP requirement if need be OK for FIT per City staff; Sept 27, 2021 E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1 (g) of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $18,000
Altek Construction Ltd Issued -
2021-08-05
#1605 - 16th floor Interior alterations on the 16th floor for a new office tenant in unit #1605 to expand into a portion of #1606 and provide improvements in this existing commercial building on this site. Scope of work: remove a demising wall between #1605 & #1606 and construct a new demising wall to increase the size of #1605 and decrease #1606. Remove/construct interior partition walls for new layout, electrical and sprinkler work TENANT: Saturna Accounting OK for Field Review per City staffinkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $60,000
Reliance World Wall & Ceiling Ltd Issued -
2021-07-23
Change of use from travel agent office to retail limited food service tenant in this existing mixed use building on this site Approved by Vancouver Coastal Health on 7/9/2021. OK for Field Review per City staff · $40,000
no contractor listed Issued -
2021-07-20
#550 - 5th floor Interior alterations and a change of use from General Office to Health Care Office for a new tenant on the 5th floor (#550 in this commercial building on this site. Scope of work: remove/construct partition walls, doors, millwork, finishes, kitchen, electrical and sprinkler work. OK for Field Review per City staffnkler permit required for proposed sprinkler work. Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $40,000
Altek Construction Ltd Issued -
2021-07-19
Interior alterations to provide drainage and water service in this existing Office (D) unit at 1170 Alberni St on the 1st storey for a future tenant in this existing commercial building on this site. Scope of work includes: X-ray and Coring of level below for new drainage and water service for future sinks and future recessed grease traps. Related to change of use / tenant improvement permit, BP-2021-02626. OK for Field Review per City staff: ~ Energy Upgrade: Project Type Exempt ~ Building Sprinklered - No sprinkler permit required. · $10,000
Altek Construction Ltd Issued -
2019-10-28
#1505 - 15th floor (Changed from #1550) Interior alterations to provide improvements for this existing office tenant on the 15th floor (#1505) in this commercial building on this site. Scope of work: remove/construct partition walls/doors for 2 new offices, finishes, lighting, ceiling work and electrical work. REVISION #1: #1505 changed to #1550. Feb 11, 2020 REVISION #2 Apr.2/20 mk: to expand into units #1501 & #1503, and add new offices, open work areas, new doors/frames & new finishes throughout. Increase project value by $75,000. Page ID/titles have been changed from original set. 1 extra page added. See original set for original work. It has not been reflected on the new set of plans. * #1550 changed back to #1505 per City staffo 3 areas to change layout; the staff room, and to relocate an open work area, and to provide four (4) new office rooms - Increase project value from $93,000 to $118,000 TENANT: Alberni Investments (1988) Inc. OK for field review per City staff: 1. Building inspector to determine on site if a separate sprinkler permit is required. 2. Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) · $118,000
Altek Construction Ltd Issued -
2019-10-08
#605 - 6th floor Interior alterations to provide tenant improvements and alter the layout for a new general office tenant on the 6th floor (#605) in this existing highrise commercial building on this site. Scope of work: remove/construct partition walls, doors, finishes and electrical work. REVISION #1: change of applicant and contractor from Matra Construction Inc. to: APPLICANT: Alex Korecki Korecki Real Estate Services Inc. 130 - 3751 Jacombs Rd Richmond, V6V 2R4 [contact removed] ([contact removed]) CONTRACTOR: Variant Services Inc. 2204 East 24th Avenue Vancouver, BC V5N 2V2 [contact removed] TENANT: Korecki Real Estate Services OK for Field Review per City staffpector to determine on site if a separate sprinkler permit is required L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $150,000
Variant Services Inc Issued -
2019-08-06
