1095 W Pender St, Vancouver

An address in Downtown, Vancouver, zoned CD-1 (163) (Comprehensive Development). 56 building permits are on file, most recently “#650 - 6th Floor Interior alterations to provide improvement to this new office tenant on…” (issued 17 February 2026). The City's 2026 assessed value is $122,788,000.

Zoning
CD-1 (163) · Comprehensive Development
Neighbourhood
Downtown
Permits on file
56
Assessed value (2026)
$122,788,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1095 W Pender St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153995, 196 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
196
Households
105
Median age
39.2
Median household income (2020)
not published
Own their home
57%
Vancouver: 45%
Average household size
1.9
Under 15
10%
65 and over
12%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-02-17 #650 - 6th Floor Interior alterations to provide improvement to this new office tenant on the 6th floor (#650) in this existing commercial building on site. Scope of work: Demo existing layout. Construct new partitions, doors, millwork, interior finishes, mechanical and sprinkler work to suit. TENANT: CDW Canada · $550,000
    Novacom Building Partners Ltd.
    Issued
  2. 2025-05-28 #600 - 6th Floor (demised and chged into #601 & #651) * SEE REVISION #1 for Revised Unit numbers. Changed to #600 and #650 Interior alterations to provide tenant improvements and to demise office unit #600 into two units (#601 and #651) in this existing commercial building on this site. Scope of work: Demise single floor into two separate tenant suites. Selective demolition of partitions, doors, millwork, ceiling & lighting. New construction for demising walls, entry doors, corridor ceiling and lighting. Electrical, HVAC and sprinklers to suit. REVISION #1 - change demising wall locations. change unit no's to #600 and #650. Oct 30/25 mk · $185,000
    no contractor listed
    Issued
  3. 2024-11-19 Unit #900 - 9th and 10th floors (#1020, #1050, #1070) Interior alterations to provide tenant improvements for this existing office tenant on the 9th floor and on the 10th floor of this existing commercial building. Scope of work: Full demo on the 9th floor and construct new partition walls, doors for new layout, remove all the demising wall and combine all the office units into one on the 10th floor, electrical and sprinkler work. REVISION #1: To configure the office rooms walls and doors on the east-south elevation on the 9th floor and throughout the 10th floor, and add card readers on both floors. (See detailed scope on the application form) - Feb 7/25 - LLL REVISION #2: To install a maglock with sequence of operation and minor office layout configuration adjustments. Increase in project cost of $10,000. - May 15/25 - LLL REVISION #3 - To make interior changes including wall layout, doors, lighting, and sprinklers on level 9 and 10. - Jan 14/26 - LLL NOTE: Concord Pacific will occupy both floors entirely thru interconnecting stairs. TENANT: Concord Pacific Development Corp · $460,000
    no contractor listed
    Issued
  4. 2024-10-22 #210 & #220 - 2nd Floor (combine) Interior alterations to combine #210 and #220 retaining #220 AND to provide tenant improvements to this existing office in this existing commercial building on this site. Scope of work: Remove the demising wall to combine 2 units and create one vacant suite #220, demolish all interior walls and install a new double entry door. Some electrical and sprinkler work. Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $45,000
    Sawatzky Contracting Ltd
    Issued
  5. 2024-09-05 Exterior and interior alterations for HVAC upgrades in this existing commercial building. The scope includes to install HVAC roof top units over the existing mechanical opening on the roof top with chainlink fence. · $120,000
    no contractor listed
    Issued
  6. 2024-08-15 #1800 - 18th Floor (Full Floor) Interior alterations to provide improvement to this new office tenant on the 18th floor (#1800) in this existing commercial building on site. Scope of work: Construct new partition walls to create more rooms, new millwork, finishes, electrical, plumbing and sprinkler work to suit. TENANT: ANSYS Inc · $800,000
    VPAC Construction Group Ltd
    Issued
