Permit GopherAlberta and B.C. property, permit and zoning records

1130 W Pender St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 34 building permits are on file, most recently “#610 - 6th floor - demising into #610 and #650 Interior alterations to the 6th floor to d…” (issued 27 October 2026). The City's 2026 assessed value is $53,383,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
34
Assessed value (2026)
$53,383,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1130 W Pender St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150850, 2,626 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
2,626
Households
1,435
Median age
37.2
Median household income (2020)
$82,000
Own their home
45%
Vancouver: 45%
Average household size
1.9
Under 15
8%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-10-27 #610 - 6th floor - demising into #610 and #650 Interior alterations to the 6th floor to demise to the existing full floor office space (#610) into two units (to be 610 and #650) and provide improvements to (#650) , in this existing commercial building. Scope of work: se;ect demo, new demising walls, partition walls, doors/frames, millwork for new kitchette, finishes. Electrical, plumbing/mechanical & Sprinklers to suit. · $150,000
    no contractor listed
    Issued
  2. 2025-12-10 #828 - 8th floor Interior alterations to provide improvements for an existing office space on the 8th floor (#828) of this existing commercial building on this site. Scope of work: add two offices. no demo proposed. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $8,500
    Central West Project Management Inc.
    Issued
  3. 2025-12-09 #1200 - 12th Floor Interior alterations to provide improvements to this existing office tenant on the 12th floor (#1200) in this existing commercial building on site. Scope of work: Minor interior layout changes in the kitchen, storage area and in one private office. New paint, flooring, electrical and sprinker work to suit. TENANT: Forestry Innovation Investment Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $70,000
    Gibraltar Holdings Ltd
    Issued
  4. 2025-04-30 #550 - 5th floor (demise into #550 & 555) Interior alterations to provide tenant improvements and to demise existing office unit #550 into two units (#550 and #555) in this existing commercial building on this site. Scope of work: To construct a new demising wall, relocate one door, new paint to match existing and electrical work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $27,000
    TotalPlan Inc
    Issued
  5. 2025-01-21 #1100 - 11th Floor Interior alterations to provide improvement to this existing office tenant on the 11th floor (#1100) of this existing commercial building on site. Scope of work: Selective demo, new walls for new office, new millwork and equipment relocation. TENANT: The Consulate General of France Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $80,000
    VPAC Construction Group Ltd
    Issued
  6. 2024-08-19 #1401 & #1410 - 14th floor Interior alterations to provide improvements to existing office tenant spaces on the 14th floor (#1401 & #1410) of this existing commercial building on this site. Scope of work: to reinstate a demising wall between #1401 & #1410 that was removed without permit. Remove a wall and reconfigure doors within both units to access a shared meeting room. Minor tenant improvements to #1401. * District Building Inspector to determine if a Special Sprinkler Inspection is required. Tenant: CO280 Solutions Inc. - unit #1401. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $35,000
    TotalPlan Inc
    Issued
  7. 2023-09-19 #1101 - 11th Floor (suite to change to #1120) Interior alterations to provide tenant improvement to this existing general office on the 11th floor (#1101) of this existing commercial building. Scope of Work: Demolish select full height partitions, construct new non-load bearing wall to underside of t-bar, relocate interior glass wall and door, new carpet, paint and sprinkler work. NOTE: Future application will use #1120 to match with addressing note Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $15,000
    TotalPlan Inc
    Issued
  8. 2023-08-01 #1450 - 14th Floor Interior alterations to provide improvements for an existing general office tenant on the 14th floor (#1450) of this existing commercial building. Scope of work: Remove non-load bearing walls, door and infill the opening, millwork, t-bar ceiling and carpet removal. Construct new drywall ceiling in boardroom and reception, new flooring, paint, millwork, electrical, plumbing and sprinkler work. TENANT: Britist Columbia Coast Pilots Ltd Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
    TotalPlan Inc
    Issued
  9. 2023-05-02 #780 - 7th Floor Interior alterations to provide tenant improvements for a new tenant on the 7th floor (#780) of this existing commercial building on site. Scope of work: Construct new partitions for new offices and a meeting room. New kitchen, millwork, electrical, plumbing and sprinkler work to suit. Revision #1: Construct a 5'x10' server room next to meeting room and add a sub-panel in the new server room. Increase in project value of $10,000. June 27/23 - LLL TENANT: Esri Canada Limited Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $20,000
    Gibraltar Holdings Ltd
    Issued
  10. 2022-10-25 #812 - 8th Floor Interior alterations to provide tenant improvements to a new tenant on the 8th floor (#812) in this existing commercial building on site. Scope of Work: Construct new partition walls for new offices, new door, power and data supply for new work stations, new paint, electrical and sprinkler work TENANT: Vanguard Law Group Llp Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $60,000
