Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1111 W Hastings St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 33 building permits are on file, most recently “Interior and exterior alterations to demolish portions of the existing structure in prepa…” (issued 3 November 2026). The City's 2026 assessed value is $38,173,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153995, 196 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-11-03
Interior and exterior alterations to demolish portions of the existing structure in preparation for the conversion of this existing 15-storey office building into a hotel. - Refer to BP-2026-02014 for the abatement and demolition of interior non-structural elements. - Refer to BP-2026-01126 for details of the proposed new work in the existing building. ISSUED: Nov. 3, 2026 (S.Yoo) · $1
Matcon Demolition Ltd Issued -
2026-06-25
1111 W Hastings Interior Alterations only to remove interior finishings, partitions and fixtures resulting in the entire building becoming a shell space in preparation for future improvements. OK for DTI per City staff2025-00646 and BP-2026-01126. Any future tenant will require Building and occupancy permits prior to occupying the space. · $1
no contractor listed Issued -
2026-06-03
Exterior and interior alterations and change of use from Office (Group D) to Temporary Sales Centre (Group D) at the 10th Floor of this existing mixed use building on this site. Alterations include 3 hotel room mock-ups. · $450,000
no contractor listed Issued -
2023-09-28
#900 - 1111 W Hastings Street Interior alterations to this existing office unit (#900) in this commercial building. Scope of work includes: 1) Rearrange interior partition walls in the unit 2) Update light fixtures 3) Update flooring Sprinkler Contractor: Gisborne Group Ok for Field Review as per City staff · $30,000
no contractor listed Issued -
2023-07-27
#1500 - 15th Storey Interior alterations to provide tenant improvements to this existing general office on the 15th floor (#1500) of this existing commercial building on site. Scope of work: Demolish select partition walls, millwork, flooring, ceiling bulkheads and lighting fixtures. New millwork, flooring, glass door/walll, movable divider wall, paint, electrical and sprinkler work. REVISION #1: Interior layout changes. Remove partition walls AND washroom. Add recessed ceiling in boardroom, drop ceiling in reception area, new storage closet. Increase in project cost by $20,000 (from $100,000 to $120,000). LLL - Nov 23/23 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $120,000
Focus Project Management Ltd Issued -
2023-04-05
#1000 & #1050 - 10th Floor (demised from #1000) Interior alterations to demise this existing general office on the 10th floor to two units #1000 and #1050 in this existing commercial building on site. Scope of work: construct a common corridor, partial demolition of existing partitions, demolish printer room, filing cabinet millwork. Construct demising walls for 2 units, build new offices and new light fixtures. REVISION #1: extend corridor wall adjacent to the existing Men's Washroom, and replace the proposed 2' X 2' light fixtures with 3" potlights. Project value increasing from $60,000.00 to $62,000.00. June 6, 2023 mlh OK for Field Review - per City staff · $62,000
no contractor listed Issued -
2023-03-22
#790 - 7th Floor (#790 expanding to #785) Interior alterations to provide tenant improvements on the 7th floor for an existing general office to expand unit to suite #785 (retaining #790) in this existing commercial Building. Scope of work: Remove a portion of the demising wall to create an opening between #785 & #790. Repair flooring, paint walls affected and electrical work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $5,000
no contractor listed Issued -
2023-02-03
#388 - 3rd floor (#320 & #388 combining) Interior alterations to combine office units #320 and #388 (retaining #388) and to provide tenant improvements for a new office tenant in this existing commercial building on this site. Scope of work: remove demising wall between the two units, remove existing partitions, walls, doors. Construct new walls, doors and glazing for new offices. Add new storage room and shower room. Install new kitchenette, electrical, plumbing and sprinkler work. TENANT: Maynards Capital Inc · $50,000
no contractor listed Issued -
2023-01-25
Exterior alterations to provide improvements to this existing commercial building on this site. Scope of work includes to repair exterior columns. OK for field review as per City staff · $15,000
Focus Project Management Ltd Issued -
2023-01-18
#501 - 5th Floor Interior alterations to provide tenant improvements for this existing general office tenant on the 5th floor (#501) of this existing commercial building on site. Scope of work: Demolish existing light fixtures, new bulkhead, pot lights and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $15,000
Focus Project Management Ltd Issued -
2022-11-22
#10 - lower level Demo to shell Interior alterations to provide improvements for existing office tenant on the lower level (unit #10) in this existing commercial building on this site. Scope of work: remove partition walls, doors, millwork, sink, T-Bar ceiling grid, electrical and sprinkler work. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. E2- Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1(g) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $75,000
Focus Project Management Ltd Issued -
2022-11-22