  7. 2024-06-25 #850 - 8th Floor (demise into #850 & #855) Interior alterations on the 8th floor to demise the existing office #850 into two units to be #850 and #855 and to provide tenant improvements to suite #855 only, in this existing commercial building on this site. Scope of work: Construct a new demising wall betweein the 2 suites, new partition walls to build new rooms/offices, new reception, millwork and finishes. TENANT: Dorsey & Whitney LLP Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $156,860
    TotalPlan Inc
    Issued
  8. 2024-06-19 #410 - 4th floor (demised from #430) Interior alterations to this existing office space on the 4th floor to demise #430 into two units (to be #430 & #410) and provide improvements to #410 only, in this existing commercial building on this site. Scope of work: demising wall, partition walls, doors/frames, new kitchen millwork, finishes. Electrical, Mechanical/plumbing, sprinklers to suit. · $600,000
    no contractor listed
    Issued
  9. 2024-05-02 4th floor common lobby and corridors Interior alterations to provide improvements to the 14th floor common lobby and corridors of this mixed-use building. Scope of work: - Demo of ceiling millwork, lights, bulkheads, t-bar ceiling, and doors. - New floor, wall and finishes, new lighting, exit signs and modifications to mechanical and sprinkler as required. OK to field review as per City staff · $175,000
    no contractor listed
    Issued
  10. 2024-03-05 #360 - 3rd floor (demising into #360 and #370) Interior alterations to demise this existing office on the 3rd floor (#360) into two units (to be #360 and #370) in this existing commercial building on this site. Scope of work: Construct new demising walls to create 2 suites. New partitions for new offices, new wall finishes, flooring, ceiling, HVAC, electrical and sprinkler work. · $150,000
    no contractor listed
    Issued
  11. 2024-01-18 #250 - 2nd Floor Interior alterations to provide tenant improvement to this existing general office on the 2nd floor (#250) of this existing commercial building on site. Scope of work: Demolish existing partitions, doors, finishes, fixtures and glazing. Construct new lunchroom millwork, partitions, electrical, plumbing and sprinkler work to suit. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
    no contractor listed
    Issued
  12. 2023-11-16 #1200 - 12th Floor (Elevator lobby and corridors) Interior alterations to provide improvements to the lobby area and corridors on the 12th floor of this existing commercial building on this site. Scope of Work: Demolish lobby ceiling and remove existing lights. Add new ceiling and lighting. Replace existing tenant doors with new, relocate card reader, new elevator surrounds, floor, wall finishes and electrical work. · $150,000
    no contractor listed
    Issued
  13. 2023-10-17 #1800 - 18th Floor Interior alterations to remove all interior partition walls and finishes from this existing office space on the 18th floor (#1800) to create a one shell space in this existing commercial building. Scope of work per VBBL 2019: Remove all interior walls, doors, ceiling work, millwork and the existing washrooms in common area. REVISION #1: To remove the existing bathroom from the scope of work, bathroom to remain as is with no modifications. - Dec 8/23 - LLL Separate permit is required for any future tenant improvement or to change the use. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $150,000
    VPAC Construction Group Ltd
    Issued
  14. 2023-09-25 #1900 - 19th floor - Elevator lobby and corridors Interior alterations to provide improvements to the lobby area and corridors on the 19th floor of this existing commercial building on this site. Scope of Work: Demolish lobby ceiling and remove existing lights. Add new ceiling and lighting. Replace existing tenant doors with new, relocate card reader, new elevator surrounds, floor, wall finishes and electrical work. · $150,000
    no contractor listed
    Issued
  15. 2023-09-22 2nd Floor - Elevator Lobby Interior alterations to provide improvements to the elevator lobby of the 2nd floor of this existing commercial building on this site. Scope of work: Remove existing ceiling millwork, fighter phone and wall scone. Replace entry doors for some tenants, new elevator surrounds, floor, wall finishes and electrical work. · $150,000
    no contractor listed
    Issued
  16. 2023-08-15 #700 - 7th Floor Interior alterations to provide tenant improvements to this existing general office on the 7th floor (#700) of this existing commercial building on site. Scope of work: Construct new partitions walls, doors to enclose some offices, new millwork, finishes, flooring, lighting fixtures, electrical and sprinkler work. · $178,000
