Permit GopherAlberta and B.C. property, permit and zoning records

1111 W Georgia St, Vancouver

An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 39 building permits are on file, most recently “#1900 - 19th floor Interior alterations to provide improvements to this existing full flo…” (issued 29 September 2026). The City's 2026 assessed value is $214,636,000.

Zoning
DD · Comprehensive Development
Neighbourhood
Downtown
Permits on file
39
Assessed value (2026)
$214,636,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1111 W Georgia St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150850, 2,626 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
2,626
Households
1,435
Median age
37.2
Median household income (2020)
$82,000
Own their home
45%
Vancouver: 45%
Average household size
1.9
Under 15
8%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-09-29 #1900 - 19th floor Interior alterations to provide improvements to this existing full floor office tenant space on the 19th floor (#1900) of this existing commercial building. Scope of work: select demo and construction of partition walls for new layout. Electrical, Mechanical/Plumbing, & sprinklers to suit. Letters of Assurnace submitted; · $2,368,901
    BGIS Integrated Technical Services Canada Ltd
    Issued
  2. 2026-05-05 #2010 - 20th floor (demising into #2010 & #2030) Interior alterations to this existing office space on the 20th floor to demise #2010 into two units (to be #2010 and #2030) in this existing commercial building on this site. Scope of work: remove a door and infill to demise unit into two. No tenant improvement work proposed. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $11,000
    RSP Construction Group Ltd
    Issued
  3. 2026-04-30 #16th Floor - 1111 W Georgia St Interior alterations to demise this existing office space into two units and provide tenant improvements to one of the newly created units on the 16th floor of this existing commercial building on this site. Separate permit required for new tenant improvements for Unit #1610 · $90,000
    Elevation Ventures Inc
    Issued
  4. 2026-01-22 #2400 - 24th Floor Interior alterations to provide improvements to this existing office for a new office tenant on the 24th floor (#2400) of this commercial building on site. Scope of work: Demo and install partition walls to suit new layout. Add new accessible washroom and upgrade finishes throughout. Electrical, mechanical/plumbing and sprinkler work to suit. REVISION #1: Wall layout changes, new accessible hardware spec and door type, demo additional · $2,500,000
    Alabaster Developments Ltd
    Issued
  5. 2025-10-03 #200 & 220 - 2nd floor (#200 demising into two units) Interior alterations to demise the unit #200 into 2 units (#200 and #220) in this existing commercial building on site. Scope of work: Select demo/construct walls, new flooring, paint, electrical and plumbing work to suit. *existing interconnection between 2nd and 3rd floors (AL-2017-00166) Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $95,000
    RSP Construction Group Ltd
    Issued
  6. 2025-04-17 16th floor - elevator lobby and corridor Interior alterations to this existing vacant full floor office space on the 16th floor to removal non loading partition walls and build new walls for elevator lobby, corridor and 3 tenant entry doors in preparation for multi tenant occupancy. All offices along the window perimeter are left as is. *Demising walls to divide this floor are not included in this scope of work and will required separate permits. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
    iD Design Consulting Ltd
    Issued
  7. 2024-08-22 #400 - 4th floor Interior alterations to provide improvements for a new full floor office tenant on the 4th floor (#400) of this existing commercial building on this site. Scope of work: select demo to remove server room, create a public corridor on the side of elevator lobby, relocate door entrances into suite, relocate kitchen/coffee room, add new closet. Electrical, plumbing, & sprinklers to suit. · $175,000
    Priority Projects Limited
    Issued
  8. 2024-05-10 1135 W Georgia Street Interior alterations only and a change of use from the existing Retail Store as a Group E Occupancy to a new Beauty and Wellness Centre use as a Group D Occupancy at 1135 W Georgia Street at this existing commercial building at this site. Tenant: Armani Nail Boutique Ltd. OK for Direct to Inspections as per City staff. · $150,000
