Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1075 W Georgia St, Vancouver
An address in Downtown, Vancouver, zoned DD (Comprehensive Development). 87 building permits are on file, most recently “#1340 - 13th Floor Interior alterations to provide improvements to this existing office t…” (issued 29 October 2026). The City's 2026 assessed value is $200,875,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150850, 2,626 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-10-29
#1340 - 13th Floor Interior alterations to provide improvements to this existing office tenant on the 13th floor (#1340) of this existing commercial building on site. Scope of work: Cosmetic upgrade to an existing meeting room with additional layer of glazing and drywall ceiling, electrical and sprinkler work to suit. · $15,000
no contractor listed Issued -
2026-09-15
6th floor (demising into #610, #630, #640, #650, #660), & common washrooms and elevator lobby. Interior alterations to the 6th floor to demise this full floor office shell space into 5 units (to be #610, #630, #640, #650, #660) and provide improvements to all five units including the common washrooms and elevator lobby in this existing commercial building. Scope of work: new demising walls, partition walls, doors/frames, millwork, finishes. Electrical, mechanical/plumbing, and sprinklers to suit. · $900,000
no contractor listed Issued -
2026-06-04
#2080 - 20th Floor Interior alterations to demise the existing office suite #2080 on the 20th floor to create (#2080 and #2090) of this existing Vancouver Heritage building on site. Scope of work: Demolish 3 private offices. Construct a demising wall to have 2 suites, electrical, mechanical work to suit. TENANT: GY Holdings Ltd NOTE: This tenant also occupies suite #2100 AND is interconnected to the 21st floor. See related BP-2026-01521. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $114,500
Aura Office Environments Inc Issued -
2026-06-02
#2100 - 21st Floor Interior alterations to provide improvement to this existing office tenant on the 21st floor (#2100) of this existing Vancouver Heritage building on site. Scope of work: Selective demo to alter existing layout which includes millwork, doors, interior walls. Construct private offices in the open space area, electrical, mechanical/plumbing work to suit. TENANT: GY Holdings Ltd NOTE: This tenant also occupies #2080 AND is interconnected to the 20th floor. See related BP-2026-01537. · $437,500
Aura Office Environments Inc Issued -
2026-05-20
1075 W GEORGIA ST Exterior and interior alterations to install air source heat pumps on the rooftop and install water source heat pumps and an electric boiler in the mechanical room in this existing commercial building on this site. · $2,361,000
MDE Electrical Mechanical Contractors Issued -
2025-11-24
#2010 - 20th Floor Interior alterations to provide improvements to this existing general office on the 20th floor (#2010) of this existing commercial building on site. Scope of work: Demolish existing layout. New open kitchen, open workstations and one new private office. Electrical and plumbing work to suit. REVISION #1: To remove 3 offices AND to add 6 workstations. - May 7/26 - LLL. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $200,000
no contractor listed Issued -
2025-11-24
#1540 - 15th Floor Interior alterations to provide improvements to this existing general office on the 15th floor (#1540) of this existing commercial building on site. Scope of work: Construct new partitions and doors to create private offices, a boardroom and sprinkler work. TENANT: Commodity Partners Inc · $55,000
no contractor listed Issued -
2025-10-14
#500 - 1075 W Georgia Street Interior alterations to provide first tenant improvements for unit #500 and change of use from General Office Shell (D) to General Office (D) for this new full floor tenant in this existing designated Vancouver Heritage A building. Scope of work: Partitions, fire alarm, mechanical, sprinkler, electrical, plumbing, renovation of existing bathrooms, addition of universal bathroom, millwork, furniture. · $3,600,000
Priority Projects Limited Issued -
2025-10-03
#960 - 9th Floor Interior alterations to provide landlord improvements to this existing general office on the 9th floor (#960) in this existing designated Vancouver Heritage Register building. Scope of work: Construct new interior walls to create private offices, electrical and plumbing work to suit. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $220,000
no contractor listed Issued -
2025-07-07
#1510 - 15th floor Interior alterations to provide improvements to this existing office space on the 15th floor (#1510) of this existing commercial building on this site. Scope of work: select demo and construction of partition walls to alter layout. Electrical to suit. *District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $50,000
no contractor listed Issued -
2025-06-09
#1701 - 17th Floor Interior alterations to provide tenant improvements to this existing General Office for a new tenant on the 17th floor (#1701) of this existing commercial building on this site. Scope of work: Demo existing layout. Construct new office partitions, interior finishes, mechanical, plumbing, electrical to suit. · $500,000
no contractor listed Issued -
2025-05-23
#2340 - 23rd floor Interior alterations to provide tenant improvement to this new tenant on the 23rd floor (#2340) of this existing commercial building on site. Scope of work: Demolish existing layout for modifications which includes new flooring, painting, demountable partitions, new millwork, HVAC, electrical and sprinkler work. TENANT: CI Global Asset Management · $600,000