    no contractor listed
    Issued
  17. 2023-04-14 #102 Exterior alterations to add outdoor patio seating for this existing Retail Store (Limited Food Establishment) in Unit # 102 in this existing commercial building. See DP-2022-00614 for a period of time, expiring Oct 3, 2023, unless extended in writing by the Director of Planning. Ok for DTI as per City staff · $1,000
    no contractor listed
    Issued
  18. 2023-03-14 #400 - 4th floor (demising into 2 units to be #430 #450) *see REV #3 Interior alterations to provide tenant improvements for an existing office space on the 4th floor (#400) of this existing commercial building on this site. Scope of work: Remove select partitions, millwork, flooring, fixture/glazing, doors & frame. New double glass entry door, new partition walls, paint, millwork, create new hallway and electrical work. REVISION #1 Mar14/24 mk - Extend east corridor and relocate existing door into corridor wall - Demo existing (2) meeting rooms and make one larger meeting room - Demo existing large meeting room and patch and repair flooring/ceiling - New millwork reception desk REVISION #2 May 24/24 mk - Demise #400 (full floor) into 3 units. (410, #430 #450). - New corridors, lighting, ceiling grid, carpet, wall covering. - increase project value from $185,000.00 to $240,000.00 REVISION #3 - June 17/24 mk -Change scope to demise into 2 units (to be #430 & #450) Demising wall work between #410 & #430 transferred to BP-2024-01040. -changes to lighting layout and convert to LED -Change entry door from single to double for unit #430. -Scope of work to include TI work to unit #430. - Remove Ceiling work from scope for unit#450 only. - Increase project value from $240,000.00 to $265,000.00 · $265,000
    no contractor listed
    Issued
  19. 2022-12-21 #305 - 3rd floor Interior alterations to provide tenant improvements for a new tenant on the 3rd floor (#305) of this existing commercial building. Scope of work: add one wall and one door. no demo in scope. *tenant in #301 is moving into #305. REVISION #1 June 14/24mk - Layout changes. - change applicant from Dena Burr to [name withheld] TENANT: Canadian Securities Exchange E2 - Retrofit Path: 1 @ L2\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $101,000
    applicant withheld (individual)
    Issued
  20. 2022-07-26 #270 - 2nd floor Interior alterations to provide improvements for an existing office tenant on the 2nd floor (#270) in this existing commercial building on this site. Scope of work: remove select partition walls, millwork, ceiling and construct new t-bar ceiling, lighting, finishes and electrical work. REVISION#1- add to scope of work; - demo entire suite instead of just a portion. - proposed floor plan changed to open floor plan with 2 meeting rooms, 2 phone rooms, & new kitchen. - ceiling grid to & lighting changed to suit new wall layout. - revised Energy Calculations. - increase project value from $150,000.00 to $170,000.00. Aug.25/22 mk · $170,000
    no contractor listed
    Issued
  21. 2022-04-14 #810 - 8th floor Interior alterations to provide tenant improvements for a new office tenant on the 8th floor (#810) in this existing commercial building on this site. Scope of work: construct partition walls, doors, finishes, lighting, electrical and sprinkler work. OK for Field Review per City staffsprinkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to incorporate Automatic FULL OFF (per City staff.4.1.1 (h) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $40,000
    Edge Vancouver Construction Group Ltd
    Issued
  22. 2022-01-19 14th floor - common lobby and corridors Interior alterations to provide improvements to 14th floor common lobby and corridors of this mixed use building. Scope of work: remove corridor ceiling and remove existing lights, new T-bar ceiling, lighting, elevator surround, flooring, finishes and electrical work. · $125,000
    no contractor listed
    Issued
  23. 2021-10-01 Interior alterations to replace an existing internal lift connecting the 21st and 22nd floors for the US Consulate in this existing commercial building on this site. OK for field review Dave Holbrook - Aug 24, 2021 · $97,512
    no contractor listed
    Issued