    no contractor listed
    Issued
  9. 2024-03-18 #1595 - (demised from #1500) Interior alterations on the 15th floor to demise the existing general office space #1500 into two units to be #1500 and #1595 and to provide tenant improvements to suite #1595 only, in this existing commercial building on this site. Scope of work: Construct demising wall to create 2 suites, new partition walls to create 2 new offices in #1595 and electrical work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $65,000
    no contractor listed
    Issued
  10. 2024-01-17 #1330 - 13th floor Interior alterations to provide improvement to this new tenant and a change of use from General Office to a Health Care office (HCO) in this unit on the 13th floor (#1330) of this existing commercial building on site. Scope of work: Demolish existing partition/glass walls to suit new layout. Construct new treatment rooms, storage, kitchen, electrical and plumbing work. REVISION #1 - change location of storage closet and add washroom. Mar 26/24 mk OK for Change of Use by Aemelia P - Dec 21/23 TENANT: Promethean Medical Aesthetics Inc · $360,000
    no contractor listed
    Issued
  11. 2022-12-21 19th floor Interior alterations to provide tenant improvements for a new office tenant on the 19th floor in this existing commercial building on this site. Scope of work: construct partition walls, doors, new kitchenette, millwork, finishes, lighting, electrical and plumbing work. TENANT: CMHC · $600,000
    no contractor listed
    Issued
  12. 2022-10-31 19th and 20th Floors: Interior alteration to subdivide an existing suite horizontally between the 19th and 20th floors, and vertically into 2 suites on the 20th floor. The existing tenant (CMHC) will occupy the 19th floor only; the 20th floor is demised for 2 new tenants (TCC Canada in Suite #2050; Suite #2010 is vacant). No DP required; OK for BP only (K.K., Jun. 6, 2022). *This permit has been reviewed under the provisions of VBBL 2019.* · $80,000
    Makcom Construction Ltd
    Issued
  13. 2022-08-30 #600 - 6th floor Interior alterations to provide tenant improvements for an existing office tenant to combine unit #600 and #680 into one unit (retaining #600) becoming a full floor tenant in this existing commercial building on this site. Scope of work: remove demising walls to combine #600 and #680, demolish existing partition walls, doors, floorings, millwork, construct new partitions, new paint, millwork, sprinklers, electrical, HVAC, and plumbing work to suit new layout. REVISION #1: Interior layout and lighting changes, addition of mag locks and existing exhaust fans to be removed. (Letter of Commitment submitted dated Dec.13,2022. Ok per City staff) Change applicant from Joanna Langley to Gavin Cunningham (same company) TENANT: Aviso Wealth Inc · $950,000
    Govan Brown Ltd
    Issued
  14. 2022-08-18 #900 - 9th Floor Interior alterations to provide tenant improvements to a new office tenant on the 9th floor (#900) in this existing commercial building on site. Scope of work: Demolish all partition walls, glazing and framing, doors, floor finishes, plumbing fixtures. Construct new interior walls, new doors, electrical, plumbing and sprinkler work. TENANT: Beedie Development Corp · $500,000
    no contractor listed
    Issued
  15. 2022-06-22 #1100 - 11th floor Interior alterations to provide improvements for this new office tenant on the 11th floor (#1100) in this commercial building on this site. Scope of work: remove all partition walls/doors, finishes and construct new partition walls, repair and modify ceiling, millwork, lighting, finishes (floor/walls), HVAC, power and data, electrical, plumbing, mechanical and sprinkler work. TENANT: Marcus & Millichap · $850,000
    no contractor listed
    Issued
  16. 2021-10-25 #1590 - 15th floor Interior alterations to provide tenant improvements for a new office tenant on the 15th floor (#1590) in this existing commercial building on this site. Scope of work: construct partition walls, doors, new kitchenette, millwork, finishes, lighting, electrical, plumbing and sprinkler work. TENANT: ITIQ Tech Recruiters Inc. OK for field review per City staffinkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to incorporate Automatic FULL OFF (per City staff.4.1.1 (h) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $150,000
    Unlimited Ceilings & Partitions Inc
    Issued
