Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
972 W 23rd Av, Vancouver
An address in South Cambie, Vancouver, zoned R1-1 (Residential Inclusive). 1 building permit is on file, most recently “Exterior and interior alterations to change the use from Single Detached House to Single …” (issued 7 February 2024). The City's 2026 assessed value is $2,916,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150658, 659 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2024-02-07
Exterior and interior alterations to change the use from Single Detached House to Single Detached House with Secondary Suite. - legalize the suite in the basement and remove the interconnecting staircase from the basement to Main floor - reconfigure the interior layout on the main and upper floor - minor window changes - including reduce the window opening facing the side yard. - change the two overhead doors to one overhead door (17' wide) in the detached two-car garage. -Repair existing roof; Add new roofing and drywall REVISION #1: - To update the drawings to reflect the added work to the roof. - To update the site plan to correctly show the sitting of the building and firefighter access. - To provide assembly details showing non-combustible insulation for side yard less than 1.2m. - To update the REUP form to reflect the scope of work per the drawings. B. Wong - Jul 8/24 Revision #2: - To update the suite separation: To retain the existing assembly B. Wong - Aug 1/25 This building is not sprinklered. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing · $180,000
Xervon Construction Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in South Cambie
Exterior alterations for building envelope repairs to this existing multiple dwelling building on this site. Scope of work includes: - Replacing the existing balcony guardrails with a fully face-mounted system - Replacing deteriorated wood trim and siding - Replacing the asphalt shingles on the mansard roof with new fibre-cement cladding Notes: 1. Exterior work only. 2. No interior or electrical work proposed. · no contractor listed2026-11-03
To demolish this existing single detached house (1928)(40,000.00) on this site (declared non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit(s): DP-2026-00487, BP-2026-01980, and BP-2026-01981 ***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.*** •\tThis permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. · Mainline Excavation Ltd2026-10-29
To construct a Multiple Dwelling "Multiplex" with a three-storey + crawlspace two-unit front building and a two-storey one-unit rear building with a carport providing three parking spaces having vehicular access from the lane. 1. Mechanical unit proposed – Exterior component located in front yard & court yard. Interior component located in stairs to second floor. · BLUEPOINT VENTURES LTD.2026-10-29