  24. 2021-08-27 Lobby - ground floor Interior alterations to provide improvement on the ground floor lobby in this existing high rise commercial building. Scope of work : Interior demolition of Lobby, Elevator Lobby ceiling, flooring, mechanical equipment and lighting. Construction of new interior finishes: lighting fixtures, ceiling, floors and revisions to mechanical and sprinkler system Revision #1: to provide soffit and soffit lighting to the main lobby area, provide upgrades to the exterior lights, lighting controls and to add power for future lights and signage. Increase in project value from $600,000.00 to $650,000.00 mlh Ok for Field Review per City staff: Energy trigger not required BOMA BEST building. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $650,000
    no contractor listed
    Issued
  25. 2021-07-06 19th floor - Elevator lobby and corridors Interior alterations to provide improvements to the lobby area and corridors on the 19th floor of this existing commercial building on this site. Scope of Work: remove and replace lobby finishes and lighting; Ceiling drywall, flooring, lighting, elevator surrounds, and tenant doors. ok for Field Review per City staffDBI. · $125,000
    no contractor listed
    Issued
  26. 2021-07-06 2nd floor Elevator Lobby and corridors Interior alterations to provide improvements to the lobby and corridors of the 2nd floor of this existing commercial building on this site. Scope of Work: remove and replace finishes and lighting; Ceiling drywall, flooring, lighting, elevator surrounds, and tenant doors. Ok for Field Review per City staffDBI. · $125,000
    no contractor listed
    Issued
  27. 2021-05-11 Interior alterations only to remove the existing oil storage tank at Parking Level P4 and to install a new oil storage tank at Parking Level P5 at this existing Manulife Place commercial building. OK for field review as per City staff · $225,000
    no contractor listed
    Issued
  28. 2021-02-24 #810 -8th floor Interior alterations to provide improvements to this existing office tenant on the 8t floor (unit #810) of this commercial building on this site. Scope of work: removal interior non structural partition walls that go up to (not through) T-bar ceiling, doors, electrical outlets, carpet tile flooring to create open floor plan. Install new carpet tile & paint. OK for Field Review per City staff · $20,000
    no contractor listed
    Issued
  29. 2020-01-17 Interior alterations only to remove the existing oil storage tank at Parking Level P4 and to install a new oil storage tank at Parking Level P5 at this existing Manulife Place commercial building. OK for field review as per City staff. · $180,000
    no contractor listed
    Issued
  30. 2019-11-19 20th floor - portion of 20th floor Interior alterations to provide tenant improvements for the existing office tenant (US Consulate occupying several floors) in this existing mixed use building. Scope of work is for a portion of the 20th floor only. Main reception is on the 19th floor (#1950). #1950 (US Consulate occupying several floors, scope of work for a portion of 20th floor only) Scope of work: remove one partition wall, patch and repair wall, new finishes and electrical work. TENANT: American Consulate General Office OK for Field Review, Aug. 8, 2019 Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Processed Thru FIT Note: Energy trigger not required; BOMA BESt building. · $6,000
    TotalPlan Inc
    Issued
  31. 2019-11-07 #1300 - 13th Floor (not a full floor tenant) Interior alterations to provide tenant improvements for a new office tenant on the 13th floor (#1300) of this existing commercial building. Scope of work: remove/construct partition walls, doors, new accessible washroom, staff kitchen, millwork, finishes, lighting, ceiling work, electrical, plumbing, mechanical and sprinkler work. TENANT: The Government of Ireland (as represented by the Consulate General of Ireland) · $1,472,962
    no contractor listed
    Issued
  32. 2019-08-15 #1050 - 10th floor Interior alteration to provide improvements for a new office tenant on the 10th floor (#1050) of this existing commercial building on this site. Scope of work: to demo and construct partition walls and doors, millwork, finishes, electrical to suit new layout. DBI to determine if a Sprinkler permit is required. Okay for field review as per City staff: BOMA BESt building · $31,478
    VPAC Construction Group Ltd
    Issued