Govan Brown Ltd Issued -
2025-04-04
#1700 and #1701 - 17th floor (demised from #1700) Interior alterations to provide improvements to this existing full floor office tenant space on the 17th floor to demise #1700 into two units to be #1700 and #1701 in this existing commercial building Scope of work: demo to select areas, new partitions, doors, millwork finishes to both suites to alter layout. Electrical, mechanical/plumbing, & sprinklers to suit. TENANT: IPSOS (both units) · $129,402
PB Management Group Inc Issued -
2025-04-02
#2400 - 24th Floor - demise and washroom/lobby upgrade Interior alterations on the 24th floor to demise the existing office #2400 into 6 units to be #2410, #2420, #2430, #2440, #2450 and #2460 and to provide cosmetic upgrades to the existing washroom and lobby in this existing commercial building on site. Scope of work: Construct new demising wall to create more than one new tenant space, electrical, plumbing and sprinkler work. REVISION #2 - Oct 31, 2025 Interior layout changes and trade revisions to suit new layout and increase in project cost of $30,000. REVISION #1: Interior layout changes including trades revisions to suite new layout AND increase in project cost of $4,500. - July 14/25- LLL · $904,500
no contractor listed Issued -
2025-01-28
#700 - 7th Floor (demise and cosmetic upgrade to washroom and lobby) Interior alterations to demise the existing full floor office tenant on the 7th floor (#700) into three (3) suites (to be #710, #720 and #730) and to do cosmetic upgrade to the washroom and common lobby in this existing commercial building on site. Scope of work: Construct demising walls to create 3 suites, new partitions for private offices, millwork, glazed doors, electrical, plumbing and sprinkler work to suit. · $900,000
no contractor listed Issued -
2024-11-13
#400 - 4th Floor Interior alterations to provide improvement to this existing general office for a new tenant on the 4th floor (#400) in this existing designated Vancouver Heritage A building on site. Scope of work: Tenant build out from a shelll/vacant space, electrical, plumbing and sprinkler work to suit. TENANT: Leede Financial · $800,000
Aura Office Environments Inc Issued -
2024-09-17
#950 - 9th Floor (demise into 2) Interior alterations on the 9th floor to demise the existing office #950 into two units to be #950 and #960 and to provide improvements to a new tenant on suite #950 only, in this existing designated Vancouver Heritage A building. Scope of work: From shell, construct new demising wall, new interior partitions, doors, millwork to create new office rooms, new kitchen, reception, electrical and plumbing work. TENANT: Canada Lands Company Separate permit is required for future tenant improvement or to change the use in suite #960. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $350,000
no contractor listed Issued -
2024-07-25
#25 Interior alterations to change this commercial unit #25 into a universal toilet room on the ground floor of this commercial building on this site. OK for DTI per City staff · $25,000
no contractor listed Issued -
2024-05-27
#700, #730 and #750 - 7th Floor Interior alterations to combine suite #730 and #750 to become #700 AND to demolish entire floor to return to shell for future tenant in this existing designated Vancouver Heritage A building. Scope of work: Full demolition of all tenant build out to shell and sprinkler work to suit. · $75,000
no contractor listed Issued -
2024-04-09
#1050 - 10th floor Interior alterations to provide improvements to this existing vacant office space to prepare for leasing on the 10th floor (#1050) of this existing commercial building on this site. Scope of work: demo/construct partition walls, doors/frames, millwork, finishes, & electrical, plumbing, sprinklers to suit. REVISION #1 - layout changes. July 26/24 mk increase project value by $46,000. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $396,000
no contractor listed Issued -
2024-04-02
#800 - 8th floor Interior alterations to provide improvements to this vacant office space to prepare for leasing on the 8th floor (#800 of this existing commercial building on this site. Scope of work: remove/construct partition walls, doors/frames to alter layout, new millwork, finishes. Electrical & Plumbing to suit. REVISION #1: Additional office room created within the unit, wall adjacent to entry of suite #800 shifted by approx 4 inches AND increase in project cost by $10,000. - Jul 8/25 - LLL * Building Inspector to determine if a Special Sprinkler Permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $360,000
no contractor listed Issued -
2024-04-02
#2310,2320,2330,2340,2350, 2360 - 23rd floor (demised from #2300) Interior alterations to provide landlord improvements by demising this full floor office shell space into 6 separate units (to be #2310,#2320, #2330, #2340, #2350, #2360) in this existing commercial building.. Scope of work demising walls to demise floor into 6 units and new corridors. Cosmetic upgrade to elevator lobby and washrooms . Electrical, Mechanical/Plumbing, Sprinklers to suit. *See BP-2024-00464 for Demo work. REVISION #1 - Aug.9/24 mk - layout changes to units #2330 & #2350. *SEPARATE PERMIT(S) REQUIRED FOR FUTURE IMPROVEMENTS TO THESE UNITS. · $970,000
no contractor listed Issued -
2024-03-04