    no contractor listed
    Issued
  11. 2022-09-14 #780 - 7th Floor Interior alterations to this existing office unit #780 on the 7th floor of this existing commercial building. E2 - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) OK to process as DTI as per City staff · $12,000
    Gibraltar Holdings Ltd
    Issued
  12. 2022-05-19 #1600 - 16th Floor Interior alterations to provide tenant improvements for this existing office tenant on the 16h floor (#1600) in this existing commercial building on this site. Scope of work: Construct partition walls to create a new office, new door, new glazing and electrical work. TENANT: Beijing Shokai Canada Ltd. OK for Field Review per City staffor to determine on site if a separate sprinkler permit is required. No sprinkler permit required as per City staffial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $4,000
    no contractor listed
    Issued
  13. 2022-04-21 Unit 1000 - 10th Floor Interior alterations to provide tenant improvements to this existing office unit (#1000) on the 10th Floor of this existing commercial building. Scope of work includes: 1) Minor reconfiguration of interior partition and mechanical systems. 2) New light fixtures, new millwork, new flooring, new wall finishes throughout office unit. · $650,000
    Reotech Construction Ltd
    Issued
  14. 2022-03-04 Unit 1010 Interior alterations to this existing office (1010) of this existing mixed use building on this site. Scope of work includes: 1) Renovation of existing office space for a new office tenant. 2) Minor reconfiguration of partition walls. 3) Minor alterations of mechanical systems. 4) New light fixtures to be installed. 5) New millwork, flooring and paint throughout. Revision 1: Scope of work: Addition of 1x D4 door at back of room #1001, painting of walls and ceiling tiles+grids in rooms #1001,1002, and 1004. Energy calculation is NOT affected and no new energy checklist is required. Value of Revision work: $500 Project Value: $650,000 + $500 = $650,500 · $650,500
    Reotech Construction Ltd
    Issued
  15. 2021-10-04 #1200 - 12th Floor Interior alterations to the existing office on the 12th floor (#1200) in this existing commercial building on this site. Scope of work: remove select partition walls, door to storage room and infill wall opening. TENANT: Forestry Innovation Investment Ltd OK for Field Review per City staff: Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1(g) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $10,000
    no contractor listed
    Issued
  16. 2021-07-15 #1000 - 10th Floor Interior alterations to provide tenant improvements to the existing tenant on the 10th floor (#1000) of this existing mixed use building. Scope of work: demo interior wall to create larger office, remove & install new door, and electrical work. TENANT: Pacific Pilotage Authority OK for Field Review per City staffspector to determine on site if a separate sprinkler permit is required. No SP required per City staff: Energy trigger not required BOMA BEST building. · $15,000
    Reotech Construction Ltd
    Issued
  17. 2020-11-30 #700 and #780 - 7th floor Interior alterations to provide tenant improvements and to demise office unit #700 into two units (#700 and #780) in this existing commercial building on this site. Scope of work: per VBBL 2019 to construct a new demising wall and relocate one door. Part 11: Major renovation upgrade triggers NOTE: future TI required for #780. TENANT: Carlson Wagonlit Travel OK for Field Review as per City staff. No sprinkler permit required. Energy Upgrade Exempted: N/A (BOMA BESt (Path 2)) · $10,000
    Gibraltar Holdings Ltd
    Issued
  18. 2020-09-23 #700 - 7th floor Interior alterations for this existing office tenant on the 7th floor (#700) to provide interior layout changes in this existing commercial building on this site. Scope of work: Per the 2019 VBBL to remove select partition walls, doors, provide new finishes and electrical work. TENANT: Carlson Wagonlit Travel OK for Field Review per City staff0 into two spaces (#700 and #780) · $40,000
    Altek Construction Ltd
    Issued
  19. 2020-08-27 #1100 Interior alterations to provide improvements for an existing office tenant at office unit #1100 on the 11th floor of this commercial building on this site. OK for Field Review per City staffMA BEST building · $12,000
    Gibraltar Holdings Ltd
    Issued
  20. 2020-04-22 #1410 - 14th Floor Interior alterations to provide tenant improvements on the 14th floor (#1410) in this existing commercial building. Scope of Work per VBBL 2019: demolish/construct partition walls and construct new opening between two existing offices Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Selected Energy Upgrade: E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) OK for Field Review per City staff · $9,000
    Matra Construction Inc
    Issued
  21. 2019-09-12 Exterior alterations to replace the brick cladding of the front planter/water feature with concrete finish and new membrane for the wheelchair ramp in the street facing courtyard for this existing office building on this site. OK for field review as per City staffklist Exempt: Site/External Alteration · $204,000
    no contractor listed
    Issued