  17. 2020-03-12 #2400 - 24th floor Interior alterations to provide improvements for this existing full floor office tenant on the 24th floor (#2400) of this existing commercial building on this site. Scope of work: Per City staff(between meeting room and staff lounge) and replace with new solid panel sliding partition. Replace bulkhead to meet seismic requirements. Selected energy upgrade: L2 - Lighting - Upgrade to Restricted to Partial Automatic ON (per City staff.4.1.1.(c) of ASHRAE 90.1-2016) OK for Field Review - Feb 3, 2020 Processed Thru FIT · $30,000
    Fusion Project Management Ltd
    Issued
  18. 2019-12-06 #104 - Ground floor Interior alterations to provide improvements to the retail unit #104 in this existing commercial building on this site. Scope of work includes to validate the unit layout of Unit#103, #103A and #104 and the use of Health Care Office for Unit #103 and #103A. OK for field review as per City stafff sprinkler permit is required. Energy Upgrade: L4 - Lighting - Upgrade all Lighting Controls (per City staff.4.1.1 of ASHRAE 90.1-2016) · $10,000
    no contractor listed
    Issued
  19. 2019-07-04 Elevator modernization, a voluntary upgrade, to replace elevator motors, controls, elevator interiors, emergency recall in accordance with Vancouver Bulletin 2008-002-BU/EL. The above work applies to Main, 2nd, 12th, 14th, and 25th floors as per plan. · $1,620,000
    no contractor listed
    Issued
  20. 2019-04-30 #1100 - 11th floor Interior alterations to provide improvements for this existing multi-floor office tenant at unit #1100 (half floor) on the 11th floors of this commercial building on this site. Scope of work: demolish/construct partition walls, glazing, doors, new finishes, manufactured wall systems, lighting, ceiling, power, ductwork, electrical, mechanical, plumbing and sprinkler work to suit new layout. TENANT: Aviso Wealth Inc. *Reception currently located on the 7th floor (#700)
    GBS Construction Managers Inc
    Issued
  21. 2019-04-30 #800 - 8th Floor (full floor) Interior alterations to provide improvements for this existing multi-floor office tenant at unit #800 (full floor) on the 8th floors of this commercial building on this site. Scope of work: demolish/construct partition walls, glazing, doors, new finishes, manufactured wall systems, lighting, ceiling, power ductwork, electrical, plumbing and sprinkler work to suit new layout. TENANT: Aviso Wealth Inc. *Reception currently located on the 7th floor (#700) · $20,000
    GBS Construction Managers Inc
    Issued
  22. 2019-04-30 #700-7th floor (full floor) Interior alterations to provide improvements for this existing multi-floor office tenant at unit #700 (full floor) on the 7th floors of this commercial building on this site. Scope of work: demolish/construct partition walls, glazing, doors, new finishes, manufactured wall systems, lighting, ceiling, power ductwork, electrical, plumbing and sprinkler work to suit new layout. REVISION #1-Coffee room added to west corner, Rooms 716, 717 & 718 reconfigured layout. No increase to value. ASHRAE reviewed. Nov.29/19 jm TENANT: Aviso Wealth Inc. *Reception currently located on the 7th floor (#700)
    GBS Construction Managers Inc
    Issued
  23. 2019-04-30 #600-6th floor Interior alterations to provide improvements for this existing office tenant at unit #600 (half floor) on the 6th floor of this commercial building on this site. Scope of work: demolish/construct partition walls, glazing, doors, new finishes, manufactured wall systems, lighting, ceiling, power ductwork, electrical, plumbing and sprinkler work to suit new layout. TENANT: Aviso Wealth Inc. *Reception currently located on the 7th floor (#700)
    GBS Construction Managers Inc
    Issued
  24. 2019-03-13 #1400 - 14th floor (Full Floor) Interior alterations to provide tenant improvements for this new full floor office tenant on the 14th floor (#1400) of this existing commercial building. Scope of work: demolish/construct partition walls, glazing, doors, new finishes, lighting, ceiling, power ductwork, electrical, mechanical and plumbing work to suit new layout. REVISION #1: Revise door hardware to install Maglocks to elevator lobby doors and increase project value from $750,000.00 to $752,000.00. No change to ASHRAE. Oct 9, 2019 mlh * Separate Sprinkler Permit required for proposed sprinkler work. OK for Field Review as per City staff · $752,000
    no contractor listed
    Issued