5th, 6th, 23rd and 24th - (Demo to shell) Interior alterations/demolition of this full floor space on the 5th, 6th, 23rd and 24th floor and return to office 'vacant' space for future tenant in this existing designated Vancouver Heritage A building. Scope of work: Demolish all non-load bearing partition walls, doors, existing floorings, millwork, t-bar ceiling, re/re lighting, and sprinkler work. · $375,000
no contractor listed Issued -
2024-01-29
#2600 - 26th Floor Interior alterations to provide tenant improvements to a new office tenant on the 26th floor (#2600) of this existing designated Heritage A commercial building on this site. Scope of work: Demolish partition walls, millwork, doors/frames, glazing, carpet. Construct additional office space and electrical work. TENANT: Bel-Fran Capital Ltd · $150,000
Reliance World Wall & Ceiling Ltd Issued -
2023-09-14
#825 - 8th floor Interior alterations to provide tenant improvements to an existing office tenant in #825 on the 8th floor of this existing designated Heritage A commercial building on this site. Scope of work: Construct a new reception area, server/storage room. Remove a wall to create a boardroom, electrical and sprinkler work. TENANT: Preszler Law Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $120,000
Gibraltar Holdings Ltd Issued -
2023-07-06
#1340 - 13th floor Interior alterations to expand the existing office tenant in #1340 into #1330 (retaining #1340) and to provide tenant improvements in this existing commercial building on this site. Scope of work: remove demising wall and construct new glazed wall and door, remove/construct select partition walls, doors, electrical, plumbing and sprinkler work. · $120,000
no contractor listed Issued -
2023-06-30
#1890 - 18th floor Interior alterations to provide tenant improvements for a new office tenant on the 18th floor (#1890) in this existing commercial building on this site. Scope of work: construct new partition walls, glass partition, doors and hardware, new data, voice and power, electrical and sprinkler work. TENANT: 1075 West Georgia Ltd. OK for Office TI Building Sprinklered - Separate sprinkler required for any proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $65,000
Central West Project Management Inc. Issued -
2023-06-13
#900 - 9th Floor Interior alterations to provide tenant improvements to this existing office on the 9th floor (#900) in this existing Heritage "A" commercial building on this site. Scope of work: Construct new partitions to build new offices, new glazed doors/frames, new millwork, electrical and plumbing work to suit. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $350,000
no contractor listed Issued -
2023-05-29
#2200 - 22nd floor (full floor tenant) Interior alterations to provide tenant improvements for a new full floor office tenant on the 22nd floor (#2200) in this existing commercial building. Scope of work: construct new partition walls, doors, ceilings, finishes, millwork, HVAC, lighting, electrical, plumbing, mechanical and sprinkler work. · $2,000,000
no contractor listed Issued -
2023-04-11
#2200 - 22nd Floor Interior alterations to provide tenant improvements for a new office tenant on the 22nd floor (#2200) to remove all non load bearing partition walls, ceiling and finishes to return to base/shell building in this existing commercial building. Scope of work: Demolish all existing interior walls, doors, ceiling, lighting, floor finishes, millwork, server racks, electrical, plumbing and sprinkler work. · $100,000
no contractor listed Issued -
2023-02-17
#1380 - 13th Floor Interior alterations to provide tenant improvements for a new office tenant on the 13th floor (#1380) in this existing commercial building on this site. Scope of work: construct new partition walls to create 3 offices, new kitchenette, millwork, finishes, power and data and electrical work. OK for Office TI Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · $150,000
Fusion Project Management Ltd Issued -
2022-05-06
#2030 - 20th floor Interior alterations to provide improvements for a new office tenant on the 23rd floor (unit # 2030) of the 20th floor of this existing Heritage "A" commercial building on this site. Scope of work: demo existing interior office fronts. Create 3 offices, 1 boardroom and open areas. New millwork, power& data to suit. Add new base building lighting throughout c/w sensor switching. Ok for Field Review per City staff E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $200,000
Fusion Project Management Ltd Issued -
2022-03-28
#2525 - 25th floor Interior alterations to provide tenant improvements to this existing office on the 25th floor (#2525) in this existing Heritage "A" commercial building on this site. Scope of work: construct glass partition/door to create one additional workspace. TENANT: Gudmundseth Mickelson Building Sprinklered - Building Inspector to determine if a Sprinkler Permit is required. OK for field review per City staffte Automatic Partial OFF (per City staff..4.1.1 (g) of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $42,000
no contractor listed Issued -
2022-02-25
#900 & #950 - 9th floor Interior alterations to demolish non load bearing partition walls by landlord to two vacant office units on the 9th floor (#900 and #950) to return to shell space in this existing Heritage "A" commercial building on this site. Scope of work: remove partition walls, T-Bar ceiling, raised floor system, millwork, new carpet/tile to #950, and remove partition walls, millwork, data/3 duplexes & 3 sprinkler heads in #900. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Separate Building Permit(s) and E2 upgrade required for future improvements to these units. OK For Field Review per City staff · $42,782