  33. 2019-06-19 #1130-11th floor Interior alterations only to provide tenant improvements for a new General Office use at unit #1130 at this existing Manulife Place commercial building. Scope of work: demolish/construct partition walls, glazing, doors, finishes, millwork, lighting, electrical and plumbing work. REVISION #1- - change glass swing door to sliding glass door in private office - add full height glazing partitions and 2 glass swing doors to new private office - new corner glazing in 2 private offices (to attach from mullion to drywall) - increase in value (scope of work) $5,000 (total now $30,000) - new RCP (ASHRAE reviewed) /September 25, 2019 jm TENANT: McDermott & Bull Canada Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $30,000
    Concrete Cashmere Ltd
    Issued
  34. 2019-06-18 #100-Ground floor Interior alterations to provide improvements for this existing office tenant at office unit #100 on the ground floor of this existing commercial building on this site. Scope of work: new glazed modular wall system, new doors, new lighting, electrical work. TENANT: Stabilization Credit Union OK for field review per City staff. Notes: 1. Building inspector to determine on site if a separate sprinkler permit is required. 2. No Energy trigger required; BOMA BESt building L2 - Lighting - Proposed upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $31,000
    Curve Construction Inc
    Issued
  35. 2019-05-23 #860 - 8th floor Interior alterations to provide tenant improvements for a new General Office tenant on the 8th floor (#860) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, glazing, finishes, millwork, new staff kitchen, electrical, plumbing and sprinkler work. TENANT: Stellar Recruitment OK for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work · $72,000
    TotalPlan Inc
    Issued
  36. 2019-05-08 #1500-15th floor (full floor tenant) Interior alterations only to provide a full floor tenant fitout for a new General Office use at unit #1500 at this existing commercial Manulife Place building. Scope of work: demolish/construct partition walls, glazing, millwork, remove/replace doors and ceiling, new finishes, lighting, electrical, plumbing and sprinkler work. REVISION #1: to shift the partition wall between office rooms #1527 and #1528 by approximately 5'-0", meeting room #1508 and #1509 doors are no longer in the contract, the doors are to swing into the common washroom entry areas and the project value increasing from $550,000.00 to $551,000.00. No change to ASHRAE. July 24, 2019 mlh · $551,000
    Reotech Construction Ltd
    Issued
  37. 2019-03-15 #1400-14th floor Interior alterations to provide improvements to this office "shell" unit #1400 on the 14th floor for a new office tenant (Pinnacle Canada Fund) in this existing commercial building on this site. Scope of work: construct new offices and meeting spaces with steel stud, drywall and glazing, doors, new staff kitchen, new power/data, millwork, relocate lighting and new lighting, electrical, plumbing and sprinkler work. REVISION #1 - Change solid wall to glass (same location), relocate electrical to adjacent wall. No increase in value. No change to ASHRAE. May 21/19 mk/jm TENANT: Pinnacle Fund Services Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. See related BP-2018-03189 that demised this floor into two units (#1400 and #1450). OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $70,000
    Allspaces Design & Management Ltd
    Issued
  38. 2018-11-26 #1450 - 14th floor Interior alterations to provide improvements to this existing office unit on the 14th floor (#1450) of this commercial building on this site. Scope of work: construct partition walls, doors, millwork, finishes, rcp, ceiling work, lighting, electrical, plumbing and sprinkler work TENANT: Manulife Real Estate OK for Field Review per City staff. · $393,000
    no contractor listed
    Issued
  39. 2018-10-01 Lobby Interior alterations to provide improvements to ground floor elevator lobby in this existing high rise commercial building. OK for FLD RVW per City staff: - Scope of work does not alter operation of elevators or fire alarm system. · $50,000
    Sawatzky Contracting Ltd
    Issued