  25. 2018-12-17 #400 & #500 - 4th and 5th floors (full floors) Interior alterations to provide improvements for this existing multi-floor office tenant at units #400 and #500 on the 4th and 5th floors of this commercial building on this site. Scope of work: demolish demising wall on the 5th floor (to combine #500 and #505;retaining #500), demolish/construct partition walls, glazing, doors, new finishes, manufactured wall systems, lighting, ceiling, power ductwork, card reader/electric strike, electrical, plumbing and sprinkler work to suit new layout. · $3,500,000
    GBS Construction Managers Inc
    Issued
  26. 2018-10-23 #1000 - 10th Floor Interior alterations to provide tenant improvements for an existing office and tenant on the 10th floor of this existing highrise office building. Scope of Work: - demolish millwork, partial walls, flooring at existing copy room and install new - construct a new interior wall to create two new offices at existing copy room - install new supply and return air grille and electrical work for the two new offices - remove existing door at storage room OK for FLD RVW per City staff. Energy Upgrade Selected: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $10,000
    David Mitchell Co Ltd
    Issued
  27. 2018-09-06 #1110 - 11th floor Interior alterations to demolish all interior partition walls to create office (shell) in this existing office unit on the 11th floor (#1110) in this existing commercial building on this site. Scope of work: demolish partition walls/doors, electrical work. NOTE: Separate permit and ASHRAE checklist will be required for future tenant improvements. OK for TIPs as per City staffn No. IA-2018-01240. Energy upgrade exempt: Interior demolition only. · $65,000
    no contractor listed
    Issued
  28. 2018-05-04 #2150 - 21st floor (full floor tenant) Interior alterations only to provide a new office and to expand the staff lounge for this existing General Office tenant on the 21st floor (#2150) in this existing commercial building. Scope of work: construct new partition to expand staff lounge, new millwork, finishes, t-bar ceiling and new partitions to enclose previous open work space area, new door, finishes, electrical and plumbing work TENANT: Connor, Clark & Lunn Financial Group Ltd. OK for field review as per City staff. Related to Special Sprinkler Permit No. IA-2018-00737 L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) · $80,000
    no contractor listed
    Issued
  29. 2018-03-01 #1570 - 15th floor Interior alterations to provide tenant improvements for a new general office tenant on the 15th floor (#1570) in this existing commercial building. Scope of work: demolish one partition wall, construct new partition walls, glazing, doors, millwork ceiling work, new staff kitchen, electrical, plumbing and sprinkler work. TENANT: Bond Capital Ltd. OK for field review per City staff Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $120,000
    no contractor listed
    Issued
  30. 2018-02-19 #1590 - 15th floor Interior alteration to provide tenant improvements for a new office tenant on the 15th floor (#1590) of this existing commercial building. Scope of work: demo of insuite washroom and lighting, install new partitions, doors, ceiling, electrical, plumbing, & sprinkler work for new layout. Okay for field review as per City stafftic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $70,000
    no contractor listed
    Issued
  31. 2017-12-20 #2150-21st floor (full floor tenant) Interior alterations to this existing unit #2150 to provide improvements for existing office (financial) tenant to enlarge the server room and relocate some partition walls in this existing commercial building. Scope of work: demolish partition walls, construct new partition walls, new t-bar ceiling, glazing, relocate lighting, electrical, mechanical and sprinkler work. · $61,626
    no contractor listed
    Issued
  32. 2017-08-30 #1790-17th floor Interior alterations only and change of use from Health Care Office to provide tenant fitout for a new General Office use at unit #1790 on the 17th floor of this existing BC Gas (Terasen Centre) commercial building. Scope of work: remove partition wall and doors, construct new partition walls, new doors (including card reader/electric strike), glazing, ceiling work, new millwork, lighting, electrical, plumbing and sprinkler work. OK for field review as per City staff. Selected energy upgrade: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) · $250,000
    no contractor listed
    Issued