Gibraltar Holdings Ltd Issued -
2021-12-13
#400 - 4th Floor Interior demolition of non load-bearing partition walls on the 4th floor (#400) to create a "shell" office space. Scope of work: demolish partition walls and doors, electrical and sprinkler work. Energy upgrade exempt: Interior demolition Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Separate permit is required for any tenant improvements to this space. OK for Field Review per City staff; Nov 10, 2021 · $21,290
Gibraltar Holdings Ltd Issued -
2021-10-29
#1380 - 13th floor Interior demolition of non load-bearing partition walls on the 13th floor (#1380) to create a "shell" office space in this existing commercial building on this site. Scope of work: remove partition walls, doors, millwork, flooring, electrical and plumbing work. Energy upgrade exempt: Interior demolition. Separate permit(s) and ASHRAE checklist will be required for any tenant improvements to this space. OK for Field Review per City staffng Inspector to determine on site if a separate sprinkler permit is required. · $34,000
Pacific One Contracting Issued -
2021-10-29
13th floor - Common elevator Lobby and corridors Interior alterations to provide improvements to the common elevator lobby and corridors on the 13th floor of this existing commercial building on this site. Scope of work: remove ceiling in corridor, dropped bulkhead, lighting fixtures, finishes and upgrade the common lobby area. Provide new T-BAR ceiling, finishes, lighting and electrical work. OK for Field Review per City staff(per City staff.4.1.1 (a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $58,000
Pacific One Contracting Issued -
2021-09-17
4th Floor Common Area Interior alterations to provide improvements to the common lobby and washrooms on the 4th floor of this existing commercial building on this site. Scope of work: - Demo existing bulkhead, ceiling detail lighting fixtures, existing wall and floor tile, plumbing fixtures - Install wall & floor tile, plumbing fixtures, mirrors, vanities, new carpet for elevator lobby and corridors - Install lighting, millwork, finishes, replace ceiling with new T-bar and GWB ceiling to match new base building standard OK for field review as per City staffote: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $160,000
Pacific One Contracting Issued -
2021-07-23
16th and 25th Floor common areas Interior alterations to provide improvements to the common area on the 16th and 25th floor of this existing commercial building on this site. Scope of work: Abate hazardous materials in common area ceilings. Update materials and fixtures in common area, washrooms and elevator lobby. E2 - Upgrade to local control (per City staff.4.1.1.(a) or ASHRAE 90.1.2016) OK for Field Review per City staff · $272,000
Pacific One Contracting Issued -
2021-07-20
#950π Interior alterations to combine the existing General office unit #950 & #960 into one unit on the 9th floor of this existing commercial building on this site. E2 - Retrofit Path: BOMA BESt (Path 1) - No Additional Upgrades Req'd E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. OK for field review as per City staff · $100,000
Fusion Project Management Ltd Issued -
2021-06-21
#925 - 9th floor Interior alteration to provide improvements for the new office tenant on the 9th floor (#925) in this existing commercial building on this site. Scope of Work: remove/construct partition walls, doors, millwork, finishes, electrical and sprinkler work. TENANT: China Telecom Ok for Field Review per City staffkler permit required for proposed sprinkler work. Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) · $70,000
Counterpoint Interiors Inc Issued -
2020-11-03
Mezzanine and 2nd floor - common washrooms/lobby Interior alterations to provide improvements to the men's and women's washroom on the mezzanine level & 2nd floor and to update the elevator lobby finishes on the 2nd floor in this existing commercial building on this site. Scope of work: remove and replace finishes and fixtures, electrical and sprinkler work. Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy Upgrade exemption: N/A (BOMA BESt (Path 1)) OK for Field Review as per City staff · $105,000
Gibraltar Holdings Ltd Issued -
2020-06-04
#1020 - 10th floor Interior alterations to provide tenant improvements to this office unit on the 10th floor (#1010) in this existing commercial building on this site. Scope of work: Per the 2019 VBBL to remove all interior partition walls, doors, T-Bar ceiling, construct new partition walls, doors, new millwork in kitchenette, ceiling work, lighting, power and data, electrical, mechanical, plumbing and sprinkler work. · $250,000
Fusion Project Management Ltd Issued -
2019-10-23
#2400-24th floor (full floor tenant) Interior alterations to the 24th floor (#2400) to provide tenant improvements for an existing full floor office tenant in this existing commercial building on the site. Scope of work: new partition walls, doors, glazing, ceiling work, voice/ data, finishes, ceiling, electrical and sprinkler work for the addition of 2 enclosed phone rooms in an existing open area with demountable partitions. TENANT: Fluor Canada Ltd. · $50,000
Halse Martin Construction Co Ltd Issued -
2019-10-23
#600-6th floor (full floor tenant) Interior alterations to the 6th floor (#600) to provide tenant improvements for an existing full floor office tenant in this existing commercial building on the site. Scope of work: new partition walls, doors, glazing, ceiling work, voice/ data, finishes, ceiling, electrical and sprinkler work for the addition of 2 enclosed phone rooms in an existing open area with demountable partitions. TENANT: Fluor Canada Ltd. · $50,000
