What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
8888 Osler St, Vancouver
An address in Marpole, Vancouver, zoned CD-1 (276) (Comprehensive Development). 5 building permits are on file, most recently “Interior alterations to provide first tenant improvements to this existing Retail- Shell …” (issued 17 October 2025). The City's 2026 assessed value for the 78 accounts at this address is $91,406,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150495, 624 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-10-17
Interior alterations to provide first tenant improvements to this existing Retail- Shell (Group E) space for a new Retail - Limited Food Services (Group E) tenant on the ground floor of this existing mixed-use building on this site. Mechanical Review Notes: - Class 4 Cooking Operation (KNLZ Ovens). - Proposed oven shall be listed under UL Product Category KNLZ (Commercial Cooking Appliances with Integral Systems for Limiting the Emission of Grease-laden Air). *** Reviewed under the VBBL 2019 *** · $100,000
no contractor listed Issued -
2024-09-05
Interior alterations to provide tenant improvements to this retail space for a Convenience Store on the ground floor of this existing mixed use building on this site. REVISION #1 ACCESSIBLE WASHROOM PARTITIONS AND PLUMBING RELOCATION DUE TO EXISTING SITE CONDITIONS · $110,000
no contractor listed Issued -
2020-02-05
To construct a new 6 storey mixed use building with 76 residential units, 5 retail units on ground level and 2 levels of underground parking accessed from lane. Related to AL-2019-00159 - Exposure to Exit Sprinkler Protection. Environmental Protection has accepted the BP with conditions: •\tMust comply with the Erosion and Sediment Control Monitoring criteria as outlined in Bulletin 2002-003-EV. •\tSubmit plumbing plans for the retail units at grade if treatment systems are required prior to discharge to the sanitary sewer system. STAGED CONSTRUCTION Stage 1 - Excavation and Shoring (issued April 26, 2019) Stage 2 - Full Construction (issued February 5, 2020) Rev #1 - Minor relocation of wall between drive aisle and Level 1 and minor revisions to match DPMA-2021-00892. Change of Mech/Plumb RP from J.Tessier to O.K. Al Milli, effective Nov 26, 2021. (issued December 23, 2021) · $20,000,000
Peak Construction Ltd Issued -
2019-04-03
Interior and Exterior alterations to remove the existing pub portion on the South-East portion of the ground floor of the existing mid-rise hotel building on this site. Related: IA-2018-01814: (IA - Sprinkler) · $50,778
3R Demolition Corp Issued -
2019-03-01
Salvage & Abatement only related to DB-2018-06341 Interior and Exterior alterations to remove the existing pub portion on the South-East portion of the ground floor of the existing mid-rise hotel building on this site. QP is Emma Gibson of Enviro-Vac Div. of Paragon Remediation Group Ltd [contact removed]
3R Demolition Corp Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Marpole
Exterior alterations to provide residential improvements in the replacement of windows on multiple floors and units of this existing multiple dwelling building on this site. Okay for Field Review as per City staff · no contractor listed2026-11-04
#352 - 8250 Manitoba St Interior alteration to provide first tenant improvements for a new Wholesale class B (F2) tenant at this industrial building on this site. Ok for field review per City staff: Noteworthy Stationary Supplies · no contractor listed2026-10-30
670 SW Marine Drive Interior alterations to provide first tenant improvements and a change of use/occupancy for this existing Retail - Shell (Group E) unit for a new Fitness Centre - Class 1 ( Low Occupant Assembly, Group D) tenant in unit 670 SW Marine Drive on the 2nd level of this existing mixed-use building on this site. · Sian Group Investments Inc2026-10-27