#100 - 1st Floor (full floor tenant) Interior alterations to provide tenant improvements to an existing full floor office on the 1st floor (#100) of this existing commercial building on site. Scope of work: remove partition walls, doors, T-Bar ceiling grid, lighting, electrical and sprinkler work. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1(g) of ASHRAE 90.1-2016. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $75,000
Focus Project Management Ltd Issued -
2022-02-17
#1000 - 10th floor (full floor tenant) Interior alterations to provide tenant improvements to an existing office tenant on the 10th floor (#1000) in this existing commercial building. Scope of work: remove select partition wall, millwork, ceiling bulkheads and lighting fixtures. OK For Field Review per City staff; Jan 12, 2022 E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1 (g) of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $5,000
no contractor listed Issued -
2021-08-17
#905 - 9th floor Interior alterations to provide improvements to an existing office tenant at on the 9th floor (#905) of this existing commercial building on this site. Scope of work: Addition of interior partition within existing boardroom to create new office room, reducing boardroom size. Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. No sprinkler permit required per City staff · $1,000
Focus Project Management Ltd Issued -
2021-08-05
#1268 - Floor 12 Interior alterations to provide improvements for this new office tenant in this existing commercial building on this site. Scope of work: Deconstruct interior walls and millwork. Construct interior walls, millwork and kitchen. DBI to determine if a Sprinkler Permit is required · $25,000
no contractor listed Issued -
2021-04-08
#900 - 9th Floor Interior alterations to provide improvements on this new office tenant on the 9th floor (#900) of this existing commercial building. Scope of work: Add a glass sidelite to the entrance, remove existing millwork for reception and construct new partition wall. REVISION #1: interior layout changes. July 27, 2021 mlh OK for Field Review per City staffcted Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $12,000
Counterpoint Interiors Inc Issued -
2020-12-24
#501 - 5th Floor Interior alterations to provide improvements on this new tenant on the 5th floor (#501) of this existing commercial building. Scope of Work: Construct new millwork, new sink & faucet for kitchen, electrical and plumbing work. TENANT: Ginkgo Health Building Sprinklered – separate sprinkler permit is not required. Selected Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per City staff.4.1.1.(g) of ASHRAE 90.1-2016) OK for Field Review - Aemelia P - Nov 10/20 Processed Thru FIT · $2,500
no contractor listed Issued -
2019-11-12
#830 - 8th floor (#830 & #850 combining, retaining #830) Interior alterations to provide improvements for and new office tenant on the 8th floor (#830) of this existing commercial building on this site. Scope of work: to make an opening in the demising wall between #830 and #850 to combine units. Add new cabinetry, new exit sign, emergency lighting, electrical for TV in Boardroom. **REVISION #1 - Extend demolition of drywall in length, to include closet, one electrical outlet and one data port. ASHRAE reviewed. Increase Project Value from $10,000. to $11,000./Feb.5/20 mk ******************************************************** *DBI to verify see if sprinkler permit is required. OK for field review as per City staffrate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $11,000
Focus Project Management Ltd Issued -
2018-12-17
#800 & #850 - 8th floor Interior alterations to combine #800 with #860 (retaining #800) and to reconfigure an existing demising wall between #800 and previously unaddressed unit (now #850) on the 8th floor of this existing commercial building. Scope of work: demolish demising wall, interior partition/door and reconfigure an existing demising wall/door, electrical and sprinkler work. REVISION #1-Removing Sprinkler work from scope. District Building Inspector to determine if a sprinkler permit is required. No fee charged. Jan.24/19 jm · $40,000
Focus Project Management Ltd Issued -
2018-08-31
#910 - 9th Floor Interior alterations to provide improvements to this office unit #910 on the 9th floor in this existing commercial building on this site. Scope of Work: - remove existing carpets, millwork - install new plumbing rough-in and electrical work for kitchen area - remove existing interior wooden door at entry and install new glass door REVISION #1 - Change layout, - change partition walls to glass walls - change wood doors to glass doors. - change job value from $10,000 to $20,000. - ASHRAE reviewed Sept. 17/18 mk REV. #2 1. Removal of two walls and installation of one new wall. 2. Changing 3 smaller rooms into 2 larger rooms. Replacing all drawings, no change to electrical. No change in project value. Oct 24, 2018/EM OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $20,000
Focus Project Management Ltd Issued -
2018-08-27
#900 - 9th floor Interior alteration to provide improvements for this existing office tenant on the 9th floor (#900) of this existing commercial building. Scope of work includes: select demo, and new partitions to alter layout for smaller offices, boardroom, modify lunchroom. Note: Okay for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $70,000
no contractor listed Issued -
2018-08-22
Unit 700 - 7th floor Interior alterations to relocate a partition wall/door and to demolish two interior partition walls in this existing office for the existing general office (financial) tenant in this existing commercial building. TENANT: CitiFund Capital Corp · $4,000
applicant withheld (individual) Issued -
2018-08-01