Halse Martin Construction Co Ltd Issued -
2019-09-05
#1920 Interior alterations to provide tenant improvements and combine the existing three office units #1920, #1960, #1980 (retaining #1920), on the 19th floor of the existing highrise commercial building on this site. · $150,000
Gibraltar Holdings Ltd Issued -
2019-07-11
19th Floor - Common Washrooms Interior alterations to provide improvements to the 19th floor men's and women's washrooms in this existing mixed use commercial building. Scope of Work: demolish ceiling, light fixtures, floor and wall tile, new fixtures and finishes in washrooms, new drywall ceiling, lighting, electrical and sprinkler work. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK for Field Review July 3, 2019 Processed THRU Fit Energy upgrade exemption: BOMA BESt · $50,000
Gibraltar Holdings Ltd Issued -
2019-05-24
Unit #2010 - 20th floor' Interior alterations to provide improvements for new General Office tenant on the 20th floor (#2010) of this existing commercial building. Scope of work; demo/construct partition walls, modify electrical/sprinkler to suit new layout, relocate sink. No lighting changes. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $25,000
Gibraltar Holdings Ltd Issued -
2019-01-17
#2600 - 26th floor Alterations to provide improvements for existing office tenant on the 26th floor (#2600) of this existing commercial building. Scope of work: minor demo of millwork, doors, flooring and finishes and replace with new millwork, glazing, glass doors, electrical, & finishes. · $225,000
Priority Projects Limited Issued -
2018-11-09
#210-2nd floor Interior alterations to provide improvements for a new office tenant at this office unit #210 on the second floor of this existing commercial building on this site. Scope of work: construct new partition walls, millwork, glazing, doors, finishes, ceiling work, card reader, electric strike, accessible washroom, electrical, mechanical, plumbing and sprinkler work. TENANT: Kabam Games Inc. OK for field review per City staff. See related BP-2018-05160 for interior demolition work to create this "shell" space. · $700,000
Canadian Turner Construction Company Ltd Issued -
2018-10-22
#210-2nd floor Interior alterations to provide improvements and to combine office units #210, #220, #230 & #250 and retain #210 on the second floor of this commercial building on this site. Work to remove all interior walls to create a "shell" office space. Scope of work also includes removal of millwork, flooring, selective lighting, mechanical ducting, electrical, plumbing and sprinkler work. TENANT (future): Kabam Games Inc. OK for field review per City staff. · $100,000
Canadian Turner Construction Company Ltd Issued -
2018-09-20
#2300 - 23rd floor (full floor tenant) Interior alterations to existing office tenant #2300 on the 23rd floor of this existing commercial building on this site. Scope of work: demolish partition walls, workstations, doors, construct new partition walls, doors, glazing, ceiling work, voice/data, electrical and sprinkler work. TENANT: Fluor Canada · $150,000
Halse Martin Construction Co Ltd Issued -
2018-08-17
#270-2nd floor Interior alterations to provide improvements for a new office tenant at this office (shell) unit #270 on the second floor of this existing Heritage "A" commercial building on this site. Scope of work: add new walls to surround server and separate printer area from open office, move coffee station, partially separate reception from open work area, minor demolition of millwork, electrical and plumbing work. · $136,000
no contractor listed Issued -
2018-08-16
#1425 Interior alteration to provide tenant improvement in this existing office suite #1425 on the 14th floor of this existing commercial building on this site. Okay for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) revision #1: - Office Room 106 changed layout - Milwork changed accordingly · $160,000
no contractor listed Issued -
2018-08-08
#910 & #925 - 9th floor Interior alterations to demise unit #925 into two units on the 9th floor (to be #910 and #925) in this existing Heritage "A" commercial building on this site. *tenant improvement work in new suite #910 only Scope of work: demolish partition walls and doors, construct new demising wall, new partition walls and doors, new sink, electrical, plumbing and sprinkler work. Address Note: Suite numbers to be posted by suite entry prior to final building inspection. Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to these units. OK for field review as per City staff: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $22,000
Gibraltar Holdings Ltd Issued -
2018-07-10
#2650 Interior alterations to provide improvements for new office tenant in existing office space. Work includes demolishing existing office space and renovating the unit with new office space layout and change flooring and partitions and lighting layout. Energy Upgrade Selected: · $100,000
MYK Construction Ltd Issued -
2018-06-14
#1890 - 18th floor Interior alterations to provide tenant improvements for a new office tenant on the 18th floor (#1890) in this existing commercial building on this site. Scope of work: construct new partition walls, doors, glazing, ceiling, lighting, power/data, finishes, electrical, plumbing and sprinkler work. REVISION #1: Delete one office and revise project value from $180,000.00 to $177,500.00. M. Henderson Aug. 14, 2018 TENANT: Firma Foreign Exchange Corp. OK for Field Review per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) See related BP-2017-06495 and subsequent Revision #1 for the demising of this floor. · $177,500