7th Floor - Common Lobby/Corridor and Washrooms Interior alterations to provide improvements to this existing common lobby/corridor and washrooms on the 7th floor of this commercial building on this site. Scope of work: remove and replace existing floor tile, light fixtures, toilet partitions, mirrors, door at men's washroom, finishes, ceiling work, all existing tenant doors and frames and electrical and plumbing work. Also to remove one door and infill with a partition wall. OK For Field Review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required · $120,000
Altek Construction Ltd Issued -
2019-07-26
Interior alterations to provide tenant improvements to #250 for a new office tenant at the 2nd level of this existing commercial building. BRB Notes: - AL-2019-00139 accepted for combustible interior wall finishes. - Minor renovation, level of upgrade required as per VBBL 2014: (F1, S2, N1, A2, E2) - Energy upgrade selected: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $910,000
Canadian Turner Construction Company Ltd Issued -
2019-06-10
Unit #1604 - 1166 Alberni St Interior alterations to provide improvements for existing General Office tenant at unit #1604 - 1166 Alberni St in this existing commercial building. OK for field review as per City staff: 1. No sprinkler head alterations proposed. District Building Inspector to determine if Sprinkler Permit is required. Energy upgrade selected: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) · $25,000
Syncor Solutions Limited Issued -
2019-03-22
#1503 Interior alterations to provide improvements for new General Office tenant in unit #1503 in this existing commercial building. Existing use was staff maintenance room with no unit #. OK for field review as per City staff: 1. No sprinkler alterations proposed. District Building Inspector to determine if sprinkler permit is required for sprinkler alterations. Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $5,000
Altek Construction Ltd Issued -
2018-11-16
#504 Interior alterations to provide improvements for a new office tenant at office unit #504 on the 5th floor of this commercial building on this site. Scope of work: demolish partition wall, closet, millwork, finishes, construct new partition wall to create 2 new offices, new glazing, finishes, ceiling work, rcp, electrical and sprinkler work. TENANT: MCI Group Canada OK for field review per City staff. Note: Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $25,000
Elevation Ventures Inc Issued -
2018-07-11
#521 To demise unit #501 into two units and provide tenant improvements for new office tenant in newly created unit. Energy Upgrade Selected: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) #521 has been added to the newly created space. #521 is to be posted as shown on the approved plans and clearly visible from the street prior to final inspection. · $3,500
Altek Construction Ltd Issued -
2018-05-31
#205 Interior alterations to move the entry door leading into unit #205 on the 2nd floor closer to common corridor in this existing commercial building. BOMA BESt building. · $21,000
Altek Construction Ltd Issued -
2018-05-28
#1101 & #1102 - 11th floor To demise the existing office tenant located at #1101 to create an additional office tenant space (#1102) and to provide tenant improvements in the newly created office space. Scope of work: demolish partitions/doors, construct new demising wall, partitions, doors, ceiling work, electrical and sprinkler work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. TENANT: De Norske Veritas Canada (DNV-GL) This is considered a minor addition confirmed with J. Chen, May 4, 2018. No energy upgrade required. BOMA BESt building. · $26,000
Epic Spaces Inc Issued -
2018-03-16
#1001 & 1002 Interior alterations to alter a demising wall, expanding unit #1001 into a portion of unit #1002, and tenant improvements in unit #1001 in this commercial building. BOMA BESt building - no additional upgrade req'd. · $22,000
Altek Construction Ltd Issued -
2018-02-13
P1 Mechanical room. Interior alteration to provide voluntary upgrade to this existing generator in this existing mechanical room in the P-1 level of this existing commercial building on this site. Scope of work includes replacing existing generator, and upgrade mechanical room to 2hr FRR walls, and 1.5hr FRR door. Okay for field review as per City staff · $200,000
no contractor listed Issued -
2017-09-20
#1550 Interior alterations to provide improvements for new office tenant at unit#1550 on the 15th floor of this existing office building. BOMA BESt building. · $125,000
Altek Construction Ltd Issued -
2017-08-31
