Permit GopherAlberta and B.C. property, permit and zoning records

1025 Robson St, Vancouver

An address in West End, Vancouver, zoned CD-1 (509) (Comprehensive Development). 9 building permits are on file, most recently “Interior alterations only for a new restaurant tenant (A-2) within an existing retail lim…” (issued 3 August 2023). The City's 2026 assessed value is $100,019,000.

Zoning
CD-1 (509) · Comprehensive Development
Neighbourhood
West End
Permits on file
9
Assessed value (2026)
$100,019,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1025 Robson St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153483, 869 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
869
Households
375
Median age
41.2
Median household income (2020)
$73,000
Own their home
47%
Vancouver: 45%
Average household size
1.7
Under 15
6%
65 and over
14%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2023-08-03 Interior alterations only for a new restaurant tenant (A-2) within an existing retail limited service food (Group E) tenant space. Proposed interior alterations are located on the 2nd storey of an existing Retail (Group E) tenant space and is a subsidiary use in the existing space. Scope of work includes: Kitchen renovation with the installation of a new oven (Class 5 cooking), new HVAC hood and ducting in the ceiling above, and cosmetic upgrades with the provision of 17 or more seats. · $250,000
    Willow Spring Construction BC Ltd
    Issued
  2. 2022-10-18 Exterior and interior alterations to provide improvements for a new retail tenant at retail unit 1025 Robson St in this commercial building on this site. Scope of work includes reconfiguring the interior layout, a new universal washroom and replacing the exterior cladding and entry doors. New Tenant: Aerie REVISION #1: - Provide fire dampers where ducts penetrate rated ceilings or walls - Relocate electric duct heater - Provide air curtains at the front entrance B. WONG - NOV 4/22 REVISION #2: - To change the layout of the stockroom and the shelving to accommodate the addition of a staff breakroom. B. WONG - MAR 3/23 OK for DB per City staff: - DBI to determine on site if a seismic letter is required for racking over 6ft high. - Energy Upgrade: E2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016). · $451,927
    no contractor listed
    Issued
  3. 2022-06-28 1035 Robson Street Interior alterations to provide tenant improvements to this existing retail space. Scope of work: - New partitions & doors, finishes, storage racking and accessible washroom - New lighting, Hvac, plumbing fixtures, and sprinkler work. Ok for Field Review per City staff · $457,735
    no contractor listed
    Issued
  4. 2022-03-24 Exterior and interior alterations to combine the two existing retail units (1035 Robson Street and 1039 Robson Street) into one on the ground floor at this existing commercial building. Scope of work includes the reconfiguration of plumbing fixtures, lighting fixtures and HVAC; to construct a new storefront with a vestibule; infill a portion of floor and to construct a new ramp to the rear exit. OK for field review as per City staff tenant improvements and to include energy upgrade. Notes: - This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. - Energy Upgrade: E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016). · $175,000
    Bolar Development Group Ltd
    Issued
  5. 2018-07-05 2nd floor Interior alterations only to provide improvements for a new retail (food) tenant (Starbucks) sharing space with existing retail tenant (Indigo) in this existing commercial building on this site. Scope of work to include installation of kitchen equipment and maximum of 16 seats. OK for Field Review per City staff. · $382,104
    no contractor listed
    Issued
  6. 2018-06-01 Interior alterations only to this existing 2 storey retail tenant space for a new retail tenant. Scope of work include demo and new partitions, doors and frames, millwork, fixtures, cladding, flooring and new washrooms. Ok for field review per City staff: Interior reconfiguration, fire alarm relocation, mechanical changes, and add scope of work to include structural changes; increase value from 3,540,000.00 to 3,600,000.00; lighting revised; exterior limestone cladding stain finish (wrought iron). · $3,600,000
    Brian Michael Lee & Gordon Miller Kerr & Daniel Keith Clayton
    Issued
  7. 2018-04-10 1025 Robson Interior alterations to provide ceiling and ductwork for air conditioning in this existing suite. No exterior work provided, hooking up to exiting ductwork. Tenant: Aldo Group Energy Upgrade: L2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1 - 2010) Note: Storefront glazing to remain clear and unobstructed. Separate permits will be required for signs and/or awnings. · $60,000
    no contractor listed
    Issued
  8. 2017-09-25 (1039 Robson) Interior alterations to provide tenant improvements for a new retail tenant in this existing retail space in this existing commercial building. Scope of work includes relocate bathroom and stairs, new electrical and lighting, finishes. OK for Field Review per City staff. Selected energy upgrade: L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010) · $30,000
    Concrete Cashmere Ltd
    Issued
  9. 2017-02-09 Interior alterations to provide tenant improvements for unit 1023 Robson (created under DB-2016-02912) to provide improvements for new retail tenant in this existing commercial building. L2 - SWH - Upgrade SWH system Outlet Temperature Controls (per City staff.4.4.3 of ASHRAE 90.1 - 2010) · $100,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1128 W Georgia St
1128 W Georgia Street Interior alterations to provide tenant improvements to the existing Hotel on the P1 mezzanine level of this existing mixed use building on this site. Okay for FR as per City staff · no contractor listed
2026-11-05
1166 Alberni St
#810 - 8th floor Interior alterations and tenant improvements to an existing general office (D) for a new partition wall and minor layout changes on the 8th floor in this existing commercial building on this site. Tenant: Cambridge Mortgage Investment Corporation Ok for field review per City staff · no contractor listed
2026-11-05
1080 Broughton St
#309 - 1350 COMOX ST Interior alterations to provide residential improvement to an existing dwelling unit at #309 - 1350 COMOX ST. on the third floor of this existing multiple dwelling building on the site. Okay for DTI per City staff · applicant withheld (individual)
2026-11-05
Something wrong on this page? Tell us and we'll check it against the City's records.