#900 & #905 - 9th floor Interior alterations to demise unit #900 into two units on the 9th floor in this existing commercial building on this site. *tenant improvement work to #900 only. Scope of work: minor demolition, construct new demising wall, new entry door, electrical, plumbing and sprinkler work. REVISION #1- Demolish closet and west wall in server room and re-build west wall in server room to align with ceiling coffer grid. No changes to ASHRAE. August 14, 2018 jm Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to any of the units on this floor. OK for field review per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $10,000
Focus Project Management Ltd Issued -
2018-05-01
#575 Interior alterations to provide improvements to this existing office unit #575 for a new office tenant (Henderson Development) in this existing commercial building on this site. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $40,000
no contractor listed Issued -
2018-04-30
#333 - 3rd floor Interior alterations only to provide tenant improvements including the relocation of an existing demising partition for this new General Office use on the 3rd floor (#333) at this existing commercial building. Scope of work: demolish demising wall and glass panel, construct new partition walls, doors, finishes, new staff kitchen, ceiling work, electrical, plumbing and sprinkler work. REVISION #1-Removal of proposed floating wall (for TV). ASHRAE not affected. May 22/18 jm OK for field review as per City staff. NOTE: Energy Upgrade: L2 - Lighting - Upgrade to incorporate automatic lighting shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $40,000
Focus Project Management Ltd Issued -
2018-04-16
#320 - 3rd floor Interior alterations only to provide tenant improvements including the relocation of an existing demising partition for this new General Office use on the 3rd floor (#320) at this existing commercial building. Scope of work: demolish and relocate demising wall, construct new partition walls, doors, finishes, new staff kitchen, ceiling work, electrical, plumbing and sprinkler work. OK for field review as per City staff. Note: L2 - Lighting - Upgrade to incorporate automatic lighting shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $80,000
Focus Project Management Ltd Issued -
2018-02-05
#1101 - 11th floor Interior alterations to provide improvements for this existing office tenant on the 11th floor (#1101) of this commercial building on this site. Scope of work: demolish a portion of the partition wall in entry, remove one door, construct partition wall, add new glass entry door and electrical work. TENANT: CPHR for BC and Yukon Note: Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) OK for field review per City staffmit No. IA-2018-00176 · $78,023
Counterpoint Interiors Inc Issued -
2018-01-16
#200 - 2nd floor (entire floor) Interior alterations to this existing office unit on the 2nd floor (#200) and to the common area washroom in this existing office building. Scope of work: demolish/construct partition walls, millwork, doors, lighting, ceiling work, electrical, plumbing and sprinkler work and replace toilets/sinks/finishes in common washrooms. REVISION #1: Revision to retain existing GWB wall previously indicated as removed. No change to ASHRAE. M. Henderson, Apr. 9, 2018 TENANT: Tricor Founders Pacific Capital Inc. · $80,000
Focus Project Management Ltd Issued -
2017-12-08
#800 and #830-8th floor Interior alterations to demise #800 into two units to be #800 and #830 in this existing commercial building on this site. Scope of work: construct new demising wall and partition wall and new doors for #830 , drop ceiling and lighting in #800. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements. Applicant advised to apply for a Special Sprinkler Inspection. OK for field review as per City staff. · $5,000
Focus Project Management Ltd Issued -
2017-11-30
#1100-11th floor Interior alterations to provide improvements to this existing office tenant space in this existing commercial building on this site. Scope of work: new partition walls, glazing, doors, power/data, lighting, electrical and sprinkler work. REVISION #1: Add new partition wall near entrance area and extend glazing wall from 12' to 15'. No change to ASHRAE. Jan. 16, 2018 mlh/jm. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $25,000
Focus Project Management Ltd Issued -
2017-10-26
#1250 (demised/Add unit#1260) Interior alterations to demolish some interior partitions and demise this existing office space on the 12th floor (#1250) into two units (to be #1250 and #1260) of this existing commercial building on this site. Unit #1260 is a shell space. Separate permit(s) and ASHRAE checklist will be required for future improvements. OK for field review per City staff. Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $10,000
Focus Project Management Ltd Issued -
2017-09-14
#800 Interior alterations to provide improvements for existing General Office tenant in unit #800 in this existing commercial building. Scope of work includes replacing existing coffered ceiling with drop ceiling. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $70,000
no contractor listed Issued -
2017-05-09
#320-3rd floor Interior alterations to provide interior non-load bearing demolition only. Scope of work: demolish all partition walls, doors, remove ceiling fixtures, all finishes to bring to "shell" space, remove/cap electrical outlets/data and switches. Future tenant improvements will required separate permit(s) and ASHRAE checklist. See Special Sprinkler Inspection Permit No. IA-2017-00537. Energy upgrade exempt: Interior demolition. · $65,000
Focus Project Management Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05