Counterpoint Interiors Inc Issued -
2018-06-14
M5 & M6 Interior alterations to combine units M5, M6 and part of corridor into shell space on the mezzanine level of this commercial building on this site. OK for field review per City staff. Note: Energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $10,000
Gibraltar Holdings Ltd Issued -
2018-05-28
#1880-18th floor Interior alterations to the 18th floor (#1880) of this existing commercial building to provide tenant improvements for a new General Office tenant. Scope of work: new interior partition walls with glazing, doors, finishes, millwork, electrical work. TENANT: Penta Search Group Ltd. See related Special Inspection No. IA-2018-00717. This space was created under BP-2017-06495 (refer also to Revision #1 to this permit.) Ok for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $100,000
Unlimited Ceilings & Partitions Inc Issued -
2018-05-10
#1510-15th floor Interior alterations to provide improvements for a new office tenant at this office unit #1510 on the 15th floor of this commercial building on this site. Scope of work: demolish partition wall, remove door, construct new partition walls, new kitchen, millwork, door, finishes, lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: Entuitive OK for field review per City staff. · $100,000
CDC Construction Ltd Issued -
2018-03-05
20th Floor - Elevator lobby and common washrooms Interior alterations to provide improvements to the common lobby, corridor and washrooms on the 20th of this existing commercial building on this site. Scope of work: demolish/remove ceiling, lighting, finishes, modify bulkhead, replace ceiling, lighting, plumbing fixtures, paint , tile, carpet. Okay for Field Review per City staffghting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010). · $60,000
Gibraltar Holdings Ltd Issued -
2018-03-05
3rd Floor-Common Washrooms Interior alterations to provide improvements to the men's and women's washrooms on the 3rd floor of this existing commercial building on this site. Scope of work: remove and replace finishes and fixtures, electrical and sprinkler work. Okay for Field Review per City staffighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $50,000
Gibraltar Holdings Ltd Issued -
2018-03-05
8th floor - Elevator lobby and common washrooms Interior alterations to to provide improvement to the common washrooms and lobby on the 8th floor of this existing Vancouver Heritage 'A' commercial building on this site. Scope of work: demolish/remove drywall ceiling, light fixtures, floor & wall tile. Install drywall ceiling, recessed sprinkler heads, lighting, paint, tile. · $60,000
Gibraltar Holdings Ltd Issued -
2018-03-05
26th floor - Elevator lobby and common washrooms Interior alterations to to provide improvement to the common washrooms and lobby on the 26th floor of this existing Vancouver Heritage 'A' commercial building on this site. Scope of work: demolish/remove drywall ceiling, light fixtures, floor & wall tile. Install drywall ceiling, lighting, paint, tile. · $60,000
Gibraltar Holdings Ltd Issued -
2018-02-26
#1810 & #1860-18th floor Interior alterations only to provide tenant fitout for a new General Office use at unit #1810 & #1860 at this existing Vancouver Heritage Register 'A' commercial building. Revision #1-Plans updated to show the expansion of this tenant into previous #1840 (now cancelled), increase of $100,000 in scope of work, updated ASHRAE/lighting compliance. This tenant will occupy both #1810 & #1860. Addressing information corrected. May 15, 2018 jm Tenant: IDC Worldsource. See related BP-2017-06495 and subsequent Revision #1 for the demising of this floor. OK for field review as per City staff. Energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $500,000
Fusion Project Management Ltd Issued -
2018-02-02
#1810, #1860, #1880, #1890-18th floor Interior alterations to renovate and divide existing tenants into proposed tenants (Units #1810, 1840, 1860, and 1880) on the 18th level of this existing high-rise office building. Notes: 1. Number of sprinkler heads to be changed is fewer than 20. 2. Any increase in occupant load shall require further review of the VBBL and may require additional washrooms. Revision #1: Reconfigure floor plan and re-address the suite numbers to Units #1810, 1860, 1880, and 1890. April 20, 2018 P.Volpi · $60,000
no contractor listed Issued -
2018-01-30
#800 - 8th floor Interior alterations to provide tenant improvements for a new office tenant in #800 on the 8th floor of this existing designated Heritage A commercial building on this site. Scope of work: demolish/construct partition walls, demolish/relocate/new doors, new sidelights, new work stations, electrical and sprinkler work. REVISION #1: Modify layout by retaining two partition walls for new meeting room. April 4/18 mk See also BP-2018-00288 (#825) for the same tenant. Energy upgrade selected: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010). TENANT: Preszler Law Firm OK for field review per City staff. · $30,000
Gibraltar Holdings Ltd Issued -
2018-01-30
#825 - 8th floor Interior alterations to provide tenant improvements for a new office tenant in #825 on the 8th floor of this existing designated Heritage A commercial building on this site. Scope of work: demolish/construct partition walls, demolish/relocate/new doors, new side lights, new workstations, electrical and sprinkler work. See also BP-2018-00289 (#800) for the same tenant. Energy upgrade selected: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010). TENANT: Preszler Law · $120,000