(502 & 503-5th floor) Interior alterations to demise unit #503 into #502 & #503 to provide improvements for a new office tenant in unit #503 on the 5th floor of this existing commercial building on this site. OK for field review per City staff: No energy trigger required BOMA BESt building · $28,000
Altek Construction Ltd Issued -
2017-08-21
#1505-15th floor Interior alterations to combine office units #1502 and #1505 (retaining #1505), to office shell space on the 15th floor of this existing commercial building on this site. Scope of work: demolish demising wall and remove all partition walls, doors, millwork and finishes. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements. Address Note: #1502 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #1505 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. See related Special Sprinkler Inspection No. IA-2017-00936. OK for Field Review per City staff. Energy upgrade exempt: Interior demolition and demising wall. · $14,000
Altek Construction Ltd Issued -
2017-07-20
#300-3rd floor Interior alterations to provide tenant improvements to Unit #300 on the third floor of this existing commercial building on this site. Scope of work: add two demountable walls with door/glazing to form an admin office, sprinkler work. TENANT: First Nations Health Authority OK for field review per City staff. · $15,000
no contractor listed Issued -
2017-07-17
#1606-16th floor Interior alterations to provide improvements for a new office tenant in existing office space on the 16th floor (#1606) in this existing commercial building. Scope of work: demolish some interior partition walls and remove doors, new finishes, electrical work. TENANT: vacant See related Special Sprinkler Inspection Permit No. IA-2017-00835. Selected Energy Upgrade: L2- Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $25,000
Altek Construction Ltd Issued -
2017-06-21
(#1500 - 15th floor) Interior alterations to provide improvements for a new office tenant on the 15th floor (#1500) of this existing commercial building. Scope of work: Construct demising walls to divide unit #1500 into two units (#1500 & #1505), to extend corridor and relocate entry door to Unit #1500 and add new entry door to Unit#1505), finishes, electrical and sprinkler work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. TENANT: #1500 - Westward Shipping #1505 - VACANT *Separate permit(s) and ASHRAE will be required for tenant improvements for newly demised unit #1505. BOMA Best Building; Voluntary upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $48,000
Altek Construction Ltd Issued -
2017-02-21
#503 - Interior alterations to provide improvements for this existing office unit #503 on the 5th floor of this existing commercial building on this site. Scope of work includes OK for field review per City staff. Energy Upgrade Exempt: BOMA BESt Building. · $30,000
Vodek Construction Solutions Inc Issued -
2017-01-11
(1400) Interior alterations to combine unit #1400 and #1408 on the 14th floor to retain #1400 for expansion of existing office tenant. Scope includes interior demolition. Okay for field review per City staff: BOMA Best · $20,000
no contractor listed Issued -
2017-01-11
#1108 - Interior alterations to the #1108 on the 11th floor of this existing commercial building to install new millwork and a new handsink. Addressing Note: Suite numbers #1105 changed to 1108 & #1108 changed to #1103 in order to meet Code requirements. OK for field review as per City staff: BOMA Best Building. · $4,500
Altek Construction Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in West End
1128 W Georgia Street Interior alterations to provide tenant improvements to the existing Hotel on the P1 mezzanine level of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
#309 - 1350 COMOX ST Interior alterations to provide residential improvement to an existing dwelling unit at #309 - 1350 COMOX ST. on the third floor of this existing multiple dwelling building on the site. Okay for DTI per City staff · applicant withheld (individual)2026-11-05
#1-955 Nicola St Exterior and interior alterations to provide tenant improvements and a change of use/occupancy from Barber Shop (Group D) to Retail - Limited Food (Group E) at #1-955 Nicola Street, as approved by the Board of Variance Appeal No. Z36308 dated March 10th, 2026, on the ground floor of this existing mixed use building on this site. ******THIS PERMIT HAS BEEN REVIEWED & ISSUED UNDER THE REQUIREMENTS OF VBBL 2025 AND AMENDMENT EFFECTIVE May 5, 2026 ******** Building Review Branch Notes: · no contractor listed2026-11-02