  22. 2019-06-18 #610 (full 6th floor tenant) Interior alterations to unit #610 on the 6th floor of this existing, sprinklered, commercial building to provide tenant improvements for the existing General Office tenant. OK for field review as per City staffate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $35,000
    Gibraltar Holdings Ltd
    Issued
  23. 2019-04-17 #325 - 3rd floor Interior alterations to combine office units #305 & #325 (retaining #325) into one unit on the 3rd floor in this existing commercial building on this site. Scope of work: remove a portion of the demising wall and add a new glass slider, electrical and sprinkler work. REVISION #1: Re-stamp to replace lost applicant's set of drawings. No changes proposed. Sept. 10, 2019 mlh TENANT: Downtown Vancouver Business Improvement Assoc. OK for field review as per City staffbuilding. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work · $20,000
    Gibraltar Holdings Ltd
    Issued
  24. 2019-02-06 #1200 Interior alterations to provide improvements for existing office tenant in unit #1200 in this existing office building. No energy upgrade required. BOMA BESt building. · $5,000
    no contractor listed
    Issued
  25. 2018-10-11 #810 Interior alterations to provide tenant improvements and validate existing WWOP partition wall in this existing office suite on the 8th floor of this existing highrise commercial building. Scope of Work: - construct a new interior wall, sidelight and door to create a new office room OK for FLD RVW per City staffon No. IA-2018-01218 Energy Upgrade Selected: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $2,500
    Gibraltar Holdings Ltd
    Issued
  26. 2018-08-15 #905 - 9th floor (full floor tenant) Interior alterations to expand the General Office on the 9th floor (#905) into #950 (retaining #905) in this existing commercial building. Scope of work: demolish portion of demising walls to combine two units into one, construct new partition walls for new storage room and electrical work. TENANT: Canadian Mental Health Association OK for field review as per City staff. Related to Special Sprinkler Permit IA-2018-01001 Energy Upgrade Exempt: Boma Best · $3,000
    BC Coastal Projects Ltd.
    Issued
  27. 2018-05-04 #1575 Interior alterations to provide renovation to suite#1560 on the 15th floor for the tenant space. Scope of work includes expanding existing tenant unit (#1560) into unit (#1505) to form a full floor tenant address as unit #1575. OK Field Review as per City staff: L2-Lighting - Upgrade all hard wired lighting within an occupied space to High Efficiency light systems · $40,000
    Allspaces Design & Management Ltd
    Issued
  28. 2018-04-30 #510-5th floor Interior alterations to provide improvements to this existing vacant office space on the 5th floor (unit #510) in this existing commercial building on this site. Scope of work: new partition wall, new door/frame, new sidelight, sprinkler work. OK for field review as per City staff · $4,800
    BC Coastal Projects Ltd.
    Issued
  29. 2017-11-10 Basement level - Shower Rooms Interior alterations to provide improvements to the existing shower rooms on the basement level of this existing commercial buildings. Scope of work: demo and patch partition walls, remove door, new shower glazing, door, upgrades to lighting and mechanical. OK for field review as per City staff. Related to IA-2017-01156. Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $30,000
    Pagliaro Projects Ltd
    Issued
  30. 2017-10-30 #1600-16th floor Interior alteration to remove and construct non-load bearing partition walls to this existing office suite #1600 in this existing commercial building on this site. Scope of work includes demolition of millwork, relocate doors and glazing, new doors and glazing, electrical and sprinkler work. Okay for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $25,500
    Gibraltar Holdings Ltd
    Issued
  31. 2017-07-21 #1650 & #1600 Interior alterations to expand unit #1650 into a portion of unit #1600 and provide improvements for existing General Office tenant at unit #1650 in this existing commercial building. OK for field review as per City staff: Upgrade to incorporate automatic lighting shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $22,000
    Gibraltar Holdings Ltd
    Issued
  32. 2017-06-28 #1401 - 14th floor Interior alterations to provide improvements for new general office tenant on the 14th floor (#1401) of this existing commercial building. Scope of work: minor demolition and construction of new partitions. See related Special Inspection Permit No. IA-2017-01333. Ok for field review per City staff. Energy Upgrade Exempt: BOMA BESt Building · $20,000
    BC Coastal Projects Ltd.
    Issued
  33. 2017-05-16 #905-9th floor Interior alterations to provide improvements for existing tenant on the 9th floor (#905) in this existing commercial building. Scope of work: construct new partition wall to divide an existing office into two and relocate door. TENANT: Canadian Mental Health Association OK for field review as per City staffspection No. IA-2017-00504. Energy Upgrade Exempt: BOMA BESt Building. · $5,000
    BC Coastal Projects Ltd.
    Issued
  34. 2017-01-19 #510-5th floor Interior alterations only to provide tenant improvements at this existing vacant General Office on the 5th floor (#510) of this existing commercial building. Scope of Work: Construct partition walls/doors to create 2 new offices, electrical work. OK for field review as per City staff. Related to IA-2017-00012. Selected Energy Upgrade: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) · $5,000
    BC Coastal Projects Ltd.
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.