Gibraltar Holdings Ltd Issued -
2018-01-25
18th floor-Common washrooms/elevator lobby Interior alterations to provide tenant improvements to common washrooms and elevator lobby on the 18th floor in this existing commercial building on this site. Scope of work: remove women's shower and restore to base building toilet, new lighting, ceiling work, new/upgrade finishes, electrical, plumbing and sprinkler work. Note: Energy upgrade selected: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010). OK for field review as per City staff · $50,000
Gibraltar Holdings Ltd Issued -
2018-01-15
#300-3rd floor Interior alterations to provide improvements for a new full floor office tenant on the 3rd floor (#300) of this existing commercial building on this site. Scope of work: demo/construction new parition, millwork, finishings, reflective ceiling, plumbing, mechanical, electrical, & sprinkler work. Note: Energy upgrade selected: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010). OK for field review per City staff. · $2,000,000
Canadian Turner Construction Company Ltd Issued -
2017-11-02
#1800 - 18th floor (full floor tenant) Interior alterations to demolish partition walls and finishes to create a full floor vacant office shell space on the 18th floor (#1800) in this existing commercial building. Scope of work includes demolition of millwork and sink, electrical, plumbing and sprinkler. No work proposed to the lobby and washrooms. Energy Upgrade Exempt: Interior demolition. Separate Permit(s) and ASHRAE will be required for future tenant improvements to this space. OK for field review per City staff · $60,000
Gibraltar Holdings Ltd Issued -
2017-10-19
#1700 - 17th floor Interior alterations to provide improvements for this full floor office tenant on the 17th floor (unit #1700) of this existing Vancouver Heritage 'A' commercial building. Scope of work: full tenant fit out. New partition walls, glass partitions, doors, millwork, reflective ceiling, electrical. REVISION #1: Interior layout changes. New lighting compliance document provided. Nov. 24, 2017 mlh REVISION #2: Change size of one office (payroll). Jan 31/18 mk Demo under separate permit - BP-2017-04323 OK for field review as per City staff · $1,000,000
no contractor listed Issued -
2017-10-17
#2400 Interior alterations for existing office tenant in suite 2400 on the 24th floor to provide improvements by relocating some partition walls in this existing commercial building. OK for field review per City staff Lighting within scope of work area to High Efficiency light systems · $62,000
Halse Martin Construction Co Ltd Issued -
2017-09-12
#1700-17th floor (full floor) Interior alterations to remove non-loadbearing walls in this existing General Office space (vacant) on the 17th floor (#1700) of this existing commercial building. Scope of work: demolish all partition walls, millwork, ceilings, doors, finishes to create a shell office space, electrical and sprinkler work. Separate permit(s) and ASHRAE checklist will be required for future tenant improvements. Energy upgrade exempt: Interior demolition only. OK for field review as per City staff. · $50,000
Gibraltar Holdings Ltd Issued -
2017-09-08
#270 Interior alterations to provide improvements to suite #270 by demolishing some partition walls and t-bar ceiling for this existing office in this existing commercial building. Additional permit(s) required for any new work. Scope of work to include new lighting. Ok for field review per City staff: Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $18,000
Gibraltar Holdings Ltd Issued -
2017-08-15
unit #1080 Interior alterations to provide tenant improvements for an existing office tenant at unit 1080 on the 10th floor and to validate the demising of this space to provide two separate tenant spaces. L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $5,000
no contractor listed Issued -
2017-08-08
#2515-25th floor Interior alterations only to provide tenant improvements for a new General Office use on the 25th floor (#2515) in this existing Vancouver Heritage Register 'A' commercial building. Scope of work: demolish/construct partition walls, remove/replace doors, ceiling work, new millwork, finishes, power/data, lighting, mechanical, electrical and sprinkler work for new tenant layout. TENANT: Coast Capital Savings OK for field review as per City staff. · $186,000
Unison Construction Management Ltd Issued -
2017-06-08
11th and 15th floor-lobby/washroom Interior alterations to the lobby and washrooms on the 11th and 15th floors of this existing commercial building. Scope of work to include modify the elevator lobby ceiling, remove and replace washroom fixtures, add T-bar ceiling to the 15th floor corridors, new finishes, electrical and sprinkler work. Ok for field review as per City staff · $100,000
Gibraltar Holdings Ltd Issued -
2017-05-02
#1100-11th floor Interior alterations to provide tenant improvements on the 11th floor (#1100) for a new office tenant in this existing Vancouver Heritage Register "A" commercial building. Scope of work: demolish partition walls, new partition walls, doors, glazing, millwork, finishes, mechanical, electrical, plumbing and sprinkler work for new tenant's layout including new lunch room. · $235,000
Matra Construction Inc Issued -
2017-04-26
