Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1122 Mainland St, Vancouver
An address in Downtown, Vancouver, zoned HA-3 (Historical Area). 17 building permits are on file, most recently “#580 - 5th floor (#580, #585, #590 combined /retain #580) Interior alterations to the 5th…” (issued 27 October 2026). The City's 2026 assessed value is $38,532,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153470, 853 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-10-27
#580 - 5th floor (#580, #585, #590 combined /retain #580) Interior alterations to the 5th floor to combine units #580, #585, & #590 into one unit (retaining #580) and provide improvements for a new office tenant in this existing commercial building on this site. Scope of work: demo demising walls, partition walls and construction new partition walls for new layout. Electrical, Plumbing, and Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $270,000
no contractor listed Issued -
2026-05-05
Exterior and interior alterations to provide tenant improvements to this existing Restaurant Class-1 (Group A-2) for a new tenant on the ground floor of this existing Vancouver Heritage Register commercial building on this site. Exterior alterations include adding two louvers for kitchen exhaust system, one intake louver in the storefront for intake, one exhaust louver facing the rear. Notes: - Reviewed under the 2025 VBBL. - Class 1 cooking operations (Grease-Laden Vapours). - Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). · $500,000
Willow Spring Construction BC Ltd Issued -
2025-10-11
Interior alterations to provide tenant improvements to the new tenant, Ray’s Yaletown, in this existing Restaurant and Neighbourhood Pub (Group A2) with ancillary Manufacturing (Brewery) in this existing Municipally-designated Heritage C commercial building. Scope of work: Changing cooking equipment under existing hood, removing one existing washroom and change entryway to washroom, installing new furniture, raised seating and bar, relocating electrical panel and grease interceptor. Building Review Notes: - Proposed occupant load is 194 persons (interior 149, future patio 34, staff 11). Maximum occupant load cannot exceed 225 persons (200 seats, 25 staff) due to washroom capacity. - Patio require separate DP/BP. - AL401051 for separation of Group F1 and A2 by tempered glazing protected with 1.5 h FPR shutter shall be maintained. Mechanical Review Notes: - Class 1 Cooking Operation (Grease-Laden Vapours). - Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - Existing hood, ducting and exhaust fan to remain. Demolish the smaller hood. *** Reviewed under the VBBL 2019 *** · $200,000
ACS ELECTRICAL LTD Issued -
2025-06-19
#460 - 4th floor (demising into #460 and #465) * SEE REVISION #2 Interior alterations to provide improvements to this existing office space on the 4th floor to demise #460 into two units (to be #460 & #465) and provide new kitchen cabinets and a sink, dishwasher, fridge in unit #460 only in this existing commercial building. REVISION #1: To correct/Switch the assigned suite numbers (#460 and #465) based on the revised drawings. - Aug 12/25 - LLL REVISION #2 - Change unit #465 to #450. Add two new offices in #450. April 14/26 mk Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $38,874
Pagliaro Projects Ltd Issued -
2025-02-20
480 & #490 (demised from #490) Interior alterations to provide improvement to this existing office space on the 4th floor (#490) to be demised into two units (#490 & #480) and provide improvements to #490 in this existing Vancouver Heritage 'C' commercial building. Scope of work: demo partition walls, construct new demising wall, new partition walls, doors/frames, new kitchen, lighting, & finishes to #490. New counter, sink and lighting only in #480. New entrance doors to both units. Electrical, plumbing/HVAC to suit. #480 is an open floor plan and will require permits if there are further improvements. * District Building Inspector to determine if a Special Sprinkler Inspection permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $137,995
Pagliaro Projects Ltd Issued -
2023-06-01
#225 - 2nd floor Interior alterations to provide improvements for a new office tenant on the 2nd floor (#225) of this existing commercial building on this site. Scope of work: remove and install new partition walls/doors to reconfigure layout. New acoustic wall, flooring, finishes, LED lighting, & relocate HVAC ducting. Electrical to suit. District Building Inspector to determine if a Special Sprinkler Permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $150,000
VPAC Construction Group Ltd Issued -
2021-02-24
#410 - 4th Floor Interior alterations to combine unit #410 and #420 (retaining #410) for the existing general office tenant in unit #410 on the 4th floor in this existing Vancouver Heritage Register C commercial building. Building Sprinklered – No sprinkler permit required. Energy upgrade:L2 - SWH - Upgrade SWH system Temperature Controls (per City staff.4.4.1 of ASHRAE 90.1 - 2010 OK for Field Review per City staff: Yousefi Law Corporation · $10,000
no contractor listed Issued -
2019-11-27
4th Floor-Common Showers/Accessible Washroom Interior alterations to install a new universal toilet room within the existing shower room of the common corridor on the 4th floor of this existing commercial building. Scope of work: demolish t-bar ceiling, interior wall, equipment, light fixture, construct new interior wall and new entry door from the corridor to accessible washroom, drywall ceiling, finishes, electrical and plumbing work. OK to install a voluntary universal toilet room within the existing shower room as per City staff. OK for field review as per City staff. L2 - Lighting - Upgrade to incorporate Automatic Full OFF (per City staff.4.1.1.(h) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $18,000