  33. 2017-07-25 #2150 - 21st floor Interior alterations to provide tenant improvements for this existing full floor General Office tenant on the 21st floor (#2150) of this existing commercial building on this site. Scope of work: demo a portion of the south end of the 21st floor including electrical, & reflective ceiling. Construct new drywall partitions, glass partitions & doors to create new offices and work space. OK for field review as per City staff. · $61,626
    no contractor listed
    Issued
  34. 2017-05-30 #2200-22nd floor (full floor space) Interior alterations for an existing General Office tenant on the 22nd floor (#2200) of this existing commercial building. Scope of work: Demolition/construction of partition walls/doors to reconfigure new office layout for new convenience washrooms, staff kitchen and offices, millwork, finishes, electrical, plumbing, and sprinkler work. OK for field review per City staff. Note: No Energy trigger required. BOMA BESt building TENANT: Connor, Clark & Lunn (Main reception: #2300) Note: this tenant occupies 3 floors (all full floor tenant spaces) - #2150, #2200 & #2300 with no interconnection between these floors. · $1,000,000
    no contractor listed
    Issued
  35. 2017-05-03 #2200-22nd floor (full floor space) Interior alterations for an existing General Office tenant on the 22nd floor (#2200) of this existing commercial building. Scope of work: demolish/construct new partition walls, new doors, lighting, electrical and sprinkler work to relocate server room and to add a closet. TENANT: Connor, Clark & Lunn (Main reception: #2300) Note: this tenant occupies 3 floors (all full floor tenant spaces) - #2150, #2200 & #2300 with no interconnection between these floors. OK for field review processing as per City staff. Energy Upgrade Exempt: BOMA BESt Building · $22,000
    no contractor listed
    Issued
  36. 2017-04-24 Outdoor Patio - to provide 42 outdoor seats for this existing restaurant - 49th Parallel Coffee Roasters on the ground floor of the Fortis BC building. Building Review Branch Notes: - Related building permit for the restaurant: DB-2016-03240. - Maximum Occupant Load: 82 persons (interior 40 persons includes inside seating and staff, exterior 42 seats) - A permanent sign indicating the above maximum occupant load shall be posted in a conspicuous location. - All signage to have separate sign permits. - At least one accessible seating area shall be provided. Development Review Branch Notes: The outdoor patio for 42 seats is for the exclusive use of 49th Parallel Coffee Roasters, unless otherwise approved in writing by the Director of Planning. If this tenant ceases to exist, Planning may wish to seek additional information regarding the new tenant space and potentially a new DB if they wish to utilize this outdoor patio. · $15,000
    applicant withheld (individual)
    Issued
  37. 2017-04-21 Interior alteration, change of use and Major Occupancy Classification of the existing retail store in the lobby at 689 Thurlow Street to restaurant class 1 (A2) on the ground floor of this existing commercial building on this site. Construction of new service space over the kitchen of the restaurant and converting part of the elevator vestibule in P3 level to ancillary storage space for the restaurant is included in the renovation work. Class-1 cooking operation Max Occupant Load (inside seating and staff) is 40 person NOTE: Construction of service space over the kitchen is approved under DP-2017-00245. Revision-1, August 31, 2017 To modify the ceiling assembly of the rated enclosure around the kitchen and the space above the kitchen housing the KVS ecology unit. · $300,000
    no contractor listed
    Issued
  38. 2017-03-31 #1790-17th floor Interior demolition only on the 17th floor (#1790) of this existing commercial building. Scope of work: demolish partition walls, remove glazing, flooring, millwork, fixtures, portions of the drywall ceiling to be replaced with t-bar, remove lighting. Separate permit(s) and ASHRAE checklist will be required for future tenant improvements. See related Special Sprinkler Inspection Permit No. IA-2017-00394. Energy upgrade exempt: Interior demolition OK for field review as per City staff · $30,000
    no contractor listed
    Issued
  39. 2017-01-11 Interior alterations to provide tenant improvement for a new office tenant at unit #1810 on the 18th floor of this existing commercial building. Tenant: Belmont Propertyies Ok for field review as per City staff: Exempt - BOMA BEST · $92,000
    TotalPlan Inc
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.