  40. 2018-09-05 #101 - ground floor Interior alterations to provide tenant improvements for a new office tenant on the ground floor (#101) in this existing commercial building on this site. Scope of work: demolish all interior partition walls/doors, construct new partition walls, doors, millwork, new washroom, finishes, ceiling work, lighting, electrical, plumbing, mechanical and sprinkler work. REVISION #1: Changes to floor layout of vault/teller/washroom area, electrical, plumbing and mechanical drawings revised, use corrected to financial institution, tenant name changed to BlueShore Financial Institution. No change to ASHRAE. Feb 26, 2019 mlh TENANT: Morningside Properties Ltd. · $1,500,000
    J W McArthur & Sons Ltd
    Issued
  41. 2018-08-21 #1400 & #1450-14th floor Interior alterations to demolish all interior partition walls in on the 14th floor (#1400) and to demise the space into two shell Office units to be #1400 & #1450. Scope of work: demolish all interior partition walls/doors, construct new demising walls, partition walls, and common corridor walls, doors, ceiling and lighting work in lobby area, ceiling work, finishes, electrical, plumbing and sprinkler work. REVISION #1-Full set of drawings submitted to show reduction in length of public corridor, elevator lobby ceiling detail change (from cove to flat drywall) with cove lighting. No increase in value. ASHRAE review (new RCP). Feb.15/19 jm Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to either unit. OK for Field Review per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $72,000
    TotalPlan Inc
    Issued
  42. 2018-05-04 #240 - Interior alterations to this amenity space approved for a staff lunch room to provide an amenity meeting space/lunch room. Ok for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $31,550
    no contractor listed
    Issued
  43. 2018-04-25 Elevator Upgrade - Interior alterations to provide elevator upgrades to seven (7) elevators at the existing 22-storey office building on this site for CSA-B44-07 upgrade. Scope of work: - Installation of automatic emergency elevator recall to the existing FAS. - Adding new smoke detector to parkade elevator lobby. - Replacement of receptacles and luminaires in the elevator machine room and elevator pit. · $52,600
    Sasco Contractors Ltd
    Issued
  44. 2018-01-15 #101-1st floor Interior alterations only to provide demolition of select interior partitions and pendant lighting to create a "shell" space at this existing Retail Store at unit #101 at this existing Manulife Place commercial building. Scope of work: demolish partition walls, remove doors, millwork, finishes, electrical work. Note: kitchen, washroom and three offices at the rear of this tenant space to remain. Separate permit(s) and ASHRAE checklist required for future tenant improvements. TENANT: Apex Communications Inc. (vacating) · $15,000
    no contractor listed
    Issued
  45. 2017-11-30 #1385 - 13th floor Interior alterations to provide improvements for this existing office tenant on the 13th floor (unit #1350) to expand into #1385 (retaining unit #1385) in this existing commercial building on this site. Scope of work: demo demising wall between #1350 and #1385 and alter layout through out. REVISION #1: Interior layout changes and the addition of an accessible washroom. No changes to ASHRAE. Jan.19/18 jm OK for field review as per City stafforate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Address Note: #1350 will be cancelled upon permit issuance and is to be removed from the building and suite entry. #1385 is to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. · $158,500
    TotalPlan Inc
    Issued
  46. 2017-10-18 #1600 - 16th Floor (full floor) Interior alterations to provide tenant improvements including a new meeting room in a portion of unit #1600 on the 16th floor of this existing General Office tenant in this existing commercial building. Scope of work: demolish/construct some partition walls, remove doors, new doors, new floor, millwork, ceiling finishes for new reception area, new meeting room, electrical and sprinkler work. TENANT: Mackenzie Fujisawa OK for field review as per City staff. Note: L2 - Lighting to incorporate space control systems (per City staff.4.1.2 of ASHRAE 90.1-2010). · $57,000
    Fusion Project Management Ltd
    Issued
  47. 2017-10-17 #750 Interior alterations to provide improvements for this new office tenant by add partition walls and creating a staff lunch room area in unit #750 on the 7th floor of this existing commercial building on this site. OK for field review per City staff: Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $72,000