#925 - 9th floor (#900 divided into two units t/b#900 & #925) Interior alterations to this vacant office space on the 9th floor to demise unit #900 into two units (to be #900 & #925) in this existing commercial building. Scope of work: to remove a door and replace with a wall to divide this unit into two units. Demolish all partition walls in newly created #925 to return to shell space for future tenant. * Unit #925 to be posted on the building prior to final inspection. June 12/17 - REVISION submitted to show reduced scope of work to unit #925. Demolition of partition walls will be limited to only half of the unit. ok for field review per City staff25: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) Note: Separate permit(s) and ASHRAE checklist will be required for any future tenant improvements to either suite. · $25,000
Gibraltar Holdings Ltd Issued -
2017-04-06
(#1150) Interior alterations to provide tenant improvements on the 11th floor (#1150) for a new office tenant in this existing Vancouver Heritage Register "A" commercial building. Scope of work: new partition walls, doors, glazing, millwork, T-bar ceiling, lighting, mechanical, electrical, plumbing and sprinkler work for new tenant's layout. See related BP-2017-01165 for interior demolition (#1150, #1160, #1200). · $625,000
Canadian Turner Construction Company Ltd Issued -
2017-04-06
#1200-12th floor (full floor) Interior alterations to the vacant shell office space to provide tenant improvements for new office on the entire 12th floor of this existing Heritage A designated commercial building. Scope of work: new partitionwalls, glazing, doors, millwork, ceiling, finishes, lighting, mechanical, electrical, plumbing and sprinkler work. TENANT: Watson Goepel Management Limited Partnership See previous BU466881 (completed Feb.25/16) for interior demolition on the 12th floor. · $1,400,000
Canadian Turner Construction Company Ltd Issued -
2017-03-16
#2500 Interior alterations to provide tenant improvement at unit #2500 on the 25th floor in this commercial building. Energy Upgrade: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) · $80,000
All Spaces Project Management Ltd Issued -
2017-03-07
#1150, #1160, #1200-11th and 12th floors Interior demolition only to the 11th and 12th floors (#1150, #1160 and #1200) of this existing Vancouver Heritage Register 'A' commercial building. Scope of work includes demolition of all partition walls, removal of demising wall between #1150 and #1160 (retain #1150), removal of all flooring and wall coverings, millwork, doors/frames and glazing. See related BP-2017-01172 for tenant improvements to #1150. Separate permit(s) and ASHRAE checklist will be required for future tenant improvements to the 12th floor. Addressing Note: #1160 will be cancelled upon permit issuance and is to be removed from the building/suite entry. #1150 to be posted as shown on the approved plans and clearly visible from the suite entry prior to final inspection. OK for SIPS processing as per City staff. Related to Special Sprinkler Permit No. IA-2017-00298. Energy upgrade exempt: Interior demolition and demising wall. · $19,800
The Artek Group Limited Issued -
2017-03-06
15th floor - units #1540 & #1580 Interior alterations to provide tenant improvements for a new General Office tenant on the 15th floor (units #1540 & #1580) of this existing commercial building. Scope of work: to demise unit #1500 into 3 units (#to be #1510,#1540, #1580). TI work in #1540 & #1580 only (same tenant). Demo & construct demising/partition walls, doors, reflective ceiling, electrical, plumbing & sprinkler work to suit new layout. * Unit #1500 to be removed from the prior to final inspection. Tenant: #1540 & #1580 - Dentsu Aegis #1510 - Vacant OK for field review processing as per City staff. Selected Energy Upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $400,000
Fusion Project Management Ltd Issued -
2017-02-24
(#2100) Interior alterations to provide improvements for full-floor General Office tenant on the 21st floor (#2100) of this existing commercial building. Scope of work: demolish/construct partition walls, doors, millwork, new finishes, mechanical, electrical, plumbing and sprinkler work for new office layout. · $625,779
Unison Construction Management Ltd Issued -
2017-02-24
(#2080) Interior alterations to provide improvements for an existing General Office tenant on the 20th floor (#2080) of this existing commercial building. Scope of work: demolish/construct partition walls, doors, millwork, new finishes, mechanical, electrical, plumbing and sprinkler work for new office layout. · $251,856
Unison Construction Management Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Downtown
#1201 - 428 BEACH CRESCENT Interior alterations to provide residential improvement to an existing dwelling unit at #1201 - 428 Beach Crescent on the twelfth floor of this multiple dwelling building on the site. Okay for DTI per City staff · Sitka Coast Construction Inc2026-11-05
4th floor - 200 Granville Street Interior alterations to provide tenant improvements to the existing common bathrooms for unit #400 on the 4th floor of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed2026-11-05
Interior and exterior (storefornt) tenant improvement and a minor addition of 156.7 m2 for this fit-out of a four-storey, interconnected retail store (Aritzia) for this CP TI of the existing building. A separate permit is required for signatures. VBBL 2025 - NFPA 13 Part 11 - F2, S2, N3, A3 Stage 1 - CP IT for the retail portion only, issued on Nov 5, 2026 (the restaurant portion to come at Stage 2). · Etro Construction Limited2026-11-05