Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
95 E 14th Av, Vancouver
An address in Mount Pleasant, Vancouver, zoned R3-3 (Residential). 2 building permits are on file, most recently “Interior and exterior alterations to this existing 3-storey residential rental building c…” (issued 17 December 2019). The City's 2026 assessed value is $9,636,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153160, 739 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2019-12-17
Interior and exterior alterations to this existing 3-storey residential rental building containing 26 rental suites on this site. No work is proposed to basement parking garage. Interior alteration includes: 1-Removal of interior partitions and re-configuring some of the suites interior layouts. No change to the existing suite demising configurations. 2- Replacement of all kitchen cabinets, plumbing and other fixtures. 3- Replacement of all electrical wiring and fixtures including detection and fire alarm system. 4- Replacement of all bathroom fixtures and their plumbing including rebuilding the plumbing walls. 5- Replacing interior doors with larger size doors. Exterior renovation is for replacing all exterior windows only. This application was reviewed under the requirements of VBBL 2014. Revision-1 January 5, 2022 Modifying interior layout of some residential suites on all floors Revision-2 December 5, 2022 To modify interior layout of suit 106, 204, 207, and 304. · $1,200,000
no contractor listed Issued -
2018-12-21
95 E 14th Avenue Interior alterations to replace domestic waterpiping, provide firestopping, and repair walls in conjunction with repiping in all of the 26 units in this existing 3-storey multiple dwelling building on this site. Scope of work to include installation of new dishwashers, washers and dryers in all units. OK for SIPS as per City staff. · $75,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Mount Pleasant
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed2026-10-30
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.2026-10-30
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes2026-10-16