no contractor listed Issued -
2019-05-16
#520 #530 Interior alteration to remove partition wall between office suite #520 and office suite #530 to create one office suite #520 on the 5th floor in this existing commercial building on this site. Okay for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $19,500
G W Property Services Ltd Issued -
2018-08-08
#228 Interior alterations to remove two (2) non-loadbearing partitions with interior door and windows at this existing General Office use at unit #228 on the second storey at this existing 5 Storey plus basement with 2 levels of underground parking Vancouver Heritage 'C' commercial building. Note: no exterior alterations proposed. OK for field review as per City staff. Related to Special Sprinkler Inspection No. IA-2018-01101. Energy Upgrade Selected: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) · $2,000
CW Painting 2000 Ltd Issued -
2017-08-29
#585-5th floor Interior alteration only to provide improvements for a new General Office tenant which was formerly unit #560 and now to be changed to unit #585, which also includes infilling an existing door opening to unit #590, on the 5th floor of this existing Vancouver Heritage Register 'C' commercial building. Scope of work: demolish partition walls and millwork, remove/relocate doors, construct new glass reception/feature wall, new finishes, millwork and lighting, ceiling, electrical work. Address Note: #560 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #585 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. TENANT: Taylor Ryan OK for field review as per City staff. Note: The applicant has indicated that this suite is NOT sprinklered. Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) · $25,000
G W Property Services Ltd Issued -
2017-07-04
#335 Interior alterations to unit #350 to provide a demising wall to create two new offices and to provide improvements for a new tenant unit#335 on the 3rd floor of this existing commercial building on this site. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $32,000
Counterpoint Interiors Inc Issued -
2017-06-26
#410 Interior alterations to rearrange the partition walls for new office tenant in this existing office space #410 on the 4th floor of this existing commercial building on this site. Ok for field review per City staff: Upgrade SWH system Temperature Controls (per City staff.4.4.1 of ASHRAE 90.1 - 2010) · $24,000
no contractor listed Issued -
2017-05-03
(460) Interior alterations to expand #460 into #465 (retaining #460) and to provide improvements for an existing tenant at this existing general office on the fourth floor of this existing Vancouver Heritage "C" commercial building on this site. OK for field review per City staff: A/B (Arch) by Micheal Mammone, [contact removed] · $50,000
no contractor listed Issued -
2017-04-04
(#225) Interior alterations to provide improvements to this existing office tenant in unit #225 on the second floor of this existing commercial building on this site. OK for field review per City staff. Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) Note to DBI: No sprinklers in suite per applicant. · $120,000
Counterpoint Interiors Inc Issued -
2017-03-14
Interior alterations to provide tenant improvements for a cycle fitness club in this existing mixed-use building Revision #1 - Minor revisions to fit site conditions · $300,000
no contractor listed Issued -
2017-02-16
Exterior alterations to replace the storefront glazing in unit 1128 Mainland St. in this existing commercial building. Work to include replacing the rear wall glazing with solid wall and replace fencing around the patio. Note: A Separate permit will be require for any interior work. OK for DB for exterior work as per City staffoupheng, Jan 06, 2016 Lower stripe film OK per City staff · $20,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
To construct a 9-storey (8 storey Z&D) building containing 94 Residential Rental (Seniors Supportive Dwelling) and amenity space serving occupant of the building. Scope of work also includes façade retention, rehabilitation and restoration of the Hartney Chambers Vancouver Heritage Building (demo and retention applied under DB-2026-00299) - 1st storey includes loading/vehicle parking, storage, service room, generator & electrical room, heat treatment room - 2nd storey includes main entrance, common dining, amenity and kitchen, UTR and residential suites, - 3-9 storey includes residential units, shower room, service room. 9th storey also includes amenity room. SHORT Project · ITC Projects Inc2026-10-30
Interior alteration to convert an existing shell CRU into a Neighbourhood Public House in this 10-storey hotel building. - Refer to BP-2021-00364 for the base building. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. The Roof Deck is excluded from this application and shall not be used by patrons of the neighbourhood public house on the ground floor. 3. The time limitation on DP-2025-00909 shall be observed. ISSUED: Oct. 30, 2026 (S.Yoo) · NDY Contracting Ltd2026-10-30
#1150 - 11th floor Interior alterations to provide improvements to this existing general office on the 11th floor (#1150) of this existing commercial building on site. Scope of work: Install new kitchenette, countertop and cabinet, electriclal, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Central West Project Management Inc.2026-10-30