    Counterpoint Interiors Inc
    Issued
  48. 2017-09-13 #1050-10th floor Interior alterations only to provide improvements for a new General Office tenant at unit #1050 at this existing Manulife Place commercial building. Scope of work: remove some interior partition walls, doors, frames, cabinets, flooring, construct new partition walls, relocate glazing, doors, new glass door, new finishes, electrical and sprinkler work to expand reception area, reconfigure office-3, expand boardroom. Selected energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) OK for field review processing as per City staff. · $50,000
    Sky Projects Ltd
    Issued
  49. 2017-08-25 #1020-10th floor Interior alterations to provide improvements for a new office tenant at this office unit #1020 on the 10th floor of this existing commercial building on this site. Scope of work: demolish/construct partition walls, relocate doors, glazing and millwork, ceiling work, electrical and sprinkler work. TENANT: 1987 The Travel Group Ltd. OK for field review per City staff. Note: Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $68,000
    Counterpoint Interiors Inc
    Issued
  50. 2017-08-02 #860-8th floor Interior alterations to provide improvements for new general office (real estate) tenant on the 8th floor (#860) in this existing commercial building. Scope of work: demolish/construct partition walls, new glazing, doors, electrical and sprinkler work. Ok for field review per City staff. Selected energy upgrade: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems · $35,000
    Fusion Project Management Ltd
    Issued
  51. 2017-07-07 #1350 Interior alteration to remove non-loadbearing partition walls and kitchenette in this existing office unit #1350 on the 13th floor in this existing commercial building on this site. Note: Any future tenant improvements will require separate permits. Okay for field review as per City staff · $14,825
    TotalPlan Inc
    Issued
  52. 2017-07-07 #1020 Interior alteration to remove non-loadbearing partition walls in this existing office unit #1020 on the 10th floor in this existing commercial building on this site. Note: Any future tenant improvements will require separate permits. Okay for field review as per City staff · $12,575
    TotalPlan Inc
    Issued
  53. 2017-05-25 #102 - Interior alterations to provide tenant improvements for an existing Retail Ltd Food tenant in unit #102 at 1095 W Pender St in this existing commercial building. Schedules Submitted: · $407,087
    no contractor listed
    Issued
  54. 2017-05-24 #600-6th floor (full floor) Interior alterations to provide tenant improvements for the entire 6th floor (full floor tenant) for a new office tenant in this existing building. Scope of work: demolish/construct partition walls, doors, millwork and glazing, new finishes, lighting, electrical, mechanical, plumbing and sprinkler work. TENANT: Scalar Decisions · $575,000
    no contractor listed
    Issued
  55. 2017-04-18 Interior alterations to this existing office tenant in unit #1250 of this existing commercial building on this site. Scope of work includes addition of a non-loadbearing partition wall. Okay for field review as per City staff: Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 901.-2010) · $10,000
    All Spaces Project Management Ltd
    Issued
  56. 2017-03-27 Unit #900 - 9th and 10th floors Interior alterations to provide tenant improvements for this existing office tenant that occupies all of the 9th floor and a portion of the 10th floor (unit #900) of this existing commercial building. Scope of work: alterations including demo and construction of partition walls/doors to reconfigure reception area and boardroom, and new finishes to common lobby area on the 9th floor as well renovations to the tenant space on the 10th floor which is inter-connected by an existing staircase. OK for Field Review per City staff Code Analysis for the existing interconnection at the time of inspection. Tenant: Concord Pacific Selected Energy Upgrade: L2 - Lighting - Upgrade all hard wired Lighting within scope of work area to High Efficiency light systems · $300,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

1515 Homer Mews
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc
2026-11-05
200 Granville St
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
725 Granville St
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited
2026-11-05